MS Projects - 10 MW Implementation Schedule
Gensol Engineering Limited
Gensol Engineering Limited
•
Mar. 23, 2014
•
10 likes
•
9,155 views
Download Now
243
ID Task Name Duration Start Finish
1 Solar PV Project-10 MW 120 days Tue 4/1/14 Tue 7/29/14
2 Site mobilization 2 days Tue...ID Task Name Duration Start Finish
69 Installation and Termination of SCADA system 5 days Sat 7/19/14 Wed 7/23/14
70 Exter...
1 of 3
A detailed project execution schedule including major and minor milestones for a 10
MW Plant. The EPC has been spread over 4 months. In case of larger or smaller power
plants, the activities would remain same while the timeline would change
Read more
Technology
Recommended
Project master schedule daughter station cng mini plant
Project master schedule daughter station cng mini plant
PT. ANSI MEGA INSTRUMENINDO, Gunawan Widihardjo
Solar mango corporate presentation
Solar mango corporate presentation
Anjali Khandelwal
progress of work till date
progress of work till date
Mohsen Almashharawi
CV SAIF UR REHMAN
CV SAIF UR REHMAN
Saif kharal
C v surveyor( Mumtaz )
C v surveyor( Mumtaz )
Mumtaz Ahmad
Sample Project Works
Sample Project Works
Rahim Virani
Management Control System- Delhi Metro_10042016
Management Control System- Delhi Metro_10042016
Anil Kumar Gupta
MS project Sample gantt chart
MS project Sample gantt chart
Dhawal Thakkar PMP
Work breakdown structure & project life cycle
Work breakdown structure & project life cycle
Sayandeep Dasgupta
Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
Gensol Engineering Limited
More Related Content
You Might Also Like
Related Books
Free with a 30 day trial from Scribd
See all
Related Audiobooks
Free with a 30 day trial from Scribd
See all
MS Projects - 10 MW Implementation Schedule
1. ID Task Name Duration Start Finish 1 Solar PV Project-10 MW 120 days Tue 4/1/14
Tue 7/29/14 2 Site mobilization 2 days Tue 4/1/14 Wed 4/2/14 3 Array Area and
General Works 110 days Sat 4/5/14 Wed 7/23/14 4 Civil Works 93 days Sat 4/5/14 Sun
7/6/14 5 Site Levelling and Grading 15 days Sat 4/5/14 Sat 4/19/14 6 Marking and
Construction of Boundary Wall 30 days Tue 4/15/14 Wed 5/14/14 7 Foundation and
Installation of Main Entry Gate 5 days Fri 4/18/14 Tue 4/22/14 8 Foundation and
Construction of Security Cabin 5 days Fri 4/18/14 Tue 4/22/14 9 Construction of
Internal Roads 5 days Tue 4/22/14 Sat 4/26/14 10 Foundation Marking for Structures
5 days Mon 4/21/14 Fri 4/25/14 11 Excavation for Structure Foundation 20 days Tue
4/22/14 Sun 5/11/14 12 Module Mounting Structure Casting 30 days Wed 4/23/14 Thu
5/22/14 13 String Monitoring Box Foundation 5 days Sat 5/3/14 Wed 5/7/14 14 Cable
trench 7 days Fri 5/23/14 Thu 5/29/14 15 Construction of Water Collection Tank 10
days Fri 5/23/14 Sun 6/1/14 16 Construction of Drainage system 30 days Tue 5/27/14
Wed 6/25/14 17 Borewell works 3 days Fri 5/23/14 Sun 5/25/14 18 Lightening Arrester
Foundation 5 days Sun 6/22/14 Thu 6/26/14 19 External Lighting Foundation 15 days
Sun 6/22/14 Sun 7/6/14 20 CCTV Camera Foundation 5 days Sun 6/22/14 Thu 6/26/14 21
Earth Pit Works 5 days Thu 6/12/14 Mon 6/16/14 22 Electrical Works 97 days Thu
4/17/14 Wed 7/23/14 23 Structure 57 days Thu 4/17/14 Fri 6/13/14 24 Purchase Order
for Structure 0 days Thu 4/17/14 Thu 4/17/14 25 Payment for Structure 0 days Thu
4/24/14 Thu 4/24/14 26 Receiving of Structure 25 days Fri 4/25/14 Mon 5/19/14 27
Installation of Structure 15 days Fri 5/30/14 Fri 6/13/14 28 PV Module 52 days Fri
4/25/14 Sun 6/15/14 29 Purchase Order for PV Module 0 days Fri 4/25/14 Fri 4/25/14
30 Payment for PV Module 7 days Fri 4/25/14 Fri 5/2/14 31 Receiving of PV Module 30
days Fri 5/2/14 Sun 6/1/14 32 Installation of PV Module 15 days Sun 6/1/14 Sun
6/15/14 33 String Monitoring Box 41 days Mon 4/21/14 Sat 5/31/14 34 Purchase Order
for SMB 0 days Mon 4/21/14 Mon 4/21/14 35 Payment for SMB 7 days Mon 4/21/14 Mon
4/28/14 36 Receiving of String Monitoring Box 30 days Mon 4/28/14 Wed 5/28/14 37
Installation of String Monitoring Box 4 days Wed 5/28/14 Sat 5/31/14 38 Inverter 69
days Sat 4/19/14 Thu 6/26/14 39 Purchase Order for Inverter 0 days Sat 4/19/14 Sat
4/19/14 40 Payment for Inverter 7 days Sat 4/19/14 Sat 4/26/14 41 Receiving of
Inverter 60 days Sat 4/26/14 Wed 6/25/14 42 Installation of Inverter 2 days Wed
6/25/14 Thu 6/26/14 43 DC Cable 64 days Tue 4/29/14 Tue 7/1/14 44 Purchase Order
for DC Cable 0 days Tue 4/29/14 Tue 4/29/14 45 Payment for DC Cable 7 days Tue
4/29/14 Tue 5/6/14 46 Receiving of DC Cable 45 days Tue 5/6/14 Fri 6/20/14 47
Laying of DC Cable 7 days Fri 6/20/14 Fri 6/27/14 48 Termination of DC Cable 5 days
Fri 6/27/14 Tue 7/1/14 49 OFC 60 days Thu 5/1/14 Sun 6/29/14 50 Purchase Order for
OFC 0 days Thu 5/1/14 Thu 5/1/14 51 Payment for OFC 7 days Thu 5/1/14 Thu 5/8/14 52
Receiving of OFC 45 days Thu 5/8/14 Sun 6/22/14 53 Laying of OFC 5 days Sun 6/22/14
Fri 6/27/14 54 Termination of OFC 3 days Fri 6/27/14 Sun 6/29/14 55 CCTV SYSTEM 40
days Sat 5/31/14 Wed 7/9/14 56 Purchase Order for CCTV 0 days Sat 5/31/14 Sat
5/31/14 57 Payment for CCTV 7 days Sat 5/31/14 Sat 6/7/14 58 Receiving of CCTV 30
days Sat 6/7/14 Mon 7/7/14 59 Installation of CCTV 3 days Mon 7/7/14 Wed 7/9/14 60
Lightening Arrestor 41 days Sat 5/31/14 Thu 7/10/14 61 Purchase order for
Lightening Arrestor 0 days Sat 5/31/14 Sat 5/31/14 62 Payment for Lightening
Arrestor 7 days Sat 5/31/14 Sat 6/7/14 63 Receiving of Lightening Arrestor 30 days
Sat 6/7/14 Mon 7/7/14 64 Installation of Lightening Arrestor 4 days Mon 7/7/14 Thu
7/10/14 65 SCADA System 72 days Tue 5/13/14 Wed 7/23/14 66 Purchase Order for SCADA
System 0 days Tue 5/13/14 Tue 5/13/14 67 Payment for SCADA System 7 days Tue
5/13/14 Tue 5/20/14 68 Receiving of SCADA 60 days Tue 5/20/14 Sat 7/19/14 /1 4/2
4/5 4/19 4/15 5/14 4/18 4/22 4/18 4/22 4/22 4/26 4/21 4/25 4/22 5/11 4/23 5/22 5/3
5/7 5/23 5/29 5/23 6/1 5/27 6/25 5/23 5/25 6/22 6/26 6/22 7/6 6/22 6/26 6/12 6/16
4/17 4/24 4/25 5/19 5/30 6/13 4/25 4/25 5/2 5/2 6/1 6/1 6/15 4/21 4/21 4/28 4/28
5/28 5/28 5/31 4/19 4/19 4/26 4/26 6/25 6/25 6/26 4/29 4/29 5/6 5/6 6/20 6/20 6/27
6/27 7/1 5/1 5/1 5/8 5/8 6/22 6/22 6/27 6/27 6/29 5/31 5/31 6/7 6/7 7/7 7/7 7/9
5/31 5/31 6/7 6/7 7/7 7/7 7/10 5/13 5/13 5/20 5/20 7/19 30 2 5 8 11 14 17 20 23 26
29 2 5 8 11 14 17 20 23 26 29 1 4 7 10 13 16 19 22 25 28 1 4 7 10 13 16 19 22 25 28
April 2014 May 2014 June 2014 July 2014 Task Progress Milestone Summary Rolled Up
Task Rolled Up Milestone Rolled Up Progress Split External Tasks Project Summary
Group By Summary Deadline Page 1 Project: Template PIS Date: Wed 3/19/14
2. ID Task Name Duration Start Finish 69 Installation and Termination of SCADA
system 5 days Sat 7/19/14 Wed 7/23/14 70 External Lighting 57 days Wed 5/21/14 Wed
7/16/14 71 Purchase Order for Poles and Lights 0 days Wed 5/21/14 Wed 5/21/14 72
Payment for Lighting System 7 days Wed 5/21/14 Wed 5/28/14 73 Receiving of Lighting
System 40 days Wed 5/28/14 Mon 7/7/14 74 Installation and Termination of Lighting
System 10 days Mon 7/7/14 Wed 7/16/14 75 Array Earthing 57 days Sun 5/18/14 Sun
7/13/14 76 Purchase Order for Earthing Equipments 0 days Sun 5/18/14 Sun 5/18/14 77
Payment for Earthing Equipments 7 days Sun 5/18/14 Sun 5/25/14 78 Receiving of
Earthing Equipments 40 days Sun 5/25/14 Fri 7/4/14 79 Array Earthing Installation
and Connection 10 days Fri 7/4/14 Sun 7/13/14 80 Main Control Room & Substation 86
days Thu 4/24/14 Fri 7/18/14 81 Civil Work in MCR & Substation 60 days Sat 4/26/14
Tue 6/24/14 82 Marking 2 days Sat 4/26/14 Sun 4/27/14 83 Excavation 3 days Mon
4/28/14 Wed 4/30/14 84 RCC Foundation 20 days Thu 5/1/14 Tue 5/20/14 85 Brick work
15 days Wed 5/21/14 Wed 6/4/14 86 Internal Plaster 7 days Thu 6/5/14 Wed 6/11/14 87
Flooring & Trenching 7 days Thu 6/12/14 Wed 6/18/14 88 Windows & Doors Fixing 7
days Thu 6/12/14 Wed 6/18/14 89 Painting work 7 days Thu 6/12/14 Wed 6/18/14 90
Finishing work of Substation Building 10 days Sun 6/15/14 Tue 6/24/14 91 Power and
Aux. Transformer Foundation 15 days Tue 5/6/14 Tue 5/20/14 92 Switch Yard Earthing
Mat Construction 7 days Fri 5/16/14 Thu 5/22/14 93 Switch Yard Equipment Foundation
15 days Fri 5/23/14 Fri 6/6/14 94 Foundation for Transmission Towers 30 days Fri
5/23/14 Sat 6/21/14 95 Electrical Works 86 days Thu 4/24/14 Fri 7/18/14 96
Transformers(Power and Aux.) 72 days Thu 4/24/14 Fri 7/4/14 97 Purchase Order for
Transformer 0 days Thu 4/24/14 Thu 4/24/14 98 Payment for Transformer 7 days Thu
4/24/14 Thu 5/1/14 99 Receiving of Transformer 60 days Thu 5/1/14 Mon 6/30/14 100
Installation of Transformer 5 days Mon 6/30/14 Fri 7/4/14 101 33 kV bay station 73
days Tue 4/29/14 Thu 7/10/14 102 Purchase Order for
VCB,Conductors,Isolator,CT,PT,Structure2 days Tue 4/29/14 Thu 5/1/14 103 Payment
for VCB,Conductors,Isolator,CT,PT,Structure7 days Thu 5/1/14 Thu 5/8/14 104
Receiving of Equipments 50 days Thu 5/8/14 Fri 6/27/14 105 Installation of
Equipments 7 days Fri 6/27/14 Thu 7/3/14 106 Termination of Conductors 7 days Fri
7/4/14 Thu 7/10/14 107 HT Panels 61 days Fri 5/9/14 Tue 7/8/14 108 Purchase Order
for HT Panels 0 days Fri 5/9/14 Fri 5/9/14 109 Payment for HT Panels 7 days Fri
5/9/14 Fri 5/16/14 110 Receiving of HT Panels 50 days Fri 5/16/14 Sat 7/5/14 111
Installation of HT Panels 4 days Sat 7/5/14 Tue 7/8/14 112 LT Panels 61 days Fri
5/9/14 Tue 7/8/14 113 Purchase Order for LT Panels 0 days Fri 5/9/14 Fri 5/9/14 114
Payment for LT Panels 7 days Fri 5/9/14 Fri 5/16/14 115 Receiving of LT Panels 50
days Fri 5/16/14 Sat 7/5/14 116 Installation of LT Panels 4 days Sat 7/5/14 Tue
7/8/14 117 LT Cable 72 days Sat 5/3/14 Sun 7/13/14 118 Purchase Order for LT Cable
0 days Sat 5/3/14 Sat 5/3/14 119 Payment for LT Cable 7 days Sat 5/3/14 Sat 5/10/14
120 Receiving of LT Cable 50 days Sat 5/10/14 Sun 6/29/14 121 Laying of LT Cable 5
days Sun 6/29/14 Thu 7/3/14 122 Terination of LT Cable 5 days Wed 7/9/14 Sun
7/13/14 123 HT Cable & Conductors 70 days Mon 5/5/14 Sun 7/13/14 124 Purchase Order
for HT Cable 0 days Mon 5/5/14 Mon 5/5/14 125 Payment for HT Cable 7 days Mon
5/5/14 Mon 5/12/14 126 Receiving of HT Cables 50 days Mon 5/12/14 Tue 7/1/14 127
Laying of HT Cable 5 days Tue 7/1/14 Sat 7/5/14 128 Termination of HT Cable 5 days
Wed 7/9/14 Sun 7/13/14 129 Control Cable 63 days Sat 5/10/14 Fri 7/11/14 130
Purchase Order for Control Cable 0 days Sat 5/10/14 Sat 5/10/14 131 Payment for
Control Cable 7 days Sat 5/10/14 Sat 5/17/14 132 Receiving of Control Cables 45
days Sat 5/17/14 Tue 7/1/14 133 Laying of Control Cable 4 days Tue 7/1/14 Fri
7/4/14 134 Termination of Control Cable 3 days Wed 7/9/14 Fri 7/11/14 135
Lightening Protection System 32 days Wed 5/21/14 Sat 6/21/14 136 Purchase Order for
LA 0 days Wed 5/21/14 Wed 5/21/14 7/19 7/23 5/21 5/21 5/28 5/28 7/7 7/7 7/16 5/18
5/18 5/25 5/25 7/4 7/4 7/13 4/26 4/27 4/28 4/30 5/1 5/20 5/21 6/4 6/5 6/11 6/12
6/18 6/12 6/18 6/12 6/18 6/15 6/24 5/6 5/20 5/16 5/22 5/23 6/6 5/23 6/21 4/24 4/24
5/1 5/1 6/30 6/30 7/4 4/29 5/1 5/1 5/8 5/8 6/27 6/27 7/3 7/4 7/10 5/9 5/9 5/16 5/16
7/5 7/5 7/8 5/9 5/9 5/16 5/16 7/5 7/5 7/8 5/3 5/3 5/10 5/10 6/29 6/29 7/3 7/9 7/13
5/5 5/5 5/12 5/12 7/1 7/1 7/5 7/9 7/13 5/10 5/10 5/17 5/17 7/1 7/1 7/4 7/9 7/11
5/21 30 2 5 8 11 14 17 20 23 26 29 2 5 8 11 14 17 20 23 26 29 1 4 7 10 13 16 19 22
25 28 1 4 7 10 13 16 19 22 25 28 April 2014 May 2014 June 2014 July 2014 Task
Progress Milestone Summary Rolled Up Task Rolled Up Milestone Rolled Up Progress
Split External Tasks Project Summary Group By Summary Deadline Page 2 Project:
Template PIS Date: Wed 3/19/14
3. ID Task Name Duration Start Finish 137 Payment for LA 7 days Wed 5/21/14 Wed
5/28/14 138 Receiving of LA 20 days Wed 5/28/14 Tue 6/17/14 139 Installation of LA
5 days Tue 6/17/14 Sat 6/21/14 140 Battery System 57 days Fri 5/9/14 Fri 7/4/14 141
Purchase Order for Battery Bank 0 days Fri 5/9/14 Fri 5/9/14 142 Payment for
Battery Bank 7 days Fri 5/9/14 Fri 5/16/14 143 Receiving of Battery Bank 45 days
Fri 5/16/14 Mon 6/30/14 144 Installation of Battery Bank 5 days Mon 6/30/14 Fri
7/4/14 145 Switch Yard Earthing 30 days Sat 4/26/14 Sun 5/25/14 146 Purchase Order
for Earthing Equipments 0 days Sat 4/26/14 Sat 4/26/14 147 Payment for Earthing
Equipments 7 days Sat 4/26/14 Sat 5/3/14 148 Receiving of Earthing Equipments 20
days Sat 5/3/14 Fri 5/23/14 149 Installation and Connection 3 days Fri 5/23/14 Sun
5/25/14 150 Internal Lightning System 42 days Mon 5/26/14 Sun 7/6/14 151 Purchase
Order for Poles and Lights 0 days Mon 5/26/14 Mon 5/26/14 152 Payment for Lighting
System 7 days Mon 5/26/14 Mon 6/2/14 153 Receiving of Lighting System 30 days Mon
6/2/14 Wed 7/2/14 154 Installation and Termination of Lighting System 5 days Wed
7/2/14 Sun 7/6/14 155 Misc. Items(SDB,Feeders,ACDB,Industrial Socket) 67 days Tue
4/29/14 Fri 7/4/14 156 Purchase Order for Misc.Items 0 days Tue 4/29/14 Tue 4/29/14
157 Payment for Misc.Items 7 days Tue 4/29/14 Tue 5/6/14 158 Receiving of
Misc.Items 50 days Tue 5/6/14 Wed 6/25/14 159 Installation and Termination of
Misc.Items 10 days Wed 6/25/14 Fri 7/4/14 160 Weather monitoring system 42 days Sat
6/7/14 Fri 7/18/14 161 Purchase Order for WMS 0 days Sat 6/7/14 Sat 6/7/14 162
Payment for WMS 7 days Sat 6/7/14 Sat 6/14/14 163 Receiving of WMS 30 days Sat
6/14/14 Mon 7/14/14 164 Installation of WMS 5 days Mon 7/14/14 Fri 7/18/14 165
Transmission Line 57 days Fri 5/16/14 Fri 7/11/14 166 Purchase Order for
Transmission Line Structures & Equipments0 days Fri 5/16/14 Fri 5/16/14 167 Payment
for Transmission Line Structures & Equipments7 days Fri 5/16/14 Fri 5/23/14 168
Receiving of Structures and Equipments 30 days Fri 5/23/14 Sun 6/22/14 169
Installation and Stringing of Equipments 20 days Sun 6/22/14 Fri 7/11/14 170 Fire
alarm system works 5 days Wed 7/9/14 Sun 7/13/14 171 Testing and commissioning 10
days Sat 7/19/14 Mon 7/28/14 172 Proposed Commercial Operation Date 1 day Tue
7/29/14 Tue 7/29/14 5/21 5/28 5/28 6/17 6/17 6/21 5/9 5/9 5/16 5/16 6/30 6/30 7/4
4/26 4/26 5/3 5/3 5/23 5/23 5/25 5/26 5/26 6/2 6/2 7/2 7/2 7/6 4/29 4/29 5/6 5/6
6/25 6/25 7/4 6/7 6/7 6/14 6/14 7/14 7/14 7/18 5/16 5/16 5/23 5/23 6/22 6/22 7/11
7/9 7/13 7/19 7/2 7/29 7 30 2 5 8 11 14 17 20 23 26 29 2 5 8 11 14 17 20 23 26 29 1
4 7 10 13 16 19 22 25 28 1 4 7 10 13 16 19 22 25 28 April 2014 May 2014 June 2014
July 2014 Task Progress Milestone Summary Rolled Up Task Rolled Up Milestone Rolled
Up Progress Split External Tasks Project Summary Group By Summary Deadline Page 3
Project: Template PIS Date: Wed 3/19/14
About Support Terms Privacy Copyright
English
© 2022 SlideShare from Scribd

More Related Content

Similar to Popop

Hu, Maria (Yue) Assign 2 B
Hu, Maria (Yue) Assign 2 BHu, Maria (Yue) Assign 2 B
Hu, Maria (Yue) Assign 2 BMarina Hu
 
Engineering Design Center Project Schedule
Engineering Design Center Project ScheduleEngineering Design Center Project Schedule
Engineering Design Center Project ScheduleVirginia Kam
 
Projec
ProjecProjec
Jadwal Pelaksanaan PPI.pdf
Jadwal Pelaksanaan PPI.pdfJadwal Pelaksanaan PPI.pdf
Jadwal Pelaksanaan PPI.pdf
GaluhWulandari10
 
Encanex - Hebron Access, Captens Brdidge, Power, Cement Barge and ICS Basket...
Encanex - Hebron  Access, Captens Brdidge, Power, Cement Barge and ICS Basket...Encanex - Hebron  Access, Captens Brdidge, Power, Cement Barge and ICS Basket...
Encanex - Hebron Access, Captens Brdidge, Power, Cement Barge and ICS Basket...Ali Yousef
 
Carolinas Core Lab BCI Timeline - Rev 4 12-08-14
Carolinas Core Lab BCI Timeline - Rev 4  12-08-14Carolinas Core Lab BCI Timeline - Rev 4  12-08-14
Carolinas Core Lab BCI Timeline - Rev 4 12-08-14Bin Kallan
 
Carolinas Core Lab BCI Timeline - Rev 4 12-08-14
Carolinas Core Lab BCI Timeline - Rev 4  12-08-14Carolinas Core Lab BCI Timeline - Rev 4  12-08-14
Carolinas Core Lab BCI Timeline - Rev 4 12-08-14Bin Kallan
 
MOL Schedule about health and environment
MOL Schedule about health and environmentMOL Schedule about health and environment
MOL Schedule about health and environment
FasiullahShah1
 
Northwestern AU+Automation Timeline REV6 6-15-12
Northwestern AU+Automation Timeline REV6  6-15-12Northwestern AU+Automation Timeline REV6  6-15-12
Northwestern AU+Automation Timeline REV6 6-15-12Bin Kallan
 
program
programprogram
Performance Analaysis - Earned Value Analysis
Performance Analaysis - Earned Value AnalysisPerformance Analaysis - Earned Value Analysis
Performance Analaysis - Earned Value AnalysisDeborah Obasogie
 
Fitzroy-Gladestone Pipeline EPC Project - Design Schedule
Fitzroy-Gladestone Pipeline EPC Project - Design ScheduleFitzroy-Gladestone Pipeline EPC Project - Design Schedule
Fitzroy-Gladestone Pipeline EPC Project - Design ScheduleGary Hayes
 
ECN Plan For C-005 Final
ECN Plan For C-005 FinalECN Plan For C-005 Final
ECN Plan For C-005 FinalOmid Latifzadeh
 
Rockford Memorial v5 3-28-12
Rockford Memorial v5 3-28-12Rockford Memorial v5 3-28-12
Rockford Memorial v5 3-28-12Bin Kallan
 
Rockford Memorial v5 3-28-12
Rockford Memorial v5 3-28-12Rockford Memorial v5 3-28-12
Rockford Memorial v5 3-28-12Bin Kallan
 
- Project.pdf
- Project.pdf- Project.pdf
- Project.pdf
Hemin Refiq
 
Chw piping works rev 6
  Chw piping works rev 6  Chw piping works rev 6
Chw piping works rev 6
JESSEREY BUSTAMANTE
 
Overhaul plan example
Overhaul plan exampleOverhaul plan example
Overhaul plan example
Judas Alfredo Haro
 
ABC_3rd Progress Mtg Briefing_050115_draft.ppt
ABC_3rd Progress Mtg Briefing_050115_draft.pptABC_3rd Progress Mtg Briefing_050115_draft.ppt
ABC_3rd Progress Mtg Briefing_050115_draft.ppt
KingHaroldDeLeon
 

Similar to Popop (20)

Hu, Maria (Yue) Assign 2 B
Hu, Maria (Yue) Assign 2 BHu, Maria (Yue) Assign 2 B
Hu, Maria (Yue) Assign 2 B
 
Engineering Design Center Project Schedule
Engineering Design Center Project ScheduleEngineering Design Center Project Schedule
Engineering Design Center Project Schedule
 
Projec
ProjecProjec
Projec
 
Jadwal Pelaksanaan PPI.pdf
Jadwal Pelaksanaan PPI.pdfJadwal Pelaksanaan PPI.pdf
Jadwal Pelaksanaan PPI.pdf
 
Encanex - Hebron Access, Captens Brdidge, Power, Cement Barge and ICS Basket...
Encanex - Hebron  Access, Captens Brdidge, Power, Cement Barge and ICS Basket...Encanex - Hebron  Access, Captens Brdidge, Power, Cement Barge and ICS Basket...
Encanex - Hebron Access, Captens Brdidge, Power, Cement Barge and ICS Basket...
 
Carolinas Core Lab BCI Timeline - Rev 4 12-08-14
Carolinas Core Lab BCI Timeline - Rev 4  12-08-14Carolinas Core Lab BCI Timeline - Rev 4  12-08-14
Carolinas Core Lab BCI Timeline - Rev 4 12-08-14
 
Carolinas Core Lab BCI Timeline - Rev 4 12-08-14
Carolinas Core Lab BCI Timeline - Rev 4  12-08-14Carolinas Core Lab BCI Timeline - Rev 4  12-08-14
Carolinas Core Lab BCI Timeline - Rev 4 12-08-14
 
MOL Schedule about health and environment
MOL Schedule about health and environmentMOL Schedule about health and environment
MOL Schedule about health and environment
 
Northwestern AU+Automation Timeline REV6 6-15-12
Northwestern AU+Automation Timeline REV6  6-15-12Northwestern AU+Automation Timeline REV6  6-15-12
Northwestern AU+Automation Timeline REV6 6-15-12
 
program
programprogram
program
 
Performance Analaysis - Earned Value Analysis
Performance Analaysis - Earned Value AnalysisPerformance Analaysis - Earned Value Analysis
Performance Analaysis - Earned Value Analysis
 
Fitzroy-Gladestone Pipeline EPC Project - Design Schedule
Fitzroy-Gladestone Pipeline EPC Project - Design ScheduleFitzroy-Gladestone Pipeline EPC Project - Design Schedule
Fitzroy-Gladestone Pipeline EPC Project - Design Schedule
 
CPM
CPMCPM
CPM
 
ECN Plan For C-005 Final
ECN Plan For C-005 FinalECN Plan For C-005 Final
ECN Plan For C-005 Final
 
Rockford Memorial v5 3-28-12
Rockford Memorial v5 3-28-12Rockford Memorial v5 3-28-12
Rockford Memorial v5 3-28-12
 
Rockford Memorial v5 3-28-12
Rockford Memorial v5 3-28-12Rockford Memorial v5 3-28-12
Rockford Memorial v5 3-28-12
 
- Project.pdf
- Project.pdf- Project.pdf
- Project.pdf
 
Chw piping works rev 6
  Chw piping works rev 6  Chw piping works rev 6
Chw piping works rev 6
 
Overhaul plan example
Overhaul plan exampleOverhaul plan example
Overhaul plan example
 
ABC_3rd Progress Mtg Briefing_050115_draft.ppt
ABC_3rd Progress Mtg Briefing_050115_draft.pptABC_3rd Progress Mtg Briefing_050115_draft.ppt
ABC_3rd Progress Mtg Briefing_050115_draft.ppt
 

Recently uploaded

RTUYUIJKLDSADAGHBDJNKSMAL,D
RTUYUIJKLDSADAGHBDJNKSMAL,DRTUYUIJKLDSADAGHBDJNKSMAL,D
RTUYUIJKLDSADAGHBDJNKSMAL,D
cy0krjxt
 
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
h7j5io0
 
一比一原版(UW毕业证)西雅图华盛顿大学毕业证如何办理
一比一原版(UW毕业证)西雅图华盛顿大学毕业证如何办理一比一原版(UW毕业证)西雅图华盛顿大学毕业证如何办理
一比一原版(UW毕业证)西雅图华盛顿大学毕业证如何办理
kecekev
 
Design Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinkingDesign Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinking
cy0krjxt
 
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
n0tivyq
 
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
jyz59f4j
 
Design Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinkingDesign Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinking
cy0krjxt
 
PDF SubmissionDigital Marketing Institute in Noida
PDF SubmissionDigital Marketing Institute in NoidaPDF SubmissionDigital Marketing Institute in Noida
PDF SubmissionDigital Marketing Institute in Noida
PoojaSaini954651
 
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdfPORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
fabianavillanib
 
LORRAINE ANDREI_LEQUIGAN_HOW TO USE TRELLO
LORRAINE ANDREI_LEQUIGAN_HOW TO USE TRELLOLORRAINE ANDREI_LEQUIGAN_HOW TO USE TRELLO
LORRAINE ANDREI_LEQUIGAN_HOW TO USE TRELLO
lorraineandreiamcidl
 
一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理
一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理
一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理
9a93xvy
 
Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...
Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...
Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...
ameli25062005
 
Mohannad Abdullah portfolio _ V2 _22-24
Mohannad Abdullah  portfolio _ V2 _22-24Mohannad Abdullah  portfolio _ V2 _22-24
Mohannad Abdullah portfolio _ V2 _22-24
M. A. Architect
 
Game Concept Presentation for Ukrainian Mythology Based Game With Designs
Game Concept Presentation for Ukrainian Mythology Based Game With DesignsGame Concept Presentation for Ukrainian Mythology Based Game With Designs
Game Concept Presentation for Ukrainian Mythology Based Game With Designs
184804
 
Design Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinkingDesign Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinking
cy0krjxt
 
Technoblade The Legacy of a Minecraft Legend.
Technoblade The Legacy of a Minecraft Legend.Technoblade The Legacy of a Minecraft Legend.
Technoblade The Legacy of a Minecraft Legend.
Techno Merch
 
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
708pb191
 
Connect Conference 2022: Passive House - Economic and Environmental Solution...
Connect Conference 2022: Passive House -  Economic and Environmental Solution...Connect Conference 2022: Passive House -  Economic and Environmental Solution...
Connect Conference 2022: Passive House - Economic and Environmental Solution...
TE Studio
 
原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样
原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样
原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样
gpffo76j
 
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
7sd8fier
 

Recently uploaded (20)

RTUYUIJKLDSADAGHBDJNKSMAL,D
RTUYUIJKLDSADAGHBDJNKSMAL,DRTUYUIJKLDSADAGHBDJNKSMAL,D
RTUYUIJKLDSADAGHBDJNKSMAL,D
 
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
 
一比一原版(UW毕业证)西雅图华盛顿大学毕业证如何办理
一比一原版(UW毕业证)西雅图华盛顿大学毕业证如何办理一比一原版(UW毕业证)西雅图华盛顿大学毕业证如何办理
一比一原版(UW毕业证)西雅图华盛顿大学毕业证如何办理
 
Design Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinkingDesign Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinking
 
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
 
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
 
Design Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinkingDesign Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinking
 
PDF SubmissionDigital Marketing Institute in Noida
PDF SubmissionDigital Marketing Institute in NoidaPDF SubmissionDigital Marketing Institute in Noida
PDF SubmissionDigital Marketing Institute in Noida
 
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdfPORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
 
LORRAINE ANDREI_LEQUIGAN_HOW TO USE TRELLO
LORRAINE ANDREI_LEQUIGAN_HOW TO USE TRELLOLORRAINE ANDREI_LEQUIGAN_HOW TO USE TRELLO
LORRAINE ANDREI_LEQUIGAN_HOW TO USE TRELLO
 
一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理
一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理
一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理
 
Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...
Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...
Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...
 
Mohannad Abdullah portfolio _ V2 _22-24
Mohannad Abdullah  portfolio _ V2 _22-24Mohannad Abdullah  portfolio _ V2 _22-24
Mohannad Abdullah portfolio _ V2 _22-24
 
Game Concept Presentation for Ukrainian Mythology Based Game With Designs
Game Concept Presentation for Ukrainian Mythology Based Game With DesignsGame Concept Presentation for Ukrainian Mythology Based Game With Designs
Game Concept Presentation for Ukrainian Mythology Based Game With Designs
 
Design Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinkingDesign Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinking
 
Technoblade The Legacy of a Minecraft Legend.
Technoblade The Legacy of a Minecraft Legend.Technoblade The Legacy of a Minecraft Legend.
Technoblade The Legacy of a Minecraft Legend.
 
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
 
Connect Conference 2022: Passive House - Economic and Environmental Solution...
Connect Conference 2022: Passive House -  Economic and Environmental Solution...Connect Conference 2022: Passive House -  Economic and Environmental Solution...
Connect Conference 2022: Passive House - Economic and Environmental Solution...
 
原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样
原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样
原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样
 
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
 

Popop

  • 1. SlideShare Home Explore Search Submit Search Upload B You MS Projects - 10 MW Implementation Schedule Gensol Engineering Limited Gensol Engineering Limited • Mar. 23, 2014 • 10 likes • 9,155 views Download Now 243 ID Task Name Duration Start Finish 1 Solar PV Project-10 MW 120 days Tue 4/1/14 Tue 7/29/14 2 Site mobilization 2 days Tue...ID Task Name Duration Start Finish 69 Installation and Termination of SCADA system 5 days Sat 7/19/14 Wed 7/23/14 70 Exter... 1 of 3 A detailed project execution schedule including major and minor milestones for a 10 MW Plant. The EPC has been spread over 4 months. In case of larger or smaller power plants, the activities would remain same while the timeline would change Read more Technology Recommended Project master schedule daughter station cng mini plant Project master schedule daughter station cng mini plant PT. ANSI MEGA INSTRUMENINDO, Gunawan Widihardjo Solar mango corporate presentation Solar mango corporate presentation Anjali Khandelwal progress of work till date progress of work till date Mohsen Almashharawi CV SAIF UR REHMAN CV SAIF UR REHMAN Saif kharal
  • 2. C v surveyor( Mumtaz ) C v surveyor( Mumtaz ) Mumtaz Ahmad Sample Project Works Sample Project Works Rahim Virani Management Control System- Delhi Metro_10042016 Management Control System- Delhi Metro_10042016 Anil Kumar Gupta MS project Sample gantt chart MS project Sample gantt chart Dhawal Thakkar PMP Work breakdown structure & project life cycle Work breakdown structure & project life cycle Sayandeep Dasgupta Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020 Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020 Gensol Engineering Limited More Related Content You Might Also Like Related Books Free with a 30 day trial from Scribd See all Related Audiobooks Free with a 30 day trial from Scribd See all MS Projects - 10 MW Implementation Schedule 1. ID Task Name Duration Start Finish 1 Solar PV Project-10 MW 120 days Tue 4/1/14 Tue 7/29/14 2 Site mobilization 2 days Tue 4/1/14 Wed 4/2/14 3 Array Area and General Works 110 days Sat 4/5/14 Wed 7/23/14 4 Civil Works 93 days Sat 4/5/14 Sun 7/6/14 5 Site Levelling and Grading 15 days Sat 4/5/14 Sat 4/19/14 6 Marking and Construction of Boundary Wall 30 days Tue 4/15/14 Wed 5/14/14 7 Foundation and Installation of Main Entry Gate 5 days Fri 4/18/14 Tue 4/22/14 8 Foundation and Construction of Security Cabin 5 days Fri 4/18/14 Tue 4/22/14 9 Construction of Internal Roads 5 days Tue 4/22/14 Sat 4/26/14 10 Foundation Marking for Structures 5 days Mon 4/21/14 Fri 4/25/14 11 Excavation for Structure Foundation 20 days Tue 4/22/14 Sun 5/11/14 12 Module Mounting Structure Casting 30 days Wed 4/23/14 Thu 5/22/14 13 String Monitoring Box Foundation 5 days Sat 5/3/14 Wed 5/7/14 14 Cable trench 7 days Fri 5/23/14 Thu 5/29/14 15 Construction of Water Collection Tank 10 days Fri 5/23/14 Sun 6/1/14 16 Construction of Drainage system 30 days Tue 5/27/14 Wed 6/25/14 17 Borewell works 3 days Fri 5/23/14 Sun 5/25/14 18 Lightening Arrester Foundation 5 days Sun 6/22/14 Thu 6/26/14 19 External Lighting Foundation 15 days Sun 6/22/14 Sun 7/6/14 20 CCTV Camera Foundation 5 days Sun 6/22/14 Thu 6/26/14 21 Earth Pit Works 5 days Thu 6/12/14 Mon 6/16/14 22 Electrical Works 97 days Thu 4/17/14 Wed 7/23/14 23 Structure 57 days Thu 4/17/14 Fri 6/13/14 24 Purchase Order for Structure 0 days Thu 4/17/14 Thu 4/17/14 25 Payment for Structure 0 days Thu 4/24/14 Thu 4/24/14 26 Receiving of Structure 25 days Fri 4/25/14 Mon 5/19/14 27 Installation of Structure 15 days Fri 5/30/14 Fri 6/13/14 28 PV Module 52 days Fri 4/25/14 Sun 6/15/14 29 Purchase Order for PV Module 0 days Fri 4/25/14 Fri 4/25/14 30 Payment for PV Module 7 days Fri 4/25/14 Fri 5/2/14 31 Receiving of PV Module 30
  • 3. days Fri 5/2/14 Sun 6/1/14 32 Installation of PV Module 15 days Sun 6/1/14 Sun 6/15/14 33 String Monitoring Box 41 days Mon 4/21/14 Sat 5/31/14 34 Purchase Order for SMB 0 days Mon 4/21/14 Mon 4/21/14 35 Payment for SMB 7 days Mon 4/21/14 Mon 4/28/14 36 Receiving of String Monitoring Box 30 days Mon 4/28/14 Wed 5/28/14 37 Installation of String Monitoring Box 4 days Wed 5/28/14 Sat 5/31/14 38 Inverter 69 days Sat 4/19/14 Thu 6/26/14 39 Purchase Order for Inverter 0 days Sat 4/19/14 Sat 4/19/14 40 Payment for Inverter 7 days Sat 4/19/14 Sat 4/26/14 41 Receiving of Inverter 60 days Sat 4/26/14 Wed 6/25/14 42 Installation of Inverter 2 days Wed 6/25/14 Thu 6/26/14 43 DC Cable 64 days Tue 4/29/14 Tue 7/1/14 44 Purchase Order for DC Cable 0 days Tue 4/29/14 Tue 4/29/14 45 Payment for DC Cable 7 days Tue 4/29/14 Tue 5/6/14 46 Receiving of DC Cable 45 days Tue 5/6/14 Fri 6/20/14 47 Laying of DC Cable 7 days Fri 6/20/14 Fri 6/27/14 48 Termination of DC Cable 5 days Fri 6/27/14 Tue 7/1/14 49 OFC 60 days Thu 5/1/14 Sun 6/29/14 50 Purchase Order for OFC 0 days Thu 5/1/14 Thu 5/1/14 51 Payment for OFC 7 days Thu 5/1/14 Thu 5/8/14 52 Receiving of OFC 45 days Thu 5/8/14 Sun 6/22/14 53 Laying of OFC 5 days Sun 6/22/14 Fri 6/27/14 54 Termination of OFC 3 days Fri 6/27/14 Sun 6/29/14 55 CCTV SYSTEM 40 days Sat 5/31/14 Wed 7/9/14 56 Purchase Order for CCTV 0 days Sat 5/31/14 Sat 5/31/14 57 Payment for CCTV 7 days Sat 5/31/14 Sat 6/7/14 58 Receiving of CCTV 30 days Sat 6/7/14 Mon 7/7/14 59 Installation of CCTV 3 days Mon 7/7/14 Wed 7/9/14 60 Lightening Arrestor 41 days Sat 5/31/14 Thu 7/10/14 61 Purchase order for Lightening Arrestor 0 days Sat 5/31/14 Sat 5/31/14 62 Payment for Lightening Arrestor 7 days Sat 5/31/14 Sat 6/7/14 63 Receiving of Lightening Arrestor 30 days Sat 6/7/14 Mon 7/7/14 64 Installation of Lightening Arrestor 4 days Mon 7/7/14 Thu 7/10/14 65 SCADA System 72 days Tue 5/13/14 Wed 7/23/14 66 Purchase Order for SCADA System 0 days Tue 5/13/14 Tue 5/13/14 67 Payment for SCADA System 7 days Tue 5/13/14 Tue 5/20/14 68 Receiving of SCADA 60 days Tue 5/20/14 Sat 7/19/14 /1 4/2 4/5 4/19 4/15 5/14 4/18 4/22 4/18 4/22 4/22 4/26 4/21 4/25 4/22 5/11 4/23 5/22 5/3 5/7 5/23 5/29 5/23 6/1 5/27 6/25 5/23 5/25 6/22 6/26 6/22 7/6 6/22 6/26 6/12 6/16 4/17 4/24 4/25 5/19 5/30 6/13 4/25 4/25 5/2 5/2 6/1 6/1 6/15 4/21 4/21 4/28 4/28 5/28 5/28 5/31 4/19 4/19 4/26 4/26 6/25 6/25 6/26 4/29 4/29 5/6 5/6 6/20 6/20 6/27 6/27 7/1 5/1 5/1 5/8 5/8 6/22 6/22 6/27 6/27 6/29 5/31 5/31 6/7 6/7 7/7 7/7 7/9 5/31 5/31 6/7 6/7 7/7 7/7 7/10 5/13 5/13 5/20 5/20 7/19 30 2 5 8 11 14 17 20 23 26 29 2 5 8 11 14 17 20 23 26 29 1 4 7 10 13 16 19 22 25 28 1 4 7 10 13 16 19 22 25 28 April 2014 May 2014 June 2014 July 2014 Task Progress Milestone Summary Rolled Up Task Rolled Up Milestone Rolled Up Progress Split External Tasks Project Summary Group By Summary Deadline Page 1 Project: Template PIS Date: Wed 3/19/14 2. ID Task Name Duration Start Finish 69 Installation and Termination of SCADA system 5 days Sat 7/19/14 Wed 7/23/14 70 External Lighting 57 days Wed 5/21/14 Wed 7/16/14 71 Purchase Order for Poles and Lights 0 days Wed 5/21/14 Wed 5/21/14 72 Payment for Lighting System 7 days Wed 5/21/14 Wed 5/28/14 73 Receiving of Lighting System 40 days Wed 5/28/14 Mon 7/7/14 74 Installation and Termination of Lighting System 10 days Mon 7/7/14 Wed 7/16/14 75 Array Earthing 57 days Sun 5/18/14 Sun 7/13/14 76 Purchase Order for Earthing Equipments 0 days Sun 5/18/14 Sun 5/18/14 77 Payment for Earthing Equipments 7 days Sun 5/18/14 Sun 5/25/14 78 Receiving of Earthing Equipments 40 days Sun 5/25/14 Fri 7/4/14 79 Array Earthing Installation and Connection 10 days Fri 7/4/14 Sun 7/13/14 80 Main Control Room & Substation 86 days Thu 4/24/14 Fri 7/18/14 81 Civil Work in MCR & Substation 60 days Sat 4/26/14 Tue 6/24/14 82 Marking 2 days Sat 4/26/14 Sun 4/27/14 83 Excavation 3 days Mon 4/28/14 Wed 4/30/14 84 RCC Foundation 20 days Thu 5/1/14 Tue 5/20/14 85 Brick work 15 days Wed 5/21/14 Wed 6/4/14 86 Internal Plaster 7 days Thu 6/5/14 Wed 6/11/14 87
  • 4. Flooring & Trenching 7 days Thu 6/12/14 Wed 6/18/14 88 Windows & Doors Fixing 7 days Thu 6/12/14 Wed 6/18/14 89 Painting work 7 days Thu 6/12/14 Wed 6/18/14 90 Finishing work of Substation Building 10 days Sun 6/15/14 Tue 6/24/14 91 Power and Aux. Transformer Foundation 15 days Tue 5/6/14 Tue 5/20/14 92 Switch Yard Earthing Mat Construction 7 days Fri 5/16/14 Thu 5/22/14 93 Switch Yard Equipment Foundation 15 days Fri 5/23/14 Fri 6/6/14 94 Foundation for Transmission Towers 30 days Fri 5/23/14 Sat 6/21/14 95 Electrical Works 86 days Thu 4/24/14 Fri 7/18/14 96 Transformers(Power and Aux.) 72 days Thu 4/24/14 Fri 7/4/14 97 Purchase Order for Transformer 0 days Thu 4/24/14 Thu 4/24/14 98 Payment for Transformer 7 days Thu 4/24/14 Thu 5/1/14 99 Receiving of Transformer 60 days Thu 5/1/14 Mon 6/30/14 100 Installation of Transformer 5 days Mon 6/30/14 Fri 7/4/14 101 33 kV bay station 73 days Tue 4/29/14 Thu 7/10/14 102 Purchase Order for VCB,Conductors,Isolator,CT,PT,Structure2 days Tue 4/29/14 Thu 5/1/14 103 Payment for VCB,Conductors,Isolator,CT,PT,Structure7 days Thu 5/1/14 Thu 5/8/14 104 Receiving of Equipments 50 days Thu 5/8/14 Fri 6/27/14 105 Installation of Equipments 7 days Fri 6/27/14 Thu 7/3/14 106 Termination of Conductors 7 days Fri 7/4/14 Thu 7/10/14 107 HT Panels 61 days Fri 5/9/14 Tue 7/8/14 108 Purchase Order for HT Panels 0 days Fri 5/9/14 Fri 5/9/14 109 Payment for HT Panels 7 days Fri 5/9/14 Fri 5/16/14 110 Receiving of HT Panels 50 days Fri 5/16/14 Sat 7/5/14 111 Installation of HT Panels 4 days Sat 7/5/14 Tue 7/8/14 112 LT Panels 61 days Fri 5/9/14 Tue 7/8/14 113 Purchase Order for LT Panels 0 days Fri 5/9/14 Fri 5/9/14 114 Payment for LT Panels 7 days Fri 5/9/14 Fri 5/16/14 115 Receiving of LT Panels 50 days Fri 5/16/14 Sat 7/5/14 116 Installation of LT Panels 4 days Sat 7/5/14 Tue 7/8/14 117 LT Cable 72 days Sat 5/3/14 Sun 7/13/14 118 Purchase Order for LT Cable 0 days Sat 5/3/14 Sat 5/3/14 119 Payment for LT Cable 7 days Sat 5/3/14 Sat 5/10/14 120 Receiving of LT Cable 50 days Sat 5/10/14 Sun 6/29/14 121 Laying of LT Cable 5 days Sun 6/29/14 Thu 7/3/14 122 Terination of LT Cable 5 days Wed 7/9/14 Sun 7/13/14 123 HT Cable & Conductors 70 days Mon 5/5/14 Sun 7/13/14 124 Purchase Order for HT Cable 0 days Mon 5/5/14 Mon 5/5/14 125 Payment for HT Cable 7 days Mon 5/5/14 Mon 5/12/14 126 Receiving of HT Cables 50 days Mon 5/12/14 Tue 7/1/14 127 Laying of HT Cable 5 days Tue 7/1/14 Sat 7/5/14 128 Termination of HT Cable 5 days Wed 7/9/14 Sun 7/13/14 129 Control Cable 63 days Sat 5/10/14 Fri 7/11/14 130 Purchase Order for Control Cable 0 days Sat 5/10/14 Sat 5/10/14 131 Payment for Control Cable 7 days Sat 5/10/14 Sat 5/17/14 132 Receiving of Control Cables 45 days Sat 5/17/14 Tue 7/1/14 133 Laying of Control Cable 4 days Tue 7/1/14 Fri 7/4/14 134 Termination of Control Cable 3 days Wed 7/9/14 Fri 7/11/14 135 Lightening Protection System 32 days Wed 5/21/14 Sat 6/21/14 136 Purchase Order for LA 0 days Wed 5/21/14 Wed 5/21/14 7/19 7/23 5/21 5/21 5/28 5/28 7/7 7/7 7/16 5/18 5/18 5/25 5/25 7/4 7/4 7/13 4/26 4/27 4/28 4/30 5/1 5/20 5/21 6/4 6/5 6/11 6/12 6/18 6/12 6/18 6/12 6/18 6/15 6/24 5/6 5/20 5/16 5/22 5/23 6/6 5/23 6/21 4/24 4/24 5/1 5/1 6/30 6/30 7/4 4/29 5/1 5/1 5/8 5/8 6/27 6/27 7/3 7/4 7/10 5/9 5/9 5/16 5/16 7/5 7/5 7/8 5/9 5/9 5/16 5/16 7/5 7/5 7/8 5/3 5/3 5/10 5/10 6/29 6/29 7/3 7/9 7/13 5/5 5/5 5/12 5/12 7/1 7/1 7/5 7/9 7/13 5/10 5/10 5/17 5/17 7/1 7/1 7/4 7/9 7/11 5/21 30 2 5 8 11 14 17 20 23 26 29 2 5 8 11 14 17 20 23 26 29 1 4 7 10 13 16 19 22 25 28 1 4 7 10 13 16 19 22 25 28 April 2014 May 2014 June 2014 July 2014 Task Progress Milestone Summary Rolled Up Task Rolled Up Milestone Rolled Up Progress Split External Tasks Project Summary Group By Summary Deadline Page 2 Project: Template PIS Date: Wed 3/19/14 3. ID Task Name Duration Start Finish 137 Payment for LA 7 days Wed 5/21/14 Wed 5/28/14 138 Receiving of LA 20 days Wed 5/28/14 Tue 6/17/14 139 Installation of LA
  • 5. 5 days Tue 6/17/14 Sat 6/21/14 140 Battery System 57 days Fri 5/9/14 Fri 7/4/14 141 Purchase Order for Battery Bank 0 days Fri 5/9/14 Fri 5/9/14 142 Payment for Battery Bank 7 days Fri 5/9/14 Fri 5/16/14 143 Receiving of Battery Bank 45 days Fri 5/16/14 Mon 6/30/14 144 Installation of Battery Bank 5 days Mon 6/30/14 Fri 7/4/14 145 Switch Yard Earthing 30 days Sat 4/26/14 Sun 5/25/14 146 Purchase Order for Earthing Equipments 0 days Sat 4/26/14 Sat 4/26/14 147 Payment for Earthing Equipments 7 days Sat 4/26/14 Sat 5/3/14 148 Receiving of Earthing Equipments 20 days Sat 5/3/14 Fri 5/23/14 149 Installation and Connection 3 days Fri 5/23/14 Sun 5/25/14 150 Internal Lightning System 42 days Mon 5/26/14 Sun 7/6/14 151 Purchase Order for Poles and Lights 0 days Mon 5/26/14 Mon 5/26/14 152 Payment for Lighting System 7 days Mon 5/26/14 Mon 6/2/14 153 Receiving of Lighting System 30 days Mon 6/2/14 Wed 7/2/14 154 Installation and Termination of Lighting System 5 days Wed 7/2/14 Sun 7/6/14 155 Misc. Items(SDB,Feeders,ACDB,Industrial Socket) 67 days Tue 4/29/14 Fri 7/4/14 156 Purchase Order for Misc.Items 0 days Tue 4/29/14 Tue 4/29/14 157 Payment for Misc.Items 7 days Tue 4/29/14 Tue 5/6/14 158 Receiving of Misc.Items 50 days Tue 5/6/14 Wed 6/25/14 159 Installation and Termination of Misc.Items 10 days Wed 6/25/14 Fri 7/4/14 160 Weather monitoring system 42 days Sat 6/7/14 Fri 7/18/14 161 Purchase Order for WMS 0 days Sat 6/7/14 Sat 6/7/14 162 Payment for WMS 7 days Sat 6/7/14 Sat 6/14/14 163 Receiving of WMS 30 days Sat 6/14/14 Mon 7/14/14 164 Installation of WMS 5 days Mon 7/14/14 Fri 7/18/14 165 Transmission Line 57 days Fri 5/16/14 Fri 7/11/14 166 Purchase Order for Transmission Line Structures & Equipments0 days Fri 5/16/14 Fri 5/16/14 167 Payment for Transmission Line Structures & Equipments7 days Fri 5/16/14 Fri 5/23/14 168 Receiving of Structures and Equipments 30 days Fri 5/23/14 Sun 6/22/14 169 Installation and Stringing of Equipments 20 days Sun 6/22/14 Fri 7/11/14 170 Fire alarm system works 5 days Wed 7/9/14 Sun 7/13/14 171 Testing and commissioning 10 days Sat 7/19/14 Mon 7/28/14 172 Proposed Commercial Operation Date 1 day Tue 7/29/14 Tue 7/29/14 5/21 5/28 5/28 6/17 6/17 6/21 5/9 5/9 5/16 5/16 6/30 6/30 7/4 4/26 4/26 5/3 5/3 5/23 5/23 5/25 5/26 5/26 6/2 6/2 7/2 7/2 7/6 4/29 4/29 5/6 5/6 6/25 6/25 7/4 6/7 6/7 6/14 6/14 7/14 7/14 7/18 5/16 5/16 5/23 5/23 6/22 6/22 7/11 7/9 7/13 7/19 7/2 7/29 7 30 2 5 8 11 14 17 20 23 26 29 2 5 8 11 14 17 20 23 26 29 1 4 7 10 13 16 19 22 25 28 1 4 7 10 13 16 19 22 25 28 April 2014 May 2014 June 2014 July 2014 Task Progress Milestone Summary Rolled Up Task Rolled Up Milestone Rolled Up Progress Split External Tasks Project Summary Group By Summary Deadline Page 3 Project: Template PIS Date: Wed 3/19/14 About Support Terms Privacy Copyright English © 2022 SlideShare from Scribd