PORT OF PORT HEDLAND -
TRAFFIC MANAGEMENT PLAN
(EASTERN HARBOUR
OPERATIONS) PROCEDURE
Page 1 of 15
TABLE OF CONTENTS
1. BACKGROUND ........................................................................................................... 2
2. OBJECTIVE ................................................................................................................. 2
3. THE TRAFFIC MANAGEMENT PLAN ......................................................................... 2
3.1 TRAFFIC FLOW ................................................................................................2
3.2 ROAD RULES ...................................................................................................3
3.3 SIGNAGE ..........................................................................................................4
3.4 PARKING ..........................................................................................................4
3.5 LIGHTING..........................................................................................................4
3.6 WALKWAYS/PEDESTRIANS ............................................................................5
3.7 COMMUNICATIONS .........................................................................................5
3.8 SPECIFIC CHANGES/VARIATIONS TO THE TMP...........................................5
3.8.1 Custody Areas/Cargo Operations.......................................................... 5
3.8.2 Oversize Haulage.................................................................................. 6
3.8.3 Cruise Vessels ...................................................................................... 6
3.8.4 Dangerous Goods Handling .................................................................. 6
3.8.5 Mine Sites.............................................................................................. 6
3.9 SECURING OF LOADS.....................................................................................7
3.10 CRANE OPERATIONS......................................................................................7
3.11 OTHER PROCEDURAL REFERENCES ...........................................................7
3.11.1 Seafarers Bus........................................................................................ 7
3.12 FITNESS FOR DUTY ........................................................................................7
3.13 COMPLIANCE/PENALTIES...............................................................................8
3.13.1 Fit for Purpose....................................................................................... 9
3.14 INCIDENT AND EMERGENCY REPORTING....................................................9
4. CHANGE MANAGEMENT ........................................................................................... 9
5. REFERENCES............................................................................................................. 9
6. PROCESS OWNER....................................................................................................10
7. APPENDIX 1: PROPOSED MINE SITE BOUNDARIES EASTSIDE – PH1 WHARF
ACCESS .....................................................................................................................11
8. APPENDIX 2: PROPOSED MINE SITE BOUNDARIES EASTSIDE – PH2 WHARF
ACCESS .....................................................................................................................12
9. APPENDIX 3: PROPOSED MINE SITE BOUNDARIES EASTSIDE – PH3 WHARF
ACCESS .....................................................................................................................13
10. APPENDIX 4 : GILBERT STREET PARKING PLAN...................................................14
11. APPENDIX 5: TRAFFIC MANAGEMENT PLAN..........................................................15
PORT OF PORT HEDLAND -
TRAFFIC MANAGEMENT PLAN
(EASTERN HARBOUR
OPERATIONS) PROCEDURE
Page 2 of 15
DOCUMENT AMENDMENT TABLE
Version Prepared By Date Amendment
2 Landside
Administration
Officer
17/09/2015 PPA re-formatting of document in line with
updated document control procedure.
1. BACKGROUND
Pilbara Ports Authority (PPA) operations are undertaken on a 24 hour per day/7 day per week
basis in locations throughout the Eastern and Western port areas. This Traffic Management
Plan (TMP) relates only to the Eastern port operations. Please refer to a separate TMP for
Utah Point/Western port operations.
2. OBJECTIVE
The PPA’s overall objective with respect to traffic management is to ensure the safe
movement of and interactions between vehicles, mobile plant and pedestrians in the work
place whilst maintaining compliance with security, environmental and business continuity
requirements.
3. THE TRAFFIC MANAGEMENT PLAN
3.1 Traffic Flow
• Traffic flow within the port area is shown within Appendix 5. At any given time the
following vehicles could be encountered operating on multiple work fronts within the
port area.
• Road trains (quads) delivering copper concentrate to the Birla and Newcrest sheds
or to the Sandfire lease area. (known as PO26);
• Self-propelled modular transport (SPMT’s) carrying oversize cargo modules;
• Road trains (B-doubles) carrying scrap metal, bulker bags or livestock;
• Roller trailers (known as mafi trailers) carrying cargo from the public berths to
cargo laydown and lease areas.
• Passenger coaches moving cruise ship tourists;
• Trailer floats moving general cargo; and
• Fork lifts and Reach stackers carrying containers and general cargo
PORT OF PORT HEDLAND -
TRAFFIC MANAGEMENT PLAN
(EASTERN HARBOUR
OPERATIONS) PROCEDURE
Page 3 of 15
• Gilbert Street is a high usage road which accommodates the staging of fuel trucks
prior to entry to the BP and Caltex gantries, salt trucks prior to entry into the Dampier
Salt (DSL) stockpile and cement trucks proceeding in and out of the West Kimberley
Cement lease area. It is also used to accommodate trucks/trailers staging for cargo
discharge operations at the public berths as well as project traffic entering the BHP
Billiton site through Gate 9.
• Where practicable, segregated transport routes have been provided for heavy vehicles,
road trains, buses (visiting cruise ships) and light vehicles.
• In order to facilitate the movement of wide loads, road maintenance or any other
special activity the PPA Landside Operations team may develop, implement and
disseminate temporary traffic management plans.
• Multiple work fronts will regularly operate at the same time. Traffic Management within
a specifically allocated area will be overseen by the Landside Operations team who will
co-ordinate meetings and develop plans to ensure safe operations.
• Gilbert Street is owned, operated and maintained by the PPA and as such any access
requires advance approval from the PPA Landside Operations team.
3.2 Road Rules
• The road rules as contained within the WA Road Traffic Code 2000 are to be observed
when driving within the Port. The only exception to the Code is that, within the Port,
pedestrians must give way to vehicular traffic (see Point 7 - References “h, l & m”).
• Speed limits to be observed within the Eastern Port are signposted and in some
instances can be temporarily signposted for specific cargo movements or road
maintenance.
• Specific speed limits are;
• Gilbert Street: 30 kph
• Wharf Areas: 10 kph
• All other areas: 25 kph
• Random speed auditing is conducted by the PPA Security team.
• Mobile phones and portable electronic devices are not to be used by any driver of a
motor vehicle or mobile plant during vehicle or plant operation.
• Drivers and passengers are to wear seat belts at all times when the vehicle or mobile
plant is moving.
• Penalties for non-compliance can include but are not limited to;
• Suspension of Port Access for a period of time,
• A requirement to re-sit the Port induction; and/or
PORT OF PORT HEDLAND -
TRAFFIC MANAGEMENT PLAN
(EASTERN HARBOUR
OPERATIONS) PROCEDURE
Page 4 of 15
• Infringements issued in accordance with Department of Mines and Petroleum
regulations.
• Permanent removal of Port Access,
3.3 Signage
• Signage and devices for the control and safe operation of all vehicles within the port
are in accordance with the legislative guidelines (Point 7 - Reference “a”.)
• When required for specific occasions (cargo haulage, oversize loads and road
maintenance), temporary road signage will be displayed.
3.4 Parking
• Permanent safe parking areas have been designed and developed within the Port.
Line marking and sign posting has been installed (Point 7 Reference “b”). Designated
parking areas are delineated on the port map (Appendix 5).
• Temporary safe parking areas have been designed and developed within the Port. As
operational requirements change these temporary parking areas will also change.
When change is required the Landside Operations Team will develop safe traffic
management plans and may require temporary signage and line marking to be
installed. Information will be disseminated to all Port users.
• A number of designated truck/trailer waiting and assembly areas have been allocated
to lease holders (BP, Caltex and DSL) along Gilbert Street. Additional areas have been
set aside for transport companies involved in delivering or loading cargo from the
public berths. Please refer to Appendix 4 for specific locations.
• The PPA Port Security Plan specifically prohibits vehicles from parking within 35
metres of ships at any of the public berths unless they form an integral part of the
vessel cargo and/or maintenance operations. Vehicles delivering personnel, tools or
equipment are to be removed immediately the task has been completed.
• A disabled parking bay is located alongside the wheelchair access ramp, immediately
in front of the main entrance to the PPA Administration building.
3.5 Lighting
• Where practicable, all roads, parking bays and pedestrian walkways are to be suitable
lit with permanent lighting to the Australian Standard.
• Whenever temporary traffic management plans, temporary parking bays and temporary
pedestrian walkways are put in place, suitable mobile lighting units are to be provided.
PORT OF PORT HEDLAND -
TRAFFIC MANAGEMENT PLAN
(EASTERN HARBOUR
OPERATIONS) PROCEDURE
Page 5 of 15
3.6 Walkways/Pedestrians
• Where practicable, segregated pedestrian walkways have been delineated using road
markings, signage and physical barriers.
• Within the Port precinct, vehicular traffic has right of way over pedestrian traffic.
• Pedestrians must comply with the PPA PPE standards applicable to their immediate
area.
• Visitors and visiting crew members are not permitted to walk through the port areas.
Visitors and visiting crew members are to utilize organized buses and taxis.
3.7 Communications
Radio communications are conducted using the following channels;
• Emergency (Shipping Control Tower) VHF Channel 16 (marine) or 12,
• Copper Sheds – UHF Channel 13, and
• Wharfs 1, 2 & 3 – UHF Channel 8
• Additional channels may be allocated for specific operations.
3.8 Specific Changes/Variations to the TMP
3.8.1 Custody Areas/Cargo Operations
• General cargo operations include the loading and discharge of break bulk/bulk
vessels. On all occasions, a pre-arrival briefing is convened one or two days
prior to the vessels arrival. During these briefings, specific TMPs for the
movement of the vessels cargo are discussed and agreed.
• Temporary TMPs will then be disseminated to those concerned. The TMP will
include maps to indicate vehicular movements from/to the wharves, from/to
laydown yards and from/to off site.
• Wharf custody can be held by various parties including the stevedores. Prior to
accessing any of the wharves (when operational), contact must be made with
the custody holder. Signs at each entry point on all wharves indicate who has
custody of the wharf and their contact number.
• Landside Restricted Zone (LRZ)
• The LRZ is indicated on the TMP map (see Appendix 5).
• A Maritime Security Identification Card to be held and must be worn/carried at
all times whilst within this area. Signage and gates indicate the LRZ
boundaries.
PORT OF PORT HEDLAND -
TRAFFIC MANAGEMENT PLAN
(EASTERN HARBOUR
OPERATIONS) PROCEDURE
Page 6 of 15
3.8.2 Oversize Haulage
• At various times, oversize cargoes will transit through the port. Specific
temporary TMPs will be developed and promulgated prior to the vessels arrival.
• Oversize cargoes will generally require escort vehicles, stop/go signage,
warning/preparatory emails to be broadcast, and swipe station removal. These
requirements will be discussed and agreed during pre-arrival briefings.
• Oversize haulage will require a permit to be issued. Landside Operations are to
be contacted for permit issues.
3.8.3 Cruise Vessels
• Cruise ships also call at Port Hedland during the summer months. Specific
temporary TMPs are developed for these visits and are promulgated prior to the
vessels arrival.
• No pedestrian access is permitted through the Port with all passenger
movements undertaken using coaches. PPA berths 1 & 2 are secured by
watchmen who will only permit authorised vehicles/pedestrians onto the
wharves.
3.8.4 Dangerous Goods Handling
• The PPA hold a “Special Berth Licence” for Berth No.2. A detailed Ammonium
Nitrate (A/N) handling procedure is noted at point 7 reference e. Specific
temporary traffic management plans have been developed for the movement of
A/N and are promulgated prior to each vessels arrival.
• Prior to the arrival of the Ammonium Nitrate vessel, berth No.2 is secured and
access is restricted to authorised vehicles and pedestrians.
3.8.5 Mine Sites
Within the bounds of the PPA there are three permanent mine sites and three areas
that are intermittent mine sites. Specifically;
• Newcrest Mining Leased area – Permanent
• Birla-Nifty Mining Leased area – Permanent
• Sandfire Mining Leased area – Permanent
• PPA Wharf 1, 2 & 3 – Intermittent when activated.
Please see appendices 1, 2, 3, & 4 for detailed maps of these mine sites.
PORT OF PORT HEDLAND -
TRAFFIC MANAGEMENT PLAN
(EASTERN HARBOUR
OPERATIONS) PROCEDURE
Page 7 of 15
3.9 Securing of Loads
All Cargo arriving/departing the Port or being moved internally is to be correctly restrained
in accordance with the guidelines contained within the National Transport Commission
(NTC) Load Restraint Guide (point 7 reference c). This includes but is not limited to;
• Trucks, trailers and light vehicles consigned to move imported or exported cargo to
or from the Port,
• Trucks, trailers, fork lifts, reach stackers, Front End Loaders (FELS) and light
vehicles used to move cargo internally.
• Garbage removal trucks and skip bin waste trucks are to comply with load restraint
guidelines.
3.10 Crane Operations
Cranes must be mobilised and operated in accordance with the Crane & Hoist Operating
Procedure PR- OHS003 (point 7 reference d).
3.11 Other Procedural References
3.11.1 Seafarers Bus
• The Port Hedland Seafarers Centre operates a schedule of daily port berth
visits to convey visiting seafarers to and from their vessels. The Seafarers bus
driver is to comply with all the requirements laid out in this procedure.
• Additionally, the Seafarers bus driver is to make contact with the organisation
which has custody of the particular berth (as per the displayed sign) by either
phone or by UHF radio prior to entering the wharf area.
• At various times, dependent upon the cargo being loaded or discharged, the
Seafarers bus is not to access the berths. These include;
 Ammonium Nitrate Discharge/Loading, bus is to wait at the southern
ramp watchman position at Berth 2,
 Fuel discharge, bus is to wait at the maintenance vehicle park behind
mobile conveyor number one (MC01) at Berth 1 and at the watchman’s
caravan at the Northern end of Berth 3, and
 Copper loading, bus is to wait at the maintenance vehicle park behind
mobile conveyor number one (MC01) at Berth 1.
3.12 Fitness for Duty
• The PPA Fitness for Duty; Fatigue Management Policy PO-HS004 is applicable to all
persons who access port controlled areas.
PORT OF PORT HEDLAND -
TRAFFIC MANAGEMENT PLAN
(EASTERN HARBOUR
OPERATIONS) PROCEDURE
Page 8 of 15
• The PPA carries out testing of all personnel who access port controlled areas for drugs
and alcohol.. Refer to Fitness for Duty Procedure; Alcohol & Drugs: PR-HS014 for
further detail (point 7 reference g).
• Any driver that is involved in a motor vehicle or mobile plant incident that occurs in a
port controlled area which results in injury to persons or damage to property, shall be
subject to drug and alcohol testing in accordance with the Fitness for Duty Procedure;
Alcohol & Drugs: PR-HS014.
• All transport companies must provide the PPA with a fatigue management plan prior to
any vehicles entering the Port for cargo operations.
3.13 Compliance/Penalties
• Only those people who hold a valid W.A. motor vehicle driver’s licence applicable to
the class of vehicle being driven are permitted to drive a motor vehicle within port
controlled areas.
• Vehicles owned by companies which are not registered for use outside of the Port and
are required to transit between mine site leases or to the workshop are to be driven by
a person who has been deemed competent by their manager (Verification of
Competency, VOC).
• Cargo handling vehicles which are not registered for use outside of the Port and are
required to transit between the wharves, laydown yards and staging areas are to be
driven by a person who has been deemed competent by their manager and holds a
VOC. Cargo handling vehicles that are not registered for use on public roads are
permitted to travel from the Port and along Gilbert Street in support of cargo
movements to the Gobi Laydown yard.
• Reach stackers with loads are not to transit from the Port to the Gobi laydown yard.
• Cargo handling vehicles include but are not limited to; ‘Mafi’ roller trailers, fork lifts,
reach stackers, elevated work platforms (EWP’s), front end loaders (FELs) and bull
dozers.
• Private motor vehicles that are registered to be driven on public roads are permitted to
enter the Port.
• Persons who are discovered to be driving a motor vehicle or plant (apart from
approved, unregistered vehicles) without the correct licence or VOC will be directed to
cease driving that vehicle. Similarly, any vehicle discovered within the Port that is not
registered for usage on public roads will be removed from the Port at the owner’s
expense.
PORT OF PORT HEDLAND -
TRAFFIC MANAGEMENT PLAN
(EASTERN HARBOUR
OPERATIONS) PROCEDURE
Page 9 of 15
3.13.1 Fit for Purpose
Transport companies are to ensure a number of requirements prior to allocating
vehicles to load cargo, in particular;
• Is the vehicle suitable for the manifested cargo to be transported
• Load capable,
• Mass capable,
• Fit for purpose
3.14 Incident and Emergency Reporting
• All incidents shall be reported in accordance with the PPA Incident Management
Procedure: PR-HS007 and using the PPA OSH System (currently Myosh).
• In the event of an emergency:
• Immediately notify the appropriate emergency services by calling 000 and
request their attendance at the PPA Security Gate.
• Contact the PPA Shipping Control Tower (SCT) by the most expedient means,
in order that they can liaise with the relevant parties to ensure a prompt
response.
• Emergency response vehicles have right of way over all other vehicles and
pedestrians when responding to an emergency.
• The SCT can be contacted on (08) 9173 9030, or VHF CH 12 or 16.
4. CHANGE MANAGEMENT
This procedure is to be reviewed at intervals of no more than two years.
5. REFERENCES
• AS 1742.2:2009 (Manual of Uniform Traffic control devices
• AS/NZS 2890.2004 (Parking Facilities – Off Street)
• NTC Load Restraint Guide
(www.ntc.gov.au/filemedia/Reports/LoadRestraintGuide2004FullCopy.pdf)
• Crane & Hoist Operating Procedures (PR-OHS003)
• Ammonium Nitrate Handling Procedures (PR OM-17)
• Truck Drivers Registration Form (LM LO003)
PORT OF PORT HEDLAND -
TRAFFIC MANAGEMENT PLAN
(EASTERN HARBOUR
OPERATIONS) PROCEDURE
Page 10 of 15
• Fitness for Duty Procedure, Alcohol & Drugs (PR HS014)
• WA Road Traffic Code 2000
• WA Main Roads “Road and Traffic Engineering Standards”
• DMP Resources Safety (Mobile equipment on mines)
• National Transport Commission – Load Restraint Guide
• Road Traffic (Vehicles)Act 2012, and
• Road Traffic (Administration)Act 2008.
6. PROCESS OWNER
Date approved: 17 September 2015 Review date: 17 September 2017
Version: 2 Approved by: General Manager Operations
PORT OF PORT HEDLAND -
TRAFFIC MANAGEMENT PLAN (EASTERN HARBOUR
OPERATIONS) PROCEDURE
Page 11 of 15
7. APPENDIX 1: PROPOSED MINE SITE BOUNDARIES EASTSIDE – PH1 WHARF ACCESS
PORT OF PORT HEDLAND -
TRAFFIC MANAGEMENT PLAN (EASTERN HARBOUR
OPERATIONS) PROCEDURE
Page 12 of 15
8. APPENDIX 2: PROPOSED MINE SITE BOUNDARIES EASTSIDE – PH2 WHARF ACCESS
PORT OF PORT HEDLAND -
TRAFFIC MANAGEMENT PLAN (EASTERN HARBOUR
OPERATIONS) PROCEDURE
Page 13 of 15
9. APPENDIX 3: PROPOSED MINE SITE BOUNDARIES EASTSIDE – PH3 WHARF ACCESS
PORT OF PORT HEDLAND -
TRAFFIC MANAGEMENT PLAN (EASTERN HARBOUR
OPERATIONS) PROCEDURE
Page 14 of 15
10. APPENDIX 4 : GILBERT STREET PARKING PLAN
PORT OF PORT HEDLAND -
TRAFFIC MANAGEMENT PLAN
(EASTERN HARBOUR
OPERATIONS) PROCEDURE
Page 15 of 15
11. APPENDIX 5: TRAFFIC MANAGEMENT PLAN

More Related Content

What's hot

NIOSH Heavy Equipment Blind Spots and Internal Traffic Control
NIOSH Heavy Equipment Blind Spots and Internal Traffic ControlNIOSH Heavy Equipment Blind Spots and Internal Traffic Control
NIOSH Heavy Equipment Blind Spots and Internal Traffic ControlJustin Tolpa, CSP
 
Lifting & Rigging Safety.pptx
Lifting & Rigging Safety.pptxLifting & Rigging Safety.pptx
Lifting & Rigging Safety.pptxDrValliammaishanmuga
 
Forklift training
Forklift trainingForklift training
Forklift trainingPRAN-RFL Group
 
Basic rigging training manual
Basic rigging training manualBasic rigging training manual
Basic rigging training manualSyam Tawakkal
 
Electrical safety in construction
Electrical safety in constructionElectrical safety in construction
Electrical safety in constructionsrinivas2036
 
OSHA Construction Safety for Vehicles, Mobile Equipment, and Machinery
OSHA Construction Safety for Vehicles, Mobile Equipment, and MachineryOSHA Construction Safety for Vehicles, Mobile Equipment, and Machinery
OSHA Construction Safety for Vehicles, Mobile Equipment, and MachineryThe Windsdor Consulting Group, Inc.
 
Forklift Operator Safety Training by Platteville Public Schools
Forklift Operator Safety Training by Platteville Public SchoolsForklift Operator Safety Training by Platteville Public Schools
Forklift Operator Safety Training by Platteville Public SchoolsAtlantic Training, LLC.
 
Lifting Presentation.
Lifting Presentation.Lifting Presentation.
Lifting Presentation.paul doherty
 
Electrical overhead crane safety
Electrical overhead crane safetyElectrical overhead crane safety
Electrical overhead crane safetyaliashraf mohammady
 
SAFE USE OF LIFTING EQUIPMENT LEEA
SAFE USE OF LIFTING EQUIPMENT LEEASAFE USE OF LIFTING EQUIPMENT LEEA
SAFE USE OF LIFTING EQUIPMENT LEEAANA ISABEL R.R.
 
Shipping industry-guidance-on-pilot-transfer-arrangements
Shipping industry-guidance-on-pilot-transfer-arrangementsShipping industry-guidance-on-pilot-transfer-arrangements
Shipping industry-guidance-on-pilot-transfer-arrangementsblacks0u1
 
Safety awareness training program
Safety awareness training programSafety awareness training program
Safety awareness training programNoel Tan
 
Nylon Web Slings Inspection Checklist
Nylon Web Slings Inspection ChecklistNylon Web Slings Inspection Checklist
Nylon Web Slings Inspection ChecklistHoist and Crane Depot
 
Overhead Crane Safety by Pennslyvania L&I
Overhead Crane Safety by Pennslyvania L&IOverhead Crane Safety by Pennslyvania L&I
Overhead Crane Safety by Pennslyvania L&IAtlantic Training, LLC.
 

What's hot (20)

NIOSH Heavy Equipment Blind Spots and Internal Traffic Control
NIOSH Heavy Equipment Blind Spots and Internal Traffic ControlNIOSH Heavy Equipment Blind Spots and Internal Traffic Control
NIOSH Heavy Equipment Blind Spots and Internal Traffic Control
 
Lift Plan
Lift PlanLift Plan
Lift Plan
 
Lifting & Rigging Safety.pptx
Lifting & Rigging Safety.pptxLifting & Rigging Safety.pptx
Lifting & Rigging Safety.pptx
 
SAFETY COMMITTEE.pdf
SAFETY COMMITTEE.pdfSAFETY COMMITTEE.pdf
SAFETY COMMITTEE.pdf
 
Forklift training
Forklift trainingForklift training
Forklift training
 
Basic rigging training manual
Basic rigging training manualBasic rigging training manual
Basic rigging training manual
 
Electrical safety in construction
Electrical safety in constructionElectrical safety in construction
Electrical safety in construction
 
FORKLIFT SAFETY
FORKLIFT SAFETYFORKLIFT SAFETY
FORKLIFT SAFETY
 
Mounted Boom Concrete Pump Safety
Mounted Boom Concrete Pump SafetyMounted Boom Concrete Pump Safety
Mounted Boom Concrete Pump Safety
 
OSHA Construction Safety for Vehicles, Mobile Equipment, and Machinery
OSHA Construction Safety for Vehicles, Mobile Equipment, and MachineryOSHA Construction Safety for Vehicles, Mobile Equipment, and Machinery
OSHA Construction Safety for Vehicles, Mobile Equipment, and Machinery
 
Forklift Operator Safety Training by Platteville Public Schools
Forklift Operator Safety Training by Platteville Public SchoolsForklift Operator Safety Training by Platteville Public Schools
Forklift Operator Safety Training by Platteville Public Schools
 
Defensive driving azmeel
Defensive driving  azmeelDefensive driving  azmeel
Defensive driving azmeel
 
Lifting Presentation.
Lifting Presentation.Lifting Presentation.
Lifting Presentation.
 
Electrical overhead crane safety
Electrical overhead crane safetyElectrical overhead crane safety
Electrical overhead crane safety
 
SAFE USE OF LIFTING EQUIPMENT LEEA
SAFE USE OF LIFTING EQUIPMENT LEEASAFE USE OF LIFTING EQUIPMENT LEEA
SAFE USE OF LIFTING EQUIPMENT LEEA
 
Shipping industry-guidance-on-pilot-transfer-arrangements
Shipping industry-guidance-on-pilot-transfer-arrangementsShipping industry-guidance-on-pilot-transfer-arrangements
Shipping industry-guidance-on-pilot-transfer-arrangements
 
Traffic safety
Traffic safetyTraffic safety
Traffic safety
 
Safety awareness training program
Safety awareness training programSafety awareness training program
Safety awareness training program
 
Nylon Web Slings Inspection Checklist
Nylon Web Slings Inspection ChecklistNylon Web Slings Inspection Checklist
Nylon Web Slings Inspection Checklist
 
Overhead Crane Safety by Pennslyvania L&I
Overhead Crane Safety by Pennslyvania L&IOverhead Crane Safety by Pennslyvania L&I
Overhead Crane Safety by Pennslyvania L&I
 

Similar to Port of-port-hedland-traffic-management-plan-(eastern-harbour-operations)

1. sunum port planning layout&design-cargo handling equipments-port opera...
1. sunum port planning layout&design-cargo handling equipments-port opera...1. sunum port planning layout&design-cargo handling equipments-port opera...
1. sunum port planning layout&design-cargo handling equipments-port opera...BARITEMEL
 
Environmental and Safety at sea port.pdf
Environmental and Safety at sea port.pdfEnvironmental and Safety at sea port.pdf
Environmental and Safety at sea port.pdfDivakarDhande2
 
C:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report Format
C:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report FormatC:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report Format
C:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report Formatkanadkapoor
 
C:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report Format
C:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report FormatC:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report Format
C:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report Formatkanadkapoor
 
C:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report Format
C:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report FormatC:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report Format
C:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report Formatkanadkapoor
 
Committee on CPECNew
Committee on CPECNewCommittee on CPECNew
Committee on CPECNewCasa Celestial
 
moloy roy sea and air logistics presentation
moloy roy   sea and air logistics presentationmoloy roy   sea and air logistics presentation
moloy roy sea and air logistics presentationAkash Maurya
 
Kicc presentation development of port of lamu manda bay 3
Kicc presentation development of port of lamu manda bay 3Kicc presentation development of port of lamu manda bay 3
Kicc presentation development of port of lamu manda bay 3Parti Djibouti
 
AITPM Conference Presentation - Laurie Piggott
AITPM Conference Presentation - Laurie PiggottAITPM Conference Presentation - Laurie Piggott
AITPM Conference Presentation - Laurie PiggottJumpingJaq
 
Changing the National Budget from Oil Business to Trade
Changing the National Budget from Oil Business to TradeChanging the National Budget from Oil Business to Trade
Changing the National Budget from Oil Business to TradeSetiono Winardi
 
MedaPorts16 | Admiral AbdelKader Darwish
MedaPorts16 | Admiral AbdelKader DarwishMedaPorts16 | Admiral AbdelKader Darwish
MedaPorts16 | Admiral AbdelKader DarwishASCAME
 
Bangkok river port case study
Bangkok river port case studyBangkok river port case study
Bangkok river port case studySem9AD
 
Southern Transport Service SOP
Southern Transport Service SOPSouthern Transport Service SOP
Southern Transport Service SOPRichard Gibbens
 
Port managment
Port managmentPort managment
Port managmentHafez Ahmad
 
Tata_steel[1].pptx
Tata_steel[1].pptxTata_steel[1].pptx
Tata_steel[1].pptxganeshjilo
 
Roll On-Roll Off service
Roll On-Roll Off serviceRoll On-Roll Off service
Roll On-Roll Off serviceGladwin Andrews
 
Traffic management plan_jan-16 (1)
Traffic management plan_jan-16 (1)Traffic management plan_jan-16 (1)
Traffic management plan_jan-16 (1)NECB
 

Similar to Port of-port-hedland-traffic-management-plan-(eastern-harbour-operations) (20)

1. sunum port planning layout&design-cargo handling equipments-port opera...
1. sunum port planning layout&design-cargo handling equipments-port opera...1. sunum port planning layout&design-cargo handling equipments-port opera...
1. sunum port planning layout&design-cargo handling equipments-port opera...
 
Environmental and Safety at sea port.pdf
Environmental and Safety at sea port.pdfEnvironmental and Safety at sea port.pdf
Environmental and Safety at sea port.pdf
 
C:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report Format
C:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report FormatC:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report Format
C:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report Format
 
C:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report Format
C:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report FormatC:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report Format
C:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report Format
 
C:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report Format
C:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report FormatC:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report Format
C:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report Format
 
Committee on CPECNew
Committee on CPECNewCommittee on CPECNew
Committee on CPECNew
 
moloy roy sea and air logistics presentation
moloy roy   sea and air logistics presentationmoloy roy   sea and air logistics presentation
moloy roy sea and air logistics presentation
 
Kicc presentation development of port of lamu manda bay 3
Kicc presentation development of port of lamu manda bay 3Kicc presentation development of port of lamu manda bay 3
Kicc presentation development of port of lamu manda bay 3
 
AITPM Conference Presentation - Laurie Piggott
AITPM Conference Presentation - Laurie PiggottAITPM Conference Presentation - Laurie Piggott
AITPM Conference Presentation - Laurie Piggott
 
Changing the National Budget from Oil Business to Trade
Changing the National Budget from Oil Business to TradeChanging the National Budget from Oil Business to Trade
Changing the National Budget from Oil Business to Trade
 
MedaPorts16 | Admiral AbdelKader Darwish
MedaPorts16 | Admiral AbdelKader DarwishMedaPorts16 | Admiral AbdelKader Darwish
MedaPorts16 | Admiral AbdelKader Darwish
 
Bangkok river port case study
Bangkok river port case studyBangkok river port case study
Bangkok river port case study
 
Southern Transport Service SOP
Southern Transport Service SOPSouthern Transport Service SOP
Southern Transport Service SOP
 
Stack and tap
Stack and tapStack and tap
Stack and tap
 
Port managment
Port managmentPort managment
Port managment
 
13682996.ppt
13682996.ppt13682996.ppt
13682996.ppt
 
Tata_steel[1].pptx
Tata_steel[1].pptxTata_steel[1].pptx
Tata_steel[1].pptx
 
Roll On-Roll Off service
Roll On-Roll Off serviceRoll On-Roll Off service
Roll On-Roll Off service
 
Traffic management plan_jan-16 (1)
Traffic management plan_jan-16 (1)Traffic management plan_jan-16 (1)
Traffic management plan_jan-16 (1)
 
African seaports expansion summit
African seaports expansion summitAfrican seaports expansion summit
African seaports expansion summit
 

More from NECB

Rts 3648 maintenance of welded track
Rts 3648  maintenance of welded trackRts 3648  maintenance of welded track
Rts 3648 maintenance of welded trackNECB
 
Etn 06-01- track stability hand book
Etn 06-01- track stability hand bookEtn 06-01- track stability hand book
Etn 06-01- track stability hand bookNECB
 
Eti 06-07- responding to buckles
Eti 06-07- responding to bucklesEti 06-07- responding to buckles
Eti 06-07- responding to bucklesNECB
 
Section 2 sleepers and fastenings
Section 2   sleepers and fasteningsSection 2   sleepers and fastenings
Section 2 sleepers and fasteningsNECB
 
Etg 02-01 - sleepers, bearers and fastenings
Etg 02-01 - sleepers, bearers and fasteningsEtg 02-01 - sleepers, bearers and fastenings
Etg 02-01 - sleepers, bearers and fasteningsNECB
 
Etf 02-01 - use of resilient fastenings
Etf 02-01 - use of resilient fasteningsEtf 02-01 - use of resilient fastenings
Etf 02-01 - use of resilient fasteningsNECB
 
Etd 02-05 - concrete sleepers - design
Etd 02-05 - concrete sleepers - designEtd 02-05 - concrete sleepers - design
Etd 02-05 - concrete sleepers - designNECB
 
Etd 02-04 - resilient rail fastenings for heavy duty concrete sleepers
Etd 02-04 - resilient rail fastenings for heavy duty concrete sleepersEtd 02-04 - resilient rail fastenings for heavy duty concrete sleepers
Etd 02-04 - resilient rail fastenings for heavy duty concrete sleepersNECB
 
Etd 02-02 - resilient rail fastenings for concrete sleepers
Etd 02-02 - resilient rail fastenings for  concrete sleepersEtd 02-02 - resilient rail fastenings for  concrete sleepers
Etd 02-02 - resilient rail fastenings for concrete sleepersNECB
 
Etc 02-04 - steel sleepers installation procedure
Etc 02-04 - steel sleepers installation procedureEtc 02-04 - steel sleepers installation procedure
Etc 02-04 - steel sleepers installation procedureNECB
 
Etc 02-03 - steel sleepers installation standard
Etc 02-03 - steel sleepers installation standardEtc 02-03 - steel sleepers installation standard
Etc 02-03 - steel sleepers installation standardNECB
 
Eta 02-03 - steel sleeper specification
Eta 02-03 - steel sleeper specificationEta 02-03 - steel sleeper specification
Eta 02-03 - steel sleeper specificationNECB
 
Eta 02-02 - reclaimed sleeper plates
Eta 02-02 - reclaimed sleeper platesEta 02-02 - reclaimed sleeper plates
Eta 02-02 - reclaimed sleeper platesNECB
 
Eta 02-01 - timber sleeper and turnout
Eta 02-01 - timber sleeper and turnoutEta 02-01 - timber sleeper and turnout
Eta 02-01 - timber sleeper and turnoutNECB
 
Decision support system for optimum soft clay improvement technique
Decision support system for optimum soft clay improvement techniqueDecision support system for optimum soft clay improvement technique
Decision support system for optimum soft clay improvement techniqueNECB
 
Interlocking concrete pavement for the port
Interlocking concrete pavement for the portInterlocking concrete pavement for the port
Interlocking concrete pavement for the portNECB
 
15.2.2 bored pile wall - method statement
15.2.2   bored pile wall - method statement15.2.2   bored pile wall - method statement
15.2.2 bored pile wall - method statementNECB
 

More from NECB (17)

Rts 3648 maintenance of welded track
Rts 3648  maintenance of welded trackRts 3648  maintenance of welded track
Rts 3648 maintenance of welded track
 
Etn 06-01- track stability hand book
Etn 06-01- track stability hand bookEtn 06-01- track stability hand book
Etn 06-01- track stability hand book
 
Eti 06-07- responding to buckles
Eti 06-07- responding to bucklesEti 06-07- responding to buckles
Eti 06-07- responding to buckles
 
Section 2 sleepers and fastenings
Section 2   sleepers and fasteningsSection 2   sleepers and fastenings
Section 2 sleepers and fastenings
 
Etg 02-01 - sleepers, bearers and fastenings
Etg 02-01 - sleepers, bearers and fasteningsEtg 02-01 - sleepers, bearers and fastenings
Etg 02-01 - sleepers, bearers and fastenings
 
Etf 02-01 - use of resilient fastenings
Etf 02-01 - use of resilient fasteningsEtf 02-01 - use of resilient fastenings
Etf 02-01 - use of resilient fastenings
 
Etd 02-05 - concrete sleepers - design
Etd 02-05 - concrete sleepers - designEtd 02-05 - concrete sleepers - design
Etd 02-05 - concrete sleepers - design
 
Etd 02-04 - resilient rail fastenings for heavy duty concrete sleepers
Etd 02-04 - resilient rail fastenings for heavy duty concrete sleepersEtd 02-04 - resilient rail fastenings for heavy duty concrete sleepers
Etd 02-04 - resilient rail fastenings for heavy duty concrete sleepers
 
Etd 02-02 - resilient rail fastenings for concrete sleepers
Etd 02-02 - resilient rail fastenings for  concrete sleepersEtd 02-02 - resilient rail fastenings for  concrete sleepers
Etd 02-02 - resilient rail fastenings for concrete sleepers
 
Etc 02-04 - steel sleepers installation procedure
Etc 02-04 - steel sleepers installation procedureEtc 02-04 - steel sleepers installation procedure
Etc 02-04 - steel sleepers installation procedure
 
Etc 02-03 - steel sleepers installation standard
Etc 02-03 - steel sleepers installation standardEtc 02-03 - steel sleepers installation standard
Etc 02-03 - steel sleepers installation standard
 
Eta 02-03 - steel sleeper specification
Eta 02-03 - steel sleeper specificationEta 02-03 - steel sleeper specification
Eta 02-03 - steel sleeper specification
 
Eta 02-02 - reclaimed sleeper plates
Eta 02-02 - reclaimed sleeper platesEta 02-02 - reclaimed sleeper plates
Eta 02-02 - reclaimed sleeper plates
 
Eta 02-01 - timber sleeper and turnout
Eta 02-01 - timber sleeper and turnoutEta 02-01 - timber sleeper and turnout
Eta 02-01 - timber sleeper and turnout
 
Decision support system for optimum soft clay improvement technique
Decision support system for optimum soft clay improvement techniqueDecision support system for optimum soft clay improvement technique
Decision support system for optimum soft clay improvement technique
 
Interlocking concrete pavement for the port
Interlocking concrete pavement for the portInterlocking concrete pavement for the port
Interlocking concrete pavement for the port
 
15.2.2 bored pile wall - method statement
15.2.2   bored pile wall - method statement15.2.2   bored pile wall - method statement
15.2.2 bored pile wall - method statement
 

Recently uploaded

ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEslot gacor bisa pakai pulsa
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...Call Girls in Nagpur High Profile
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoĂŁo Esperancinha
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 

Recently uploaded (20)

ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 

Port of-port-hedland-traffic-management-plan-(eastern-harbour-operations)

  • 1. PORT OF PORT HEDLAND - TRAFFIC MANAGEMENT PLAN (EASTERN HARBOUR OPERATIONS) PROCEDURE Page 1 of 15 TABLE OF CONTENTS 1. BACKGROUND ........................................................................................................... 2 2. OBJECTIVE ................................................................................................................. 2 3. THE TRAFFIC MANAGEMENT PLAN ......................................................................... 2 3.1 TRAFFIC FLOW ................................................................................................2 3.2 ROAD RULES ...................................................................................................3 3.3 SIGNAGE ..........................................................................................................4 3.4 PARKING ..........................................................................................................4 3.5 LIGHTING..........................................................................................................4 3.6 WALKWAYS/PEDESTRIANS ............................................................................5 3.7 COMMUNICATIONS .........................................................................................5 3.8 SPECIFIC CHANGES/VARIATIONS TO THE TMP...........................................5 3.8.1 Custody Areas/Cargo Operations.......................................................... 5 3.8.2 Oversize Haulage.................................................................................. 6 3.8.3 Cruise Vessels ...................................................................................... 6 3.8.4 Dangerous Goods Handling .................................................................. 6 3.8.5 Mine Sites.............................................................................................. 6 3.9 SECURING OF LOADS.....................................................................................7 3.10 CRANE OPERATIONS......................................................................................7 3.11 OTHER PROCEDURAL REFERENCES ...........................................................7 3.11.1 Seafarers Bus........................................................................................ 7 3.12 FITNESS FOR DUTY ........................................................................................7 3.13 COMPLIANCE/PENALTIES...............................................................................8 3.13.1 Fit for Purpose....................................................................................... 9 3.14 INCIDENT AND EMERGENCY REPORTING....................................................9 4. CHANGE MANAGEMENT ........................................................................................... 9 5. REFERENCES............................................................................................................. 9 6. PROCESS OWNER....................................................................................................10 7. APPENDIX 1: PROPOSED MINE SITE BOUNDARIES EASTSIDE – PH1 WHARF ACCESS .....................................................................................................................11 8. APPENDIX 2: PROPOSED MINE SITE BOUNDARIES EASTSIDE – PH2 WHARF ACCESS .....................................................................................................................12 9. APPENDIX 3: PROPOSED MINE SITE BOUNDARIES EASTSIDE – PH3 WHARF ACCESS .....................................................................................................................13 10. APPENDIX 4 : GILBERT STREET PARKING PLAN...................................................14 11. APPENDIX 5: TRAFFIC MANAGEMENT PLAN..........................................................15
  • 2. PORT OF PORT HEDLAND - TRAFFIC MANAGEMENT PLAN (EASTERN HARBOUR OPERATIONS) PROCEDURE Page 2 of 15 DOCUMENT AMENDMENT TABLE Version Prepared By Date Amendment 2 Landside Administration Officer 17/09/2015 PPA re-formatting of document in line with updated document control procedure. 1. BACKGROUND Pilbara Ports Authority (PPA) operations are undertaken on a 24 hour per day/7 day per week basis in locations throughout the Eastern and Western port areas. This Traffic Management Plan (TMP) relates only to the Eastern port operations. Please refer to a separate TMP for Utah Point/Western port operations. 2. OBJECTIVE The PPA’s overall objective with respect to traffic management is to ensure the safe movement of and interactions between vehicles, mobile plant and pedestrians in the work place whilst maintaining compliance with security, environmental and business continuity requirements. 3. THE TRAFFIC MANAGEMENT PLAN 3.1 Traffic Flow • Traffic flow within the port area is shown within Appendix 5. At any given time the following vehicles could be encountered operating on multiple work fronts within the port area. • Road trains (quads) delivering copper concentrate to the Birla and Newcrest sheds or to the Sandfire lease area. (known as PO26); • Self-propelled modular transport (SPMT’s) carrying oversize cargo modules; • Road trains (B-doubles) carrying scrap metal, bulker bags or livestock; • Roller trailers (known as mafi trailers) carrying cargo from the public berths to cargo laydown and lease areas. • Passenger coaches moving cruise ship tourists; • Trailer floats moving general cargo; and • Fork lifts and Reach stackers carrying containers and general cargo
  • 3. PORT OF PORT HEDLAND - TRAFFIC MANAGEMENT PLAN (EASTERN HARBOUR OPERATIONS) PROCEDURE Page 3 of 15 • Gilbert Street is a high usage road which accommodates the staging of fuel trucks prior to entry to the BP and Caltex gantries, salt trucks prior to entry into the Dampier Salt (DSL) stockpile and cement trucks proceeding in and out of the West Kimberley Cement lease area. It is also used to accommodate trucks/trailers staging for cargo discharge operations at the public berths as well as project traffic entering the BHP Billiton site through Gate 9. • Where practicable, segregated transport routes have been provided for heavy vehicles, road trains, buses (visiting cruise ships) and light vehicles. • In order to facilitate the movement of wide loads, road maintenance or any other special activity the PPA Landside Operations team may develop, implement and disseminate temporary traffic management plans. • Multiple work fronts will regularly operate at the same time. Traffic Management within a specifically allocated area will be overseen by the Landside Operations team who will co-ordinate meetings and develop plans to ensure safe operations. • Gilbert Street is owned, operated and maintained by the PPA and as such any access requires advance approval from the PPA Landside Operations team. 3.2 Road Rules • The road rules as contained within the WA Road Traffic Code 2000 are to be observed when driving within the Port. The only exception to the Code is that, within the Port, pedestrians must give way to vehicular traffic (see Point 7 - References “h, l & m”). • Speed limits to be observed within the Eastern Port are signposted and in some instances can be temporarily signposted for specific cargo movements or road maintenance. • Specific speed limits are; • Gilbert Street: 30 kph • Wharf Areas: 10 kph • All other areas: 25 kph • Random speed auditing is conducted by the PPA Security team. • Mobile phones and portable electronic devices are not to be used by any driver of a motor vehicle or mobile plant during vehicle or plant operation. • Drivers and passengers are to wear seat belts at all times when the vehicle or mobile plant is moving. • Penalties for non-compliance can include but are not limited to; • Suspension of Port Access for a period of time, • A requirement to re-sit the Port induction; and/or
  • 4. PORT OF PORT HEDLAND - TRAFFIC MANAGEMENT PLAN (EASTERN HARBOUR OPERATIONS) PROCEDURE Page 4 of 15 • Infringements issued in accordance with Department of Mines and Petroleum regulations. • Permanent removal of Port Access, 3.3 Signage • Signage and devices for the control and safe operation of all vehicles within the port are in accordance with the legislative guidelines (Point 7 - Reference “a”.) • When required for specific occasions (cargo haulage, oversize loads and road maintenance), temporary road signage will be displayed. 3.4 Parking • Permanent safe parking areas have been designed and developed within the Port. Line marking and sign posting has been installed (Point 7 Reference “b”). Designated parking areas are delineated on the port map (Appendix 5). • Temporary safe parking areas have been designed and developed within the Port. As operational requirements change these temporary parking areas will also change. When change is required the Landside Operations Team will develop safe traffic management plans and may require temporary signage and line marking to be installed. Information will be disseminated to all Port users. • A number of designated truck/trailer waiting and assembly areas have been allocated to lease holders (BP, Caltex and DSL) along Gilbert Street. Additional areas have been set aside for transport companies involved in delivering or loading cargo from the public berths. Please refer to Appendix 4 for specific locations. • The PPA Port Security Plan specifically prohibits vehicles from parking within 35 metres of ships at any of the public berths unless they form an integral part of the vessel cargo and/or maintenance operations. Vehicles delivering personnel, tools or equipment are to be removed immediately the task has been completed. • A disabled parking bay is located alongside the wheelchair access ramp, immediately in front of the main entrance to the PPA Administration building. 3.5 Lighting • Where practicable, all roads, parking bays and pedestrian walkways are to be suitable lit with permanent lighting to the Australian Standard. • Whenever temporary traffic management plans, temporary parking bays and temporary pedestrian walkways are put in place, suitable mobile lighting units are to be provided.
  • 5. PORT OF PORT HEDLAND - TRAFFIC MANAGEMENT PLAN (EASTERN HARBOUR OPERATIONS) PROCEDURE Page 5 of 15 3.6 Walkways/Pedestrians • Where practicable, segregated pedestrian walkways have been delineated using road markings, signage and physical barriers. • Within the Port precinct, vehicular traffic has right of way over pedestrian traffic. • Pedestrians must comply with the PPA PPE standards applicable to their immediate area. • Visitors and visiting crew members are not permitted to walk through the port areas. Visitors and visiting crew members are to utilize organized buses and taxis. 3.7 Communications Radio communications are conducted using the following channels; • Emergency (Shipping Control Tower) VHF Channel 16 (marine) or 12, • Copper Sheds – UHF Channel 13, and • Wharfs 1, 2 & 3 – UHF Channel 8 • Additional channels may be allocated for specific operations. 3.8 Specific Changes/Variations to the TMP 3.8.1 Custody Areas/Cargo Operations • General cargo operations include the loading and discharge of break bulk/bulk vessels. On all occasions, a pre-arrival briefing is convened one or two days prior to the vessels arrival. During these briefings, specific TMPs for the movement of the vessels cargo are discussed and agreed. • Temporary TMPs will then be disseminated to those concerned. The TMP will include maps to indicate vehicular movements from/to the wharves, from/to laydown yards and from/to off site. • Wharf custody can be held by various parties including the stevedores. Prior to accessing any of the wharves (when operational), contact must be made with the custody holder. Signs at each entry point on all wharves indicate who has custody of the wharf and their contact number. • Landside Restricted Zone (LRZ) • The LRZ is indicated on the TMP map (see Appendix 5). • A Maritime Security Identification Card to be held and must be worn/carried at all times whilst within this area. Signage and gates indicate the LRZ boundaries.
  • 6. PORT OF PORT HEDLAND - TRAFFIC MANAGEMENT PLAN (EASTERN HARBOUR OPERATIONS) PROCEDURE Page 6 of 15 3.8.2 Oversize Haulage • At various times, oversize cargoes will transit through the port. Specific temporary TMPs will be developed and promulgated prior to the vessels arrival. • Oversize cargoes will generally require escort vehicles, stop/go signage, warning/preparatory emails to be broadcast, and swipe station removal. These requirements will be discussed and agreed during pre-arrival briefings. • Oversize haulage will require a permit to be issued. Landside Operations are to be contacted for permit issues. 3.8.3 Cruise Vessels • Cruise ships also call at Port Hedland during the summer months. Specific temporary TMPs are developed for these visits and are promulgated prior to the vessels arrival. • No pedestrian access is permitted through the Port with all passenger movements undertaken using coaches. PPA berths 1 & 2 are secured by watchmen who will only permit authorised vehicles/pedestrians onto the wharves. 3.8.4 Dangerous Goods Handling • The PPA hold a “Special Berth Licence” for Berth No.2. A detailed Ammonium Nitrate (A/N) handling procedure is noted at point 7 reference e. Specific temporary traffic management plans have been developed for the movement of A/N and are promulgated prior to each vessels arrival. • Prior to the arrival of the Ammonium Nitrate vessel, berth No.2 is secured and access is restricted to authorised vehicles and pedestrians. 3.8.5 Mine Sites Within the bounds of the PPA there are three permanent mine sites and three areas that are intermittent mine sites. Specifically; • Newcrest Mining Leased area – Permanent • Birla-Nifty Mining Leased area – Permanent • Sandfire Mining Leased area – Permanent • PPA Wharf 1, 2 & 3 – Intermittent when activated. Please see appendices 1, 2, 3, & 4 for detailed maps of these mine sites.
  • 7. PORT OF PORT HEDLAND - TRAFFIC MANAGEMENT PLAN (EASTERN HARBOUR OPERATIONS) PROCEDURE Page 7 of 15 3.9 Securing of Loads All Cargo arriving/departing the Port or being moved internally is to be correctly restrained in accordance with the guidelines contained within the National Transport Commission (NTC) Load Restraint Guide (point 7 reference c). This includes but is not limited to; • Trucks, trailers and light vehicles consigned to move imported or exported cargo to or from the Port, • Trucks, trailers, fork lifts, reach stackers, Front End Loaders (FELS) and light vehicles used to move cargo internally. • Garbage removal trucks and skip bin waste trucks are to comply with load restraint guidelines. 3.10 Crane Operations Cranes must be mobilised and operated in accordance with the Crane & Hoist Operating Procedure PR- OHS003 (point 7 reference d). 3.11 Other Procedural References 3.11.1 Seafarers Bus • The Port Hedland Seafarers Centre operates a schedule of daily port berth visits to convey visiting seafarers to and from their vessels. The Seafarers bus driver is to comply with all the requirements laid out in this procedure. • Additionally, the Seafarers bus driver is to make contact with the organisation which has custody of the particular berth (as per the displayed sign) by either phone or by UHF radio prior to entering the wharf area. • At various times, dependent upon the cargo being loaded or discharged, the Seafarers bus is not to access the berths. These include;  Ammonium Nitrate Discharge/Loading, bus is to wait at the southern ramp watchman position at Berth 2,  Fuel discharge, bus is to wait at the maintenance vehicle park behind mobile conveyor number one (MC01) at Berth 1 and at the watchman’s caravan at the Northern end of Berth 3, and  Copper loading, bus is to wait at the maintenance vehicle park behind mobile conveyor number one (MC01) at Berth 1. 3.12 Fitness for Duty • The PPA Fitness for Duty; Fatigue Management Policy PO-HS004 is applicable to all persons who access port controlled areas.
  • 8. PORT OF PORT HEDLAND - TRAFFIC MANAGEMENT PLAN (EASTERN HARBOUR OPERATIONS) PROCEDURE Page 8 of 15 • The PPA carries out testing of all personnel who access port controlled areas for drugs and alcohol.. Refer to Fitness for Duty Procedure; Alcohol & Drugs: PR-HS014 for further detail (point 7 reference g). • Any driver that is involved in a motor vehicle or mobile plant incident that occurs in a port controlled area which results in injury to persons or damage to property, shall be subject to drug and alcohol testing in accordance with the Fitness for Duty Procedure; Alcohol & Drugs: PR-HS014. • All transport companies must provide the PPA with a fatigue management plan prior to any vehicles entering the Port for cargo operations. 3.13 Compliance/Penalties • Only those people who hold a valid W.A. motor vehicle driver’s licence applicable to the class of vehicle being driven are permitted to drive a motor vehicle within port controlled areas. • Vehicles owned by companies which are not registered for use outside of the Port and are required to transit between mine site leases or to the workshop are to be driven by a person who has been deemed competent by their manager (Verification of Competency, VOC). • Cargo handling vehicles which are not registered for use outside of the Port and are required to transit between the wharves, laydown yards and staging areas are to be driven by a person who has been deemed competent by their manager and holds a VOC. Cargo handling vehicles that are not registered for use on public roads are permitted to travel from the Port and along Gilbert Street in support of cargo movements to the Gobi Laydown yard. • Reach stackers with loads are not to transit from the Port to the Gobi laydown yard. • Cargo handling vehicles include but are not limited to; ‘Mafi’ roller trailers, fork lifts, reach stackers, elevated work platforms (EWP’s), front end loaders (FELs) and bull dozers. • Private motor vehicles that are registered to be driven on public roads are permitted to enter the Port. • Persons who are discovered to be driving a motor vehicle or plant (apart from approved, unregistered vehicles) without the correct licence or VOC will be directed to cease driving that vehicle. Similarly, any vehicle discovered within the Port that is not registered for usage on public roads will be removed from the Port at the owner’s expense.
  • 9. PORT OF PORT HEDLAND - TRAFFIC MANAGEMENT PLAN (EASTERN HARBOUR OPERATIONS) PROCEDURE Page 9 of 15 3.13.1 Fit for Purpose Transport companies are to ensure a number of requirements prior to allocating vehicles to load cargo, in particular; • Is the vehicle suitable for the manifested cargo to be transported • Load capable, • Mass capable, • Fit for purpose 3.14 Incident and Emergency Reporting • All incidents shall be reported in accordance with the PPA Incident Management Procedure: PR-HS007 and using the PPA OSH System (currently Myosh). • In the event of an emergency: • Immediately notify the appropriate emergency services by calling 000 and request their attendance at the PPA Security Gate. • Contact the PPA Shipping Control Tower (SCT) by the most expedient means, in order that they can liaise with the relevant parties to ensure a prompt response. • Emergency response vehicles have right of way over all other vehicles and pedestrians when responding to an emergency. • The SCT can be contacted on (08) 9173 9030, or VHF CH 12 or 16. 4. CHANGE MANAGEMENT This procedure is to be reviewed at intervals of no more than two years. 5. REFERENCES • AS 1742.2:2009 (Manual of Uniform Traffic control devices • AS/NZS 2890.2004 (Parking Facilities – Off Street) • NTC Load Restraint Guide (www.ntc.gov.au/filemedia/Reports/LoadRestraintGuide2004FullCopy.pdf) • Crane & Hoist Operating Procedures (PR-OHS003) • Ammonium Nitrate Handling Procedures (PR OM-17) • Truck Drivers Registration Form (LM LO003)
  • 10. PORT OF PORT HEDLAND - TRAFFIC MANAGEMENT PLAN (EASTERN HARBOUR OPERATIONS) PROCEDURE Page 10 of 15 • Fitness for Duty Procedure, Alcohol & Drugs (PR HS014) • WA Road Traffic Code 2000 • WA Main Roads “Road and Traffic Engineering Standards” • DMP Resources Safety (Mobile equipment on mines) • National Transport Commission – Load Restraint Guide • Road Traffic (Vehicles)Act 2012, and • Road Traffic (Administration)Act 2008. 6. PROCESS OWNER Date approved: 17 September 2015 Review date: 17 September 2017 Version: 2 Approved by: General Manager Operations
  • 11. PORT OF PORT HEDLAND - TRAFFIC MANAGEMENT PLAN (EASTERN HARBOUR OPERATIONS) PROCEDURE Page 11 of 15 7. APPENDIX 1: PROPOSED MINE SITE BOUNDARIES EASTSIDE – PH1 WHARF ACCESS
  • 12. PORT OF PORT HEDLAND - TRAFFIC MANAGEMENT PLAN (EASTERN HARBOUR OPERATIONS) PROCEDURE Page 12 of 15 8. APPENDIX 2: PROPOSED MINE SITE BOUNDARIES EASTSIDE – PH2 WHARF ACCESS
  • 13. PORT OF PORT HEDLAND - TRAFFIC MANAGEMENT PLAN (EASTERN HARBOUR OPERATIONS) PROCEDURE Page 13 of 15 9. APPENDIX 3: PROPOSED MINE SITE BOUNDARIES EASTSIDE – PH3 WHARF ACCESS
  • 14. PORT OF PORT HEDLAND - TRAFFIC MANAGEMENT PLAN (EASTERN HARBOUR OPERATIONS) PROCEDURE Page 14 of 15 10. APPENDIX 4 : GILBERT STREET PARKING PLAN
  • 15. PORT OF PORT HEDLAND - TRAFFIC MANAGEMENT PLAN (EASTERN HARBOUR OPERATIONS) PROCEDURE Page 15 of 15 11. APPENDIX 5: TRAFFIC MANAGEMENT PLAN