Project Management Institute

  Aerospace and Defense
            (A&D)
Specific Interest Group (SIG)

         Soon to be a
Community of Practice (CoP)
Project Management Institute (PMI®)


 PMI is the world’s leading not-for-profit membership association for the
  project management profession with more than half a million members
  and credential holders in 185 countries.
   PMI Headquarters:
     Four Campus Boulevard
     Newtown Square, Pennsylvania 19073-3299
     Telephone: +1-610-356-4600
     Fax: +1-610-356-4647
     E-mail: pmihq@pmi.org
     Internet: www.pmi.org

   PMI Regional Service Centre:
    • Europe
    • Middle East                                WWW.PMI.ORG
    • Africa (EMEA)
    • Brussels, Belgium
Project Management Institute (PMI®)


 Worldwide advocacy for project management is supported by
   Globally recognized standards (Project Management Body of Knowledge
    (PMBOK® Guide)),
   Credentials (PMP®, PgMP ®, APM®, PMI-RMP®, PMI-SP®),
   Extensive research program,
   Professional development & training (PMI® Educational Foundation)
 These services are the basis of greater recognition of project
  management’s success in industry, government, and academia.
 PMI's core values are the fundamental principles that guide actions and
  create a common language for a diverse group of global stakeholders.
 PMI provides a strong network and community for it members with local
  chapters, websites, webinars, global events and symposia.



                                                                            3
PMI Membership Distribution


 69% North America                                        North America


 12% Europe
                                                           Europe

 19% All other Countries
                                                           All other
                                                           countries


 Almost 260 chartered and potential chapters
 More than 30 chartered Specific Interest Groups (SIGs) and 2
  Colleges soon to convert to Community of Practices (COPs)
Project Management Profession
                                               and Success Factors


 Estimated Size of PM Profession:
     USA Practitioners              4.5 Million
     Global Practitioners          16.5 Million
     Global Projects Value/Yr.     ~$10 Trillion (USD)


 Top Project Success Factors:
     Executive Support/Sponsorship
     Organizational Structure – Project vs. Line
     User/Stakeholder/Customer Involvement
     Experienced & Trained Project Managers
Benefits of Project Management
                                            for the Organization


   Balances competing demands emphasizing project top success factors
   Clarifies project goals and project scope
   Continuously improves project performance
   Provides consistent monitoring & controlling
   Expands participant communications
   Refines resource requirement projections
   Measures project performance
   Prioritizes projects and programs
Benefits of Project Management
                                                 for the Individual


   Enhances both professional and personal growth opportunities
   Develops portable skills and experience
   Builds one’s reputation and network
   Creates high visibility of project results
   Increases opportunities for salary growth
   Provides future source of company leaders
PMI Products and Services



Project Management
   Research and       Project Management
     Standards            Certification




                          ®        Project Management Ins
Project Management         Project
    Professional         Management
   Development           Information
Project Management Research


 PMI Research Program addresses five areas interest:
     Selling Project Management to Sr. Executives
     Linkage of Project Mgmt. to Strategic Planning
     Developing Performance in Virtual Teams
     Quantitative Value of Project Management
     Developing Program & Portfolio Management
 Professional Needs Assessment
 Useful Information & Tools/Techniques for Current and Future
  Applications
 Inspiring Research in areas of defined interest
 Assessments & Forecasts on the Future of Project Management
 Evolution of the Project Management Profession
Globally Recognized Standards




Standards Include: PMBOK Guide 4th Edition, U.S. DoD Extension to the
PMBOK, Earned Value Management, Scheduling, Risk, Organization Project
Management Maturity Model, Work Breakdown Structures, and others…...



                                                                         10
Project Management Standards
Project Management Standards


 PMI’s A Guide to the Project Management Body of Knowledge
  (PMBOK Guide) – Fourth Edition
Standards Projects in Progress


    THEME                                TITLE
-Projects        PMBOK® Guide 4th Edition (’08)
                 PMBOK® Guide Extension – Construction
                 PMBOK® Guide Extension – Government 3rd Edition (’06)
                 PMBOK® Guide Extension – Dept. of Defense (Issued)
                 Practice Standard for Earned Value Management
                 Practice Standard for Configuration Mgmt.
                 Practice Standard for Schedules
                 Practice Standard for WBS – Update
-Programs        Program/Portfolio Management (split in ’04)
-People          Project Manager Competency Development Framework
-Organizations   Organizational PM Maturity Model (OPM3)
-Professions     None at this time
Project Management Certification

 Certifications:
     Project Management Professional (PMP)®
     Program Management Professional (PgMP)®
     Certified Associate of Project Management (CAPM)®
     PMI Risk Management Professional (PMI-RMP)®
     PMI Scheduling Professional (PMI-SP)®
 Certification Examination is offered via computer at locations globally.
   The official language of the PMP Certification examination is English.
   Candidates can choose from seven additional languages to aid them while
    taking the exam.
 Certified Associate in Project Management (CAPM™)
   Designed for practitioners new to the project management industry or are
    specialized in project control processes
   Project management practitioners who have demonstrated fundamental
    project management knowledge & experience
Demand for PMP Certification


500,000
                                               361,238
450,000                                        **as of 12.31.09


400,000
          Growth Trend in the PMP Credential
350,000
300,000
250,000
200,000
150,000
100,000
 50,000
     0
Project Management Information


 PMI Online Bookstore
   www.pmibookstore.org
 PMI Information SourceGuide
 The PMI James R. Snyder Center for Project Management
  Knowledge and Wisdom
PMI Publications


 Periodicals
   Quarterly Project Management Journal®
   Monthly PM Network®
   Monthly PMI Today®
 Largest project management-focused publishing program in existence
PMI Specific Interest Group
                                              Community of Practice


 Project management is a broad discipline covering many areas of
  special interest. Specific interests in unique industries pose unique
  challenges.
 PMI introduced Specific Interest Groups (SIGs), soon to be Community
  of Practices (COPs), to create a forum for individuals and organizations
  that share common interests, industry, or project focus.
   The SIG/COP is where one goes to find others who possess specialized
    knowledge and skills and understands the kinds of issues you are dealing
    with.
   SIG/COP activities include networking, establishing standards and practices
    within a focused area, developing technical papers, and working on special
    projects.




                                                                                  18
PMI® Aerospace and Defense (A&D) SIG/COP


 A&D Specific Interest Group/Community of Practice is dedicated to
  building communities, sharing knowledge and helping A&D project
  professionals develop and mature their project management skills.

 Vision: Provide leadership as the global project, program and portfolio
  professional organization for the A&D community.

 Mission: The PMI® A&D SIG/COP exists to foster
  professional and personal growth in project,
  program, and portfolio management by:
   Building Communities
   Sharing Knowledge and Information
   Developing Skills

                www.pmi-adsig.org
A&D SIG/COP Membership


                                               Pacific South
                                                Rim    America
 2009 Membership ~ 2,100               Europe 2.1%
                                                        0.7%   Middle East
                                          4.0%                    1.5%
                                    Canada
                                     8.8%
 Founded 1991

 Chartered 1996

                                                                      USA
                                                                     82.9%



 Since SIG membership has no geographical boundaries, SIG members
  pay a nominal fee to support SIG activities and must be a member of
  PMI in good standing.
 Join the PMI® A&D SIG and start networking with your peers NOW!
A&D SIG Strategic Plan


 2010 Strategic Initiatives includes these Goals:
  1.    Run a virtual process-driven business
  2.    Deliver significant member value through better communication and a
        stronger program
  3.    Create a global collaborative aerospace & defense PM community
  4.    Build an aerospace & defense portfolio, program and project management
        library
  5.    Establish cooperative alliances to extend SIG members’ products and
        services
 1 to 3 Year Strategic Action Plan:
      Improve member and sponsor benefits
      Facilitate the growth of sponsorships
      Further develop electronic communications
      Establish SIG sponsored A&D training
      Promote PM learning in A&D industry
Benefits of A&D SIG Membership


 A&D SIG/COP Developed Benefits to SIG Members:
   Significantly improved communications capabilities
    • Access to an updated interactive web site, quarterly newsletters, a
      networking directory, seminars, teleconferences,, and publications.
   Promotion of peer to peer PM member networking
   Advocacy of A&D industry organizational sponsorships
   Advocacy of alliances with professional organizations
   Established & sponsored A&D industry PM training
   Promotion of advanced A&D industry PM learning
   Development of A&D SIG Local Interest Groups
Benefits of A&D SIG Membership


 Advocacy of A&D Industry Alliances and Sponsorships:
   Establish new Agency & Corporate Sponsorship Program
   Establish alliances with other PMI SIGs and professional organizations.
   Establish partnerships with PMI Chapters to develop A&D SIG sponsored
    A&D Local Interest Groups (LIGs).

 Improved Professional Development Opportunities:
   A&D SIG is offering PMP Exam Prep and A&D industry specific PM training
    to members and organizations
   A&D SIG will define the need for advanced A&D
    industry PM learning and promote learning on
    SIG web site
   A&D SIG will promote PM learning in the A&D LIGs
    by co-sponsoring learning programs with PMI chapter
    alliances
Benefits of A&D SIG Membership


 Significantly Improved Communications:
   New web site in development in Dec. ‘09 that includes current links plus:
    training, job resources, alliance/sponsor pages, members only pages, A&D
    industry news, etc.
   Use of Linkedin as a networking and information portal. Group contains a
    job board, marketplace, A&D news.
   Mass email distribution of newsletters, bulletins, etc.
   Promotion of member networking by sharing of
    articles on advanced learning, lessons learned, and                    new
    issues.
A&D SIG Sponsorship Program’s Benefits for
                                                Sponsors


 A&D SIG Will Provide Their Sponsors:
   Help to develop A&D specific project management Best Practices and
    venues for increased PM learning
   Access to A&D SIG sponsored training
   Opportunities to network with other professionals
   Current information on PMI enhanced PM processes, principles, and
    practices
   Awareness of need for Advanced PM Certification
   Information on relevant process changes
Overview of DoD Extension to the PMBOK®


 Generally follows revised DoD 5000 Directive
 Modifications to existing PMBOK Chapters
 Development of 5 new Chapters:
     Chap 13 -   Systems Engineering Mgmt
     Chap 14 -   Software Acquisition Mgmt
     Chap 15 -   Logistics Mgmt.
     Chap 16 -   Test & Evaluation Mgmt
     Chap 17 -   Manufacturing Mgmt
 Actual issue as PMI Standard in 7/03
 Strategic Goal for 2010 to update for revised DoD 5000 series
  Directives
The PMI PMP Certification receives DoD
                                                   Recognition


 A&S SIG Facilitated DAU Acceptance of PMP Equivalence with PMT
  250

   PMP is now accepted as part of DoD/DAU DAWIA Program Manager
    Certification

   PMP is determined equivalent to the DAU PMT 250 – Program Management
    Tools coursework

   PMT 250 is the primary training requirement for the Program Manager Level
    II DAWIA Certificate

   This acceptance by DAU is validated by letter from the DAU President to the
    PMI CEO – May ‘04
Join or Volunteer!
 The PMI® A&D SIG/COP is dedicated to providing professional and
  personal growth for aerospace and defense professionals.
   If you are a project, program or portfolio manager, or aspiring to become
    one, and want to be more effective at initiating, planning, prioritizing, leading,
    organizing and controlling project, program and/or portfolio work in A&D, this
    SIG/COP can help your cause!
 To join, go to the web site www.pmi-adsig.org
   Check for upcoming educational opportunities and events.
   Network with other industry pro’s and volunteer:
 The A&D SIG/COP highly encourages volunteering
   You will find it most rewarding, both professionally and personally.
   Earn 10 PDU’s per year for your service
   Current Volunteer Needs
     • Regional Ambassadors
     • Regional Directors
     • Deputy Board Members
   Contact the Director of Volunteers at volunteerdirector@pmi-adsig.org and
    Indicate the area(s) in which you would be interested.
Let’s Support Building the A&D Industry
                          for the Future!

PMI A&D SIG/CoP Overview Rev 02 03 10

  • 1.
    Project Management Institute Aerospace and Defense (A&D) Specific Interest Group (SIG) Soon to be a Community of Practice (CoP)
  • 2.
    Project Management Institute(PMI®)  PMI is the world’s leading not-for-profit membership association for the project management profession with more than half a million members and credential holders in 185 countries.  PMI Headquarters: Four Campus Boulevard Newtown Square, Pennsylvania 19073-3299 Telephone: +1-610-356-4600 Fax: +1-610-356-4647 E-mail: pmihq@pmi.org Internet: www.pmi.org  PMI Regional Service Centre: • Europe • Middle East WWW.PMI.ORG • Africa (EMEA) • Brussels, Belgium
  • 3.
    Project Management Institute(PMI®)  Worldwide advocacy for project management is supported by  Globally recognized standards (Project Management Body of Knowledge (PMBOK® Guide)),  Credentials (PMP®, PgMP ®, APM®, PMI-RMP®, PMI-SP®),  Extensive research program,  Professional development & training (PMI® Educational Foundation)  These services are the basis of greater recognition of project management’s success in industry, government, and academia.  PMI's core values are the fundamental principles that guide actions and create a common language for a diverse group of global stakeholders.  PMI provides a strong network and community for it members with local chapters, websites, webinars, global events and symposia. 3
  • 4.
    PMI Membership Distribution 69% North America North America  12% Europe Europe  19% All other Countries All other countries  Almost 260 chartered and potential chapters  More than 30 chartered Specific Interest Groups (SIGs) and 2 Colleges soon to convert to Community of Practices (COPs)
  • 5.
    Project Management Profession and Success Factors  Estimated Size of PM Profession:  USA Practitioners 4.5 Million  Global Practitioners 16.5 Million  Global Projects Value/Yr. ~$10 Trillion (USD)  Top Project Success Factors:  Executive Support/Sponsorship  Organizational Structure – Project vs. Line  User/Stakeholder/Customer Involvement  Experienced & Trained Project Managers
  • 6.
    Benefits of ProjectManagement for the Organization  Balances competing demands emphasizing project top success factors  Clarifies project goals and project scope  Continuously improves project performance  Provides consistent monitoring & controlling  Expands participant communications  Refines resource requirement projections  Measures project performance  Prioritizes projects and programs
  • 7.
    Benefits of ProjectManagement for the Individual  Enhances both professional and personal growth opportunities  Develops portable skills and experience  Builds one’s reputation and network  Creates high visibility of project results  Increases opportunities for salary growth  Provides future source of company leaders
  • 8.
    PMI Products andServices Project Management Research and Project Management Standards Certification ® Project Management Ins Project Management Project Professional Management Development Information
  • 9.
    Project Management Research PMI Research Program addresses five areas interest:  Selling Project Management to Sr. Executives  Linkage of Project Mgmt. to Strategic Planning  Developing Performance in Virtual Teams  Quantitative Value of Project Management  Developing Program & Portfolio Management  Professional Needs Assessment  Useful Information & Tools/Techniques for Current and Future Applications  Inspiring Research in areas of defined interest  Assessments & Forecasts on the Future of Project Management  Evolution of the Project Management Profession
  • 10.
    Globally Recognized Standards StandardsInclude: PMBOK Guide 4th Edition, U.S. DoD Extension to the PMBOK, Earned Value Management, Scheduling, Risk, Organization Project Management Maturity Model, Work Breakdown Structures, and others…... 10
  • 11.
  • 12.
    Project Management Standards PMI’s A Guide to the Project Management Body of Knowledge (PMBOK Guide) – Fourth Edition
  • 13.
    Standards Projects inProgress THEME TITLE -Projects PMBOK® Guide 4th Edition (’08) PMBOK® Guide Extension – Construction PMBOK® Guide Extension – Government 3rd Edition (’06) PMBOK® Guide Extension – Dept. of Defense (Issued) Practice Standard for Earned Value Management Practice Standard for Configuration Mgmt. Practice Standard for Schedules Practice Standard for WBS – Update -Programs Program/Portfolio Management (split in ’04) -People Project Manager Competency Development Framework -Organizations Organizational PM Maturity Model (OPM3) -Professions None at this time
  • 14.
    Project Management Certification Certifications:  Project Management Professional (PMP)®  Program Management Professional (PgMP)®  Certified Associate of Project Management (CAPM)®  PMI Risk Management Professional (PMI-RMP)®  PMI Scheduling Professional (PMI-SP)®  Certification Examination is offered via computer at locations globally.  The official language of the PMP Certification examination is English.  Candidates can choose from seven additional languages to aid them while taking the exam.  Certified Associate in Project Management (CAPM™)  Designed for practitioners new to the project management industry or are specialized in project control processes  Project management practitioners who have demonstrated fundamental project management knowledge & experience
  • 15.
    Demand for PMPCertification 500,000 361,238 450,000 **as of 12.31.09 400,000 Growth Trend in the PMP Credential 350,000 300,000 250,000 200,000 150,000 100,000 50,000 0
  • 16.
    Project Management Information PMI Online Bookstore  www.pmibookstore.org  PMI Information SourceGuide  The PMI James R. Snyder Center for Project Management Knowledge and Wisdom
  • 17.
    PMI Publications  Periodicals  Quarterly Project Management Journal®  Monthly PM Network®  Monthly PMI Today®  Largest project management-focused publishing program in existence
  • 18.
    PMI Specific InterestGroup Community of Practice  Project management is a broad discipline covering many areas of special interest. Specific interests in unique industries pose unique challenges.  PMI introduced Specific Interest Groups (SIGs), soon to be Community of Practices (COPs), to create a forum for individuals and organizations that share common interests, industry, or project focus.  The SIG/COP is where one goes to find others who possess specialized knowledge and skills and understands the kinds of issues you are dealing with.  SIG/COP activities include networking, establishing standards and practices within a focused area, developing technical papers, and working on special projects. 18
  • 19.
    PMI® Aerospace andDefense (A&D) SIG/COP  A&D Specific Interest Group/Community of Practice is dedicated to building communities, sharing knowledge and helping A&D project professionals develop and mature their project management skills.  Vision: Provide leadership as the global project, program and portfolio professional organization for the A&D community.  Mission: The PMI® A&D SIG/COP exists to foster professional and personal growth in project, program, and portfolio management by:  Building Communities  Sharing Knowledge and Information  Developing Skills www.pmi-adsig.org
  • 20.
    A&D SIG/COP Membership Pacific South Rim America  2009 Membership ~ 2,100 Europe 2.1% 0.7% Middle East 4.0% 1.5% Canada 8.8%  Founded 1991  Chartered 1996 USA 82.9%  Since SIG membership has no geographical boundaries, SIG members pay a nominal fee to support SIG activities and must be a member of PMI in good standing.  Join the PMI® A&D SIG and start networking with your peers NOW!
  • 21.
    A&D SIG StrategicPlan  2010 Strategic Initiatives includes these Goals: 1. Run a virtual process-driven business 2. Deliver significant member value through better communication and a stronger program 3. Create a global collaborative aerospace & defense PM community 4. Build an aerospace & defense portfolio, program and project management library 5. Establish cooperative alliances to extend SIG members’ products and services  1 to 3 Year Strategic Action Plan:  Improve member and sponsor benefits  Facilitate the growth of sponsorships  Further develop electronic communications  Establish SIG sponsored A&D training  Promote PM learning in A&D industry
  • 22.
    Benefits of A&DSIG Membership  A&D SIG/COP Developed Benefits to SIG Members:  Significantly improved communications capabilities • Access to an updated interactive web site, quarterly newsletters, a networking directory, seminars, teleconferences,, and publications.  Promotion of peer to peer PM member networking  Advocacy of A&D industry organizational sponsorships  Advocacy of alliances with professional organizations  Established & sponsored A&D industry PM training  Promotion of advanced A&D industry PM learning  Development of A&D SIG Local Interest Groups
  • 23.
    Benefits of A&DSIG Membership  Advocacy of A&D Industry Alliances and Sponsorships:  Establish new Agency & Corporate Sponsorship Program  Establish alliances with other PMI SIGs and professional organizations.  Establish partnerships with PMI Chapters to develop A&D SIG sponsored A&D Local Interest Groups (LIGs).  Improved Professional Development Opportunities:  A&D SIG is offering PMP Exam Prep and A&D industry specific PM training to members and organizations  A&D SIG will define the need for advanced A&D industry PM learning and promote learning on SIG web site  A&D SIG will promote PM learning in the A&D LIGs by co-sponsoring learning programs with PMI chapter alliances
  • 24.
    Benefits of A&DSIG Membership  Significantly Improved Communications:  New web site in development in Dec. ‘09 that includes current links plus: training, job resources, alliance/sponsor pages, members only pages, A&D industry news, etc.  Use of Linkedin as a networking and information portal. Group contains a job board, marketplace, A&D news.  Mass email distribution of newsletters, bulletins, etc.  Promotion of member networking by sharing of articles on advanced learning, lessons learned, and new issues.
  • 25.
    A&D SIG SponsorshipProgram’s Benefits for Sponsors  A&D SIG Will Provide Their Sponsors:  Help to develop A&D specific project management Best Practices and venues for increased PM learning  Access to A&D SIG sponsored training  Opportunities to network with other professionals  Current information on PMI enhanced PM processes, principles, and practices  Awareness of need for Advanced PM Certification  Information on relevant process changes
  • 26.
    Overview of DoDExtension to the PMBOK®  Generally follows revised DoD 5000 Directive  Modifications to existing PMBOK Chapters  Development of 5 new Chapters:  Chap 13 - Systems Engineering Mgmt  Chap 14 - Software Acquisition Mgmt  Chap 15 - Logistics Mgmt.  Chap 16 - Test & Evaluation Mgmt  Chap 17 - Manufacturing Mgmt  Actual issue as PMI Standard in 7/03  Strategic Goal for 2010 to update for revised DoD 5000 series Directives
  • 27.
    The PMI PMPCertification receives DoD Recognition  A&S SIG Facilitated DAU Acceptance of PMP Equivalence with PMT 250  PMP is now accepted as part of DoD/DAU DAWIA Program Manager Certification  PMP is determined equivalent to the DAU PMT 250 – Program Management Tools coursework  PMT 250 is the primary training requirement for the Program Manager Level II DAWIA Certificate  This acceptance by DAU is validated by letter from the DAU President to the PMI CEO – May ‘04
  • 28.
    Join or Volunteer! The PMI® A&D SIG/COP is dedicated to providing professional and personal growth for aerospace and defense professionals.  If you are a project, program or portfolio manager, or aspiring to become one, and want to be more effective at initiating, planning, prioritizing, leading, organizing and controlling project, program and/or portfolio work in A&D, this SIG/COP can help your cause!  To join, go to the web site www.pmi-adsig.org  Check for upcoming educational opportunities and events.  Network with other industry pro’s and volunteer:  The A&D SIG/COP highly encourages volunteering  You will find it most rewarding, both professionally and personally.  Earn 10 PDU’s per year for your service  Current Volunteer Needs • Regional Ambassadors • Regional Directors • Deputy Board Members  Contact the Director of Volunteers at volunteerdirector@pmi-adsig.org and Indicate the area(s) in which you would be interested.
  • 29.
    Let’s Support Buildingthe A&D Industry for the Future!