Hostel Management System
Presented by
Bhanu Regmi
Sanothimi Campus ,Bhaktapur,Nepal
Introduction
• Hostel Management System is a Customize
and user-friendly software for Hostel which
provides hostel information, hostel room
information, and hostel accounts information.
• It helps admin to manage
– Student Record
– Staff record
– Generating staff and student report
2
objectives
•
• To replace the existing system which is much more
time consuming.
• To provide quick and efficient means for gathering the
student information along with their rooms, Fees of
Student and finally the Check in and checkout of
student.
• To generate reports on hostel occupancy and financial
reports.
3
Existing system
• Requires a lot of time as well as manpower.
• It is very difficult to maintain or update all the
record and retrieve certain data.
4
5
Advantages of proposed system
• High security.
• Data redundancy can be avoided.
• Easy to handle, update and keep record.
• Backup data can easily generated.
6
Methodology
Developmental Model
7
Modules of HMS
• Student Module
• Staff module
• Salary Module
• Room and Fee Module
8
Requirements
• Hardware Requirements
– Processor: Pentium
– Ram :512Mb
– Hard disk :160GB
– Monitor
– Keyboard
9
Software requirements
• Language: c sharp(c#)
• Operating system: windows 7
• Software: Visual Studio 2013
• Database: SQL server 2008
10
Feasibility Study
• Technical feasibility.
• Economic feasibility and
• Operational feasibility of the project
11
Data Collection Method
• Data collection methods or fact gathering
techniques which are used while gathering the
information about Hotel Management System
(HMS), they are:
• (1) Interviewing
• (2) Record inspection
• (3) Observation
12
Testing
• Testing is the process of running a system with
the intention of finding errors. Testing
enhances the integrity of a system by
detecting deviations in design and errors in
the system
13
Steps of testing…………….
• Unit Testing
• Integration testing
• Validation testing
• Output Testing
• User Acceptance Testing
14
Delimitations
• All the data are held in a single computer, it does not
involve the Internet.
• This system is designed for school level hostels further
we can upgrade this software for college and university.
15
Expected Output
• All the details related to a hosteller could be
finding in one place like the admission details,
fees details, room details, attendance, message
details, student details etc.
• Will make the monitoring of student moment.
• The same application could be used by both the
account section and the hostel management for
their specific needs and purposes.
• Generate reports on hostel occupancy and
financial reports.
•
16
Project Timeline
17
• THANK YOU
18

Hostel Management System

  • 1.
    Hostel Management System Presentedby Bhanu Regmi Sanothimi Campus ,Bhaktapur,Nepal
  • 2.
    Introduction • Hostel ManagementSystem is a Customize and user-friendly software for Hostel which provides hostel information, hostel room information, and hostel accounts information. • It helps admin to manage – Student Record – Staff record – Generating staff and student report 2
  • 3.
    objectives • • To replacethe existing system which is much more time consuming. • To provide quick and efficient means for gathering the student information along with their rooms, Fees of Student and finally the Check in and checkout of student. • To generate reports on hostel occupancy and financial reports. 3
  • 4.
    Existing system • Requiresa lot of time as well as manpower. • It is very difficult to maintain or update all the record and retrieve certain data. 4
  • 5.
  • 6.
    Advantages of proposedsystem • High security. • Data redundancy can be avoided. • Easy to handle, update and keep record. • Backup data can easily generated. 6
  • 7.
  • 8.
    Modules of HMS •Student Module • Staff module • Salary Module • Room and Fee Module 8
  • 9.
    Requirements • Hardware Requirements –Processor: Pentium – Ram :512Mb – Hard disk :160GB – Monitor – Keyboard 9
  • 10.
    Software requirements • Language:c sharp(c#) • Operating system: windows 7 • Software: Visual Studio 2013 • Database: SQL server 2008 10
  • 11.
    Feasibility Study • Technicalfeasibility. • Economic feasibility and • Operational feasibility of the project 11
  • 12.
    Data Collection Method •Data collection methods or fact gathering techniques which are used while gathering the information about Hotel Management System (HMS), they are: • (1) Interviewing • (2) Record inspection • (3) Observation 12
  • 13.
    Testing • Testing isthe process of running a system with the intention of finding errors. Testing enhances the integrity of a system by detecting deviations in design and errors in the system 13
  • 14.
    Steps of testing……………. •Unit Testing • Integration testing • Validation testing • Output Testing • User Acceptance Testing 14
  • 15.
    Delimitations • All thedata are held in a single computer, it does not involve the Internet. • This system is designed for school level hostels further we can upgrade this software for college and university. 15
  • 16.
    Expected Output • Allthe details related to a hosteller could be finding in one place like the admission details, fees details, room details, attendance, message details, student details etc. • Will make the monitoring of student moment. • The same application could be used by both the account section and the hostel management for their specific needs and purposes. • Generate reports on hostel occupancy and financial reports. • 16
  • 17.
  • 18.