This pre-installation checklist for a Haas machine model verifies that the foundation meets specifications, optional anchors are installed correctly if needed, and the machine location has been prepared according to the layout with a large enough entrance and lifting equipment. It also checks that the electrical supply voltage and wiring are correct, compressed air pressure and compressor meet requirements, and coolant type and concentration are appropriate.