CONTENTS
1 METHOD STATEMENT LOG
2 CONCRETE MIX DESIGN SUMMARY
3 NCR & NCN LOG
5 MATERIAL APPROVAL SUMMARY
7 SOME GOOD PRACTICES
4 GC VISIT SUMMARY
6 QUALITY ORGANISTAIONAL CHART
Shanghai Tunnel Engineering Co., Ltd.
1.METHOD STATEMENT LOG
Shanghai Tunnel Engineering Co., Ltd.
Shanghai Tunnel Engineering Co., Ltd.
• Total 44 Method Statement and 3 Work Procedure have been submitted as on 14.03.2022.
• Total 34 Method Statement and 2 Work Procedure have been approved.
• Future Submission Plan & Status (Fortnight):
1. Comments Compliance for the MS
Shanghai Tunnel Engineering Co., Ltd.
2.CONCRETE MIX DESIGN SUMMARY
• Various Concrete Mix Design have been submitted.
• On-Going Mix Design in QA/QC Lab:
1. Design Mix of Backfill Grout for Tunnel is finalized and has been submitted for approval/NOC.
2. Compliance of Mix design shall be submitted as earliest possible.
Shanghai Tunnel Engineering Co., Ltd.
3.NCR & NCN LOG
3a.NCN LOG
Shanghai Tunnel Engineering Co., Ltd.
3.NCR & NCN LOG
3b. NCR LOG
Shanghai Tunnel Engineering Co., Ltd.
4.GC VISIT SUMMARY
• 23 GC Quality Walk have been conducted and out of 23, compliance of 20 has been submitted to NCRTC/GC.
Compliance of 3 nos. quality walk observation is in progress.
• Summary of GC Quality Walk:
• For Detailed Log : ..Quality Observation by GC PKG-04GC Observation Log.xlsx
Sl No.
Quality
Walk No.
Date of Quality
Walk
Ref. No. & Date of
Compliance Submission
No. of
Observation
Raised
No. of
Observatio
n Closed
No. of
Observa
tion
Open
Remarks
1 2 05-05-2021 OU/2021/0670 03.07.2021 12 12 0 NoNo Received
2 3 01-06-2021 OU/2021/0671 03.07.2021 15 15 0 NoNo Received
3 4 15-06-2021 OU/2021/0672 03.07.2021 19 19 0 NoNo Received
4 4(a) 08-07-2021 OU/2021/0760 16.07.2021 25 25 0 NoNo Received
5 5 19-07-2021 OU/2021/0851 26.07.2021 9 9 0 NoNo Received
6 6 02.08.2021 OU/2021/0975 13.08.2021 15 14 1
7 7 11.08.2021 OU/2021/1094 04.09.2021 15 15 0 NoNo Received
8 8 02.09.2021 OU/2021/1152 13.09.2021 3 3 0 NoNo Received
9 9 16.09.2021 OU/2021/1250 28.09.2021 8 8 0 NoNo Received
10 10 07.10.2021 OU/2021/1365 20.10.2021 8 8 0 Comme nts
11 11 21.10.2021 OU/2021/1466 10.11.2021 20 20 0 No No Received
12 12 11.11.2021 via QC App 6 6 0 No No A wait ed
13 13 22.11.2021 via QC App 9 9 0 No No Received
14 14 29.11.2021 via QC App 8 8 0 No No A wait ed
15 15 07.12.2021 via QC App 3 3 0 No No Received
16 16 13.12.2021 via QC App 8 8 0 No No Received
17 17 23.12.2021 via QC App 4 4 0 No No Received
18 18 29.12.2021 via QC App 2 2 0 No No A wait ed
19 19 24.01.2022 via QC App 2 1 1 No No A wait ed
20 20 29.01.2022 via QC App 15 6 9 No No A wait ed
21 21 07.02.2022 via QC App 11 8 3 Complying
22 22 24.02.2022 via QC App 8 1 7 Complying
23 23 02.03.2022 via QC App 10 2 8 Complying
Total 235 206 29
COMPLIANCE STATUS OF GC QUALITY WALK OBSERVATION
Shanghai Tunnel Engineering Co., Ltd.
5.MATERIAL APPROVAL SUMMARY
Shanghai Tunnel Engineering Co., Ltd.
Shanghai Tunnel Engineering Co., Ltd.
6. QUALITY ORGANIZATIONAL CHART
Shanghai Tunnel Engineering Co., Ltd.
7.SOME GOOD PRACTICES
Gasket Fixing at casting yard
Shanghai Tunnel Engineering Co., Ltd.
7.SOME GOOD PRACTICES
Training Conducted at Khichripur & Vaishali Site’s
Shanghai Tunnel Engineering Co., Ltd.
7.SOME GOOD PRACTICES
DPT been conducted on Strut & Waler Proper application of Shuttering oil and Application
of Foam on edges to prevent slurry loss.
Shanghai Tunnel Engineering Co., Ltd.
Storage of Rebar in proper way at site.
Pull out conducted on waler bracket LS02
Shanghai Tunnel Engineering Co., Ltd.
Quality means doing it right when no one is looking!!
Thank You!

More Related Content

Similar to PPT_14.03.2022.pptx

CV - Senior QAQC Engineer-Civil
CV - Senior QAQC Engineer-CivilCV - Senior QAQC Engineer-Civil
CV - Senior QAQC Engineer-Civil
Alagusundaram PatchaiMuthukkon
 
jahangir
jahangirjahangir
jahangir
Jahangir Bhatti
 
VO meeting Sept22.pptx
VO meeting Sept22.pptxVO meeting Sept22.pptx
VO meeting Sept22.pptx
RajeshKumarSharma71
 
VO meeting Sept22.pptx
VO meeting Sept22.pptxVO meeting Sept22.pptx
VO meeting Sept22.pptx
RajeshKumarSharma71
 
QA-QC_Processes_for_QA-QC_for_HL-LHC_Coil_Fabrication.pptx
QA-QC_Processes_for_QA-QC_for_HL-LHC_Coil_Fabrication.pptxQA-QC_Processes_for_QA-QC_for_HL-LHC_Coil_Fabrication.pptx
QA-QC_Processes_for_QA-QC_for_HL-LHC_Coil_Fabrication.pptx
arissa13
 
Rengaraj nagappan cv aug 15done
Rengaraj nagappan cv aug 15doneRengaraj nagappan cv aug 15done
Rengaraj nagappan cv aug 15done
Assignment Help
 
Piping Engineer
Piping EngineerPiping Engineer
Piping Engineer
ervinay singh
 
Monthly Progress Report - September 2014
Monthly Progress Report - September 2014Monthly Progress Report - September 2014
Monthly Progress Report - September 2014
Sam Kendall, MSc, BSc Civil Eng., PMP®, MIEAust
 
Quality Management Plan
Quality Management PlanQuality Management Plan
Quality Management Plan
AnuragBhat7
 
Mantena Neeladri varma_original
Mantena Neeladri varma_originalMantena Neeladri varma_original
Mantena Neeladri varma_original
Neeladri varma
 
Welcome-to-our-presentation.project (2).pptx
Welcome-to-our-presentation.project (2).pptxWelcome-to-our-presentation.project (2).pptx
Welcome-to-our-presentation.project (2).pptx
mahidfahim08
 
AGTL Project Status and Progress_20-01-2021.pptx
AGTL Project Status and Progress_20-01-2021.pptxAGTL Project Status and Progress_20-01-2021.pptx
AGTL Project Status and Progress_20-01-2021.pptx
MdAbuNaser13
 
CV of Mohammad Mujeebuddin - PMO QA Manager
CV of Mohammad Mujeebuddin - PMO QA ManagerCV of Mohammad Mujeebuddin - PMO QA Manager
CV of Mohammad Mujeebuddin - PMO QA Manager
Mujeebuddin Mohammad
 
P7512-EXT-SQ-0030
P7512-EXT-SQ-0030P7512-EXT-SQ-0030
P7512-EXT-SQ-0030
Anandan Ramu
 
Curriculum_Vitate 20.09.15
Curriculum_Vitate 20.09.15Curriculum_Vitate 20.09.15
Curriculum_Vitate 20.09.15
Gangadharan Ramakrishnan
 
Huzoor-_feb_20091 CV (2)
Huzoor-_feb_20091 CV (2)Huzoor-_feb_20091 CV (2)
Huzoor-_feb_20091 CV (2)
Huzoor Ahmed
 
Huzoor-_feb_20091 CV (2)
Huzoor-_feb_20091 CV (2)Huzoor-_feb_20091 CV (2)
Huzoor-_feb_20091 CV (2)
Huzoor Ahmed
 
Vinu cv august 16
Vinu cv august 16Vinu cv august 16
Vinu cv august 16
Ramasamy Vinu
 
CV of Ramprasad-converted-compressed.pdf
CV of Ramprasad-converted-compressed.pdfCV of Ramprasad-converted-compressed.pdf
CV of Ramprasad-converted-compressed.pdf
RAMPRASADBALLAV1
 
HKIS windows analysis delay-------------
HKIS windows analysis delay-------------HKIS windows analysis delay-------------
HKIS windows analysis delay-------------
engmts19861
 

Similar to PPT_14.03.2022.pptx (20)

CV - Senior QAQC Engineer-Civil
CV - Senior QAQC Engineer-CivilCV - Senior QAQC Engineer-Civil
CV - Senior QAQC Engineer-Civil
 
jahangir
jahangirjahangir
jahangir
 
VO meeting Sept22.pptx
VO meeting Sept22.pptxVO meeting Sept22.pptx
VO meeting Sept22.pptx
 
VO meeting Sept22.pptx
VO meeting Sept22.pptxVO meeting Sept22.pptx
VO meeting Sept22.pptx
 
QA-QC_Processes_for_QA-QC_for_HL-LHC_Coil_Fabrication.pptx
QA-QC_Processes_for_QA-QC_for_HL-LHC_Coil_Fabrication.pptxQA-QC_Processes_for_QA-QC_for_HL-LHC_Coil_Fabrication.pptx
QA-QC_Processes_for_QA-QC_for_HL-LHC_Coil_Fabrication.pptx
 
Rengaraj nagappan cv aug 15done
Rengaraj nagappan cv aug 15doneRengaraj nagappan cv aug 15done
Rengaraj nagappan cv aug 15done
 
Piping Engineer
Piping EngineerPiping Engineer
Piping Engineer
 
Monthly Progress Report - September 2014
Monthly Progress Report - September 2014Monthly Progress Report - September 2014
Monthly Progress Report - September 2014
 
Quality Management Plan
Quality Management PlanQuality Management Plan
Quality Management Plan
 
Mantena Neeladri varma_original
Mantena Neeladri varma_originalMantena Neeladri varma_original
Mantena Neeladri varma_original
 
Welcome-to-our-presentation.project (2).pptx
Welcome-to-our-presentation.project (2).pptxWelcome-to-our-presentation.project (2).pptx
Welcome-to-our-presentation.project (2).pptx
 
AGTL Project Status and Progress_20-01-2021.pptx
AGTL Project Status and Progress_20-01-2021.pptxAGTL Project Status and Progress_20-01-2021.pptx
AGTL Project Status and Progress_20-01-2021.pptx
 
CV of Mohammad Mujeebuddin - PMO QA Manager
CV of Mohammad Mujeebuddin - PMO QA ManagerCV of Mohammad Mujeebuddin - PMO QA Manager
CV of Mohammad Mujeebuddin - PMO QA Manager
 
P7512-EXT-SQ-0030
P7512-EXT-SQ-0030P7512-EXT-SQ-0030
P7512-EXT-SQ-0030
 
Curriculum_Vitate 20.09.15
Curriculum_Vitate 20.09.15Curriculum_Vitate 20.09.15
Curriculum_Vitate 20.09.15
 
Huzoor-_feb_20091 CV (2)
Huzoor-_feb_20091 CV (2)Huzoor-_feb_20091 CV (2)
Huzoor-_feb_20091 CV (2)
 
Huzoor-_feb_20091 CV (2)
Huzoor-_feb_20091 CV (2)Huzoor-_feb_20091 CV (2)
Huzoor-_feb_20091 CV (2)
 
Vinu cv august 16
Vinu cv august 16Vinu cv august 16
Vinu cv august 16
 
CV of Ramprasad-converted-compressed.pdf
CV of Ramprasad-converted-compressed.pdfCV of Ramprasad-converted-compressed.pdf
CV of Ramprasad-converted-compressed.pdf
 
HKIS windows analysis delay-------------
HKIS windows analysis delay-------------HKIS windows analysis delay-------------
HKIS windows analysis delay-------------
 

Recently uploaded

Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
IJECEIAES
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
co23btech11018
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
Yasser Mahgoub
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
mahammadsalmanmech
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
ihlasbinance2003
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
KrishnaveniKrishnara1
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Sinan KOZAK
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
jpsjournal1
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
abbyasa1014
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
rpskprasana
 
Casting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdfCasting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdf
zubairahmad848137
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
Rahul
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
Hitesh Mohapatra
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
Dr Ramhari Poudyal
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
IJECEIAES
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
Victor Morales
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 

Recently uploaded (20)

Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
 
Casting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdfCasting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdf
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 

PPT_14.03.2022.pptx

  • 1. Shanghai Tunnel Engineering Co., Ltd. NCRTC National Capital Region Transport Corporation CONTRACT NO: DM/CN/COR-OF/086 NEW ASHOK NAGAR DN RAMP TO SAHIBABAD UP RAMP QUALITY PROGRESS REVIEW MEETING 14TH March 2022
  • 2. Shanghai Tunnel Engineering Co., Ltd. CONTENTS 1 METHOD STATEMENT LOG 2 CONCRETE MIX DESIGN SUMMARY 3 NCR & NCN LOG 5 MATERIAL APPROVAL SUMMARY 7 SOME GOOD PRACTICES 4 GC VISIT SUMMARY 6 QUALITY ORGANISTAIONAL CHART
  • 3. Shanghai Tunnel Engineering Co., Ltd. 1.METHOD STATEMENT LOG
  • 5. Shanghai Tunnel Engineering Co., Ltd. • Total 44 Method Statement and 3 Work Procedure have been submitted as on 14.03.2022. • Total 34 Method Statement and 2 Work Procedure have been approved. • Future Submission Plan & Status (Fortnight): 1. Comments Compliance for the MS
  • 6. Shanghai Tunnel Engineering Co., Ltd. 2.CONCRETE MIX DESIGN SUMMARY • Various Concrete Mix Design have been submitted. • On-Going Mix Design in QA/QC Lab: 1. Design Mix of Backfill Grout for Tunnel is finalized and has been submitted for approval/NOC. 2. Compliance of Mix design shall be submitted as earliest possible.
  • 7. Shanghai Tunnel Engineering Co., Ltd. 3.NCR & NCN LOG 3a.NCN LOG
  • 8. Shanghai Tunnel Engineering Co., Ltd. 3.NCR & NCN LOG 3b. NCR LOG
  • 9. Shanghai Tunnel Engineering Co., Ltd. 4.GC VISIT SUMMARY • 23 GC Quality Walk have been conducted and out of 23, compliance of 20 has been submitted to NCRTC/GC. Compliance of 3 nos. quality walk observation is in progress. • Summary of GC Quality Walk: • For Detailed Log : ..Quality Observation by GC PKG-04GC Observation Log.xlsx Sl No. Quality Walk No. Date of Quality Walk Ref. No. & Date of Compliance Submission No. of Observation Raised No. of Observatio n Closed No. of Observa tion Open Remarks 1 2 05-05-2021 OU/2021/0670 03.07.2021 12 12 0 NoNo Received 2 3 01-06-2021 OU/2021/0671 03.07.2021 15 15 0 NoNo Received 3 4 15-06-2021 OU/2021/0672 03.07.2021 19 19 0 NoNo Received 4 4(a) 08-07-2021 OU/2021/0760 16.07.2021 25 25 0 NoNo Received 5 5 19-07-2021 OU/2021/0851 26.07.2021 9 9 0 NoNo Received 6 6 02.08.2021 OU/2021/0975 13.08.2021 15 14 1 7 7 11.08.2021 OU/2021/1094 04.09.2021 15 15 0 NoNo Received 8 8 02.09.2021 OU/2021/1152 13.09.2021 3 3 0 NoNo Received 9 9 16.09.2021 OU/2021/1250 28.09.2021 8 8 0 NoNo Received 10 10 07.10.2021 OU/2021/1365 20.10.2021 8 8 0 Comme nts 11 11 21.10.2021 OU/2021/1466 10.11.2021 20 20 0 No No Received 12 12 11.11.2021 via QC App 6 6 0 No No A wait ed 13 13 22.11.2021 via QC App 9 9 0 No No Received 14 14 29.11.2021 via QC App 8 8 0 No No A wait ed 15 15 07.12.2021 via QC App 3 3 0 No No Received 16 16 13.12.2021 via QC App 8 8 0 No No Received 17 17 23.12.2021 via QC App 4 4 0 No No Received 18 18 29.12.2021 via QC App 2 2 0 No No A wait ed 19 19 24.01.2022 via QC App 2 1 1 No No A wait ed 20 20 29.01.2022 via QC App 15 6 9 No No A wait ed 21 21 07.02.2022 via QC App 11 8 3 Complying 22 22 24.02.2022 via QC App 8 1 7 Complying 23 23 02.03.2022 via QC App 10 2 8 Complying Total 235 206 29 COMPLIANCE STATUS OF GC QUALITY WALK OBSERVATION
  • 10. Shanghai Tunnel Engineering Co., Ltd. 5.MATERIAL APPROVAL SUMMARY
  • 12. Shanghai Tunnel Engineering Co., Ltd. 6. QUALITY ORGANIZATIONAL CHART
  • 13. Shanghai Tunnel Engineering Co., Ltd. 7.SOME GOOD PRACTICES Gasket Fixing at casting yard
  • 14. Shanghai Tunnel Engineering Co., Ltd. 7.SOME GOOD PRACTICES Training Conducted at Khichripur & Vaishali Site’s
  • 15. Shanghai Tunnel Engineering Co., Ltd. 7.SOME GOOD PRACTICES DPT been conducted on Strut & Waler Proper application of Shuttering oil and Application of Foam on edges to prevent slurry loss.
  • 16. Shanghai Tunnel Engineering Co., Ltd. Storage of Rebar in proper way at site. Pull out conducted on waler bracket LS02
  • 17. Shanghai Tunnel Engineering Co., Ltd. Quality means doing it right when no one is looking!! Thank You!