Construction Project Manager
Different body involved in preparation of estimate can be grouped into following three
classes.
• The owner or owner's staff such as project manager.
• Contractor's personnel such as senior manager, planner, site management staffs etc.
• Materials suppliers and contractors
Challenges in Estimating
• To co-ordinate different parties involved in the project or construction in particular
• An estimator has to understand the project details, study drawing and
specification, obtain working conditions, labour and equipment productivity and
collecting other data from the site
• An estimator also assesses the temporary work at the site such as formwork for
concreting, temporary plant for the storage of materials.
Data for Estimate:
• DRAWINGS- plan, elevations and detailed drawings to scale are required. Scale
1cm -1m, for detailed it should be scaled to 1cm to 10 cm,
• SPECIFICATIONS- i) general specifications
ii) detailed specifications
• RATES- rates per unit of various items of work, the rates of various materials to be
used in the construction, different wages of labour, skilled or unskilled as mason,
carpenter, mazdoor, bhishti etc. location of work and its distance from source of
materials and the cost of transport should be known.
Rates can be obtained rom P.W.D schedule of rate book.
In the organization, background work for estimation is carried out by higher management and
organizations keeps the details regarding unit cost of the items called schedule of rate,
productivity, and guideline for basic calculation.The basic calculation is carried out by junior
level engineers or assistants.
In preparing detailed estimate, we need to know the following two things
• Quantities of the items involved.
• Obtaining cost of the items involved.
Methods of obtaining quantities of the items involved is called quantity estimate and method
obtaining unit cost of the items involved is called rate analysis.
Types of Estimate:
• Preliminary estimate.
• Detailed estimate or item rate estimate
• Plinth area estimate
• Approximate quantity method estimate
• Revised estimate
• Supplementary estimate
• Annual repair or maintenance estimate
Requirements of preliminary and detailed estimate:
To prepare a preliminary estimate, quantity of work to be planned is measured in terms of unit of
person, built up area, extent of work in kilometre such as a preliminary estimate of housing can be
calculated based on type of house and number of house to be built. Similar preliminary estimate of
highway can be calculated by knowing the type of road in terms of lane or pavement and length of
the load.
Preliminary Estimate
Different methods of preliminary estimate can be grouped into the following categories –
• Time referenced cost estimate
• Cost capacity factor
• Component ration/installation cost ratio
• Parameter cost
The preliminary estimate is obtained during early phases of project. As the project progresses, an
estimate keeps on getting refined and lastly we get definitive estimate.
Details of measurements form
Abstract of Estimate Form
Ppt chapter1
Ppt chapter1
Ppt chapter1
Ppt chapter1
Ppt chapter1
Ppt chapter1
Ppt chapter1
Ppt chapter1
Ppt chapter1
Ppt chapter1
Ppt chapter1
Ppt chapter1
Ppt chapter1
Ppt chapter1
Ppt chapter1
Ppt chapter1
Ppt chapter1
Ppt chapter1
Ppt chapter1
Ppt chapter1
Ppt chapter1
Ppt chapter1
Ppt chapter1

More Related Content

What's hot

Approximate estimate
Approximate estimateApproximate estimate
Approximate estimate
Prasad Manerikar
 
Estimating part 2
Estimating part 2Estimating part 2
Estimating part 2
ArunRavi43
 
1# introduction to Quantity Surveying
1# introduction to Quantity Surveying1# introduction to Quantity Surveying
1# introduction to Quantity Surveying
LIJI A
 
Professional practices (lec 04) by k.iqbal
Professional practices (lec 04) by k.iqbalProfessional practices (lec 04) by k.iqbal
Professional practices (lec 04) by k.iqbal
Zakee Kazmee
 
Planning and cost analysis of the commercial building
Planning and cost analysis of the commercial buildingPlanning and cost analysis of the commercial building
Planning and cost analysis of the commercial building
ila vamsi krishna
 
Approximate estimate
Approximate estimateApproximate estimate
Approximate estimate
Ganesh Tatikonda
 
P cost and budget
P cost and budgetP cost and budget
P cost and budget
Jubayer Alam Shoikat
 
Estimating part 1
Estimating part 1Estimating part 1
Estimating part 1
ArunRavi43
 
B.arch Estimation and Costing
B.arch  Estimation and CostingB.arch  Estimation and Costing
B.arch Estimation and Costing
SamreenFatima29
 
Professional practices (lec 05) by k.iqbal
Professional practices (lec 05) by k.iqbalProfessional practices (lec 05) by k.iqbal
Professional practices (lec 05) by k.iqbal
Zakee Kazmee
 
Methods of estimation - Estimation, Costing and Valuation Engineering
Methods of estimation - Estimation, Costing and Valuation EngineeringMethods of estimation - Estimation, Costing and Valuation Engineering
Methods of estimation - Estimation, Costing and Valuation Engineering
Shanmugasundaram N
 
type of cost Estimation
type of cost Estimationtype of cost Estimation
type of cost Estimation
Educational Learner
 
Quantity-Surveyor (ICI+ITD)-pdf.pdf
Quantity-Surveyor (ICI+ITD)-pdf.pdfQuantity-Surveyor (ICI+ITD)-pdf.pdf
Quantity-Surveyor (ICI+ITD)-pdf.pdf
Chong Yi Hui
 
Systematic layout planning
Systematic layout planningSystematic layout planning
Systematic layout planning
priyanka verma
 
Quantity surveying -scope and purpose
Quantity surveying -scope and purposeQuantity surveying -scope and purpose
Quantity surveying -scope and purpose
Abhijeet Bhosale
 
Purpose and importance of estimate
Purpose and importance of estimatePurpose and importance of estimate
Purpose and importance of estimate
Arpit Sethia
 
Quantity surveyor
Quantity surveyorQuantity surveyor
Quantity surveyor
LY97
 
Planning and cost analysis of the commercial building
Planning and cost analysis of the commercial buildingPlanning and cost analysis of the commercial building
Planning and cost analysis of the commercial building
ila vamsi krishna
 
Ici & itd
Ici & itdIci & itd
Ici & itd
Ngo Jia Haur
 
Estimating and Costing
Estimating and CostingEstimating and Costing
Estimating and Costing
Ganesh Tatikonda
 

What's hot (20)

Approximate estimate
Approximate estimateApproximate estimate
Approximate estimate
 
Estimating part 2
Estimating part 2Estimating part 2
Estimating part 2
 
1# introduction to Quantity Surveying
1# introduction to Quantity Surveying1# introduction to Quantity Surveying
1# introduction to Quantity Surveying
 
Professional practices (lec 04) by k.iqbal
Professional practices (lec 04) by k.iqbalProfessional practices (lec 04) by k.iqbal
Professional practices (lec 04) by k.iqbal
 
Planning and cost analysis of the commercial building
Planning and cost analysis of the commercial buildingPlanning and cost analysis of the commercial building
Planning and cost analysis of the commercial building
 
Approximate estimate
Approximate estimateApproximate estimate
Approximate estimate
 
P cost and budget
P cost and budgetP cost and budget
P cost and budget
 
Estimating part 1
Estimating part 1Estimating part 1
Estimating part 1
 
B.arch Estimation and Costing
B.arch  Estimation and CostingB.arch  Estimation and Costing
B.arch Estimation and Costing
 
Professional practices (lec 05) by k.iqbal
Professional practices (lec 05) by k.iqbalProfessional practices (lec 05) by k.iqbal
Professional practices (lec 05) by k.iqbal
 
Methods of estimation - Estimation, Costing and Valuation Engineering
Methods of estimation - Estimation, Costing and Valuation EngineeringMethods of estimation - Estimation, Costing and Valuation Engineering
Methods of estimation - Estimation, Costing and Valuation Engineering
 
type of cost Estimation
type of cost Estimationtype of cost Estimation
type of cost Estimation
 
Quantity-Surveyor (ICI+ITD)-pdf.pdf
Quantity-Surveyor (ICI+ITD)-pdf.pdfQuantity-Surveyor (ICI+ITD)-pdf.pdf
Quantity-Surveyor (ICI+ITD)-pdf.pdf
 
Systematic layout planning
Systematic layout planningSystematic layout planning
Systematic layout planning
 
Quantity surveying -scope and purpose
Quantity surveying -scope and purposeQuantity surveying -scope and purpose
Quantity surveying -scope and purpose
 
Purpose and importance of estimate
Purpose and importance of estimatePurpose and importance of estimate
Purpose and importance of estimate
 
Quantity surveyor
Quantity surveyorQuantity surveyor
Quantity surveyor
 
Planning and cost analysis of the commercial building
Planning and cost analysis of the commercial buildingPlanning and cost analysis of the commercial building
Planning and cost analysis of the commercial building
 
Ici & itd
Ici & itdIci & itd
Ici & itd
 
Estimating and Costing
Estimating and CostingEstimating and Costing
Estimating and Costing
 

Similar to Ppt chapter1

ESTIMATION_AND_COSTING assignmentt-1.pdf
ESTIMATION_AND_COSTING assignmentt-1.pdfESTIMATION_AND_COSTING assignmentt-1.pdf
ESTIMATION_AND_COSTING assignmentt-1.pdf
suchitamantry2002
 
Quantity Survey and Estimation basic terms
Quantity Survey and Estimation basic termsQuantity Survey and Estimation basic terms
Quantity Survey and Estimation basic terms
meghajain275
 
Quantity Surveying & valuation.ppt
Quantity Surveying & valuation.pptQuantity Surveying & valuation.ppt
Quantity Surveying & valuation.ppt
TauheedKhan45
 
CPM 1 .pdf
CPM 1 .pdfCPM 1 .pdf
CPM 1 .pdf
MD RUKHASAR ALAM
 
Estimation and costing of a commercial building
Estimation and costing of a commercial buildingEstimation and costing of a commercial building
Estimation and costing of a commercial building
lckr117
 
Estimation Costing and Valuation Unit 1
Estimation Costing and Valuation Unit 1Estimation Costing and Valuation Unit 1
Estimation Costing and Valuation Unit 1
Padmasinh Patil
 
EEEC pdf.pdf
EEEC pdf.pdfEEEC pdf.pdf
EEEC pdf.pdf
BSuresh26
 
Estimating and costing
Estimating and costingEstimating and costing
Estimating and costing
AyushHajare
 
Estimation Costing and Valuation Unit 1 to Unit 6
Estimation Costing and Valuation Unit 1 to Unit 6Estimation Costing and Valuation Unit 1 to Unit 6
Estimation Costing and Valuation Unit 1 to Unit 6
Padmasinh Patil
 
SPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATIONSPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATION
Ar Naveen Naveen
 
Estimation Costing and Valuation Unit 2
Estimation Costing and Valuation Unit 2Estimation Costing and Valuation Unit 2
Estimation Costing and Valuation Unit 2
Padmasinh Patil
 
Estimation and Costing
Estimation and Costing Estimation and Costing
Estimation and Costing
Vijay325
 
specification estimation and valuation of a building
specification estimation and valuation of a buildingspecification estimation and valuation of a building
specification estimation and valuation of a building
swethasekhar5
 
IV -I - EQS - .pptx
IV -I - EQS - .pptxIV -I - EQS - .pptx
IV -I - EQS - .pptx
GovindarajuluBadana
 
Quantity surveyor
Quantity surveyorQuantity surveyor
Quantity surveyor
温 庄壁
 
Terminology used in estimating and costing
Terminology used in estimating and costingTerminology used in estimating and costing
Terminology used in estimating and costing
Janak Mehta
 
CV-Sounder
CV-SounderCV-Sounder
CV-Sounder
sounder duraisamy
 
Introduction to estimation
Introduction to estimationIntroduction to estimation
Introduction to estimation
DhavalMithaiwala
 
Introduction to estimating & costing
Introduction to estimating & costingIntroduction to estimating & costing
Introduction to estimating & costing
Janak Mehta
 
EstimationandCosting.ppt
EstimationandCosting.pptEstimationandCosting.ppt
EstimationandCosting.ppt
BALAMURUGANR53
 

Similar to Ppt chapter1 (20)

ESTIMATION_AND_COSTING assignmentt-1.pdf
ESTIMATION_AND_COSTING assignmentt-1.pdfESTIMATION_AND_COSTING assignmentt-1.pdf
ESTIMATION_AND_COSTING assignmentt-1.pdf
 
Quantity Survey and Estimation basic terms
Quantity Survey and Estimation basic termsQuantity Survey and Estimation basic terms
Quantity Survey and Estimation basic terms
 
Quantity Surveying & valuation.ppt
Quantity Surveying & valuation.pptQuantity Surveying & valuation.ppt
Quantity Surveying & valuation.ppt
 
CPM 1 .pdf
CPM 1 .pdfCPM 1 .pdf
CPM 1 .pdf
 
Estimation and costing of a commercial building
Estimation and costing of a commercial buildingEstimation and costing of a commercial building
Estimation and costing of a commercial building
 
Estimation Costing and Valuation Unit 1
Estimation Costing and Valuation Unit 1Estimation Costing and Valuation Unit 1
Estimation Costing and Valuation Unit 1
 
EEEC pdf.pdf
EEEC pdf.pdfEEEC pdf.pdf
EEEC pdf.pdf
 
Estimating and costing
Estimating and costingEstimating and costing
Estimating and costing
 
Estimation Costing and Valuation Unit 1 to Unit 6
Estimation Costing and Valuation Unit 1 to Unit 6Estimation Costing and Valuation Unit 1 to Unit 6
Estimation Costing and Valuation Unit 1 to Unit 6
 
SPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATIONSPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATION
 
Estimation Costing and Valuation Unit 2
Estimation Costing and Valuation Unit 2Estimation Costing and Valuation Unit 2
Estimation Costing and Valuation Unit 2
 
Estimation and Costing
Estimation and Costing Estimation and Costing
Estimation and Costing
 
specification estimation and valuation of a building
specification estimation and valuation of a buildingspecification estimation and valuation of a building
specification estimation and valuation of a building
 
IV -I - EQS - .pptx
IV -I - EQS - .pptxIV -I - EQS - .pptx
IV -I - EQS - .pptx
 
Quantity surveyor
Quantity surveyorQuantity surveyor
Quantity surveyor
 
Terminology used in estimating and costing
Terminology used in estimating and costingTerminology used in estimating and costing
Terminology used in estimating and costing
 
CV-Sounder
CV-SounderCV-Sounder
CV-Sounder
 
Introduction to estimation
Introduction to estimationIntroduction to estimation
Introduction to estimation
 
Introduction to estimating & costing
Introduction to estimating & costingIntroduction to estimating & costing
Introduction to estimating & costing
 
EstimationandCosting.ppt
EstimationandCosting.pptEstimationandCosting.ppt
EstimationandCosting.ppt
 

Recently uploaded

Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
Madan Karki
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
Hitesh Mohapatra
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
mahammadsalmanmech
 
Heat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation pptHeat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation ppt
mamunhossenbd75
 
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEMTIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
HODECEDSIET
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
VICTOR MAESTRE RAMIREZ
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
JamalHussainArman
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
SUTEJAS
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
MIGUELANGEL966976
 
Recycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part IIRecycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part II
Aditya Rajan Patra
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
Dr Ramhari Poudyal
 
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
RadiNasr
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
Victor Morales
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
nooriasukmaningtyas
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
ihlasbinance2003
 
Casting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdfCasting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdf
zubairahmad848137
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
171ticu
 
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
Las Vegas Warehouse
 

Recently uploaded (20)

Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
 
Heat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation pptHeat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation ppt
 
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEMTIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
 
Recycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part IIRecycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part II
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
 
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
 
Casting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdfCasting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdf
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
 
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
 

Ppt chapter1

  • 2.
  • 3.
  • 4.
  • 6. Different body involved in preparation of estimate can be grouped into following three classes. • The owner or owner's staff such as project manager. • Contractor's personnel such as senior manager, planner, site management staffs etc. • Materials suppliers and contractors
  • 7. Challenges in Estimating • To co-ordinate different parties involved in the project or construction in particular • An estimator has to understand the project details, study drawing and specification, obtain working conditions, labour and equipment productivity and collecting other data from the site • An estimator also assesses the temporary work at the site such as formwork for concreting, temporary plant for the storage of materials.
  • 8. Data for Estimate: • DRAWINGS- plan, elevations and detailed drawings to scale are required. Scale 1cm -1m, for detailed it should be scaled to 1cm to 10 cm, • SPECIFICATIONS- i) general specifications ii) detailed specifications • RATES- rates per unit of various items of work, the rates of various materials to be used in the construction, different wages of labour, skilled or unskilled as mason, carpenter, mazdoor, bhishti etc. location of work and its distance from source of materials and the cost of transport should be known. Rates can be obtained rom P.W.D schedule of rate book.
  • 9. In the organization, background work for estimation is carried out by higher management and organizations keeps the details regarding unit cost of the items called schedule of rate, productivity, and guideline for basic calculation.The basic calculation is carried out by junior level engineers or assistants. In preparing detailed estimate, we need to know the following two things • Quantities of the items involved. • Obtaining cost of the items involved. Methods of obtaining quantities of the items involved is called quantity estimate and method obtaining unit cost of the items involved is called rate analysis.
  • 10. Types of Estimate: • Preliminary estimate. • Detailed estimate or item rate estimate • Plinth area estimate • Approximate quantity method estimate • Revised estimate • Supplementary estimate • Annual repair or maintenance estimate
  • 11. Requirements of preliminary and detailed estimate: To prepare a preliminary estimate, quantity of work to be planned is measured in terms of unit of person, built up area, extent of work in kilometre such as a preliminary estimate of housing can be calculated based on type of house and number of house to be built. Similar preliminary estimate of highway can be calculated by knowing the type of road in terms of lane or pavement and length of the load. Preliminary Estimate Different methods of preliminary estimate can be grouped into the following categories – • Time referenced cost estimate • Cost capacity factor • Component ration/installation cost ratio • Parameter cost The preliminary estimate is obtained during early phases of project. As the project progresses, an estimate keeps on getting refined and lastly we get definitive estimate.
  • 12.
  • 13.
  • 14.
  • 15.
  • 16.