-:About NTPC:•
•
•
•
•
•
•
•
•

NTPC, the largest power Company in India, was setup in 1975 to accelerate
power development in the country.
Dr.Arup Roy choudhary is chairman & MD since 1/09/2010.
NTPC has installed capacity of 41,684 MW.
NTPC ranked 300th in the ‘2013, Forbes Global 2000’ ranking of the World’s
biggest companies.
NTPC plans to become a 128,000 MW company by 2032.
It has 16 coal based power stations (23,395 MW)
7 gas based power stations (3,955 MW)
4 power stations in Joint Ventures (1,794 MW).
NTPC has been awarded NO-1,best workplace in india among large
organization and the best psu for the year 2010.
-:NTPC, DADRI:TOTAL CAPACITY OF DADRI POWER PLANT :(A) THERMAL
I:- 04X210 MW = 840 MW
II:- 02X490 MW = 980 MW
TOTAL
= 1820 MW
B)

GAS

(C) SOLAR

= 817 MW
= 05MW

GRAND TOTAL = 2642 MW
PMI Revision 00

October 14, 2013

5
Diagram of a typical coal-fired thermal power station
-:Generation of Electricity:•
•

•
•
•

Prime mover coupled to
Alternator
Prime mover is driven by energy
obtained from various sources
such as
burning of fuel
pressure of water
Force of wind etc.
Fig. Fundamental of generation of Electricity
-:Thermal Power Plant:•

A generating station which converts heat energy of coal combustion
into electrical energy is known as a steam power station.

•

Steam is produced in the boiler by utilizing the heat of coal
combustion. The steam is then expanded in the steam turbine and is
condensed in a condenser to be fed into the boiler again. The steam
turbine drives the alternator which converts mechanical energy of the
turbine into electrical energy.
-:Basic Power Plant Cycle:-
-:WORKING OF STEAM POWER PLANT:Coal is burnt in a boiler ,which converts water into
steam.
• The steam is expanded in a turbine used to drive
alternator.
• The steam expanded is condensed in a condenser to
be feed into the boiler again.
• The entire arrangement of steam power plant can be
divided into.
•

a. fuel and ash plant.
b. air and fuel gas plant.
c. feed water and steam plant.
d. cooling water plant.
-:Main and Auxiliary Equipments:1. Coal handling plant
2. Stoker
3. Pulverizer
4.Boiler
5.Superheater
6.Eonomiser & Air preheater
7.Reheater
8.Deaerator
9.Condenser
10.Primary air fan
11.Turbine(prime mover)
12.Draft fan & chimney
13.Electo-static precipitator
14.Cooling tower
15.Ash handling plant
16.Electrical equipment
a. Generator
b. Transformers
c. Switch yard
-:Coal handling plant:-

•The

function of coal handling plant is automatic feeding of coal to the boiler
furnace.
• A thermal power plant burns enormous amounts of coal.
•A 200MW plant may require around 2000 tons of coal daily
Coal conveyor : This is a belt type of arrangement. With this coal is transported from
coal storage place in power plant to the place near by boiler.  

Stoker : The coal which is brought near by boiler has to put in boiler furnace for
combustion. This stoker is a mechanical device for feeding coal to a furnace.

Pulverizer : The coal is put in the boiler after pulverization. For this pulverizer is used. A
pulverizer is a device for grinding coal for combustion in a furnace in a power plant. A
pulverizer is a device for grinding coal for combustion in a furnace in a power plant.
Pulverizing mills are further classified as:
1.Contact mill
2.Ball mill
3.Impact mill
-:Boiler:A boiler is closed vessel in which water is converted into steam by
utilising the heat of coal combustion.
Steam boilers are broadly classified into following two types:base on the
relative position of water and gases.
(a) Water tube boilers (b) Fire tube boilers
In a water tube boiler, water flows
through the tubes and the hot gases of
combustion flow over these tubes.
Water-tube boilers are used for highpressure boilers
Examples: cochron, Lancashire,
locomotive boiler.
In a fire tube boiler, the hot products of combustion pass through the
tubes surrounded by water.

• The heated water then rises into the steam drum. Here, saturated steam is
drawn off the top of the drum. The steam will reenter the furnace in
through a superheater in order to become superheated. Superheated
steam is used in driving turbines. Since water droplets can severely
damage turbine blades, steam is superheated to 730°F (390°C) or higher
in order to ensure that there is no water entrained in the steam.
-:Super heater:•

A device which removes last traces of moisture.

•
•

It helps in reduction in requirement of steam quantity.
steam being dry reduces the mechanical resistance of
turbine.
No corrosion at the turbine blades.

•
-:Economizer and Air Pre-heater:•

An economizer is a heat transfer device used for heating the feed water with
the help of hot flue gases before leaving the chimney.

•

It helps in improving the efficiency of the power plant.

•

Air preheater is a device which utilizes the waste heat of the flue gases leaving
the economizer to heat the air to be supplied to the boiler.
-:Reheater :Some of the heat of superheated
steam is used to rotate the turbine
where it loses some of its energy.
The steam after reheating is used
to rotate the second steam turbine
where the heat is converted to
mechanical
energy.
This
mechanical energy is used to run
the alternator, which is coupled to
turbine , there by generating
electrical energy.
-:DEAERATOR:•A steam generating boiler requires that the boiler feed water should be devoid
of air and other dissolved gases, particularly corrosive ones.
• In order to avoid corrosion of the metal, power station uses a Deaerator, for
the removal of air and other dissolved gases from the boiler feed water.
•A deaerator has a vertical, domed deaeration section mounted on top of a
horizontal cylindrical vessel which serves as a deaerated boiler feed water
storage tank.
-:Condenser:Which condenses the steam at the exhaust of turbine.
•It

creates a very low pressure at the exhaust of turbine, this
helps in converting heat energy of steam into mechanical
energy in the prime mover.
•The

condensed steam can be used as feed water to the
boiler.
•Classification of condenser
1.Jet condensers or contact condensers,
2. Surface condensers
Primary Air Fan:•

Air to blow the coal from the mill
to the boiler, called the primary
air, is supplied by a large fan
driven by a variable speed motor

•

When mixed with a stream of air
the powdered coal behaves more
like a gas than a solid

•

Primary air does two jobs –
heating the coal powder and
secondly lifting it into the furnace
through pipelines
-:Prime Mover (i.e. Turbine):A steam turbine is a mechanical device that extracts thermal energy from
pressurized steam, and converts it into mechanical energy.
The steam turbine is a form of heat engine that derives much of its
improvement in thermodynamic efficiency from the use of multiple stages in
the expansion of the steam, which results in a closer approach to the ideal
reversible expansion process.
About 86% of all electric generation in the world is by use of steam turbines.

BOILER

GENERATOR
STEAM TURBINE
-:Cooling Towers:Remove heat from the
water discharged from the
condenser so that the water
can be discharged to the
river or re circulated and
reused.
• Air can be circulated in the
cooling towers through
natural draft and
mechanical draft.
• Type of cooling tower
1. Wet cooling tower
2. Dry cooling tower
•
Induced Draught (ID) Fan

Chimney
•

•

Two induced draught fans draw
gases out of the boiler

•

The gas has already passed
through the air heaters and
precipitators before it has
reached these fans

•

The heat from the flue gases or
smoke is used in the air heaters
to heat up the primary and
secondary air

The chimney is 275 meters' high
and 50,000 tonnes of reinforced
concrete were used to make it

•

It consists of flues each of which
serve typically two or three boilers
(two units)
-:Electro-Static Precipitator:-

Top View of ESP Schematic Diagram



Side view of ESP Schematic Diagram

It is a device which removes dust or other finely divided particles from flue gases by
charging the particles inductively with an electric field, then attracting them to highly
charged collector plates. Also known as precipitator. The process depends on two
steps. In the first step the suspension passes through an electric discharge (corona
discharge) area where ionization of the gas occurs. The ions produced collide with
the suspended particles and confer on them an electric charge. The charged particles
drift toward an electrode of opposite sign and are deposited on the electrode where
their electric charge is neutralized. The phenomenon would be more correctly
designated as electrode position from the gas phase
-:COAL TRANSPORTATION SYATEM:



Source of coal = Piparwar Mines North Karanpur (Jharkhand)
Location = Near Ranchi
Means of transportation-Railway



Rout of ply=kalari-gawaroad,seonnogarmughalsarai,Allahabad,Kanpur,Aligarh,dadri-plant unloading area.



Distance = 1124 Km from kholori to dadri with electrified trak from
seonnogar.



Type of coal = F-grade (Washed),E grade(Raw)



C.V(calorific value)=3600-3800 kcal/kg.



Coal requirement = 13,000 MT/Day(04 rakes)



Type of wagon= 1.BOBR(bogy open rapid discharge)
= 2.Box-N(min 2 door on each said)
ASH HANDLING PLANT
The percentage of ash in coal is 5% in good quality coal & about 40% in poor
quality coal.
• Power plants generally use poor quality of coal , thus amount of ash produced
by it is quite large.
• A modern 1000MW plant produces about 4800 tons of ash daily.
• The stations use some conveyor arrangement to carry ash to dump sites.
•
-:Electrical Equipments:Alternator
An alternator is coupled to a steam turbine and converts mechanical
energy of the turbine into electrical energy.
It may be hydrogen or air cooled.
The necessary excitation is provided by means of main and pilot exciters
directly coupled to the alternator shaft.
Transformers
(a) main step-transformers, which steps-up generated voltage transmission
of power
(b) station transformers, general purpose
(c) auxiliary transformers, which supply to individual unit-auxiliaries.
Control Room and Switchyard :
The control room monitors the overall operation of the plant. It is
provided with controls for real and reactive power flow. It is provided
with safety relays and switchgears.
-:Coal Ash can be used in:•
•
•
•
•
•

Construction of embankments and fills
Construction of road in sub-base
Manufacture of cement
Manufacture of bricks/blocks
Filling as flowable fill material
Agriculture as soil amendment/source of
essential plant nutrients
-:TRIPICAL DIAGRAM OP THERMAL POWER PLANT:-
Efficiency of Thermal Power Station or Plant
The overall efficiency of a thermal power station or plant varies from 20% to 26% and
it depends upon plant capacity.
ppt of ntpc dadri by emam raza khan

More Related Content

What's hot

Vocational training report
Vocational training reportVocational training report
Vocational training report
ATUL RAJ
 
training report NTPC Muzaffarpur Bihar
training report  NTPC Muzaffarpur Bihar training report  NTPC Muzaffarpur Bihar
training report NTPC Muzaffarpur Bihar
Dilip kumar
 
power point presentation over thermal power plant
power point presentation over thermal power plantpower point presentation over thermal power plant
power point presentation over thermal power plant
Anis Haider
 
INTERNSHIP REPORT NTPC
INTERNSHIP REPORT NTPCINTERNSHIP REPORT NTPC
INTERNSHIP REPORT NTPCADITYA ARYAN
 
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHAL
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHALVOCATIONAL TRAINING REPORT @ NTPC VINDHYACHAL
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHAL
Milind Punj
 
kota Super Thermal Power Station training ppt
kota Super Thermal Power Station training pptkota Super Thermal Power Station training ppt
kota Super Thermal Power Station training ppt
Er. Aman Agrawal
 
Mejia Thermal Power Station
Mejia Thermal Power StationMejia Thermal Power Station
Mejia Thermal Power Station
sagnikchoudhury
 
ntpc khalgaon
ntpc khalgaonntpc khalgaon
ntpc khalgaon
Vimal Tripathi
 
Industrial training report of NTPC
Industrial training report of NTPC Industrial training report of NTPC
Industrial training report of NTPC
Shivam Singh
 
Project Report on Industrial Summer Training at NTPC Simhadri
 Project Report on Industrial Summer Training at NTPC Simhadri Project Report on Industrial Summer Training at NTPC Simhadri
Project Report on Industrial Summer Training at NTPC Simhadri
Ashish Uppu
 
CONTROL AND INSTRUMENTATION OF POWER PLANT
CONTROL AND INSTRUMENTATION OF POWER PLANTCONTROL AND INSTRUMENTATION OF POWER PLANT
CONTROL AND INSTRUMENTATION OF POWER PLANTSubarna Poddar
 
ppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESH
ppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESHppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESH
ppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESHAKHILESH KUMAR
 
Ntpc dadri thermal power plant & switchyard
Ntpc dadri thermal power plant & switchyardNtpc dadri thermal power plant & switchyard
Ntpc dadri thermal power plant & switchyard
I.E.T. lucknow
 
Thermal Power Plant training Report
Thermal Power Plant training ReportThermal Power Plant training Report
Thermal Power Plant training Report
Shani Kumar Singh
 
SUMMER TRAINING AT NTPC DADRI GAS SECTION
SUMMER TRAINING AT NTPC DADRI GAS SECTIONSUMMER TRAINING AT NTPC DADRI GAS SECTION
SUMMER TRAINING AT NTPC DADRI GAS SECTION
AMIT KUMAR
 
Bokaro Thermal Power Plant
Bokaro Thermal Power PlantBokaro Thermal Power Plant
Bokaro Thermal Power Plant
Sourav Mahato
 
ELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial Report
ELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial ReportELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial Report
ELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial Report
Utkarsh Chaubey
 

What's hot (20)

Vocational training report
Vocational training reportVocational training report
Vocational training report
 
training report NTPC Muzaffarpur Bihar
training report  NTPC Muzaffarpur Bihar training report  NTPC Muzaffarpur Bihar
training report NTPC Muzaffarpur Bihar
 
power point presentation over thermal power plant
power point presentation over thermal power plantpower point presentation over thermal power plant
power point presentation over thermal power plant
 
INTERNSHIP REPORT NTPC
INTERNSHIP REPORT NTPCINTERNSHIP REPORT NTPC
INTERNSHIP REPORT NTPC
 
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHAL
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHALVOCATIONAL TRAINING REPORT @ NTPC VINDHYACHAL
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHAL
 
kota Super Thermal Power Station training ppt
kota Super Thermal Power Station training pptkota Super Thermal Power Station training ppt
kota Super Thermal Power Station training ppt
 
Kstps ppt
Kstps pptKstps ppt
Kstps ppt
 
Mejia Thermal Power Station
Mejia Thermal Power StationMejia Thermal Power Station
Mejia Thermal Power Station
 
ntpc khalgaon
ntpc khalgaonntpc khalgaon
ntpc khalgaon
 
Industrial training report of NTPC
Industrial training report of NTPC Industrial training report of NTPC
Industrial training report of NTPC
 
Project Report on Industrial Summer Training at NTPC Simhadri
 Project Report on Industrial Summer Training at NTPC Simhadri Project Report on Industrial Summer Training at NTPC Simhadri
Project Report on Industrial Summer Training at NTPC Simhadri
 
Ntpc
NtpcNtpc
Ntpc
 
CONTROL AND INSTRUMENTATION OF POWER PLANT
CONTROL AND INSTRUMENTATION OF POWER PLANTCONTROL AND INSTRUMENTATION OF POWER PLANT
CONTROL AND INSTRUMENTATION OF POWER PLANT
 
ppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESH
ppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESHppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESH
ppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESH
 
Ntpc dadri thermal power plant & switchyard
Ntpc dadri thermal power plant & switchyardNtpc dadri thermal power plant & switchyard
Ntpc dadri thermal power plant & switchyard
 
Thermal Power Plant training Report
Thermal Power Plant training ReportThermal Power Plant training Report
Thermal Power Plant training Report
 
SUMMER TRAINING AT NTPC DADRI GAS SECTION
SUMMER TRAINING AT NTPC DADRI GAS SECTIONSUMMER TRAINING AT NTPC DADRI GAS SECTION
SUMMER TRAINING AT NTPC DADRI GAS SECTION
 
NTPC PROJECT..
NTPC PROJECT..NTPC PROJECT..
NTPC PROJECT..
 
Bokaro Thermal Power Plant
Bokaro Thermal Power PlantBokaro Thermal Power Plant
Bokaro Thermal Power Plant
 
ELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial Report
ELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial ReportELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial Report
ELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial Report
 

Similar to ppt of ntpc dadri by emam raza khan

Mtps ppt
Mtps pptMtps ppt
Mtps ppt
sourabhgnit
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
Anish Kumar Gupta
 
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...
Shubham Thakur
 
thermal and nuclear power plant
 thermal and nuclear power plant thermal and nuclear power plant
thermal and nuclear power plant
Akash soni
 
compalete file 2023 (AutoRecovered).docx
compalete file 2023 (AutoRecovered).docxcompalete file 2023 (AutoRecovered).docx
compalete file 2023 (AutoRecovered).docx
VishalSen33
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
aman Singh
 
Kota thermal power plant ppt
Kota thermal power plant pptKota thermal power plant ppt
Kota thermal power plant ppt
Prakash Jarotia
 
Harsh ntpc
Harsh ntpcHarsh ntpc
Ntpc ppt complete
Ntpc ppt completeNtpc ppt complete
Ntpc ppt complete
Vikas Singh
 
Bandel training
Bandel trainingBandel training
Bandel training
Subhadip Sadhukhan
 
Ntpc dadri ppt by pc sharma
Ntpc dadri ppt by pc sharmaNtpc dadri ppt by pc sharma
Ntpc dadri ppt by pc sharmaPrakash Sharma
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
Rahul Jalan
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
Viren Patel
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
Vivek Pathak
 
Thermal Power Plant (Bathinda) PPT
Thermal Power Plant (Bathinda) PPTThermal Power Plant (Bathinda) PPT
Thermal Power Plant (Bathinda) PPT
Fateh Singh
 
Project Report on “WORKING MODEL OF POWER GRID/SMART GRID
Project Report on “WORKING MODEL OF POWER GRID/SMART GRIDProject Report on “WORKING MODEL OF POWER GRID/SMART GRID
Project Report on “WORKING MODEL OF POWER GRID/SMART GRID
Prasant Kumar
 

Similar to ppt of ntpc dadri by emam raza khan (20)

Ntpc2 111125042448-phpapp02
Ntpc2 111125042448-phpapp02Ntpc2 111125042448-phpapp02
Ntpc2 111125042448-phpapp02
 
Ntpc dadri ppt
Ntpc dadri pptNtpc dadri ppt
Ntpc dadri ppt
 
Mtps ppt
Mtps pptMtps ppt
Mtps ppt
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Ntpc2
Ntpc2Ntpc2
Ntpc2
 
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...
 
thermal and nuclear power plant
 thermal and nuclear power plant thermal and nuclear power plant
thermal and nuclear power plant
 
compalete file 2023 (AutoRecovered).docx
compalete file 2023 (AutoRecovered).docxcompalete file 2023 (AutoRecovered).docx
compalete file 2023 (AutoRecovered).docx
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Kota thermal power plant ppt
Kota thermal power plant pptKota thermal power plant ppt
Kota thermal power plant ppt
 
Harsh ntpc
Harsh ntpcHarsh ntpc
Harsh ntpc
 
Ntpc ppt complete
Ntpc ppt completeNtpc ppt complete
Ntpc ppt complete
 
Bandel training
Bandel trainingBandel training
Bandel training
 
Ntpc dadri ppt by pc sharma
Ntpc dadri ppt by pc sharmaNtpc dadri ppt by pc sharma
Ntpc dadri ppt by pc sharma
 
KTPS
KTPSKTPS
KTPS
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Thermal Power Plant (Bathinda) PPT
Thermal Power Plant (Bathinda) PPTThermal Power Plant (Bathinda) PPT
Thermal Power Plant (Bathinda) PPT
 
Project Report on “WORKING MODEL OF POWER GRID/SMART GRID
Project Report on “WORKING MODEL OF POWER GRID/SMART GRIDProject Report on “WORKING MODEL OF POWER GRID/SMART GRID
Project Report on “WORKING MODEL OF POWER GRID/SMART GRID
 

More from Dubai Electricity and Water Authority | DEWA | Official-Page (6)

Delivery challan.
Delivery challan.Delivery challan.
Delivery challan.
 
Fabrication and determination of critical thickness of spherical objects
Fabrication and determination of critical      thickness of spherical objectsFabrication and determination of critical      thickness of spherical objects
Fabrication and determination of critical thickness of spherical objects
 
Application for refund of security
Application for refund of securityApplication for refund of security
Application for refund of security
 
bhushan steel ppt
bhushan steel pptbhushan steel ppt
bhushan steel ppt
 
Alttc report
Alttc report Alttc report
Alttc report
 
Emam training
Emam training Emam training
Emam training
 

Recently uploaded

The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
Delapenabediema
 
Introduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp NetworkIntroduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp Network
TechSoup
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
Sandy Millin
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
Jisc
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
siemaillard
 
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup   New Member Orientation and Q&A (May 2024).pdfWelcome to TechSoup   New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
TechSoup
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
Celine George
 
Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
Vikramjit Singh
 
Guidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th SemesterGuidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th Semester
Atul Kumar Singh
 
Polish students' mobility in the Czech Republic
Polish students' mobility in the Czech RepublicPolish students' mobility in the Czech Republic
Polish students' mobility in the Czech Republic
Anna Sz.
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
MysoreMuleSoftMeetup
 
Additional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdfAdditional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdf
joachimlavalley1
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
Celine George
 
The basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptxThe basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptx
heathfieldcps1
 
Language Across the Curriculm LAC B.Ed.
Language Across the  Curriculm LAC B.Ed.Language Across the  Curriculm LAC B.Ed.
Language Across the Curriculm LAC B.Ed.
Atul Kumar Singh
 
Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptx
Pavel ( NSTU)
 
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdfAdversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Po-Chuan Chen
 
Embracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic ImperativeEmbracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic Imperative
Peter Windle
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Thiyagu K
 
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCECLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
BhavyaRajput3
 

Recently uploaded (20)

The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
 
Introduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp NetworkIntroduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp Network
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
 
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup   New Member Orientation and Q&A (May 2024).pdfWelcome to TechSoup   New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
 
Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
 
Guidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th SemesterGuidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th Semester
 
Polish students' mobility in the Czech Republic
Polish students' mobility in the Czech RepublicPolish students' mobility in the Czech Republic
Polish students' mobility in the Czech Republic
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
 
Additional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdfAdditional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdf
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
 
The basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptxThe basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptx
 
Language Across the Curriculm LAC B.Ed.
Language Across the  Curriculm LAC B.Ed.Language Across the  Curriculm LAC B.Ed.
Language Across the Curriculm LAC B.Ed.
 
Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptx
 
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdfAdversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
 
Embracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic ImperativeEmbracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic Imperative
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
 
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCECLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
 

ppt of ntpc dadri by emam raza khan

  • 1. -:A SUMMER TRAINIG EXPERIENCE: IN -:NATIONAL THERMAL POWER PLANT{DADRI}:-  PRESENTED BY: EMAM RAZA  ROLL.NO-1002940032  M.E STUDENT OF KIET(GZB) UNDER THE GUIDANCE OF:- MR. R.K SHINHA DGM, EE Department of power plant (DADRI)
  • 2. -:About NTPC:• • • • • • • • • NTPC, the largest power Company in India, was setup in 1975 to accelerate power development in the country. Dr.Arup Roy choudhary is chairman & MD since 1/09/2010. NTPC has installed capacity of 41,684 MW. NTPC ranked 300th in the ‘2013, Forbes Global 2000’ ranking of the World’s biggest companies. NTPC plans to become a 128,000 MW company by 2032. It has 16 coal based power stations (23,395 MW) 7 gas based power stations (3,955 MW) 4 power stations in Joint Ventures (1,794 MW). NTPC has been awarded NO-1,best workplace in india among large organization and the best psu for the year 2010.
  • 3.
  • 4. -:NTPC, DADRI:TOTAL CAPACITY OF DADRI POWER PLANT :(A) THERMAL I:- 04X210 MW = 840 MW II:- 02X490 MW = 980 MW TOTAL = 1820 MW B) GAS (C) SOLAR = 817 MW = 05MW GRAND TOTAL = 2642 MW
  • 6. Diagram of a typical coal-fired thermal power station
  • 7. -:Generation of Electricity:• • • • • Prime mover coupled to Alternator Prime mover is driven by energy obtained from various sources such as burning of fuel pressure of water Force of wind etc. Fig. Fundamental of generation of Electricity
  • 8. -:Thermal Power Plant:• A generating station which converts heat energy of coal combustion into electrical energy is known as a steam power station. • Steam is produced in the boiler by utilizing the heat of coal combustion. The steam is then expanded in the steam turbine and is condensed in a condenser to be fed into the boiler again. The steam turbine drives the alternator which converts mechanical energy of the turbine into electrical energy.
  • 10. -:WORKING OF STEAM POWER PLANT:Coal is burnt in a boiler ,which converts water into steam. • The steam is expanded in a turbine used to drive alternator. • The steam expanded is condensed in a condenser to be feed into the boiler again. • The entire arrangement of steam power plant can be divided into. • a. fuel and ash plant. b. air and fuel gas plant. c. feed water and steam plant. d. cooling water plant.
  • 11. -:Main and Auxiliary Equipments:1. Coal handling plant 2. Stoker 3. Pulverizer 4.Boiler 5.Superheater 6.Eonomiser & Air preheater 7.Reheater 8.Deaerator 9.Condenser 10.Primary air fan 11.Turbine(prime mover) 12.Draft fan & chimney 13.Electo-static precipitator 14.Cooling tower 15.Ash handling plant 16.Electrical equipment a. Generator b. Transformers c. Switch yard
  • 12. -:Coal handling plant:- •The function of coal handling plant is automatic feeding of coal to the boiler furnace. • A thermal power plant burns enormous amounts of coal. •A 200MW plant may require around 2000 tons of coal daily
  • 13. Coal conveyor : This is a belt type of arrangement. With this coal is transported from coal storage place in power plant to the place near by boiler.   Stoker : The coal which is brought near by boiler has to put in boiler furnace for combustion. This stoker is a mechanical device for feeding coal to a furnace. Pulverizer : The coal is put in the boiler after pulverization. For this pulverizer is used. A pulverizer is a device for grinding coal for combustion in a furnace in a power plant. A pulverizer is a device for grinding coal for combustion in a furnace in a power plant. Pulverizing mills are further classified as: 1.Contact mill 2.Ball mill 3.Impact mill
  • 14. -:Boiler:A boiler is closed vessel in which water is converted into steam by utilising the heat of coal combustion. Steam boilers are broadly classified into following two types:base on the relative position of water and gases. (a) Water tube boilers (b) Fire tube boilers In a water tube boiler, water flows through the tubes and the hot gases of combustion flow over these tubes. Water-tube boilers are used for highpressure boilers Examples: cochron, Lancashire, locomotive boiler.
  • 15. In a fire tube boiler, the hot products of combustion pass through the tubes surrounded by water. • The heated water then rises into the steam drum. Here, saturated steam is drawn off the top of the drum. The steam will reenter the furnace in through a superheater in order to become superheated. Superheated steam is used in driving turbines. Since water droplets can severely damage turbine blades, steam is superheated to 730°F (390°C) or higher in order to ensure that there is no water entrained in the steam.
  • 16. -:Super heater:• A device which removes last traces of moisture. • • It helps in reduction in requirement of steam quantity. steam being dry reduces the mechanical resistance of turbine. No corrosion at the turbine blades. •
  • 17. -:Economizer and Air Pre-heater:• An economizer is a heat transfer device used for heating the feed water with the help of hot flue gases before leaving the chimney. • It helps in improving the efficiency of the power plant. • Air preheater is a device which utilizes the waste heat of the flue gases leaving the economizer to heat the air to be supplied to the boiler.
  • 18. -:Reheater :Some of the heat of superheated steam is used to rotate the turbine where it loses some of its energy. The steam after reheating is used to rotate the second steam turbine where the heat is converted to mechanical energy. This mechanical energy is used to run the alternator, which is coupled to turbine , there by generating electrical energy.
  • 19. -:DEAERATOR:•A steam generating boiler requires that the boiler feed water should be devoid of air and other dissolved gases, particularly corrosive ones. • In order to avoid corrosion of the metal, power station uses a Deaerator, for the removal of air and other dissolved gases from the boiler feed water. •A deaerator has a vertical, domed deaeration section mounted on top of a horizontal cylindrical vessel which serves as a deaerated boiler feed water storage tank.
  • 20. -:Condenser:Which condenses the steam at the exhaust of turbine. •It creates a very low pressure at the exhaust of turbine, this helps in converting heat energy of steam into mechanical energy in the prime mover. •The condensed steam can be used as feed water to the boiler. •Classification of condenser 1.Jet condensers or contact condensers, 2. Surface condensers
  • 21. Primary Air Fan:• Air to blow the coal from the mill to the boiler, called the primary air, is supplied by a large fan driven by a variable speed motor • When mixed with a stream of air the powdered coal behaves more like a gas than a solid • Primary air does two jobs – heating the coal powder and secondly lifting it into the furnace through pipelines
  • 22. -:Prime Mover (i.e. Turbine):A steam turbine is a mechanical device that extracts thermal energy from pressurized steam, and converts it into mechanical energy. The steam turbine is a form of heat engine that derives much of its improvement in thermodynamic efficiency from the use of multiple stages in the expansion of the steam, which results in a closer approach to the ideal reversible expansion process. About 86% of all electric generation in the world is by use of steam turbines. BOILER GENERATOR STEAM TURBINE
  • 23. -:Cooling Towers:Remove heat from the water discharged from the condenser so that the water can be discharged to the river or re circulated and reused. • Air can be circulated in the cooling towers through natural draft and mechanical draft. • Type of cooling tower 1. Wet cooling tower 2. Dry cooling tower •
  • 24. Induced Draught (ID) Fan Chimney • • Two induced draught fans draw gases out of the boiler • The gas has already passed through the air heaters and precipitators before it has reached these fans • The heat from the flue gases or smoke is used in the air heaters to heat up the primary and secondary air The chimney is 275 meters' high and 50,000 tonnes of reinforced concrete were used to make it • It consists of flues each of which serve typically two or three boilers (two units)
  • 25. -:Electro-Static Precipitator:- Top View of ESP Schematic Diagram  Side view of ESP Schematic Diagram It is a device which removes dust or other finely divided particles from flue gases by charging the particles inductively with an electric field, then attracting them to highly charged collector plates. Also known as precipitator. The process depends on two steps. In the first step the suspension passes through an electric discharge (corona discharge) area where ionization of the gas occurs. The ions produced collide with the suspended particles and confer on them an electric charge. The charged particles drift toward an electrode of opposite sign and are deposited on the electrode where their electric charge is neutralized. The phenomenon would be more correctly designated as electrode position from the gas phase
  • 26.
  • 27. -:COAL TRANSPORTATION SYATEM:   Source of coal = Piparwar Mines North Karanpur (Jharkhand) Location = Near Ranchi Means of transportation-Railway  Rout of ply=kalari-gawaroad,seonnogarmughalsarai,Allahabad,Kanpur,Aligarh,dadri-plant unloading area.  Distance = 1124 Km from kholori to dadri with electrified trak from seonnogar.  Type of coal = F-grade (Washed),E grade(Raw)  C.V(calorific value)=3600-3800 kcal/kg.  Coal requirement = 13,000 MT/Day(04 rakes)  Type of wagon= 1.BOBR(bogy open rapid discharge) = 2.Box-N(min 2 door on each said)
  • 28. ASH HANDLING PLANT The percentage of ash in coal is 5% in good quality coal & about 40% in poor quality coal. • Power plants generally use poor quality of coal , thus amount of ash produced by it is quite large. • A modern 1000MW plant produces about 4800 tons of ash daily. • The stations use some conveyor arrangement to carry ash to dump sites. •
  • 29. -:Electrical Equipments:Alternator An alternator is coupled to a steam turbine and converts mechanical energy of the turbine into electrical energy. It may be hydrogen or air cooled. The necessary excitation is provided by means of main and pilot exciters directly coupled to the alternator shaft. Transformers (a) main step-transformers, which steps-up generated voltage transmission of power (b) station transformers, general purpose (c) auxiliary transformers, which supply to individual unit-auxiliaries. Control Room and Switchyard : The control room monitors the overall operation of the plant. It is provided with controls for real and reactive power flow. It is provided with safety relays and switchgears.
  • 30. -:Coal Ash can be used in:• • • • • • Construction of embankments and fills Construction of road in sub-base Manufacture of cement Manufacture of bricks/blocks Filling as flowable fill material Agriculture as soil amendment/source of essential plant nutrients
  • 31. -:TRIPICAL DIAGRAM OP THERMAL POWER PLANT:-
  • 32. Efficiency of Thermal Power Station or Plant The overall efficiency of a thermal power station or plant varies from 20% to 26% and it depends upon plant capacity.