SlideShare a Scribd company logo
GLOBAL KEIHIN CIRCLE
PRESENTED BY
KEIHIN INDIA MANUFACTURING PVT. LTD
4th-AURAVA
t/1-√v2/c2
A
ANDON
U
UNIVERSAL
R
RIGHT SIZE TOOL OR DEVICE
A
AUTOMATION
V
VALUE STREAM MAPPING
A
AUTONOMATION
SIGNIFICANCE/意義/
महत्व
t/1-√v2/c2
LOCATION OF KEIHIN INDIA MANUFACTURING PVT. LTD. IN INDIA
ESTABLISHED : 1997
CUSTOMER : HONDA CARS INDIA LTD.
MARUTI SUZUKI INDIA LTD.
GENERAL MOTORS
PRINS EUROPE
YAMAHA MOTORS
CERTIFIED : TS 16949 DEC-03
ISO 14001 IN MAR-04
PRODUCTS : INTAKE MANIFOLD ASSY
PIPE FUELASSY (NGV)
INJECTOR ASSY (NGV)
FUEL PUMP MODULE
EMPLOYEES : 130
t
MFG. INTAKE MANIFOLD FOR
CITY, BRIO, AMAZE,JAZZ
MFG. PIPE FUELASSY.(NGV) FOR
EECO, ERTIGA, WAGON-R
MFG. PIPE FUELASSY.(NGV) FOR GENERAL MOTORS
MFG. INJECTORS ASSY. (NGV) FOR
PRINS 6 MODELS
MFG. FUEL PUMP MODULE FOR YAMAHA MOTOR
KEIHIN INDIA MANUFACTURING PVT. LTD. MAIN PRODUCTS
£”%^
$XX=
WHO ARE IN?
LET’S
BEGIN
Sales and purchase dept.
Business development
sales and
relations development
Sales and purchase dept.
sales and relations development
QA/QC dept.
control, and monitor all activities
related to Quality
Production dept.
ensures all products are manufactured
with utmost efficiency
Engineering and
maintenance dept.
maintainability, reliability,
and availability of
equipment
ADVISOR
SURAJ SAN
LEADER
SHASHANK
MEMBER
PRIYANK
MEMBER
DEEPAK
FACILITATOR
ALLAN SAN
Engineering and
maintenance dept.
Leading the
maintainability,
reliability, and
availability of equipment
MEMBER
MOHAN
TEAM 4TH AURAVA
STEPS RESPONSIBILITY TASK
Selection of
theme
Team Set kick-off meeting
Agree on objectives,
History research, Data
collection, Study on
scenario
Identification of
the most
important product
or process
Team prototype Dev.
Gaol setting
Technical Request
Analysis of
selected process
Shashank, Deepak,
Mohan
Testing over Machine
.
Development of
the proper
strategy for
critical process
Shashank, Deepak,
Mohan
Hardware configuration
Implementations
of actions
Shashank Operations
Dev. Complete
Final assessment Team Launch
AS PER IMPROVEMENT MODEL DEC JAN FEB MARCH APRIL MAY
1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5
ACTIVITY PLAN
SELECTION OF THEME
t/1-√v2/c2
£”%^
$
XX=
BRAINSTORMING FOR THEME SELECTION
Yeah! Including
inspection cutting
machine as well
Solar panel, how’s
about that …so that we
cad head to sustainable
development
In house
development, saved
so much, if we
consider the cost
saving as a goal
Guys, we will go
for something that
has been hidden
to others yet, we
need sum up of all
CONCLUSION OF THE DISSCUSION
TIME
TIME is the event that effects
all type of processes/products
BASIC FEATURES
INVOLVED IN THEME
Energy saving by solar
panel installation
Cost saving by
adopting in-house
modifications&
fabrications in
machine for DBW
project
Time saving by smart
troubleshooting
QUALITY AND
INNOVATION
COST SAVING
DIFFICULTY
COST INVOLVED
LEARNING
SAFETY
TOTAL
Taking the steps
to reduce
downtime in
manufacturing
settings can seem
overwhelming,
................................!!
but the money
saved, and
additional profits
earned from this
concept are
worthwhile.
TIMELESS
IMPRESSIVE
GOOD
AVERAGE
TERRIBLE
THEME SELECTION
C
O
N
C
L
U
S
I
O
N
Selection
of theme
is done
IDENTIFICATION OF
THE MOST IMPORTANT
PRODUCT OR PROCESS
t/1-√v2/c2
£”%^
$
XX=
0
0.5
1
1.5
2
2.5
3
3.5
4
4.5
5
CHCOLLARM/C
LEAKTESTM/C
M5HEATINSERTMACHINE
CHCOLLARINSERTM/C
THCOLLARINSERTM/C
M6HEATINSERTMACHINE
IFCOLLARINSERTM/C
CHCOLLARPRESSFITM/C
CHCOLLARPRESSFITM/C
THCOLLARINSERTM/C
M5HEATINSERTMACHINE
THCOLLARINSERTM/C
IFCOLLARINSERTM/C
THCOLLARINSERTM/C
DOWN
TIME(HRS)
STANDARD
MTTR(HRS)
TARGET
MTTR(HRS)
ACTUAL
MTTR(HRS)
BEFORE IMPLEMENTATION APRIL TO JAN(16-17) INMANI LINE
MONTH WISE
0
0.5
1
1.5
2
2.5
3
3.5
APRIL
MAY
JUNE
JULY
AUG
SEP
OCT
NOV
DEC
JAN
DOWN
TIME(HRS)
STANDARD
MTTR(HRS)
TARGET
MTTR(HRS)
ACTUAL
MTTR(HRS)
MACHINE WISE
TARGET SET
SPECIFICALLY
FOR SMALL
AND MEDIUM
END MACHINE
OUR AIM
IS TO
MINIMIZE
AS MUCH
AS
POSSIBLE
IDENTIFICATION OF THE MOST IMPORTANT PRODUCT OR PROCESS
AIM
SO
Analysis of
selected
process
So, Identification
of the most
important
product or
process is done
1 2 3 4 5 6 7 8
8
1 2 3 4 5 6 7 8
8
BREAK
DOWN
MEAN
TIME TO
REPAIR
SO OUR
AIM IS
TO
REDUCE
MTTR BY
70%
AIM
POSSIBLE AREAS to reduce down time
ANALYSIS OF SLECTED
PROCESS
t/1-√v2/c2
£”%^
$
XX=
Methods
Delay in
identifying
the fault in
machinery
MaterialsMeasurement
Environment Manpower Machines
Limited specified
Indications
Through PC
communication
•Time taking for
frequent error
•Usually without
comments over
commands
Spare parts
can't be use till the
cause is isolated
Unnecessarily
replacement or
fitment of spare
while hitting the
cause
Complicated
system and
vague cause
Old machines
Problem occurrence
becomes frequent
SOP(standard
operating
procedure) is
availed
Improvisation
Inexperienced
handler
Under
training
Lack of
manpower
Error indications isn’t
similar and sufficient
Mechanical,
electrical,
electronics etc.
Risk of approach
wrong
Some machines are with
two processors
CAUSE AND EFFECT DIAGRAM
Methods
Delay in
identifying
the fault in
machinery
Analysis of
selected
process
started
3 6 9
2 4 6
1 2 3
RISK LEVEL
PROBABILITY
SEVERITY
1 2 3
123 1 : LOW
2: MODERATE
3: HIGH
PROBABILITY OF
ACCIDENT=P
SEVERITY OF
ACCIDENT=S
RISK LEVEL =P(1) *S(2)= 2
RISK LEVEL =P(2) *S(1)= 2
RISK LEVEL =P(.9) *S(3) = 2.7
P DEPENDS ON LEVEL OF M/C COMPLEXITY OR ITS
COMPONENTS EX.
• ROBOT
•HYDRAULIC PRESS CYLINDER
•PNEUMATIC CYLINDERS , ACTUATORS ETC
1 2 3 4 5
1
• EMERGENCY PREPAREDNESS AND RESPONSE (4.4.7)
• Identify likely OHS accident and emergency scenarios which may have impacts
on people, process, and have business risks.
• Determine potential OHS impacts.
• Develop[ simple rapid response procedures to control OHS impacts.
• Periodically test emergency procedures to control after incidents.
• Train staff in implementation of emergency controls.
CLAUSE FROM OHSAS:18001 (2007)
It also
supports the
clause from
OHSAS
SO FROM 1 AND 2,
WE NEED TO
MITIGATE THE
CHANCES OF
IMPACTS OVER
ANY LIFE
2
Sir machine
is not
starting
Hey…am
here only
!!
I will not start
Means no home
position, ok I ill
call
maintenance
What is being done while breakdown…!!
Here we have
analysed the
predefined process
of corrective
maintenance
Hmm…
let me
start from
1
•Photo electric sensor
•Load sensor
•Air pressure sensor
•Read switch on cylinder
•Area sensor
•Proximity sensor
•Switches
Input side
•PLC
•DRIVES
•PID
Process side
• Contactors
• Relays
• Solenoid valves
• Motor driver
• heater
• Alphanumeric
display
Output side
1 23
x
minutes
z
minutes
y
minutes
Problem
could be
anywhere
x + y + z minutesMax time to inspect the problem
Existing Troubleshooting approach
DEVELOPMENT OF
PROPER STRATEGY FOR
CRITICAL PROCESSES
t/1-√v2/c2
£”%^
$
XX=
Demonstration over IF
collar press Machine
22
1
0
5
13
10
21
30
31
34
Let’s begin with
the development of
the proper strategy
for critical process
Input side devices
• AREA SENSOR
• READ SWITCH
• PHOTOELECTRIC SENSOR
• MAIN AIR PRESSURE
Input side devices
• SWITCHES
• LOAD CELL
(LOW PRESSURE)
• PROXIMITY
SENSORS
To eliminate the time of inspection spend on step 1
SENS.
WORK
WELL
OK
POLLS
OUT I/P
SIGNALS
HOW
10 5
13
10
21 22 30
31 34
CONFIGURE
INTO PANEL
1
5
0
13
10
2122
3031
34
INSTALLED
IT ONTO
MACHINE
THEN
Here we are
assured from
the input side
of the machine
Let’s work
more
How justify ..
To eliminate the time of inspection spend on step 3
HOW
This way we
should go
This manner
Never mind
AS PER THE OBJECTIVE
U
• ULTIMATE
C
• CONCLUSION
A
• ANALYSIS
on
on
LAST ERROR=N+ 9
If the above
condition is
true then
machine unit
abnormal on
Here M504 is
having value
10000(BC)
i.e. 16
M504
M505
M506
M507
M508
M6 UNIT
ABNORMAL
PLC ERR.
BATT. ERR.
CYL. READ ERR.
ROBO ERR.
So we have
plans for
separation of
all pre-eminent
errors
AS PER THE OBJECTIVE Development of the proper strategy for
critical process is done over here
•Photo electric sensor
•Load sensor
•Air pressure sensor
•Read switch on cylinder
•Area sensor
•Proximity sensor
•Switches
Input side
•PLC
•DRIVES
•PID
Process side
• Contactors
• Relays
• Solenoid valves
• Motor driver
• heater
• Alphanumeric
display
Output side
x
minutes
y
minutes
z minutesz
minutes
Max
time to
inspect
the
problem
Eliminating the time of inspection spend on step 1 and 3
1 23
AS PER OBJECTIVE
Our strategy for
critical process
is eliminating
the time of
inspection
IMPLIMENTATION AND
TRIALS OF ACTIONS
t/1-√v2/c2
£”%^
$
XX=
IMPLIMENTATION AND TRIALS
INDICATOR ON PRESS FIT
TYPE MACHINE
INDICATOR ON HEAT
INSERT TYPE MACHINE
PAPER TAG FOR ERROR SITE
TRIAL ON
PANEL SIDE
Implementations
of actions
FINALASSESSMENT OF
IMPLEMENTED ACTION
t/1-√v2/c2
£”%^
$
XX=
0
0.5
1
1.5
2
2.5
3
3.5
DOWN
TIME(HRS)
STANDARD
MTTR(HRS)
TARGET
MTTR(HRS)
ACTUAL MTTR
ANALYSIS AND FINAL ASSESSMENT OF IMPLEMENTED ACTION
AFTER IMPLEMENTATION FEB TO PRESENT (17 -18) INMANI LINE
MONTH WISEMACHINE WISE
0
0.5
1
1.5
2
2.5
3
3.5
DOWN
TIME(HRS)
STANDARD
MTTR(HRS)
TARGET
MTTR(HRS)
ACHIEVED
MTTR(HRS)
OUR CONCERN IS
OVER THE BD
RELATED TO
MACHINE
ABNORMAL
BEHAVIOUR
ACTUAL
MTTR(0.06) IS
MUCH BELLOW
THE TARGET
(0.1)MTTR
THESE ARE
MECHANICAL BD,
SO OUT OF
CONCERN
FINAL
ASSESSMENT OF
IMPLEMENTED
ACTION
STARTED
0
0.5
1
1.5
2
2.5
3
3.5
DOWN
TIME(HRS)
STANDARD
MTTR(HRS)
TARGET
MTTR(HRS)
ACTUAL
MTTR(HRS)
0
0.5
1
1.5
2
2.5
3
3.5
DOWN
TIME(HRS)
STANDARD
MTTR(HRS)
TARGET
MTTR(HRS)
ACTUAL
MTTR(HRS)
ANALYSIS AND FINAL ASSESSMENT OF IMPLEMENTED ACTION
COMPARISION ON THE BASIS OF EFFECTIVENESS (MTTR)
AFTERBEFORE
HERE WE
ARRIVED TO THE
CONCLUSION
OUR WORK
FLUXES TO
ACHIEVE THE
IMPROVE MENT IN
%
0
0.05
0.1
0.15
0.2
0.25
0.3
0.35
0.4
PREVIOUS
YEAR MTTR
SET TARGET
MTTR
ACHIEVED
TARGET MTTR
MTTR
MTTR
70.58
82.35
0.34
0.1
0.06
ANALYSIS AND FINAL ASSESSMENT OF IMPLEMENTED ACTION
RESULT OF FINAL OF IMPLEMENTED ACTION
BEFORE
IMPLEMENTATION
APRIL TO JAN(16-17)
INMANI LINE
SET TARGET
AS PER THE
DEVELOPRD
STRATEGY
AFTER
IMPLEMENTATION
FEB TO PRESENT
(17 -18) INMANI
LINE
WOW !
THAT’S
AMAZING
Let’s begin
the
assessment
over cost
COST ANALYSIS (REGULAR TIME)
S.NO. MACHINE
NAME
TOTAL BREAK DOWN TIME
W.R.T MACHINE (HRS.)
NO. OF
BD
LABOUR
COST
YEARLY
(Rupees)
ESTIMATED
COST PER PIECE
(Rupees)
NO.
REFUSED
PIECE
COST OF
REFUSED
PIECES
(Rupees)
1. Heat insert
machine m5
0.95+2.08+1.16 = 4.19 3 1414.125 1000 2*3=6 6000
2. Heat insert
machine m6
0.8+0.44+0.88+0.75 =2.87 4 968.625 1000 2*4=8 8000
3. Collar insert
machine CH
0.67+3.5+0.92+0.8 =5.89 4 1987.875 1000 2*4=8 8000
4. Collar insert
machine TH
0.5+0.8+0.3+0.26 =1.86 4 627.75 1000 2*4=8 8000
5. Collar press
fit machine
IF
0.92+2.42+0.66+0.17 =4.17 4 1407.375 1000 2*4=8 8000
TOTAL (Rupees) 18.98 19 6405.75 5000 38 38000
TOTAL (Rupees) = Total of LABOUR COST
+ Total of COST OF REFUSED PIECES
(Rupees)
= 44405.75 Amount that we
could have save
previous year
while regular
time
PREVIOUS
YEAR
S.NO. MACHINE
NAME
TOTAL BREAK DOWN TIME
W.R.T MACHINE (HRS.) =
OVER TIME FOR RECOVERY
NO. OF BD LABOUR COST
YEARLY (OT)
(Rupees)
1. Heat insert
machine m5
0.95+2.08+1.16 = 4.19 3 2178.8
2. Heat insert
machine m6
0.8+0.44+0.88+0.75 =2.87 4 1492.4
3. Collar insert
machine CH
0.67+3.5+0.92+0.8 =5.89 4 3062.8
4. Collar insert
machine TH
0.5+0.8+0.3+0.26 =1.86 4 967.2
5. Collar press fit
machine IF
0.92+2.42+0.66+0.17 =4.17 4 2168.4
TOTAL
(Rupees)
= Total of LABOUR COST
YEARLY (OT)
9869.6
COST ANALYSIS (OVER TIME)
Amount that we
could have save
previous year in
the expense of
OT
PREVIOUS
YEAR
S.NO. ITEMS USED QUANTITY OF
ITEM
COST OF ITEMS
MARKET PRICE(RUPEES)
1. Indicator (LED) 15 375
2. Acrylic sheet 1(244*211) 1000
3. Paper tag 5 5
4. Wire 10 meters 500
S.NO. ITEMS USED QUANTITY OF
ITEM
COST OF ITEMS
ACTUAL (RUPEES)
1. Indicator (LED) 15 200 (EXCLUDING SPARE)
2. Acrylic sheet 1(244*211) 0 (SCRAP)
3. Paper tag 5 0 (WASTES)
4. Wire 10 meters 0 (SPARE)
COST ANALYSIS (INVESTMENT)
TOTAL COST OF INVESTMENT
(RUPEES)
1880
TOTAL COST OF INVESTMENT
(RUPEES)
200
Right now we
are availed with
all items in
scrap and spare
PREVIOUS
YEAR
BEFORE
AFTER
CONCLUSION
S.NO. MACHINE LINE
SETUP IN
WORKSHOP
TOTAL TIME
SAVED(HRS.)
TOTAL MONEY
SAVED(Rupees)
1. IN MANI 37.96 9869.6 + 44405.75
= 54275.35
2. DBW
3. BOBBIN
COST ANALYSIS (CONCLUSION)
PREVIOUS
YEAR
SIMULATION OF THE CONCEPT
THANK YOU
t/1-√v2/c2

More Related Content

Similar to PLC problem troubleshooting

Final ams power_point_slides-------newwww
Final ams power_point_slides-------newwwwFinal ams power_point_slides-------newwww
Final ams power_point_slides-------newwwwvivekmsmech
 
Cairo 01 Six Sigma Measure
Cairo 01 Six Sigma MeasureCairo 01 Six Sigma Measure
Cairo 01 Six Sigma Measureahmad bassiouny
 
online_failure detection
online_failure detectiononline_failure detection
online_failure detectionSyed Farukh
 
IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...
IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...
IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...IRJET Journal
 
Comparative characteristics of pert and cpm
Comparative characteristics of pert and cpmComparative characteristics of pert and cpm
Comparative characteristics of pert and cpmKinshook Chaturvedi
 
VSM (Lean Manufacturing) Project PPT
VSM (Lean Manufacturing) Project PPTVSM (Lean Manufacturing) Project PPT
VSM (Lean Manufacturing) Project PPTFASI93
 
RESUME - ALOK SAXENA - CNC - ELECTRONICS ENGINEER
RESUME - ALOK SAXENA - CNC - ELECTRONICS ENGINEERRESUME - ALOK SAXENA - CNC - ELECTRONICS ENGINEER
RESUME - ALOK SAXENA - CNC - ELECTRONICS ENGINEERAlok Saxena
 
Reducing manufacturing lead time of steam turbine casing
Reducing manufacturing lead time of steam turbine casingReducing manufacturing lead time of steam turbine casing
Reducing manufacturing lead time of steam turbine casingeSAT Publishing House
 
CONDITION BASED MONITORING PRESENTATION
CONDITION BASED MONITORING PRESENTATIONCONDITION BASED MONITORING PRESENTATION
CONDITION BASED MONITORING PRESENTATIONIgnesias Tsotetsi
 
IRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
IRJET- A Case Study Approach of Quality Tools in Manufacturing IndustryIRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
IRJET- A Case Study Approach of Quality Tools in Manufacturing IndustryIRJET Journal
 
Production - Reducing Machine Setup Time - IEM
Production - Reducing Machine Setup Time - IEMProduction - Reducing Machine Setup Time - IEM
Production - Reducing Machine Setup Time - IEMGan Chun Chet
 
H0432045055
H0432045055H0432045055
H0432045055theijes
 
IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...
IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...
IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...IRJET Journal
 
ZBC in commodities.ppt
ZBC in commodities.pptZBC in commodities.ppt
ZBC in commodities.pptSoulmananIndia
 
Santec presentation on Heavy Duty Hydraulic presses
Santec presentation on  Heavy Duty  Hydraulic presses Santec presentation on  Heavy Duty  Hydraulic presses
Santec presentation on Heavy Duty Hydraulic presses SANTEC GROUP
 

Similar to PLC problem troubleshooting (20)

Final ams power_point_slides-------newwww
Final ams power_point_slides-------newwwwFinal ams power_point_slides-------newwww
Final ams power_point_slides-------newwww
 
Cairo 01 Six Sigma Measure
Cairo 01 Six Sigma MeasureCairo 01 Six Sigma Measure
Cairo 01 Six Sigma Measure
 
online_failure detection
online_failure detectiononline_failure detection
online_failure detection
 
IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...
IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...
IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...
 
Comparative characteristics of pert and cpm
Comparative characteristics of pert and cpmComparative characteristics of pert and cpm
Comparative characteristics of pert and cpm
 
VSM (Lean Manufacturing) Project PPT
VSM (Lean Manufacturing) Project PPTVSM (Lean Manufacturing) Project PPT
VSM (Lean Manufacturing) Project PPT
 
RESUME - ALOK SAXENA - CNC - ELECTRONICS ENGINEER
RESUME - ALOK SAXENA - CNC - ELECTRONICS ENGINEERRESUME - ALOK SAXENA - CNC - ELECTRONICS ENGINEER
RESUME - ALOK SAXENA - CNC - ELECTRONICS ENGINEER
 
A012430106
A012430106A012430106
A012430106
 
Reducing manufacturing lead time of steam turbine casing
Reducing manufacturing lead time of steam turbine casingReducing manufacturing lead time of steam turbine casing
Reducing manufacturing lead time of steam turbine casing
 
CONDITION BASED MONITORING PRESENTATION
CONDITION BASED MONITORING PRESENTATIONCONDITION BASED MONITORING PRESENTATION
CONDITION BASED MONITORING PRESENTATION
 
IRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
IRJET- A Case Study Approach of Quality Tools in Manufacturing IndustryIRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
IRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
 
Production - Reducing Machine Setup Time - IEM
Production - Reducing Machine Setup Time - IEMProduction - Reducing Machine Setup Time - IEM
Production - Reducing Machine Setup Time - IEM
 
H0432045055
H0432045055H0432045055
H0432045055
 
Tpm
Tpm Tpm
Tpm
 
Tpm
Tpm Tpm
Tpm
 
Work measurement
Work measurementWork measurement
Work measurement
 
IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...
IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...
IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...
 
ZBC in commodities.ppt
ZBC in commodities.pptZBC in commodities.ppt
ZBC in commodities.ppt
 
luai_cv
luai_cvluai_cv
luai_cv
 
Santec presentation on Heavy Duty Hydraulic presses
Santec presentation on  Heavy Duty  Hydraulic presses Santec presentation on  Heavy Duty  Hydraulic presses
Santec presentation on Heavy Duty Hydraulic presses
 

More from shashank tiwari

ANDROID BASED AUTOMATED SMART WHEELCHAIR
ANDROID BASED AUTOMATED SMART WHEELCHAIRANDROID BASED AUTOMATED SMART WHEELCHAIR
ANDROID BASED AUTOMATED SMART WHEELCHAIRshashank tiwari
 
Android based automated wheelchair
Android based automated wheelchairAndroid based automated wheelchair
Android based automated wheelchairshashank tiwari
 
microcontroller board ppt
microcontroller board pptmicrocontroller board ppt
microcontroller board pptshashank tiwari
 
Quality check machine for outer door mirror of cars
Quality check machine for outer door mirror of carsQuality check machine for outer door mirror of cars
Quality check machine for outer door mirror of carsshashank tiwari
 

More from shashank tiwari (6)

final ppt
final pptfinal ppt
final ppt
 
ANDROID BASED AUTOMATED SMART WHEELCHAIR
ANDROID BASED AUTOMATED SMART WHEELCHAIRANDROID BASED AUTOMATED SMART WHEELCHAIR
ANDROID BASED AUTOMATED SMART WHEELCHAIR
 
Android based automated wheelchair
Android based automated wheelchairAndroid based automated wheelchair
Android based automated wheelchair
 
microcontroller board ppt
microcontroller board pptmicrocontroller board ppt
microcontroller board ppt
 
SHASHANK PROJECT
SHASHANK PROJECTSHASHANK PROJECT
SHASHANK PROJECT
 
Quality check machine for outer door mirror of cars
Quality check machine for outer door mirror of carsQuality check machine for outer door mirror of cars
Quality check machine for outer door mirror of cars
 

Recently uploaded

fundamentals of drawing and isometric and orthographic projection
fundamentals of drawing and isometric and orthographic projectionfundamentals of drawing and isometric and orthographic projection
fundamentals of drawing and isometric and orthographic projectionjeevanprasad8
 
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdfA CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdfKamal Acharya
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfPipe Restoration Solutions
 
2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edge2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edgePaco Orozco
 
Natalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in KrakówNatalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in Krakówbim.edu.pl
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234AafreenAbuthahir2
 
Explosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdfExplosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdf884710SadaqatAli
 
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptxCloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptxMd. Shahidul Islam Prodhan
 
Hall booking system project report .pdf
Hall booking system project report  .pdfHall booking system project report  .pdf
Hall booking system project report .pdfKamal Acharya
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
 
A case study of cinema management system project report..pdf
A case study of cinema management system project report..pdfA case study of cinema management system project report..pdf
A case study of cinema management system project report..pdfKamal Acharya
 
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical EngineeringC Sai Kiran
 
İTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopİTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopEmre Günaydın
 
Toll tax management system project report..pdf
Toll tax management system project report..pdfToll tax management system project report..pdf
Toll tax management system project report..pdfKamal Acharya
 
shape functions of 1D and 2 D rectangular elements.pptx
shape functions of 1D and 2 D rectangular elements.pptxshape functions of 1D and 2 D rectangular elements.pptx
shape functions of 1D and 2 D rectangular elements.pptxVishalDeshpande27
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Electivekarthi keyan
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptssuser9bd3ba
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Dr.Costas Sachpazis
 

Recently uploaded (20)

fundamentals of drawing and isometric and orthographic projection
fundamentals of drawing and isometric and orthographic projectionfundamentals of drawing and isometric and orthographic projection
fundamentals of drawing and isometric and orthographic projection
 
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdfA CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edge2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edge
 
Natalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in KrakówNatalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in Kraków
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Explosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdfExplosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdf
 
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptxCloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
 
Hall booking system project report .pdf
Hall booking system project report  .pdfHall booking system project report  .pdf
Hall booking system project report .pdf
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
A case study of cinema management system project report..pdf
A case study of cinema management system project report..pdfA case study of cinema management system project report..pdf
A case study of cinema management system project report..pdf
 
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
 
İTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopİTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering Workshop
 
Toll tax management system project report..pdf
Toll tax management system project report..pdfToll tax management system project report..pdf
Toll tax management system project report..pdf
 
shape functions of 1D and 2 D rectangular elements.pptx
shape functions of 1D and 2 D rectangular elements.pptxshape functions of 1D and 2 D rectangular elements.pptx
shape functions of 1D and 2 D rectangular elements.pptx
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 

PLC problem troubleshooting

  • 1. GLOBAL KEIHIN CIRCLE PRESENTED BY KEIHIN INDIA MANUFACTURING PVT. LTD 4th-AURAVA t/1-√v2/c2
  • 2. A ANDON U UNIVERSAL R RIGHT SIZE TOOL OR DEVICE A AUTOMATION V VALUE STREAM MAPPING A AUTONOMATION SIGNIFICANCE/意義/ महत्व t/1-√v2/c2
  • 3. LOCATION OF KEIHIN INDIA MANUFACTURING PVT. LTD. IN INDIA ESTABLISHED : 1997 CUSTOMER : HONDA CARS INDIA LTD. MARUTI SUZUKI INDIA LTD. GENERAL MOTORS PRINS EUROPE YAMAHA MOTORS CERTIFIED : TS 16949 DEC-03 ISO 14001 IN MAR-04 PRODUCTS : INTAKE MANIFOLD ASSY PIPE FUELASSY (NGV) INJECTOR ASSY (NGV) FUEL PUMP MODULE EMPLOYEES : 130
  • 4. t MFG. INTAKE MANIFOLD FOR CITY, BRIO, AMAZE,JAZZ MFG. PIPE FUELASSY.(NGV) FOR EECO, ERTIGA, WAGON-R MFG. PIPE FUELASSY.(NGV) FOR GENERAL MOTORS MFG. INJECTORS ASSY. (NGV) FOR PRINS 6 MODELS MFG. FUEL PUMP MODULE FOR YAMAHA MOTOR KEIHIN INDIA MANUFACTURING PVT. LTD. MAIN PRODUCTS
  • 6. Sales and purchase dept. Business development sales and relations development Sales and purchase dept. sales and relations development QA/QC dept. control, and monitor all activities related to Quality Production dept. ensures all products are manufactured with utmost efficiency Engineering and maintenance dept. maintainability, reliability, and availability of equipment ADVISOR SURAJ SAN LEADER SHASHANK MEMBER PRIYANK MEMBER DEEPAK FACILITATOR ALLAN SAN Engineering and maintenance dept. Leading the maintainability, reliability, and availability of equipment MEMBER MOHAN TEAM 4TH AURAVA
  • 7. STEPS RESPONSIBILITY TASK Selection of theme Team Set kick-off meeting Agree on objectives, History research, Data collection, Study on scenario Identification of the most important product or process Team prototype Dev. Gaol setting Technical Request Analysis of selected process Shashank, Deepak, Mohan Testing over Machine . Development of the proper strategy for critical process Shashank, Deepak, Mohan Hardware configuration Implementations of actions Shashank Operations Dev. Complete Final assessment Team Launch AS PER IMPROVEMENT MODEL DEC JAN FEB MARCH APRIL MAY 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 ACTIVITY PLAN
  • 9. BRAINSTORMING FOR THEME SELECTION Yeah! Including inspection cutting machine as well Solar panel, how’s about that …so that we cad head to sustainable development In house development, saved so much, if we consider the cost saving as a goal Guys, we will go for something that has been hidden to others yet, we need sum up of all
  • 10. CONCLUSION OF THE DISSCUSION TIME TIME is the event that effects all type of processes/products
  • 11. BASIC FEATURES INVOLVED IN THEME Energy saving by solar panel installation Cost saving by adopting in-house modifications& fabrications in machine for DBW project Time saving by smart troubleshooting QUALITY AND INNOVATION COST SAVING DIFFICULTY COST INVOLVED LEARNING SAFETY TOTAL Taking the steps to reduce downtime in manufacturing settings can seem overwhelming, ................................!! but the money saved, and additional profits earned from this concept are worthwhile. TIMELESS IMPRESSIVE GOOD AVERAGE TERRIBLE THEME SELECTION C O N C L U S I O N Selection of theme is done
  • 12. IDENTIFICATION OF THE MOST IMPORTANT PRODUCT OR PROCESS t/1-√v2/c2 £”%^ $ XX=
  • 13. 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 CHCOLLARM/C LEAKTESTM/C M5HEATINSERTMACHINE CHCOLLARINSERTM/C THCOLLARINSERTM/C M6HEATINSERTMACHINE IFCOLLARINSERTM/C CHCOLLARPRESSFITM/C CHCOLLARPRESSFITM/C THCOLLARINSERTM/C M5HEATINSERTMACHINE THCOLLARINSERTM/C IFCOLLARINSERTM/C THCOLLARINSERTM/C DOWN TIME(HRS) STANDARD MTTR(HRS) TARGET MTTR(HRS) ACTUAL MTTR(HRS) BEFORE IMPLEMENTATION APRIL TO JAN(16-17) INMANI LINE MONTH WISE 0 0.5 1 1.5 2 2.5 3 3.5 APRIL MAY JUNE JULY AUG SEP OCT NOV DEC JAN DOWN TIME(HRS) STANDARD MTTR(HRS) TARGET MTTR(HRS) ACTUAL MTTR(HRS) MACHINE WISE TARGET SET SPECIFICALLY FOR SMALL AND MEDIUM END MACHINE OUR AIM IS TO MINIMIZE AS MUCH AS POSSIBLE IDENTIFICATION OF THE MOST IMPORTANT PRODUCT OR PROCESS AIM SO Analysis of selected process
  • 14. So, Identification of the most important product or process is done 1 2 3 4 5 6 7 8 8 1 2 3 4 5 6 7 8 8 BREAK DOWN MEAN TIME TO REPAIR SO OUR AIM IS TO REDUCE MTTR BY 70% AIM POSSIBLE AREAS to reduce down time
  • 16. Methods Delay in identifying the fault in machinery MaterialsMeasurement Environment Manpower Machines Limited specified Indications Through PC communication •Time taking for frequent error •Usually without comments over commands Spare parts can't be use till the cause is isolated Unnecessarily replacement or fitment of spare while hitting the cause Complicated system and vague cause Old machines Problem occurrence becomes frequent SOP(standard operating procedure) is availed Improvisation Inexperienced handler Under training Lack of manpower Error indications isn’t similar and sufficient Mechanical, electrical, electronics etc. Risk of approach wrong Some machines are with two processors CAUSE AND EFFECT DIAGRAM Methods Delay in identifying the fault in machinery Analysis of selected process started
  • 17. 3 6 9 2 4 6 1 2 3 RISK LEVEL PROBABILITY SEVERITY 1 2 3 123 1 : LOW 2: MODERATE 3: HIGH PROBABILITY OF ACCIDENT=P SEVERITY OF ACCIDENT=S RISK LEVEL =P(1) *S(2)= 2 RISK LEVEL =P(2) *S(1)= 2 RISK LEVEL =P(.9) *S(3) = 2.7 P DEPENDS ON LEVEL OF M/C COMPLEXITY OR ITS COMPONENTS EX. • ROBOT •HYDRAULIC PRESS CYLINDER •PNEUMATIC CYLINDERS , ACTUATORS ETC 1 2 3 4 5 1
  • 18. • EMERGENCY PREPAREDNESS AND RESPONSE (4.4.7) • Identify likely OHS accident and emergency scenarios which may have impacts on people, process, and have business risks. • Determine potential OHS impacts. • Develop[ simple rapid response procedures to control OHS impacts. • Periodically test emergency procedures to control after incidents. • Train staff in implementation of emergency controls. CLAUSE FROM OHSAS:18001 (2007) It also supports the clause from OHSAS SO FROM 1 AND 2, WE NEED TO MITIGATE THE CHANCES OF IMPACTS OVER ANY LIFE 2
  • 19. Sir machine is not starting Hey…am here only !! I will not start Means no home position, ok I ill call maintenance What is being done while breakdown…!! Here we have analysed the predefined process of corrective maintenance
  • 20. Hmm… let me start from 1 •Photo electric sensor •Load sensor •Air pressure sensor •Read switch on cylinder •Area sensor •Proximity sensor •Switches Input side •PLC •DRIVES •PID Process side • Contactors • Relays • Solenoid valves • Motor driver • heater • Alphanumeric display Output side 1 23 x minutes z minutes y minutes Problem could be anywhere x + y + z minutesMax time to inspect the problem Existing Troubleshooting approach
  • 21. DEVELOPMENT OF PROPER STRATEGY FOR CRITICAL PROCESSES t/1-√v2/c2 £”%^ $ XX=
  • 22. Demonstration over IF collar press Machine 22 1 0 5 13 10 21 30 31 34 Let’s begin with the development of the proper strategy for critical process
  • 23. Input side devices • AREA SENSOR • READ SWITCH • PHOTOELECTRIC SENSOR • MAIN AIR PRESSURE
  • 24. Input side devices • SWITCHES • LOAD CELL (LOW PRESSURE) • PROXIMITY SENSORS
  • 25. To eliminate the time of inspection spend on step 1 SENS. WORK WELL OK POLLS OUT I/P SIGNALS HOW
  • 26. 10 5 13 10 21 22 30 31 34 CONFIGURE INTO PANEL 1 5 0 13 10 2122 3031 34 INSTALLED IT ONTO MACHINE THEN Here we are assured from the input side of the machine Let’s work more
  • 27. How justify .. To eliminate the time of inspection spend on step 3 HOW This way we should go This manner Never mind AS PER THE OBJECTIVE
  • 28. U • ULTIMATE C • CONCLUSION A • ANALYSIS on on LAST ERROR=N+ 9 If the above condition is true then machine unit abnormal on Here M504 is having value 10000(BC) i.e. 16 M504 M505 M506 M507 M508
  • 29. M6 UNIT ABNORMAL PLC ERR. BATT. ERR. CYL. READ ERR. ROBO ERR. So we have plans for separation of all pre-eminent errors AS PER THE OBJECTIVE Development of the proper strategy for critical process is done over here
  • 30. •Photo electric sensor •Load sensor •Air pressure sensor •Read switch on cylinder •Area sensor •Proximity sensor •Switches Input side •PLC •DRIVES •PID Process side • Contactors • Relays • Solenoid valves • Motor driver • heater • Alphanumeric display Output side x minutes y minutes z minutesz minutes Max time to inspect the problem Eliminating the time of inspection spend on step 1 and 3 1 23 AS PER OBJECTIVE Our strategy for critical process is eliminating the time of inspection
  • 31. IMPLIMENTATION AND TRIALS OF ACTIONS t/1-√v2/c2 £”%^ $ XX=
  • 32. IMPLIMENTATION AND TRIALS INDICATOR ON PRESS FIT TYPE MACHINE INDICATOR ON HEAT INSERT TYPE MACHINE PAPER TAG FOR ERROR SITE TRIAL ON PANEL SIDE Implementations of actions
  • 34. 0 0.5 1 1.5 2 2.5 3 3.5 DOWN TIME(HRS) STANDARD MTTR(HRS) TARGET MTTR(HRS) ACTUAL MTTR ANALYSIS AND FINAL ASSESSMENT OF IMPLEMENTED ACTION AFTER IMPLEMENTATION FEB TO PRESENT (17 -18) INMANI LINE MONTH WISEMACHINE WISE 0 0.5 1 1.5 2 2.5 3 3.5 DOWN TIME(HRS) STANDARD MTTR(HRS) TARGET MTTR(HRS) ACHIEVED MTTR(HRS) OUR CONCERN IS OVER THE BD RELATED TO MACHINE ABNORMAL BEHAVIOUR ACTUAL MTTR(0.06) IS MUCH BELLOW THE TARGET (0.1)MTTR THESE ARE MECHANICAL BD, SO OUT OF CONCERN FINAL ASSESSMENT OF IMPLEMENTED ACTION STARTED
  • 35. 0 0.5 1 1.5 2 2.5 3 3.5 DOWN TIME(HRS) STANDARD MTTR(HRS) TARGET MTTR(HRS) ACTUAL MTTR(HRS) 0 0.5 1 1.5 2 2.5 3 3.5 DOWN TIME(HRS) STANDARD MTTR(HRS) TARGET MTTR(HRS) ACTUAL MTTR(HRS) ANALYSIS AND FINAL ASSESSMENT OF IMPLEMENTED ACTION COMPARISION ON THE BASIS OF EFFECTIVENESS (MTTR) AFTERBEFORE HERE WE ARRIVED TO THE CONCLUSION OUR WORK FLUXES TO ACHIEVE THE IMPROVE MENT IN %
  • 36. 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 PREVIOUS YEAR MTTR SET TARGET MTTR ACHIEVED TARGET MTTR MTTR MTTR 70.58 82.35 0.34 0.1 0.06 ANALYSIS AND FINAL ASSESSMENT OF IMPLEMENTED ACTION RESULT OF FINAL OF IMPLEMENTED ACTION BEFORE IMPLEMENTATION APRIL TO JAN(16-17) INMANI LINE SET TARGET AS PER THE DEVELOPRD STRATEGY AFTER IMPLEMENTATION FEB TO PRESENT (17 -18) INMANI LINE WOW ! THAT’S AMAZING Let’s begin the assessment over cost
  • 37. COST ANALYSIS (REGULAR TIME) S.NO. MACHINE NAME TOTAL BREAK DOWN TIME W.R.T MACHINE (HRS.) NO. OF BD LABOUR COST YEARLY (Rupees) ESTIMATED COST PER PIECE (Rupees) NO. REFUSED PIECE COST OF REFUSED PIECES (Rupees) 1. Heat insert machine m5 0.95+2.08+1.16 = 4.19 3 1414.125 1000 2*3=6 6000 2. Heat insert machine m6 0.8+0.44+0.88+0.75 =2.87 4 968.625 1000 2*4=8 8000 3. Collar insert machine CH 0.67+3.5+0.92+0.8 =5.89 4 1987.875 1000 2*4=8 8000 4. Collar insert machine TH 0.5+0.8+0.3+0.26 =1.86 4 627.75 1000 2*4=8 8000 5. Collar press fit machine IF 0.92+2.42+0.66+0.17 =4.17 4 1407.375 1000 2*4=8 8000 TOTAL (Rupees) 18.98 19 6405.75 5000 38 38000 TOTAL (Rupees) = Total of LABOUR COST + Total of COST OF REFUSED PIECES (Rupees) = 44405.75 Amount that we could have save previous year while regular time PREVIOUS YEAR
  • 38. S.NO. MACHINE NAME TOTAL BREAK DOWN TIME W.R.T MACHINE (HRS.) = OVER TIME FOR RECOVERY NO. OF BD LABOUR COST YEARLY (OT) (Rupees) 1. Heat insert machine m5 0.95+2.08+1.16 = 4.19 3 2178.8 2. Heat insert machine m6 0.8+0.44+0.88+0.75 =2.87 4 1492.4 3. Collar insert machine CH 0.67+3.5+0.92+0.8 =5.89 4 3062.8 4. Collar insert machine TH 0.5+0.8+0.3+0.26 =1.86 4 967.2 5. Collar press fit machine IF 0.92+2.42+0.66+0.17 =4.17 4 2168.4 TOTAL (Rupees) = Total of LABOUR COST YEARLY (OT) 9869.6 COST ANALYSIS (OVER TIME) Amount that we could have save previous year in the expense of OT PREVIOUS YEAR
  • 39. S.NO. ITEMS USED QUANTITY OF ITEM COST OF ITEMS MARKET PRICE(RUPEES) 1. Indicator (LED) 15 375 2. Acrylic sheet 1(244*211) 1000 3. Paper tag 5 5 4. Wire 10 meters 500 S.NO. ITEMS USED QUANTITY OF ITEM COST OF ITEMS ACTUAL (RUPEES) 1. Indicator (LED) 15 200 (EXCLUDING SPARE) 2. Acrylic sheet 1(244*211) 0 (SCRAP) 3. Paper tag 5 0 (WASTES) 4. Wire 10 meters 0 (SPARE) COST ANALYSIS (INVESTMENT) TOTAL COST OF INVESTMENT (RUPEES) 1880 TOTAL COST OF INVESTMENT (RUPEES) 200 Right now we are availed with all items in scrap and spare PREVIOUS YEAR
  • 40. BEFORE AFTER CONCLUSION S.NO. MACHINE LINE SETUP IN WORKSHOP TOTAL TIME SAVED(HRS.) TOTAL MONEY SAVED(Rupees) 1. IN MANI 37.96 9869.6 + 44405.75 = 54275.35 2. DBW 3. BOBBIN COST ANALYSIS (CONCLUSION) PREVIOUS YEAR
  • 41. SIMULATION OF THE CONCEPT