What is Custom Power?
Custom power is the employment of power electronic or static controllers in
distribution systems rated at 1 kV through 38 kV for the purpose of supplying a
level of reliability and/or power quality that is needed by electric power customers
who are sensitive to power variations. Custom power devices, or controllers,
include static switches, inverters, converters, injection transformers, master-
control modules, and/or energy-storage modules that have the ability to perform
current-interruption and voltage-regulation functions in a distribution system.
A custom power device is a type of power-conditioning device. Power-
conditioning technology, in general, includes all devices used to correct the
problems faced by end-user loads in response to voltage sags, voltage
interruptions, voltage flicker, harmonic distortion, and voltage-regulation
problems. While the term “power conditioning” has no voltage boundary, the term
“custom power” is bound by the scope of IEEE P1409 to include power
conditioners with input and/or output voltage ratings between 1 and 38 kV. This
scope limits the location of a custom power device to a medium-voltage primary
distribution system. However, the technologies used at medium voltage and low
voltage are frequently very similar.
CategoriesofPowerQuality Variations
The recent proliferation of electronic equipment and microprocessor-based
controls has caused electric utilities to redefine power quality in terms of the
quality of voltage supply rather than availability of power. In this regard, IEEE
Std. 1159-1995, Recommended Practice for Monitoring Electric Power Quality,
has created categories of power quality disturbances based upon duration,
magnitude, and spectral content. Table 2-1 shows the categories of power quality
disturbances with spectral content, typical duration, and typical magnitude.
Range of PowerQuality Variations in Distribution Circuits:
Table: 1 Categories ofPowerQuality Variation – IEEE 1159-1995
Categories Spectral
Content
Typical
Duration
Typical
Magnitudes
1.0 Transients
1.1 Impulsive
> 5 kHz < 200 µs1.1.1 Voltage
1.1.2 Current > 5 kHz < 200 µs
1.2 Oscillatory
< 500 kHz < 30 cycles1.2.1 Low Frequency
1.2.2 Medium Frequency 300–2 kHz < 3 cycles
1.2.3 High Frequency > 2 kHz < 0.5 cycle
2.0 Short-Duration Variations
2.1 Sags 0.5–30
cycles 0.1–1.0 pu2.1.1 Instantaneous
2.1.2 Momentary
30–120
cycles 0.1–1.0 pu
2.1.3 Temporary
2 sec–2
min 0.1–1.0 pu
2.2 Swells 0.5–30
cycles 0.1–1.8 pu2.1.1 Instantaneous
2.1.2 Momentary
30–120
cycles 0.1–1.8 pu
2.1.3 Temporary
2 sec–2
min 0.1–1.8 pu
3.0 Long-Duration Variations
> 2 min 0.1–1.2 pu3.1 Overvoltages
3.2 Undervoltages > 2 min 0.8–1.0 pu
4.0 Interruptions
< 2 sec
0
4.1 Momentary
4.2 Temporary
2 sec–2
min 0
4.3 Long-Term > 2 min 0
5.0 Waveform Distortion 0–100th
Harmonic
steady-
state
0–
20%
5.2 Voltage
5.3 Current
0–100th
Harmonic
steady-
state 0–100%
6.0 Waveform Notching 0–200 kHz
steady-
state
7.0 Flicker < 30 Hz intermittent 0.1–7%
8.0 Noise 0–200 kHz intermittent
Voltage Sags, Swells, andInterruptions:
Figure -1 shows a typical voltage sag, swell, and interruption.
Voltage sag is a short-duration decrease of the RMS voltage value, lasting from
0.5 cycles to 120 seconds. Sags are caused by faults on the power system or by
the starting of a relatively large motor or other large load. A voltage swell may
accompany voltage sag.
A voltage swell occurs when a single line-to-ground fault on the system results in
a temporary voltage rise on the unfaulted phases. Removing a large load or adding
a large capacitor bank can also cause voltage swells, but these events tend to cause
longer-duration changes in the voltage magnitude and will usually be classified as
long-duration variations.
A voltage interruption is the complete loss of voltage. A disconnection of
electricity causes an interruption, usually by the opening of a circuit breaker, line
recloser, or fuse. For example, if a tree comes into contact with an overhead
electricity line, a circuit breaker will clear the fault (short circuit), and the
customers who receive their power from the faulted line will experience an
interruption.
Fig-1 Typical Short Duration RMS Voltage Variations
System Faults:
Customers located on a faulted feeder will experience one or more interruptions,
depending on the type of fault and the reclosing practices of the utility. For a
temporary fault, one or two reclosing operations may be required before normal
power is restored. For a permanent fault, a number of reclosing operations
(usually no more than three) will occur before the breaker “locks out.” In this
case, the customers will experience a sustained interruption. Note that the
interruptions associated with successive operations of the breaker may be of
varying duration depending on relay characteristics. This gives the fault multiple
opportunities to clear. The multiple operations also give sectionalizers the
opportunity to operate. These devices typically open during the dead time after
counting a certain number of consecutive incidents of fault current within a short
time period. The number of fault-current incidents is typically two, although it
could be one if the sectionalizer is at the head of an underground cable, where all
faults are assumed to be permanent.
Reclosing practices vary from utility to utility and, perhaps, from circuit to circuit.
Feeders that are mostly underground will typically not have any reclosing
operations because most faults on underground feeders are permanent. Some
utilities are experimenting with faster reclosing times (0.3 to 0.5 seconds) for the
first reclosing operation in order to solve residential customer problems with
momentary interruptions. Residential electronic equipment such as clock radios,
VCRs, microwaves, and televisions can often ride through a 0.5-second
interruption but cannot ride through longer-duration interruptions. At medium-
voltage levels, it usually takes a minimum of 10 to 12 cycles of dead time to ensure
that the ionized gases from faults are dispersed.
Customers located on parallel feeders (that is, feeders that are supplied from the
same bus as the faulted feeder) will experience a voltage sag for as long as the
fault remains on the line. On medium-voltage systems, nearly all faults are cleared
within one second and can be cleared in as short as three cycles, depending on the
magnitude of the fault current and the relay settings. This means that customers on
parallel feeders will experience at least one voltage sag lasting from
Three cycles to about one second and, possibly, additional voltage sags if reclosing
operations are required. Voltage sags are much less severe than interruptions, and
the duration of interest is only the period of time that the fault is on the line.
If there are more than two feeders supplied from a common distribution bus, then
voltage sags will occur more frequently than actual interruptions because a fault
on any one feeder will cause voltage sags on all the other feeders.
Customers that are fed directly from the high-voltage system (that is,
transmission-fed or large industrial customers) usually have more than one line
supplying the facility. Therefore, interruptions should be very infrequent for
these customers. However, these customers will experience voltage sags during
fault conditions over a wide range of the transmission system. Voltage sags
caused by faults in a high-voltage system generally have more consistent
characteristics. The faults that originate in the medium- and low-voltage systems
tend to have more variation.
Because voltage sags can be much more frequent than interruptions, it is
important to consider the impacts and possible remedies for voltage sags
separately from the required solutions for complete interruptions.
Overvoltages andUndervoltages
Long-duration voltage variations that are outside the normal magnitude limits are
most often caused by unusual conditions on the power system. For example, out-
of-service lines or transformers sometimes cause undervoltages, as shown in
Figure 2. These types of RMS voltage variations are normally short-term, lasting
less than one or two days. Voltage variations lasting for a longer period of time
are normally correcting by adjusting the tap on a step-voltage regulating
transformer.
The root cause of most voltage-regulation problems is that there is too much
impedance in the power system to properly supply the load. The load draws the
current that gives a voltage drop across the system impedance. The resistive drop
is in phase with the current, and the reactive drop is 90 degrees out of phase.
Therefore, the load voltage drops low under heavy load. High voltages can come
about when the source voltage has been boosted to overcome the impedance drop
and the load suddenly diminishes.
Figure 2
Example RMS Measurement of Under voltage
Voltage Flicker
Voltage flicker is an amplitude modulation of voltage at frequencies less than 25
Hz, which the human eye can detect as a variation in the light intensity of a lamp.
Voltage flicker, as shown in Figure-3, is caused by an arcing condition on the
power system. The arcing condition may be a normal part of a production process,
such as a resistance welder or an electric arc furnace. Voltage step changes greater
than 3% usually caused by the starting of large motors may also cause light
flicker, but these events are better classified as sags. Flicker problems can be
corrected with the installation of filters, static VAR systems, or distribution static
compensators.
Figure -3 Example of Voltage Flicker Caused by an Arc Furnace
Harmonic Distortion:
The phenomenon known as harmonic distortion is the presence of frequencies in
the voltage that are integer multiples of the fundamental system frequency, which
is 60 Hz for the North
American system. Electronic loads and saturable devices generate harmonic
distortion. Computers, lighting, and electronic office equipment generate harmonic
distortion in commercial facilities. In industrial facilities, adjustable-speed motor
drives and other power electronic loads can generate significant amounts of
harmonics.
It is generally safe to assume that the sine wave voltage generated in central power
stations is very good. In most areas, the voltage found on transmission systems
typically has much less than 1% percent distortion. However, the distortion may
reach 5% to 8% as we move closer to the load. At some loads, the current
waveforms will barely resemble a sine wave. Figure -4, for example, shows a
waveform with over 17% harmonic distortion.
Figure -4
Example Voltage Waveform with 3rd
Harmonics and 17.42% Total
Harmonic Distortion
Electronic power converters can chop the current into a variety of waveforms.
Most distortion is periodic, or harmonic. That is, it repeats cycle after cycle,
changing very slowly, if at all. This has given rise to the widespread use of the
term “harmonics” to describe perturbations in the waveform. However, this term
must be carefully qualified to make sense.
Solutions to problems caused by harmonic distortion include the installation of
active or passive filters at the load or bus, or taking advantage of transformer
connections that enable cancellation of zero-sequence components.
Voltage Notching:
Voltage notching is caused by the commutation of power electronic rectifiers. It is
an effect that can cause concern over power quality in any installation where
converter equipment, such as variable-speed drives, are connected. The effect is
caused by the switching action of a drive’s input rectifier. When the DC-link
current in a drive is commutated from one rectifier thyristor to the next, there is an
instant during which a line-to-line short circuit occurs at the input terminals of the
rectifier. The result is a phase voltage with four notches per cycle caused by a six-
pulse electronic rectifier, as shown in Figure -5.
Figure -5 Example Waveform with Notching
TransientDisturbances:
Transient disturbances are caused by the injection of energy by switching or by
lightning. The disturbance may either be unidirectional or oscillatory. Lightning,
electrostatic discharge, load switching, or capacitor switching may cause a
unidirectional transient, as shown in Figure -6, which is characterized by its peak
value and rise time. On the other hand, an oscillatory transient, as shown in Figure
-7, is characterized by its frequency content. It can be caused by a switching
operation such as the energization of a capacitor bank, distribution line, or cable,
or the opening of an inductive current. Low- and medium-frequency oscillations,
with principle frequencies less than 2 kHz, are normally caused by power system
switching. The switching of a load close in proximity to the point of interest may
cause high-frequency oscillations with principle frequencies above 2 kHz.
Common solutions to problems caused by transients include the application of
surge arresters, passive and active filters, and isolation transformers.
Rangeof Power Quality Variationsin Distribution Circuits
Figure -6 Impulsive Transient Waveform
Figure 2-7 Oscillatory Transient Waveform Caused by a Capacitor
Energizing

More Related Content

What's hot

1-ф to 1-ф Cycloconverter ppt
1-ф to 1-ф Cycloconverter ppt1-ф to 1-ф Cycloconverter ppt
1-ф to 1-ф Cycloconverter pptUtsav Yagnik
 
FAULT Analysis presentation Armstrong
FAULT Analysis presentation ArmstrongFAULT Analysis presentation Armstrong
FAULT Analysis presentation ArmstrongArmstrong Okai Ababio
 
Power system protection topic 1
Power system protection topic 1Power system protection topic 1
Power system protection topic 1Siswoyo Edo
 
NGR & Zig-Zag Transformer.pptx
NGR & Zig-Zag Transformer.pptxNGR & Zig-Zag Transformer.pptx
NGR & Zig-Zag Transformer.pptxMUHAMMAD TAHIR
 
three phase fault analysis with auto reset for temporary fault and trip for p...
three phase fault analysis with auto reset for temporary fault and trip for p...three phase fault analysis with auto reset for temporary fault and trip for p...
three phase fault analysis with auto reset for temporary fault and trip for p...Vikram Rawani
 
Current Transformer and Potential Transformer
Current Transformer and Potential TransformerCurrent Transformer and Potential Transformer
Current Transformer and Potential TransformerRidwanul Hoque
 
Protection & switchgear
Protection & switchgear   Protection & switchgear
Protection & switchgear johny renoald
 
Digital underground cable fault locator (dufcl).
Digital underground cable fault locator (dufcl).Digital underground cable fault locator (dufcl).
Digital underground cable fault locator (dufcl).ITODO Victory
 
Motor Control Centre
Motor Control CentreMotor Control Centre
Motor Control Centresalehkhan
 
Design and implementation of cyclo converter for high frequency applications
Design and implementation of cyclo converter for high frequency applicationsDesign and implementation of cyclo converter for high frequency applications
Design and implementation of cyclo converter for high frequency applicationscuashok07
 
Automatic voltage regulator(avr)/voltage booster
Automatic voltage regulator(avr)/voltage boosterAutomatic voltage regulator(avr)/voltage booster
Automatic voltage regulator(avr)/voltage boosterJestem Zhou
 

What's hot (20)

1-ф to 1-ф Cycloconverter ppt
1-ф to 1-ф Cycloconverter ppt1-ф to 1-ф Cycloconverter ppt
1-ф to 1-ф Cycloconverter ppt
 
Differential Relay.pptx
Differential Relay.pptxDifferential Relay.pptx
Differential Relay.pptx
 
Current Transformer
Current TransformerCurrent Transformer
Current Transformer
 
Frequency counter
Frequency counterFrequency counter
Frequency counter
 
FAULT Analysis presentation Armstrong
FAULT Analysis presentation ArmstrongFAULT Analysis presentation Armstrong
FAULT Analysis presentation Armstrong
 
Power system protection topic 1
Power system protection topic 1Power system protection topic 1
Power system protection topic 1
 
NGR & Zig-Zag Transformer.pptx
NGR & Zig-Zag Transformer.pptxNGR & Zig-Zag Transformer.pptx
NGR & Zig-Zag Transformer.pptx
 
three phase fault analysis with auto reset for temporary fault and trip for p...
three phase fault analysis with auto reset for temporary fault and trip for p...three phase fault analysis with auto reset for temporary fault and trip for p...
three phase fault analysis with auto reset for temporary fault and trip for p...
 
Ct & pt
Ct & pt Ct & pt
Ct & pt
 
Current Transformer and Potential Transformer
Current Transformer and Potential TransformerCurrent Transformer and Potential Transformer
Current Transformer and Potential Transformer
 
Unsymmetrical fault
Unsymmetrical faultUnsymmetrical fault
Unsymmetrical fault
 
Protection & switchgear
Protection & switchgear   Protection & switchgear
Protection & switchgear
 
Lightning arresters
Lightning arrestersLightning arresters
Lightning arresters
 
Digital underground cable fault locator (dufcl).
Digital underground cable fault locator (dufcl).Digital underground cable fault locator (dufcl).
Digital underground cable fault locator (dufcl).
 
Motor Control Centre
Motor Control CentreMotor Control Centre
Motor Control Centre
 
Power flow analysis
Power flow analysisPower flow analysis
Power flow analysis
 
Short and long interruptions- UNIT-II-POWER QUALITY
Short and long interruptions- UNIT-II-POWER QUALITYShort and long interruptions- UNIT-II-POWER QUALITY
Short and long interruptions- UNIT-II-POWER QUALITY
 
Faults on Power System
Faults on Power SystemFaults on Power System
Faults on Power System
 
Design and implementation of cyclo converter for high frequency applications
Design and implementation of cyclo converter for high frequency applicationsDesign and implementation of cyclo converter for high frequency applications
Design and implementation of cyclo converter for high frequency applications
 
Automatic voltage regulator(avr)/voltage booster
Automatic voltage regulator(avr)/voltage boosterAutomatic voltage regulator(avr)/voltage booster
Automatic voltage regulator(avr)/voltage booster
 

Similar to Custom Power Devices Improve Power Quality

Transcat and Megger: Power Quality 101 Webinar
Transcat and Megger: Power Quality 101 WebinarTranscat and Megger: Power Quality 101 Webinar
Transcat and Megger: Power Quality 101 WebinarTranscat
 
Power-Quality report file for b.tech and dip
Power-Quality report file for b.tech and dipPower-Quality report file for b.tech and dip
Power-Quality report file for b.tech and dipOmPrakash781786
 
Chep 02 Power Frequency Disturbance
Chep 02 Power Frequency DisturbanceChep 02 Power Frequency Disturbance
Chep 02 Power Frequency DisturbancePiyush Tandel
 
Power quality &amp; demand side management
Power quality &amp; demand side managementPower quality &amp; demand side management
Power quality &amp; demand side managementMark Anthony Enoy
 
Protection system
Protection systemProtection system
Protection systemAIRMANGESH
 
Ppt on introduction to power quality
Ppt on introduction to power qualityPpt on introduction to power quality
Ppt on introduction to power qualityShivani Mishra
 
Dynamic Voltage Regulator
Dynamic Voltage RegulatorDynamic Voltage Regulator
Dynamic Voltage RegulatorRamesh Tholiya
 
Short circuit test in brief
Short circuit test in briefShort circuit test in brief
Short circuit test in briefMuthar Hussain
 
IRJET-Review on Power Quality Enhancement in weak Power Grids by Integration ...
IRJET-Review on Power Quality Enhancement in weak Power Grids by Integration ...IRJET-Review on Power Quality Enhancement in weak Power Grids by Integration ...
IRJET-Review on Power Quality Enhancement in weak Power Grids by Integration ...IRJET Journal
 
Inspection of voltage sags and voltage swells incident in power quality probl...
Inspection of voltage sags and voltage swells incident in power quality probl...Inspection of voltage sags and voltage swells incident in power quality probl...
Inspection of voltage sags and voltage swells incident in power quality probl...IRJET Journal
 
A Voltage Controlled Dstatcom for Power Quality Improvement
A Voltage Controlled Dstatcom for Power Quality ImprovementA Voltage Controlled Dstatcom for Power Quality Improvement
A Voltage Controlled Dstatcom for Power Quality Improvementiosrjce
 
report on the Power quality
report on the Power qualityreport on the Power quality
report on the Power qualityYuvraj Singh
 

Similar to Custom Power Devices Improve Power Quality (20)

Transcat and Megger: Power Quality 101 Webinar
Transcat and Megger: Power Quality 101 WebinarTranscat and Megger: Power Quality 101 Webinar
Transcat and Megger: Power Quality 101 Webinar
 
1
11
1
 
Power-Quality report file for b.tech and dip
Power-Quality report file for b.tech and dipPower-Quality report file for b.tech and dip
Power-Quality report file for b.tech and dip
 
Super
SuperSuper
Super
 
Chep 02 Power Frequency Disturbance
Chep 02 Power Frequency DisturbanceChep 02 Power Frequency Disturbance
Chep 02 Power Frequency Disturbance
 
Power quality &amp; demand side management
Power quality &amp; demand side managementPower quality &amp; demand side management
Power quality &amp; demand side management
 
Protection system
Protection systemProtection system
Protection system
 
Ppt on introduction to power quality
Ppt on introduction to power qualityPpt on introduction to power quality
Ppt on introduction to power quality
 
Transient Suppressors
Transient SuppressorsTransient Suppressors
Transient Suppressors
 
Gc3510651086
Gc3510651086Gc3510651086
Gc3510651086
 
Power Quality
Power QualityPower Quality
Power Quality
 
Dynamic Voltage Regulator
Dynamic Voltage RegulatorDynamic Voltage Regulator
Dynamic Voltage Regulator
 
Short circuit test in brief
Short circuit test in briefShort circuit test in brief
Short circuit test in brief
 
If3415111540
If3415111540If3415111540
If3415111540
 
IRJET-Review on Power Quality Enhancement in weak Power Grids by Integration ...
IRJET-Review on Power Quality Enhancement in weak Power Grids by Integration ...IRJET-Review on Power Quality Enhancement in weak Power Grids by Integration ...
IRJET-Review on Power Quality Enhancement in weak Power Grids by Integration ...
 
Inspection of voltage sags and voltage swells incident in power quality probl...
Inspection of voltage sags and voltage swells incident in power quality probl...Inspection of voltage sags and voltage swells incident in power quality probl...
Inspection of voltage sags and voltage swells incident in power quality probl...
 
A Voltage Controlled Dstatcom for Power Quality Improvement
A Voltage Controlled Dstatcom for Power Quality ImprovementA Voltage Controlled Dstatcom for Power Quality Improvement
A Voltage Controlled Dstatcom for Power Quality Improvement
 
E010612734
E010612734E010612734
E010612734
 
Surge supressor
Surge supressorSurge supressor
Surge supressor
 
report on the Power quality
report on the Power qualityreport on the Power quality
report on the Power quality
 

More from Raja Adapa

Ambassador and its journey in India.docx
Ambassador and its journey in India.docxAmbassador and its journey in India.docx
Ambassador and its journey in India.docxRaja Adapa
 
To create anaconda environment user defined path other than default path.docx
To create anaconda environment user defined path other than default path.docxTo create anaconda environment user defined path other than default path.docx
To create anaconda environment user defined path other than default path.docxRaja Adapa
 
To create anaconda environment user defined path other than default path.docx
To create anaconda environment user defined path other than default path.docxTo create anaconda environment user defined path other than default path.docx
To create anaconda environment user defined path other than default path.docxRaja Adapa
 
Methods of Capital Budgeting
Methods of Capital BudgetingMethods of Capital Budgeting
Methods of Capital BudgetingRaja Adapa
 
Outline the Methods of Performance Appraisal
Outline the Methods of Performance AppraisalOutline the Methods of Performance Appraisal
Outline the Methods of Performance AppraisalRaja Adapa
 
Methods of Wage Fixation 3
Methods of Wage Fixation 3Methods of Wage Fixation 3
Methods of Wage Fixation 3Raja Adapa
 
Methods of Wage Fixation - 2
Methods of Wage Fixation - 2Methods of Wage Fixation - 2
Methods of Wage Fixation - 2Raja Adapa
 
Methods of Wage Fixation
Methods of Wage FixationMethods of Wage Fixation
Methods of Wage FixationRaja Adapa
 
Loading Capability Limits of Transmission Lines
Loading Capability Limits of Transmission LinesLoading Capability Limits of Transmission Lines
Loading Capability Limits of Transmission LinesRaja Adapa
 
Some of the Basic Important Concepts in MBA
Some of the Basic Important Concepts in MBASome of the Basic Important Concepts in MBA
Some of the Basic Important Concepts in MBARaja Adapa
 
Important Formulas of BEP, Ratio Analysis, Capital Budgeting
Important Formulas of BEP, Ratio Analysis, Capital BudgetingImportant Formulas of BEP, Ratio Analysis, Capital Budgeting
Important Formulas of BEP, Ratio Analysis, Capital BudgetingRaja Adapa
 
Theoretical Framework for a Marketing Project
Theoretical Framework for a Marketing ProjectTheoretical Framework for a Marketing Project
Theoretical Framework for a Marketing ProjectRaja Adapa
 
Types of Market Structure
Types of Market StructureTypes of Market Structure
Types of Market StructureRaja Adapa
 
Types of Scales and Scaling Techniques
Types of Scales and Scaling TechniquesTypes of Scales and Scaling Techniques
Types of Scales and Scaling TechniquesRaja Adapa
 
Market Location Tactics
Market Location TacticsMarket Location Tactics
Market Location TacticsRaja Adapa
 
Porter's Five Force Model
Porter's Five Force ModelPorter's Five Force Model
Porter's Five Force ModelRaja Adapa
 
Outline of Types of Organizational Structures
Outline of Types of Organizational StructuresOutline of Types of Organizational Structures
Outline of Types of Organizational StructuresRaja Adapa
 
Model paper 6 (UGC NET Paper-1)
Model paper 6 (UGC NET Paper-1)Model paper 6 (UGC NET Paper-1)
Model paper 6 (UGC NET Paper-1)Raja Adapa
 
Model paper 5 (UGC NET Paper-1)
Model paper 5 (UGC NET Paper-1)Model paper 5 (UGC NET Paper-1)
Model paper 5 (UGC NET Paper-1)Raja Adapa
 

More from Raja Adapa (20)

Ambassador and its journey in India.docx
Ambassador and its journey in India.docxAmbassador and its journey in India.docx
Ambassador and its journey in India.docx
 
To create anaconda environment user defined path other than default path.docx
To create anaconda environment user defined path other than default path.docxTo create anaconda environment user defined path other than default path.docx
To create anaconda environment user defined path other than default path.docx
 
To create anaconda environment user defined path other than default path.docx
To create anaconda environment user defined path other than default path.docxTo create anaconda environment user defined path other than default path.docx
To create anaconda environment user defined path other than default path.docx
 
SCM PPT.pptx
SCM PPT.pptxSCM PPT.pptx
SCM PPT.pptx
 
Methods of Capital Budgeting
Methods of Capital BudgetingMethods of Capital Budgeting
Methods of Capital Budgeting
 
Outline the Methods of Performance Appraisal
Outline the Methods of Performance AppraisalOutline the Methods of Performance Appraisal
Outline the Methods of Performance Appraisal
 
Methods of Wage Fixation 3
Methods of Wage Fixation 3Methods of Wage Fixation 3
Methods of Wage Fixation 3
 
Methods of Wage Fixation - 2
Methods of Wage Fixation - 2Methods of Wage Fixation - 2
Methods of Wage Fixation - 2
 
Methods of Wage Fixation
Methods of Wage FixationMethods of Wage Fixation
Methods of Wage Fixation
 
Loading Capability Limits of Transmission Lines
Loading Capability Limits of Transmission LinesLoading Capability Limits of Transmission Lines
Loading Capability Limits of Transmission Lines
 
Some of the Basic Important Concepts in MBA
Some of the Basic Important Concepts in MBASome of the Basic Important Concepts in MBA
Some of the Basic Important Concepts in MBA
 
Important Formulas of BEP, Ratio Analysis, Capital Budgeting
Important Formulas of BEP, Ratio Analysis, Capital BudgetingImportant Formulas of BEP, Ratio Analysis, Capital Budgeting
Important Formulas of BEP, Ratio Analysis, Capital Budgeting
 
Theoretical Framework for a Marketing Project
Theoretical Framework for a Marketing ProjectTheoretical Framework for a Marketing Project
Theoretical Framework for a Marketing Project
 
Types of Market Structure
Types of Market StructureTypes of Market Structure
Types of Market Structure
 
Types of Scales and Scaling Techniques
Types of Scales and Scaling TechniquesTypes of Scales and Scaling Techniques
Types of Scales and Scaling Techniques
 
Market Location Tactics
Market Location TacticsMarket Location Tactics
Market Location Tactics
 
Porter's Five Force Model
Porter's Five Force ModelPorter's Five Force Model
Porter's Five Force Model
 
Outline of Types of Organizational Structures
Outline of Types of Organizational StructuresOutline of Types of Organizational Structures
Outline of Types of Organizational Structures
 
Model paper 6 (UGC NET Paper-1)
Model paper 6 (UGC NET Paper-1)Model paper 6 (UGC NET Paper-1)
Model paper 6 (UGC NET Paper-1)
 
Model paper 5 (UGC NET Paper-1)
Model paper 5 (UGC NET Paper-1)Model paper 5 (UGC NET Paper-1)
Model paper 5 (UGC NET Paper-1)
 

Recently uploaded

Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 

Recently uploaded (20)

Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 

Custom Power Devices Improve Power Quality

  • 1. What is Custom Power? Custom power is the employment of power electronic or static controllers in distribution systems rated at 1 kV through 38 kV for the purpose of supplying a level of reliability and/or power quality that is needed by electric power customers who are sensitive to power variations. Custom power devices, or controllers, include static switches, inverters, converters, injection transformers, master- control modules, and/or energy-storage modules that have the ability to perform current-interruption and voltage-regulation functions in a distribution system. A custom power device is a type of power-conditioning device. Power- conditioning technology, in general, includes all devices used to correct the problems faced by end-user loads in response to voltage sags, voltage interruptions, voltage flicker, harmonic distortion, and voltage-regulation problems. While the term “power conditioning” has no voltage boundary, the term “custom power” is bound by the scope of IEEE P1409 to include power conditioners with input and/or output voltage ratings between 1 and 38 kV. This scope limits the location of a custom power device to a medium-voltage primary distribution system. However, the technologies used at medium voltage and low voltage are frequently very similar. CategoriesofPowerQuality Variations The recent proliferation of electronic equipment and microprocessor-based controls has caused electric utilities to redefine power quality in terms of the quality of voltage supply rather than availability of power. In this regard, IEEE Std. 1159-1995, Recommended Practice for Monitoring Electric Power Quality, has created categories of power quality disturbances based upon duration, magnitude, and spectral content. Table 2-1 shows the categories of power quality disturbances with spectral content, typical duration, and typical magnitude.
  • 2. Range of PowerQuality Variations in Distribution Circuits: Table: 1 Categories ofPowerQuality Variation – IEEE 1159-1995 Categories Spectral Content Typical Duration Typical Magnitudes 1.0 Transients 1.1 Impulsive > 5 kHz < 200 µs1.1.1 Voltage 1.1.2 Current > 5 kHz < 200 µs 1.2 Oscillatory < 500 kHz < 30 cycles1.2.1 Low Frequency 1.2.2 Medium Frequency 300–2 kHz < 3 cycles 1.2.3 High Frequency > 2 kHz < 0.5 cycle 2.0 Short-Duration Variations 2.1 Sags 0.5–30 cycles 0.1–1.0 pu2.1.1 Instantaneous 2.1.2 Momentary 30–120 cycles 0.1–1.0 pu 2.1.3 Temporary 2 sec–2 min 0.1–1.0 pu 2.2 Swells 0.5–30 cycles 0.1–1.8 pu2.1.1 Instantaneous 2.1.2 Momentary 30–120 cycles 0.1–1.8 pu 2.1.3 Temporary 2 sec–2 min 0.1–1.8 pu
  • 3. 3.0 Long-Duration Variations > 2 min 0.1–1.2 pu3.1 Overvoltages 3.2 Undervoltages > 2 min 0.8–1.0 pu 4.0 Interruptions < 2 sec 0 4.1 Momentary 4.2 Temporary 2 sec–2 min 0 4.3 Long-Term > 2 min 0 5.0 Waveform Distortion 0–100th Harmonic steady- state 0– 20% 5.2 Voltage 5.3 Current 0–100th Harmonic steady- state 0–100% 6.0 Waveform Notching 0–200 kHz steady- state 7.0 Flicker < 30 Hz intermittent 0.1–7% 8.0 Noise 0–200 kHz intermittent Voltage Sags, Swells, andInterruptions: Figure -1 shows a typical voltage sag, swell, and interruption. Voltage sag is a short-duration decrease of the RMS voltage value, lasting from 0.5 cycles to 120 seconds. Sags are caused by faults on the power system or by the starting of a relatively large motor or other large load. A voltage swell may accompany voltage sag. A voltage swell occurs when a single line-to-ground fault on the system results in a temporary voltage rise on the unfaulted phases. Removing a large load or adding a large capacitor bank can also cause voltage swells, but these events tend to cause
  • 4. longer-duration changes in the voltage magnitude and will usually be classified as long-duration variations. A voltage interruption is the complete loss of voltage. A disconnection of electricity causes an interruption, usually by the opening of a circuit breaker, line recloser, or fuse. For example, if a tree comes into contact with an overhead electricity line, a circuit breaker will clear the fault (short circuit), and the customers who receive their power from the faulted line will experience an interruption. Fig-1 Typical Short Duration RMS Voltage Variations System Faults: Customers located on a faulted feeder will experience one or more interruptions, depending on the type of fault and the reclosing practices of the utility. For a temporary fault, one or two reclosing operations may be required before normal power is restored. For a permanent fault, a number of reclosing operations (usually no more than three) will occur before the breaker “locks out.” In this case, the customers will experience a sustained interruption. Note that the interruptions associated with successive operations of the breaker may be of varying duration depending on relay characteristics. This gives the fault multiple opportunities to clear. The multiple operations also give sectionalizers the opportunity to operate. These devices typically open during the dead time after counting a certain number of consecutive incidents of fault current within a short time period. The number of fault-current incidents is typically two, although it
  • 5. could be one if the sectionalizer is at the head of an underground cable, where all faults are assumed to be permanent. Reclosing practices vary from utility to utility and, perhaps, from circuit to circuit. Feeders that are mostly underground will typically not have any reclosing operations because most faults on underground feeders are permanent. Some utilities are experimenting with faster reclosing times (0.3 to 0.5 seconds) for the first reclosing operation in order to solve residential customer problems with momentary interruptions. Residential electronic equipment such as clock radios, VCRs, microwaves, and televisions can often ride through a 0.5-second interruption but cannot ride through longer-duration interruptions. At medium- voltage levels, it usually takes a minimum of 10 to 12 cycles of dead time to ensure that the ionized gases from faults are dispersed. Customers located on parallel feeders (that is, feeders that are supplied from the same bus as the faulted feeder) will experience a voltage sag for as long as the fault remains on the line. On medium-voltage systems, nearly all faults are cleared within one second and can be cleared in as short as three cycles, depending on the magnitude of the fault current and the relay settings. This means that customers on parallel feeders will experience at least one voltage sag lasting from Three cycles to about one second and, possibly, additional voltage sags if reclosing operations are required. Voltage sags are much less severe than interruptions, and the duration of interest is only the period of time that the fault is on the line. If there are more than two feeders supplied from a common distribution bus, then voltage sags will occur more frequently than actual interruptions because a fault on any one feeder will cause voltage sags on all the other feeders.
  • 6. Customers that are fed directly from the high-voltage system (that is, transmission-fed or large industrial customers) usually have more than one line supplying the facility. Therefore, interruptions should be very infrequent for these customers. However, these customers will experience voltage sags during fault conditions over a wide range of the transmission system. Voltage sags caused by faults in a high-voltage system generally have more consistent characteristics. The faults that originate in the medium- and low-voltage systems tend to have more variation. Because voltage sags can be much more frequent than interruptions, it is important to consider the impacts and possible remedies for voltage sags separately from the required solutions for complete interruptions. Overvoltages andUndervoltages Long-duration voltage variations that are outside the normal magnitude limits are most often caused by unusual conditions on the power system. For example, out- of-service lines or transformers sometimes cause undervoltages, as shown in Figure 2. These types of RMS voltage variations are normally short-term, lasting less than one or two days. Voltage variations lasting for a longer period of time are normally correcting by adjusting the tap on a step-voltage regulating transformer. The root cause of most voltage-regulation problems is that there is too much impedance in the power system to properly supply the load. The load draws the current that gives a voltage drop across the system impedance. The resistive drop is in phase with the current, and the reactive drop is 90 degrees out of phase. Therefore, the load voltage drops low under heavy load. High voltages can come
  • 7. about when the source voltage has been boosted to overcome the impedance drop and the load suddenly diminishes. Figure 2 Example RMS Measurement of Under voltage Voltage Flicker Voltage flicker is an amplitude modulation of voltage at frequencies less than 25 Hz, which the human eye can detect as a variation in the light intensity of a lamp. Voltage flicker, as shown in Figure-3, is caused by an arcing condition on the power system. The arcing condition may be a normal part of a production process, such as a resistance welder or an electric arc furnace. Voltage step changes greater than 3% usually caused by the starting of large motors may also cause light flicker, but these events are better classified as sags. Flicker problems can be corrected with the installation of filters, static VAR systems, or distribution static compensators. Figure -3 Example of Voltage Flicker Caused by an Arc Furnace
  • 8. Harmonic Distortion: The phenomenon known as harmonic distortion is the presence of frequencies in the voltage that are integer multiples of the fundamental system frequency, which is 60 Hz for the North American system. Electronic loads and saturable devices generate harmonic distortion. Computers, lighting, and electronic office equipment generate harmonic distortion in commercial facilities. In industrial facilities, adjustable-speed motor drives and other power electronic loads can generate significant amounts of harmonics. It is generally safe to assume that the sine wave voltage generated in central power stations is very good. In most areas, the voltage found on transmission systems typically has much less than 1% percent distortion. However, the distortion may reach 5% to 8% as we move closer to the load. At some loads, the current waveforms will barely resemble a sine wave. Figure -4, for example, shows a waveform with over 17% harmonic distortion. Figure -4 Example Voltage Waveform with 3rd Harmonics and 17.42% Total Harmonic Distortion
  • 9. Electronic power converters can chop the current into a variety of waveforms. Most distortion is periodic, or harmonic. That is, it repeats cycle after cycle, changing very slowly, if at all. This has given rise to the widespread use of the term “harmonics” to describe perturbations in the waveform. However, this term must be carefully qualified to make sense. Solutions to problems caused by harmonic distortion include the installation of active or passive filters at the load or bus, or taking advantage of transformer connections that enable cancellation of zero-sequence components. Voltage Notching: Voltage notching is caused by the commutation of power electronic rectifiers. It is an effect that can cause concern over power quality in any installation where converter equipment, such as variable-speed drives, are connected. The effect is caused by the switching action of a drive’s input rectifier. When the DC-link current in a drive is commutated from one rectifier thyristor to the next, there is an instant during which a line-to-line short circuit occurs at the input terminals of the rectifier. The result is a phase voltage with four notches per cycle caused by a six- pulse electronic rectifier, as shown in Figure -5. Figure -5 Example Waveform with Notching
  • 10. TransientDisturbances: Transient disturbances are caused by the injection of energy by switching or by lightning. The disturbance may either be unidirectional or oscillatory. Lightning, electrostatic discharge, load switching, or capacitor switching may cause a unidirectional transient, as shown in Figure -6, which is characterized by its peak value and rise time. On the other hand, an oscillatory transient, as shown in Figure -7, is characterized by its frequency content. It can be caused by a switching operation such as the energization of a capacitor bank, distribution line, or cable, or the opening of an inductive current. Low- and medium-frequency oscillations, with principle frequencies less than 2 kHz, are normally caused by power system switching. The switching of a load close in proximity to the point of interest may cause high-frequency oscillations with principle frequencies above 2 kHz. Common solutions to problems caused by transients include the application of surge arresters, passive and active filters, and isolation transformers. Rangeof Power Quality Variationsin Distribution Circuits Figure -6 Impulsive Transient Waveform Figure 2-7 Oscillatory Transient Waveform Caused by a Capacitor Energizing