The document provides procedures for applying a neoprene coating to riser pipes, clamps, and field joints for the Umm Al Dalakh Field Early Production Scheme project. It outlines materials requirements, including that the neoprene coating must withstand temperatures from -100°C to +92°C and have a minimum design life of 40 years. It also describes surface preparation, application of primer and coating, inspection and testing requirements, and addresses handling, storage, and potential repairs. Prequalification tests are specified to ensure the coating meets project specifications.
Building Economics Group Presentation SlidesMelvin Lim
The document provides details of a proposed 20-storey office development with commercial space and an underground basement located at Cecil Telok Ayer Street. It includes a site plan, elevations, cost plan, benchmark comparisons, and proposed materials for construction. The total gross floor area is 77,162 square meters with an estimated total gross development cost of RM354,855,400. Green features and materials are proposed to achieve a green rating for the development.
A defense contractor needed a high-performance seal to integrate missile canisters with a Navy ship deck. The seal had to withstand harsh conditions at sea while maintaining positive air pressure and extending up to 40 feet. PGC developed a rubber seal design within 6 weeks that met specifications, developed manufacturable extrusion and drilling processes, and delivered sample materials for evaluation and selection. The contractor selected a Viton fluoroelastomer formulation that met performance and cost needs, and PGC's solution helped earn their confidence for future defense projects.
This document provides a method statement for pouring concrete for the base of a treated water tank (TWT) in Sri Lanka. It outlines the materials, equipment, workforce, procedures, inspections, and safety measures for the pour. Concrete will be placed using a pumping car and crane and consolidated with vibrators. Pouring will proceed in 2m layers, maintaining finish levels. Initial curing will begin after set and continue for at least 7 days with wet burlap and plastic sheeting. Safety protocols include permits, PPE, barricades, and appointed safety personnel.
11. KGA, MALL - Execution Plan - R- 06.03.2023.pptxssuser2ec079
The document provides an execution plan for the KGA Mall project in Changanassery presented by Build Tech Associates. It includes an agenda, project brief detailing a 9 floor commercial and hospitality building, Build Tech's approach focusing on quality and safety, proposed construction methodology in 4 steps, site organization chart, deployment plans for equipment, shuttering materials, and manpower, milestone dates across a 12 month period, and pour joint plans for different floors.
To get exposure of the process Mivan technology and the Raft Foundation
To learn about basic technical skills required during construction
To improve soft skills like communication and teamwork at the workplace.
Summary of internship
This document provides details of the applicant's work experience and education. It lists various roles held from 2009 to present in construction and architecture firms in Egypt, UAE, and Saudi Arabia, including positions as a BIM architect, site engineer, and junior architect. It also lists an architectural engineering degree with a GPA of 2.74 from an Egyptian university. Contact information and skills including BIM modeling, Revit, Dynamo, and coordination with other disciplines are provided at the end.
AK Cladding/Centria - Intro Brochure/Pre QualificationKeith Evans
AK Cladding LLC specializes in design, material supply, installation, and project management of leading roofing and cladding systems. They have extensive experience with metal roofing and cladding installations in the UK and Middle East. Their Dubai office houses manufacturing facilities for standing seam panels, membrane-lined gutters, and works with leading suppliers of insulated panels and drainage systems.
The document provides procedures for applying a neoprene coating to riser pipes, clamps, and field joints for the Umm Al Dalakh Field Early Production Scheme project. It outlines materials requirements, including that the neoprene coating must withstand temperatures from -100°C to +92°C and have a minimum design life of 40 years. It also describes surface preparation, application of primer and coating, inspection and testing requirements, and addresses handling, storage, and potential repairs. Prequalification tests are specified to ensure the coating meets project specifications.
Building Economics Group Presentation SlidesMelvin Lim
The document provides details of a proposed 20-storey office development with commercial space and an underground basement located at Cecil Telok Ayer Street. It includes a site plan, elevations, cost plan, benchmark comparisons, and proposed materials for construction. The total gross floor area is 77,162 square meters with an estimated total gross development cost of RM354,855,400. Green features and materials are proposed to achieve a green rating for the development.
A defense contractor needed a high-performance seal to integrate missile canisters with a Navy ship deck. The seal had to withstand harsh conditions at sea while maintaining positive air pressure and extending up to 40 feet. PGC developed a rubber seal design within 6 weeks that met specifications, developed manufacturable extrusion and drilling processes, and delivered sample materials for evaluation and selection. The contractor selected a Viton fluoroelastomer formulation that met performance and cost needs, and PGC's solution helped earn their confidence for future defense projects.
This document provides a method statement for pouring concrete for the base of a treated water tank (TWT) in Sri Lanka. It outlines the materials, equipment, workforce, procedures, inspections, and safety measures for the pour. Concrete will be placed using a pumping car and crane and consolidated with vibrators. Pouring will proceed in 2m layers, maintaining finish levels. Initial curing will begin after set and continue for at least 7 days with wet burlap and plastic sheeting. Safety protocols include permits, PPE, barricades, and appointed safety personnel.
11. KGA, MALL - Execution Plan - R- 06.03.2023.pptxssuser2ec079
The document provides an execution plan for the KGA Mall project in Changanassery presented by Build Tech Associates. It includes an agenda, project brief detailing a 9 floor commercial and hospitality building, Build Tech's approach focusing on quality and safety, proposed construction methodology in 4 steps, site organization chart, deployment plans for equipment, shuttering materials, and manpower, milestone dates across a 12 month period, and pour joint plans for different floors.
To get exposure of the process Mivan technology and the Raft Foundation
To learn about basic technical skills required during construction
To improve soft skills like communication and teamwork at the workplace.
Summary of internship
This document provides details of the applicant's work experience and education. It lists various roles held from 2009 to present in construction and architecture firms in Egypt, UAE, and Saudi Arabia, including positions as a BIM architect, site engineer, and junior architect. It also lists an architectural engineering degree with a GPA of 2.74 from an Egyptian university. Contact information and skills including BIM modeling, Revit, Dynamo, and coordination with other disciplines are provided at the end.
AK Cladding/Centria - Intro Brochure/Pre QualificationKeith Evans
AK Cladding LLC specializes in design, material supply, installation, and project management of leading roofing and cladding systems. They have extensive experience with metal roofing and cladding installations in the UK and Middle East. Their Dubai office houses manufacturing facilities for standing seam panels, membrane-lined gutters, and works with leading suppliers of insulated panels and drainage systems.
Graduation Project (DESIGN AND ANALYSIS OF MULTI-TOWER STRUCTURE USING ETABS).khaledalshami93
The document describes the design and analysis of a multi-tower structure using ETABS software. It includes sections on the project location, modeling and analysis of the structure using ETABS, structural design including shear wall and beam design, post-tensioned slab design, construction management and risk assessment. The overall purpose is to analyze and design a multi-tower structure consisting of a hotel tower and office tower located in Amman, Jordan.
The manufacturer proposed a solution to address soldiers trapped in Humvee rollovers by developing a windshield with quick-release latches allowing escape in under 5 seconds. PGC engineers were challenged to develop seals protecting the windshield from elements while supporting its weight and isolation during installation, removal and vehicle movements. PGC developed prototypes, tested them, and delivered production-level seal sets within a week, exceeding expectations. The windshield kits have been used across military vehicle platforms and allow installation by maintenance personnel in about an hour.
This industrial training report summarizes the student's training at Simplex Infrastructures Ltd. It provides details of two residential construction projects - Godrej Prakriti Housing Complex III and describes the structures being built. Quality control procedures are outlined including material testing and ensuring specifications are met. Formwork designs, reinforcement details, and estimating quantities are discussed. Plant and machinery used on-site are listed. The report aims to impart the student's practical and theoretical engineering skills.
This industrial training report summarizes the student's training at Simplex Infrastructures Ltd. It provides details of two construction projects - Godrej Prakriti Housing Complex III and details of formwork, quality control measures, site execution, safety procedures, and plant & machinery used. The student gained exposure to various construction activities like formwork, concrete pouring, bar bending, and quality testing of materials. Safety of workers was ensured through use of personal protective equipment.
Edly Omar is seeking a challenging role as an NDT specialist. He has over 10 years of experience in non-destructive testing methods including ultrasonic, magnetic particle, dye penetrant, and radiographic testing. He has worked in industries such as shipbuilding, marine, chemical, pipelines, and subsea manufacturing. His resume lists professional certifications in ultrasonic, magnetic particle, dye penetrant, and radiographic testing as well as previous employment with FMC Technologies and other NDT companies.
This document describes the design of a residential villa building with 3 stories using STAAD-Pro software. It discusses the introduction, applicable design codes, software used, project details, structural design objectives, material properties, loads, and the analysis process. The analysis is performed on the RCC structure in STAAD-Pro by assigning loads, properties, and applying the IS 456-2000 code. The design of slab, beams, columns, footing, and staircase are done as per Indian codes and standards. The STAAD-Pro model results in reinforcement areas comparable to manual calculations.
The document discusses methods for improving the efficiency of oil and gas field development using modern equipment and technologies from STS-GeoService LLC. It describes the company's unique gas-dynamic fracturing technology using the GDK-170 pressure generator, which has increased permeability and production at over 1000 wells. The technology offers benefits like high efficiency, mobility, economic effectiveness and environmental friendliness. It has helped increase total additional oil production by 1.5 million tons with over 90% treatment success rates.
This document provides guidance on soil nail design and construction in Hong Kong. It summarizes local experience with soil nailing and recommendations from technical studies. The guide covers applications of soil nailing for slopes, retaining walls and excavations. It provides recommendations for site investigation, analytical design procedures, construction methods, testing, and monitoring/maintenance of soil nail systems. The overall aim is to promote reliable design and construction practices for soil nailing in Hong Kong.
This document provides guidance on soil nail design and construction in Hong Kong. It summarizes local experience with soil nailing and recommendations from technical studies. The guide covers applications of soil nailing for slopes, retaining walls and excavations. It provides recommendations for site investigation, analytical design procedures, construction methods, testing, and monitoring/maintenance of soil nail systems. The overall aim is to promote reliable soil nail structures through standardized design and construction practices.
IRJET- Controlling the Formation of Rust in the Rocker Panel using Cavity...IRJET Journal
This document discusses a study that aimed to prevent rust formation in the rocker panel of vehicles using cavity wax. The researchers used Deming's PDCA (plan-do-check-act) cycle to guide their methodology. In the plan stage, they selected a vehicle body and cut out the rocker panel. In the do stage, they applied cavity wax to the rocker panel using a pump. In the check stage, they evaluated if the wax was applied evenly. In the act stage, they identified areas for process improvement. The results showed that applying cavity wax to the rocker panel via this process helped prevent rust formation.
This document discusses insulated metal panels (IMPs) and provides information on their advantages, specifications, and business development opportunities. It reviews relevant codes and policies, how IMPs can help projects qualify for LEED and tax credits, and examples of energy modeling cost savings when using IMPs. The document also includes case studies of IMP projects and defines important terms related to IMP performance ratings and specifications.
The document is a report on an industrial training project at a hospital construction site in Chennai by URC Constructions Private Limited. It provides details of the project such as constructing a basement parking facility, 8 floors and other areas on a site located in Perungudi, Chennai. It describes the soil conditions, foundation design, construction stages, safety measures, and estimates for the project. The traineeship provided hands-on experience in construction practices, challenges, and learning.
Offshore Engineering has 10 years of experience providing engineering design and quality validation services for offshore oil and gas projects. They have expertise in FPSO and topside design, and have worked on numerous projects in various countries, including designing modules for FPSOs with oil processing, water injection, gas compression, and flare systems. Offshore Engineering partners with Kavin Engineering to leverage their combined expertise in executing FPSO projects.
Coal gen 2011 wet fgd performance upgrade at b.l. england unit 2NAES Corporation
The document describes a case study of performance improvements to the wet flue gas desulfurization (FGD) system at the B.L. England Unit 2 coal power plant using ALRD® technology. The plant was facing new, stricter emissions limits and considered various upgrade options before choosing to install two levels of ALRD plates during scheduled outages. The installation was completed successfully within budget and on schedule. After the upgrade, the FGD system was able to achieve over 97% SO2 removal and meet the new emission limit of 0.15 lbs SO2/MMBtu, demonstrating the effectiveness of the ALRD technology.
Coal gen 2011 wet fgd performance upgrade at b.l. england unit 2NAES Corporation
Dennis Del Vechhio, NAES Special Project Supervisor at B.L. England Generating Station, presented A Case Study of Wet FGD Performance Improvements at the Coal-Gen Conference on August 17.
The document contains plans and specifications for renovations to Hanson's Lodge, including:
- A site plan showing the layout of the proposed residence, carport, and other site features.
- Floor plans, elevations, and sections detailing the framing, finishes, and fixtures of the building.
- Schedules specifying windows, doors, framing sizes and materials to be used.
- Engineering details for concrete footings and structural requirements.
- Notes indicating all work must comply with the relevant building codes and standards.
This document describes the services provided by a manufacturing, engineering and contracting organization. The company has over 20 years of experience providing various services across India, including pre-engineered metal buildings, metal roofing and cladding, false ceiling systems, aluminum windows, doors and partitions, and signage. The company offers benefits such as quick construction times, reduced maintenance costs, and energy efficient buildings.
IRJET- Glass Facade Water Cooling SystemIRJET Journal
This document discusses a proposed glass facade water cooling system for buildings. The system works by circulating water over the exterior glass panels during a fire to keep the glass cool and prevent cracking or falling. Water is pumped from an overhead tank to the top of the glass facade and flows down evenly, then is collected at the bottom and recirculated. Estimates show a building with 1800 sqm of glass would require a 95,000 liter water tank to account for the water needed to cover the glass surface as well as losses from the piping system. The system aims to provide a safer alternative to current glass facades that can crack and fall during high temperatures of a fire.
This document provides details on the construction sequence and progress photos for 1240 villa projects using tunnel form works. It outlines a 3 stage process: (1) substructure works including excavation, foundations and ground floor tunnel; (2) superstructure works such as first floor tunnel, block works, plastering and roofing; and (3) finishing works like tile works, MEP installations, joinery, painting and handover. Accompanying photos show the construction progress from initial excavation through to completed villas.
Graduation Project (DESIGN AND ANALYSIS OF MULTI-TOWER STRUCTURE USING ETABS).khaledalshami93
The document describes the design and analysis of a multi-tower structure using ETABS software. It includes sections on the project location, modeling and analysis of the structure using ETABS, structural design including shear wall and beam design, post-tensioned slab design, construction management and risk assessment. The overall purpose is to analyze and design a multi-tower structure consisting of a hotel tower and office tower located in Amman, Jordan.
The manufacturer proposed a solution to address soldiers trapped in Humvee rollovers by developing a windshield with quick-release latches allowing escape in under 5 seconds. PGC engineers were challenged to develop seals protecting the windshield from elements while supporting its weight and isolation during installation, removal and vehicle movements. PGC developed prototypes, tested them, and delivered production-level seal sets within a week, exceeding expectations. The windshield kits have been used across military vehicle platforms and allow installation by maintenance personnel in about an hour.
This industrial training report summarizes the student's training at Simplex Infrastructures Ltd. It provides details of two residential construction projects - Godrej Prakriti Housing Complex III and describes the structures being built. Quality control procedures are outlined including material testing and ensuring specifications are met. Formwork designs, reinforcement details, and estimating quantities are discussed. Plant and machinery used on-site are listed. The report aims to impart the student's practical and theoretical engineering skills.
This industrial training report summarizes the student's training at Simplex Infrastructures Ltd. It provides details of two construction projects - Godrej Prakriti Housing Complex III and details of formwork, quality control measures, site execution, safety procedures, and plant & machinery used. The student gained exposure to various construction activities like formwork, concrete pouring, bar bending, and quality testing of materials. Safety of workers was ensured through use of personal protective equipment.
Edly Omar is seeking a challenging role as an NDT specialist. He has over 10 years of experience in non-destructive testing methods including ultrasonic, magnetic particle, dye penetrant, and radiographic testing. He has worked in industries such as shipbuilding, marine, chemical, pipelines, and subsea manufacturing. His resume lists professional certifications in ultrasonic, magnetic particle, dye penetrant, and radiographic testing as well as previous employment with FMC Technologies and other NDT companies.
This document describes the design of a residential villa building with 3 stories using STAAD-Pro software. It discusses the introduction, applicable design codes, software used, project details, structural design objectives, material properties, loads, and the analysis process. The analysis is performed on the RCC structure in STAAD-Pro by assigning loads, properties, and applying the IS 456-2000 code. The design of slab, beams, columns, footing, and staircase are done as per Indian codes and standards. The STAAD-Pro model results in reinforcement areas comparable to manual calculations.
The document discusses methods for improving the efficiency of oil and gas field development using modern equipment and technologies from STS-GeoService LLC. It describes the company's unique gas-dynamic fracturing technology using the GDK-170 pressure generator, which has increased permeability and production at over 1000 wells. The technology offers benefits like high efficiency, mobility, economic effectiveness and environmental friendliness. It has helped increase total additional oil production by 1.5 million tons with over 90% treatment success rates.
This document provides guidance on soil nail design and construction in Hong Kong. It summarizes local experience with soil nailing and recommendations from technical studies. The guide covers applications of soil nailing for slopes, retaining walls and excavations. It provides recommendations for site investigation, analytical design procedures, construction methods, testing, and monitoring/maintenance of soil nail systems. The overall aim is to promote reliable design and construction practices for soil nailing in Hong Kong.
This document provides guidance on soil nail design and construction in Hong Kong. It summarizes local experience with soil nailing and recommendations from technical studies. The guide covers applications of soil nailing for slopes, retaining walls and excavations. It provides recommendations for site investigation, analytical design procedures, construction methods, testing, and monitoring/maintenance of soil nail systems. The overall aim is to promote reliable soil nail structures through standardized design and construction practices.
IRJET- Controlling the Formation of Rust in the Rocker Panel using Cavity...IRJET Journal
This document discusses a study that aimed to prevent rust formation in the rocker panel of vehicles using cavity wax. The researchers used Deming's PDCA (plan-do-check-act) cycle to guide their methodology. In the plan stage, they selected a vehicle body and cut out the rocker panel. In the do stage, they applied cavity wax to the rocker panel using a pump. In the check stage, they evaluated if the wax was applied evenly. In the act stage, they identified areas for process improvement. The results showed that applying cavity wax to the rocker panel via this process helped prevent rust formation.
This document discusses insulated metal panels (IMPs) and provides information on their advantages, specifications, and business development opportunities. It reviews relevant codes and policies, how IMPs can help projects qualify for LEED and tax credits, and examples of energy modeling cost savings when using IMPs. The document also includes case studies of IMP projects and defines important terms related to IMP performance ratings and specifications.
The document is a report on an industrial training project at a hospital construction site in Chennai by URC Constructions Private Limited. It provides details of the project such as constructing a basement parking facility, 8 floors and other areas on a site located in Perungudi, Chennai. It describes the soil conditions, foundation design, construction stages, safety measures, and estimates for the project. The traineeship provided hands-on experience in construction practices, challenges, and learning.
Offshore Engineering has 10 years of experience providing engineering design and quality validation services for offshore oil and gas projects. They have expertise in FPSO and topside design, and have worked on numerous projects in various countries, including designing modules for FPSOs with oil processing, water injection, gas compression, and flare systems. Offshore Engineering partners with Kavin Engineering to leverage their combined expertise in executing FPSO projects.
Coal gen 2011 wet fgd performance upgrade at b.l. england unit 2NAES Corporation
The document describes a case study of performance improvements to the wet flue gas desulfurization (FGD) system at the B.L. England Unit 2 coal power plant using ALRD® technology. The plant was facing new, stricter emissions limits and considered various upgrade options before choosing to install two levels of ALRD plates during scheduled outages. The installation was completed successfully within budget and on schedule. After the upgrade, the FGD system was able to achieve over 97% SO2 removal and meet the new emission limit of 0.15 lbs SO2/MMBtu, demonstrating the effectiveness of the ALRD technology.
Coal gen 2011 wet fgd performance upgrade at b.l. england unit 2NAES Corporation
Dennis Del Vechhio, NAES Special Project Supervisor at B.L. England Generating Station, presented A Case Study of Wet FGD Performance Improvements at the Coal-Gen Conference on August 17.
The document contains plans and specifications for renovations to Hanson's Lodge, including:
- A site plan showing the layout of the proposed residence, carport, and other site features.
- Floor plans, elevations, and sections detailing the framing, finishes, and fixtures of the building.
- Schedules specifying windows, doors, framing sizes and materials to be used.
- Engineering details for concrete footings and structural requirements.
- Notes indicating all work must comply with the relevant building codes and standards.
This document describes the services provided by a manufacturing, engineering and contracting organization. The company has over 20 years of experience providing various services across India, including pre-engineered metal buildings, metal roofing and cladding, false ceiling systems, aluminum windows, doors and partitions, and signage. The company offers benefits such as quick construction times, reduced maintenance costs, and energy efficient buildings.
IRJET- Glass Facade Water Cooling SystemIRJET Journal
This document discusses a proposed glass facade water cooling system for buildings. The system works by circulating water over the exterior glass panels during a fire to keep the glass cool and prevent cracking or falling. Water is pumped from an overhead tank to the top of the glass facade and flows down evenly, then is collected at the bottom and recirculated. Estimates show a building with 1800 sqm of glass would require a 95,000 liter water tank to account for the water needed to cover the glass surface as well as losses from the piping system. The system aims to provide a safer alternative to current glass facades that can crack and fall during high temperatures of a fire.
This document provides details on the construction sequence and progress photos for 1240 villa projects using tunnel form works. It outlines a 3 stage process: (1) substructure works including excavation, foundations and ground floor tunnel; (2) superstructure works such as first floor tunnel, block works, plastering and roofing; and (3) finishing works like tile works, MEP installations, joinery, painting and handover. Accompanying photos show the construction progress from initial excavation through to completed villas.
DEMOCRACY IN PAKISTAN BALANCING HOPES AND OVERCOMING HURDLES.pptxZiyad Zaidi
The document discusses the evolution and current state of democracy in Pakistan. It covers Pakistan's history of military rule and political instability. It also examines the country's constitutional framework and the roles of citizens, political parties, and civil society in shaping democracy. Challenges to Pakistan's democracy are discussed, including corruption, electoral issues, and regional disparities. The roles of media, women's participation, youth engagement, and international relations are also addressed in relation to democracy in Pakistan.
Monetary policy involves central banks manipulating money supply and interest rates to influence economic activity and achieve goals like full employment and stable prices. Tools include open market operations, reserve requirements, and discount rates. Monetary policy can be expansionary, increasing money supply to boost economy, or contractionary, decreasing money supply to curb inflation. The document discusses monetary policy mechanisms, types of policies, transmission mechanisms, side effects, factors influencing inflation in Pakistan, and the IMF's impact on Pakistan's monetary policies. It also outlines some advantages of monetary policy.
Project Cost and Scheduling Management.pptxZiyad Zaidi
This document outlines the phases and quality standards for a home renovation project, including defining objectives, developing design plans, procuring materials, construction, electrical and plumbing work, interior decorating, quality checks, and project closure. It discusses the importance of projects from an organizational perspective in building reputation and expertise. Cost management, staff management, and stock management are identified as key risks to the project. The document emphasizes maintaining high standards of workmanship, using quality materials and finishes, and assigning a dedicated project manager.
Project procurement Management final report.docxZiyad Zaidi
this is a report on Project procurement of management Saudi Pan Kingdom Company Procurement-plan (Final Project). its is a plan of Saudi Pan Kingdom Company Procurement-plan (Final Project)
Agriautos Industries Ltd is a Pakistani company that manufactures and sells auto parts including shock absorbers. It has implemented SAP R/3 ECC 6.0 to automate its business processes and gain industry-specific best practices and better controls. The ERP implementation aims to improve operational efficiency, streamline processes, enhance data management and customer service. Challenges include change management, data migration and customization but the system is expected to provide improved efficiency, data accuracy, inventory management and financial controls.
PMP Presentation of Failed project of HAL HF-24 Marut.pptZiyad Zaidi
The HAL HF-24 Marut was India's first indigenous fighter jet, developed in the 1960s. It had design flaws that limited its performance and was not thoroughly tested before deployment. While pioneering for India's aviation industry, the Marut program ultimately failed due to technical issues, inadequate testing, and lack of funding. However, it provided valuable lessons that informed future aircraft development in India.
PMP Presentation of Failed project of HAL HF-24 Marut.docxZiyad Zaidi
The HAL HF-24 Marut was India's first domestically designed and produced fighter aircraft. Developed in the 1960s by Hindustan Aeronautics Limited with German designer Kurt Tank, the Marut had a small swept wing and was highly maneuverable but had limited combat capabilities due to its low-powered engines. A total of 147 Maruts were produced for the Indian Air Force, serving as both an interceptor and ground attack aircraft until being phased out in the 1980s due to its inability to reach supersonic speeds as originally intended.
Vertex Engineering is presenting their quality management plan for a construction project in Bahria Town, Karachi. The plan outlines their quality objectives, which include verifying control testing, monitoring design and progress, checking dimensions, and inspecting materials. It describes the quality management process, which involves reviewing drawings and maintaining schedule and budget compliance. Key roles and responsibilities are defined, along with the tools and techniques that will be used, such as audits, checklists, and reports. Field inspections, material testing procedures, and quality reports are also covered.
Project Quality Management Final Report.docxZiyad Zaidi
The document outlines a quality management plan for a construction project. It discusses:
- The roles and responsibilities for quality management, including a quality control manager who will oversee inspections and testing.
- A quality management process involving defining requirements, assurance, control, deliverables acceptance, and final acceptance.
- Tools and techniques used for quality planning, assurance, and control such as audits, reviews, and checklists.
- Key quality assurance activities like reviewing plans, inspecting materials, and monitoring subcontractor work.
The quality control manager will implement the plan, documenting inspections and tests, to help ensure the project meets specifications.
This document establishes the Quality Management Plan for the construction of the new Abbotsford Hospital and Cancer Centre in Abbotsford, BC. The plan defines quality management objectives, processes, roles and responsibilities to ensure a uniform high quality of workmanship throughout all phases of construction. Key aspects of the quality management process include defining quality characteristics, performing quality assurance activities, using tools and techniques such as cost-benefit analysis and statistical sampling, conducting quality reviews, and maintaining quality records. The quality control manager is responsible for ensuring all materials and work comply with contract specifications.
This document discusses project governance and organizational project management (OPM) governance. It defines governance and OPM governance, which includes the policies, procedures, and systems through which organizational leadership directs, defines, authorizes, and supports the alignment of strategy and organizational goals for projects. The document also outlines the key domains of OPM governance: risk, alignment, performance, and communication. It provides examples of activities within each domain to implement effective OPM governance.
Project governance is defined as the set of rules, procedures and policies that determine how projects are managed and overseen. It defines how decisions are made during projects and determines the metrics by which project success is measured. Project governance provides the management framework for project decision making and is critical because it lays out the accountabilities and responsibilities associated with projects, unlike organizational governance arrangements. There are different levels of governance including organizational, project, program, portfolio, and others.
Leveraging Generative AI to Drive Nonprofit InnovationTechSoup
In this webinar, participants learned how to utilize Generative AI to streamline operations and elevate member engagement. Amazon Web Service experts provided a customer specific use cases and dived into low/no-code tools that are quick and easy to deploy through Amazon Web Service (AWS.)
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) CurriculumMJDuyan
(𝐓𝐋𝐄 𝟏𝟎𝟎) (𝐋𝐞𝐬𝐬𝐨𝐧 𝟏)-𝐏𝐫𝐞𝐥𝐢𝐦𝐬
𝐃𝐢𝐬𝐜𝐮𝐬𝐬 𝐭𝐡𝐞 𝐄𝐏𝐏 𝐂𝐮𝐫𝐫𝐢𝐜𝐮𝐥𝐮𝐦 𝐢𝐧 𝐭𝐡𝐞 𝐏𝐡𝐢𝐥𝐢𝐩𝐩𝐢𝐧𝐞𝐬:
- Understand the goals and objectives of the Edukasyong Pantahanan at Pangkabuhayan (EPP) curriculum, recognizing its importance in fostering practical life skills and values among students. Students will also be able to identify the key components and subjects covered, such as agriculture, home economics, industrial arts, and information and communication technology.
𝐄𝐱𝐩𝐥𝐚𝐢𝐧 𝐭𝐡𝐞 𝐍𝐚𝐭𝐮𝐫𝐞 𝐚𝐧𝐝 𝐒𝐜𝐨𝐩𝐞 𝐨𝐟 𝐚𝐧 𝐄𝐧𝐭𝐫𝐞𝐩𝐫𝐞𝐧𝐞𝐮𝐫:
-Define entrepreneurship, distinguishing it from general business activities by emphasizing its focus on innovation, risk-taking, and value creation. Students will describe the characteristics and traits of successful entrepreneurs, including their roles and responsibilities, and discuss the broader economic and social impacts of entrepreneurial activities on both local and global scales.
हिंदी वर्णमाला पीपीटी, hindi alphabet PPT presentation, hindi varnamala PPT, Hindi Varnamala pdf, हिंदी स्वर, हिंदी व्यंजन, sikhiye hindi varnmala, dr. mulla adam ali, hindi language and literature, hindi alphabet with drawing, hindi alphabet pdf, hindi varnamala for childrens, hindi language, hindi varnamala practice for kids, https://www.drmullaadamali.com
Communicating effectively and consistently with students can help them feel at ease during their learning experience and provide the instructor with a communication trail to track the course's progress. This workshop will take you through constructing an engaging course container to facilitate effective communication.
How to Setup Warehouse & Location in Odoo 17 InventoryCeline George
In this slide, we'll explore how to set up warehouses and locations in Odoo 17 Inventory. This will help us manage our stock effectively, track inventory levels, and streamline warehouse operations.
Walmart Business+ and Spark Good for Nonprofits.pdfTechSoup
"Learn about all the ways Walmart supports nonprofit organizations.
You will hear from Liz Willett, the Head of Nonprofits, and hear about what Walmart is doing to help nonprofits, including Walmart Business and Spark Good. Walmart Business+ is a new offer for nonprofits that offers discounts and also streamlines nonprofits order and expense tracking, saving time and money.
The webinar may also give some examples on how nonprofits can best leverage Walmart Business+.
The event will cover the following::
Walmart Business + (https://business.walmart.com/plus) is a new shopping experience for nonprofits, schools, and local business customers that connects an exclusive online shopping experience to stores. Benefits include free delivery and shipping, a 'Spend Analytics” feature, special discounts, deals and tax-exempt shopping.
Special TechSoup offer for a free 180 days membership, and up to $150 in discounts on eligible orders.
Spark Good (walmart.com/sparkgood) is a charitable platform that enables nonprofits to receive donations directly from customers and associates.
Answers about how you can do more with Walmart!"
2. SUBJECT : PRIMAVERA
FACULTY : SIR FAIZ
GROUP MEMBERS:
FARAZ KHAN 10655
ZAIN JAWAID 10238
ZIYAD HASAN 11091
HASNAIN SHEIKH 62811
3. TABLE OF CONTENT
PROJECT CHARTER
SCOPE DETAILS
SCHEDULE
BUDGET STRUCTURE
WBS
RISK REGISTER
RESOURCE BREAK DOWN STRUCTURE
LIST OF EMPLOYEES
TECHNICAL FEATURES
EQUIPMENTS
OUR SUCCESSFUL PROJECTS
4. PROJECT MANAGER FARAZ KHAN
TEAM MEMBERS VICE PRESIDENT,GM TECHNICAL
SPONSER CREEK MARINA PVT LTD
CONSULTANT MEINHARDT SINGAPORE
ENTRANCE LOBBY (TESTING & COMISSIONING)
SHOWFLAT (TESTING & COMISSIONING)
1-Jun-22
PROJECT TEAM APPROVAL/REVIEW COMMITTEE
FINANCIALS
BUDGET TO COMPLETE THIS PROJECT IS 50,000,000 PKR
MILESTONE SCHEDULE
MILESTONE SCHEDULE TARGET COMPLETION DATE ACTUAL DATE
INSTALLATION OF CURTAIN WALL
1) THERMAL BREAK WINDOW
2) VIEW OF NATURAL LANDSCAPE
RISK & ISSUES
DUE TO COVID UNCERTAINTY FOR IMPORTED ITEMS
LOCAL MATERIAL PRICES ARE HIGH DUE TO ESCALATION
ASSUMPTIONS
System to be Installed from technal France
Imported Glass to be processed from Dubai
Welcome to Creek Marina Residences, where dreams become reality. Karachi, the City of Lights. Shimmering on the coast of
the Arabian Sea, this growing metropolis houses a wealth of commercial, historical, and natural gem
PROJECT SCOPE PROJECT DELIVERABLES
PROJECT SPONSER:
PROJECT END DATE:
1-Feb-22 1-Jun-22
INSTALLATION OF GLAZING WORK ON FAÇADE TOWER 7 CREEK
MARINA
BUSINESS NEED
PROJECT CHARTER
PROJECT TITLE:
PROJECT START DATE:
FARAZ KHAN
CREEK MARINA PVT LTD
PROJECT MANAGER:
5. SCOPE DETAILS
SCOPE: INSTALLATION OF ALUMINIUM WITH GLASS (CURTAIN WALLS) GLAZING WORK ON THE FAÇADE
LOCATION: LEVEL 1 : ENTRANCE LOBBY
LEVEL 2: SHOW FLAT
COVERED AREA: LEVEL 1: 3000 SQM(SQUARE METER)
LEVEL 2: 2000 SQM (SQUARE METER)
LEVEL 1: 30,000,000 PKR ( THIRTY MILLIONS RUPEES)
LEVEL 2: 20,000,000 PKR ( TWENTY MILLIONS RUPEES)
TOTAL AMOUNT: 50,000,000 PKR ( FIFTY MILLIONS RUPEES)
DURATION: 4 MONTHS
DEVELOPER : CREEK MARINA PRIVATE LTD
CONTRACTOR: ALCOP
CONTRACT
AWARD
AMOUNT:
6. SCOPE OF THE PROJECT
BLOCK 7 LEVEL-1 ENTRANCE LOBBY (FAÇADE WORK)
7. SCOPE OF THE PROJECT
BLOCK 7 LEVEL-2 SHOW APARTMENT -3BR (FAÇADE WORK,A/C LEDGE
RAILING WORKS )
9. PROJECT NAME
PROJECT
DURATION
PROJECT
START DATE
PROJECT END
DATE
CREEK MARINA 4 MONTHS 1-Feb-22 1-Jun-22
JUNE
NO OPENINGS # LOCATION
DURATION
(Days)
START DATE END DATE
WEEK
1
WEEK
2
WEEK
3
WEEK
4
WEEK
1
WEEK
2
WEEK
3
WEEK
4
WEEK
1
WEEK
2
WEEK
3
WEEK
4
WEEK
1
WEEK
2
WEEK
3
WEEK
4
WEEK 1
INSTALLATION OF ALUMNIUM FRAMING
1 AW5 INSTALLATION OF ALUMNIUM FRAMING 50 1-Feb-22 23-Mar-22
2 AW6 INSTALLATION OF ALUMNIUM FRAMING 50 2-Feb-22 24-Mar-22
3 AW8 INSTALLATION OF ALUMNIUM FRAMING 50 3-Feb-22 25-Mar-22
4 AW9 INSTALLATION OF ALUMNIUM FRAMING 50 4-Feb-22 26-Mar-22
5 AW10 INSTALLATION OF ALUMNIUM FRAMING 50 5-Feb-22 27-Mar-22
6 AW11 INSTALLATION OF ALUMNIUM FRAMING 50 6-Feb-22 28-Mar-22
7 AW12 INSTALLATION OF ALUMNIUM FRAMING 50 7-Feb-22 29-Mar-22
GLASS PROCESSING AND TRANSIT TIME AT SITE 30 29-Mar-22 30-Apr-22
9 AW5 INSTALLATION OF GLASS PANEL 25 1-May-22 26-May-22
10 AW6 INSTALLATION OF GLASS PANEL 25 2-May-22 27-May-22
11 AW8 INSTALLATION OF GLASS PANEL 25 3-May-22 28-May-22
12 AW9 INSTALLATION OF GLASS PANEL 25 4-May-22 29-May-22
13 AW10 INSTALLATION OF GLASS PANEL 25 5-May-22 30-May-22
14 AW11 INSTALLATION OF GLASS PANEL 25 6-May-22 31-May-22
15 AW12 INSTALLATION OF GLASS PANEL 25 7-May-22 1-Jun-22
INSTALLATION OF GLASS PANEL
MAY
INSTALLATION OF ALUMNIUM FRAME
GLASS PROCESSING AND TRANSIT TIME @ SITE
DATE: 5 /1/2022
FEB MAR APR
10. WBS
Baker rod placed on
either sides of
windows jambs
Silicon sealant
across jambs
Cutting of Alumnium
as per size
Fixing of Alumnium
frame
Processing of Glass
Resizing of Glass
Installation of Gaskit on
Alumnium frame
Placement of Glass
Installation of Curtain
Wall
Finishing
layout of windows
Installation of
bracket
Pressure plate on
Glass
14. Project
(Sindh /
DIRECTOR
(Farhan Saeed)
Legal Consultant Company
Secretary
Chief Operating Officer
(Faraz Siddiqui)
General Manager
(Sales)
Marketing
Manager
General Manager
(Technical) HR Manager
General Manager
(Finance) Factory
Manager
Manager Finance Team
Marketing
Officer
Sales Manager
(Punjab / KPK)
Sales Manager
Balochistan))
Asst. Project
Manager 1
Asst. Project
Manager 2
Asst. Project
Manager 3
Installation
Manager
Aluminiu
m
Fabrication
Staff
ACP
Fabrication
Staff
Sales Engineer Sales Engineer
Project
Supervisor
1
Project
Supervisor
2
Project
Supervisor
3
Site Works
Team
Site Works
Team
Site Works
Team
Site Works
Team
Site Works
Team
Site Works
Team
RESOURCE BREAKDOWN STRUCTURE
15.
16. LIST OF KEY PERSONNEL
NAME DESIGNATION EXPERIENCE
A) Head Office
M. Farhan Saeed Director 25 Years.
Faraz Siddiqui Chief Operating Offer 15 Years.
Engr. Ijlal Hasan General Manager-Technical 47 Years.
M. Hanif General Manager-Sales 38 Years.
Engr. M Faraz khan Projects Manager 08 Years.
B) Regional Office (Punjab & KPK)
Mr. Nadeem-ul-Haq. Regional Manager 40 Years.
Mr. Faisal Jillani Sales Manger 12 Years
C) Site Execution
Khursheed Anwar Senior Project Manager 25 Years.
Fahad Khatri Project Manager 10 Years.
M. Faheem Project Manager 10 Years.
M. Shameem Factory Manager 15 Years.
Besides the above Management Team the Projects & Installation Team
comprises of 06 independent units for each assigned project headed by an
experienced foreman.
17. 1) TECHNICAL FEATURES
TECHNAL® Architectural Aluminum system is based on Thermal Break
System Aluminum profiles and accessories with 28mm for curtain walls,
Doors & windows:
a) TECHNAL® MX – TECHNAL fully capped curtain wall is considered
for integrated Doors / Windows with Fixed glazing.
The selection of mullion is based on TECHNAL structural calculations
by considering wind pressure of 2500 Pa with deflection L/175 & L/240
+ 6.35mm for span more than 4.1m.
b) TECHNAL® FY55 – TECHNAL thermally broken range is considered
for fixed and casement window.
c) TECHNAL® PY55 – TECHNAL thermally broken range is considered
for hinged doors with open-in / out / double action option using plinth
profile.
d) TECHNAL® P70 CL – TECHNAL thermally broken range is
considered for the sliders without fly screen.
e) Aluminum profiles is considered in Anodized Finish.
f) Glass comprising of 8mm Sunguard HP Silver 35 Tempered Glass +
12mm black air spacer + 6mm clear Tempered glass.
g) Glass will be processed in UAE by Future Architectural Glass LLC.
Proposed glass is manufactured by AGC.