SlideShare a Scribd company logo
1 of 3
DEBASHIS DAS.
Project Management & NPD Engineer.Project Management & NPD Engineer.
(Scope Management/Communication Management/
Risk Management/Project Execution and Monitoring)
Contact No.: +91 8277022796
Email: devmechi108@gmail.com
A dynamic, team spirited and performance driven engineering professional with an
extraordinary blend of leadership, business acumen and industrial knowledge. Ability to
communicate and motivate team members to enhance strategic goals and achieve objectives.
 Project management  Injection molding, Machining  Six Sigma – Black belt
Casting & Sheet metal processing
 Design of experiments Tool Design verification &  Powder Metallurgy
Validation
Organisational Experience
Aug’2015– Till Date
Mann And Hummel Filter. – Bangalore
COMPANY PROFILE: MANN+HUMMEL has displayed an impressive track record 1.000
research & development specialists, continuous growth and more than 16 filter elements produced per second
over 70 years.
With a clear vision of "Leadership in Filtration" the Group´s product portfolio includes air filter systems, intake
manifold systems, liquid filter systems, cabin filters and sound-design components called symposer, as well as
filter elements for motor vehicles maintenance.
For general engineering, process engineering and industrial applications, the product range includes industrial
filters, membrane filters for water filtration and filter systems
Roles and responsibilities:
• Project Kick-off meeting, understand the project requirement & define the detail project scope.
• Assisted in developing business plans that were based on the efficiency of the Six Sigma methods.
• Apart from project giving training on Six Sigma Green belt and helping in other project to solve
manufacturing issues through six sigma tool.
• Conduct Contract Review meeting with the team and other stakeholders/Customers.
• Conduct Project Kick off Meeting with the team.
• Project Scope Management
o Creating/Updating WBS (Work Breakdown Structure) using MS Project.
o Create SOW (Statement of Work).
o Involved in creating MSA along with Senior Management.
o Defining activities, calendars-definition and estimate duration using both MS Project and MS
Excel.
o Preparing resource sheets and allocating resources to activities.
• Project Planning and scheduling.
• Project Execution and Monitoring.
o Handling customer queries.
o Consolidating various processes like, process sheets, Tool Data Sheet (TDS) and route card
from engineering team. And Control Plan, bal coning and inspecting plan from Quality Team.
• Conducting Risk Analysis meeting with engineering and quality teams.
• Coordinated with teams in achieving the target before deadline,
• Used various tools to identify the project failure, co-ordinated meetings for failure study
• Had communication from the base level to the top level of management; suppliers to Customers in
executing various projects.
• Participated in summits and presented our products, where we interacted with our competitors.
Jun’2011– Aug’2015
INDO-US MIM TEC PVT LTD. – Bangalore
COMPANY PROFILE: Indo-MIM is a ISO/TS 16949:2002leading global supplier of
precision-engineered products using Metal Injection Molding (MIM) as the core manufacturing
technology. The MIM process combines the design flexibility of plastic injection molding with the
strength and integrity of wrought metals to offer cost effective solutions for highly complex part
geometries. The major customers are Leatherman Tool Group-U.S, Honeywell Turbo Technology-
France, Grace Engineering-U.S, South co-U.S
Roles and responsibilities:
• Leading cross functional team coordination to support shared corporate suppliers across sites designing,
developing, implementing, and maintaining a process for the management of as per the AIAG methods
meeting with ts 16949:2009 requirements.
• Coordinates and facilitates, as required, the supplier corrective actions to improve processes, quality,
capability, etc. This includes process recommendations as well as surveillance as required.
• Initiate corrective or preventive actions to prevent re-occurrence or occurrence of non-conformities related
to system deviation
• Design and development of Poka-yoke gauges and fixtures required for new products as well for the
improving the production.
• Identify current and new vectors of supplier quality intelligence and utilize for developing tangible, clear, and
concise supplier quality information for the Develop and implement tools, Key Performance Indicators (KPI’s),
and metrics to measure and evaluate supplier quality risk.
• Preparation of PPAP documents as per the customer requirement and getting approval from the customer.
• Participate on all internal/external supplier validation efforts (as applicable), including but not limited to,
assessing supplier quality programs, and follow up with internal and external functions as needed.
• Conducting gauge R&R, ISIR and Process capability studies for new projects.
• Actively participate in association meetings to develop relationship and build further supplier quality
intelligence on upcoming regulatory changes or competitive intelligences.
• Implementing cost saving initiatives; achieving cost reduction through value engineering, reduction in
breakdown, rework and waste elimination.
• Work towards reduction of cycle time & improve quality of the processes.
• Reduce Manufacturing cost and improve quality of the processes/product by implementing Lean systems and
kaizen activities.
• Support the Operation team to successfully deliver the Solution during the Mass production stage of Project
Core Competencies –
New Product Development
 Interfacing with CFT / Parent company for
necessary modifications in component design for
manufacturability of components and getting into
the customer delight.
 Handling process planning for new products;
developing and introducing new processes.
 Establishing work norms using time study &
motion measurements (MOST Techniques) for the
various working atmosphere.
Relationship Management
 Leading, managing and monitoring the
performance of multi-skilled work force.
 Establishing and motivating team culture in
the productivity improvements.
 Attending Customers,& Certifying Bodies and
implementing there voice on the project and
process.
Quality / Method Improvement
 Ensuring adherence to the quality standards
as per TS 16949 and establishing charts /
statistical tools to minimize the scrap /
reworks in ongoing processes as well
systematic quality audits.
 Implementing cost saving initiatives;
achieving cost reduction through value
engineering, reduction in breakdown, rework and
waste elimination.
 Pending corrective actions (8D’s) and also
measure the effectiveness of corrective actions
of corrective actions implemented.
Achievements:
 Successfully implemented 5Kaizen projects and giving sustenance result.
 Worked with program/project managers involving steering and tracking of project according to the master plan
thereby acquired knowledge of Project Management.
 Youngest VAVE and CFT member and got appreciation from management for providing innovative ideas for product
development and cost saving.
 Acted as the managing in charge for “the packaging and material handling” and “testing” for various projects, where I
did cost saving by six sigma tool and got wide appreciation.
Training programs undergone:
 Advanced Lean Six Sigma green belt program form QMG Bangalore (Sept 2013 – Dec – 2013).
 Advance Product quality Planning (APQP) given by Bosch.
 8D’s by Stanadyne.
 Lean Process by Boston Group.
 Green Belt Project:
1) Optimizing the feedstock particle size for metal injection molding to reduce the molding defects and improve the
yield of MIM parts.
2) Develop a DOE by considering all the noise factors and main factors to execute the new programs with
minimum risk through MIM process.
 Certified Six Sigma Black belt by MSME.
1) Improved product performance of cellulose filter through process improvement benefiting of 5lakhs profit
per month.
Educational Qualification
 B.Tech (Mechanical Engineering) from C.E.B, BHUBANESWAR (BIJUPATTNAIK UNIVERSITY OF TECHNOLOGY) with
First class (6.87 CGPA) in AUG 2011.
 Intermediate in science from Baripada College, Baripada securing first class (60.44%).
 SSLC from Bileipada high School, keonjhar securing first class (72.4%).
Computer Knowledge
 Operating Systems : MS office, Windows98, 2000, XP,2007
 Software Skill : SAP erp system
Personal Information
 Date of birth: July 2nd
1989.
 Languages known: Oriya, Bengali, English, Hindi.
 Passport#:-M4064739
 Correspondence Address: HOUSE#-13/13,FIRST FLOOR 1ST MAIN ROAD
CHIKKABOMMASANDRA POST-G.K.V.K, BANGALORE 560065
Yours sincerely,
Debashis Das

More Related Content

What's hot

Gail Rodriguez Resume 2015 extended
Gail Rodriguez Resume 2015 extendedGail Rodriguez Resume 2015 extended
Gail Rodriguez Resume 2015 extendedGail Rodriguez
 
Quality : Concept & Overview for Construction Projects.
Quality : Concept & Overview for Construction Projects.Quality : Concept & Overview for Construction Projects.
Quality : Concept & Overview for Construction Projects.Sanjay Mishra
 
Vittal Resume 22.07.2015.2
Vittal Resume 22.07.2015.2Vittal Resume 22.07.2015.2
Vittal Resume 22.07.2015.2Vittal B
 
Plant head (operation)
Plant head (operation)Plant head (operation)
Plant head (operation)RAFIQUL ISLAM
 
Sushil Kumar Jain resume (International) mod 3
Sushil Kumar Jain resume (International) mod 3Sushil Kumar Jain resume (International) mod 3
Sushil Kumar Jain resume (International) mod 3Sushil Kumar Jain
 
Draft lytle+resume1 6 28-2017.docx 2
Draft lytle+resume1 6 28-2017.docx  2Draft lytle+resume1 6 28-2017.docx  2
Draft lytle+resume1 6 28-2017.docx 2Rhonda Lytle
 
1. STUDY ON QUALITY ASSURANCE AND QUALITY CONTROL MANAGEMENT SYSTEM IN 20 STO...
1.	STUDY ON QUALITY ASSURANCE AND QUALITY CONTROL MANAGEMENT SYSTEM IN 20 STO...1.	STUDY ON QUALITY ASSURANCE AND QUALITY CONTROL MANAGEMENT SYSTEM IN 20 STO...
1. STUDY ON QUALITY ASSURANCE AND QUALITY CONTROL MANAGEMENT SYSTEM IN 20 STO...AELC
 
Ahmed BakrResume
Ahmed BakrResumeAhmed BakrResume
Ahmed BakrResumeAhmed Bakr
 
Construction quality management plan (Construction Productivity Analysis)
Construction quality management plan (Construction Productivity Analysis)Construction quality management plan (Construction Productivity Analysis)
Construction quality management plan (Construction Productivity Analysis)Jayson Narito
 
Arthur Rehn no contact information 4-9-16
Arthur Rehn no contact information 4-9-16Arthur Rehn no contact information 4-9-16
Arthur Rehn no contact information 4-9-16Art Rehn
 
APQP Application
APQP ApplicationAPQP Application
APQP ApplicationEddie Lam
 
April 2016 - Denita's Resume
April 2016 - Denita's ResumeApril 2016 - Denita's Resume
April 2016 - Denita's ResumeDenita Kuhowski
 
Lohbauer resume 021717
Lohbauer resume 021717Lohbauer resume 021717
Lohbauer resume 021717Dave Lohbauer
 
Chad mc lean resume ep4
Chad mc lean resume ep4Chad mc lean resume ep4
Chad mc lean resume ep4Chad M. McLean
 

What's hot (20)

Gail Rodriguez Resume 2015 extended
Gail Rodriguez Resume 2015 extendedGail Rodriguez Resume 2015 extended
Gail Rodriguez Resume 2015 extended
 
Quality : Concept & Overview for Construction Projects.
Quality : Concept & Overview for Construction Projects.Quality : Concept & Overview for Construction Projects.
Quality : Concept & Overview for Construction Projects.
 
Vittal Resume 22.07.2015.2
Vittal Resume 22.07.2015.2Vittal Resume 22.07.2015.2
Vittal Resume 22.07.2015.2
 
Plant head (operation)
Plant head (operation)Plant head (operation)
Plant head (operation)
 
Sushil Kumar Jain resume (International) mod 3
Sushil Kumar Jain resume (International) mod 3Sushil Kumar Jain resume (International) mod 3
Sushil Kumar Jain resume (International) mod 3
 
Draft lytle+resume1 6 28-2017.docx 2
Draft lytle+resume1 6 28-2017.docx  2Draft lytle+resume1 6 28-2017.docx  2
Draft lytle+resume1 6 28-2017.docx 2
 
1. STUDY ON QUALITY ASSURANCE AND QUALITY CONTROL MANAGEMENT SYSTEM IN 20 STO...
1.	STUDY ON QUALITY ASSURANCE AND QUALITY CONTROL MANAGEMENT SYSTEM IN 20 STO...1.	STUDY ON QUALITY ASSURANCE AND QUALITY CONTROL MANAGEMENT SYSTEM IN 20 STO...
1. STUDY ON QUALITY ASSURANCE AND QUALITY CONTROL MANAGEMENT SYSTEM IN 20 STO...
 
Quality plan
Quality planQuality plan
Quality plan
 
Ahmed BakrResume
Ahmed BakrResumeAhmed BakrResume
Ahmed BakrResume
 
Construction quality management plan (Construction Productivity Analysis)
Construction quality management plan (Construction Productivity Analysis)Construction quality management plan (Construction Productivity Analysis)
Construction quality management plan (Construction Productivity Analysis)
 
Arthur Rehn no contact information 4-9-16
Arthur Rehn no contact information 4-9-16Arthur Rehn no contact information 4-9-16
Arthur Rehn no contact information 4-9-16
 
Resume Uma 2015
Resume Uma 2015Resume Uma 2015
Resume Uma 2015
 
APQP Application
APQP ApplicationAPQP Application
APQP Application
 
April 2016 - Denita's Resume
April 2016 - Denita's ResumeApril 2016 - Denita's Resume
April 2016 - Denita's Resume
 
Nelson Resume
Nelson ResumeNelson Resume
Nelson Resume
 
CV Mohan
CV MohanCV Mohan
CV Mohan
 
Raghavendra Resume
Raghavendra ResumeRaghavendra Resume
Raghavendra Resume
 
Lohbauer resume 021717
Lohbauer resume 021717Lohbauer resume 021717
Lohbauer resume 021717
 
Chad mc lean resume ep4
Chad mc lean resume ep4Chad mc lean resume ep4
Chad mc lean resume ep4
 
Sanjeev - cv
Sanjeev - cvSanjeev - cv
Sanjeev - cv
 

Viewers also liked

PGI: Presentación Miguel Pato
PGI: Presentación Miguel PatoPGI: Presentación Miguel Pato
PGI: Presentación Miguel PatoPTF
 
Presentación Marcelo Grimoldi
Presentación Marcelo GrimoldiPresentación Marcelo Grimoldi
Presentación Marcelo GrimoldiPTF
 
Emprendedor social 4to modulo
Emprendedor social 4to moduloEmprendedor social 4to modulo
Emprendedor social 4to moduloPTF
 
Presentacion final l
Presentacion final lPresentacion final l
Presentacion final lPTF
 
Presentacion ptf sem.empresas familiares
Presentacion ptf sem.empresas familiaresPresentacion ptf sem.empresas familiares
Presentacion ptf sem.empresas familiaresPTF
 
IET_Estimating_market_share_through_mobile_traffic_analysis linkedin
IET_Estimating_market_share_through_mobile_traffic_analysis linkedinIET_Estimating_market_share_through_mobile_traffic_analysis linkedin
IET_Estimating_market_share_through_mobile_traffic_analysis linkedinAsoka Korale
 
3Com 1647-010-010-AA
3Com 1647-010-010-AA3Com 1647-010-010-AA
3Com 1647-010-010-AAsavomir
 
Protek - Luis Fretes PAE WEEK
Protek - Luis Fretes PAE WEEKProtek - Luis Fretes PAE WEEK
Protek - Luis Fretes PAE WEEKPTF
 
3Com 3C17701
3Com 3C177013Com 3C17701
3Com 3C17701savomir
 
3Com 09N9909
3Com 09N99093Com 09N9909
3Com 09N9909savomir
 
Manual de access 2010
Manual de access 2010Manual de access 2010
Manual de access 2010heco21
 
Institucional PTF 2013
Institucional PTF 2013 Institucional PTF 2013
Institucional PTF 2013 PTF
 
Roberto Converti . py publico privado
Roberto Converti . py publico privadoRoberto Converti . py publico privado
Roberto Converti . py publico privadoPTF
 
Presentacion michael porter participantes v230813
Presentacion michael porter   participantes v230813Presentacion michael porter   participantes v230813
Presentacion michael porter participantes v230813PTF
 
Modelos de gestion conferencia paraguay converti. final final
Modelos de gestion conferencia paraguay converti.  final finalModelos de gestion conferencia paraguay converti.  final final
Modelos de gestion conferencia paraguay converti. final finalPTF
 
Ptf exponegocios 03 oct participantes
Ptf exponegocios  03 oct participantesPtf exponegocios  03 oct participantes
Ptf exponegocios 03 oct participantesPTF
 

Viewers also liked (18)

paginas FTP
paginas FTPpaginas FTP
paginas FTP
 
PGI: Presentación Miguel Pato
PGI: Presentación Miguel PatoPGI: Presentación Miguel Pato
PGI: Presentación Miguel Pato
 
Presentación Marcelo Grimoldi
Presentación Marcelo GrimoldiPresentación Marcelo Grimoldi
Presentación Marcelo Grimoldi
 
Emprendedor social 4to modulo
Emprendedor social 4to moduloEmprendedor social 4to modulo
Emprendedor social 4to modulo
 
Presentacion final l
Presentacion final lPresentacion final l
Presentacion final l
 
Presentacion ptf sem.empresas familiares
Presentacion ptf sem.empresas familiaresPresentacion ptf sem.empresas familiares
Presentacion ptf sem.empresas familiares
 
IET_Estimating_market_share_through_mobile_traffic_analysis linkedin
IET_Estimating_market_share_through_mobile_traffic_analysis linkedinIET_Estimating_market_share_through_mobile_traffic_analysis linkedin
IET_Estimating_market_share_through_mobile_traffic_analysis linkedin
 
3Com 1647-010-010-AA
3Com 1647-010-010-AA3Com 1647-010-010-AA
3Com 1647-010-010-AA
 
Protek - Luis Fretes PAE WEEK
Protek - Luis Fretes PAE WEEKProtek - Luis Fretes PAE WEEK
Protek - Luis Fretes PAE WEEK
 
3Com 3C17701
3Com 3C177013Com 3C17701
3Com 3C17701
 
3Com 09N9909
3Com 09N99093Com 09N9909
3Com 09N9909
 
Manual de access 2010
Manual de access 2010Manual de access 2010
Manual de access 2010
 
Institucional PTF 2013
Institucional PTF 2013 Institucional PTF 2013
Institucional PTF 2013
 
Roberto Converti . py publico privado
Roberto Converti . py publico privadoRoberto Converti . py publico privado
Roberto Converti . py publico privado
 
Presentacion michael porter participantes v230813
Presentacion michael porter   participantes v230813Presentacion michael porter   participantes v230813
Presentacion michael porter participantes v230813
 
Modelos de gestion conferencia paraguay converti. final final
Modelos de gestion conferencia paraguay converti.  final finalModelos de gestion conferencia paraguay converti.  final final
Modelos de gestion conferencia paraguay converti. final final
 
Ptf exponegocios 03 oct participantes
Ptf exponegocios  03 oct participantesPtf exponegocios  03 oct participantes
Ptf exponegocios 03 oct participantes
 
Tiempos modernos
Tiempos modernosTiempos modernos
Tiempos modernos
 

Similar to Debahis CV

Bruce Billington resume - July 2016
Bruce Billington resume - July 2016Bruce Billington resume - July 2016
Bruce Billington resume - July 2016Bruce Billington
 
Suresh Babu G P Resume
Suresh Babu G P ResumeSuresh Babu G P Resume
Suresh Babu G P Resumesuresh babu
 
Dinesh Kumar: Experienced Medical Device Project Manager Resume
Dinesh Kumar: Experienced Medical Device Project Manager ResumeDinesh Kumar: Experienced Medical Device Project Manager Resume
Dinesh Kumar: Experienced Medical Device Project Manager ResumeDinesh Kumar
 
Resume - Brigido Salgado Sr Mechanical Engineer 1
Resume - Brigido Salgado Sr Mechanical Engineer 1Resume - Brigido Salgado Sr Mechanical Engineer 1
Resume - Brigido Salgado Sr Mechanical Engineer 1Salgado Brigido
 
Pranshu Resume (Jan16)
Pranshu Resume (Jan16)Pranshu Resume (Jan16)
Pranshu Resume (Jan16)Pranshu Negi
 
Industrialengineeringpresentation
IndustrialengineeringpresentationIndustrialengineeringpresentation
IndustrialengineeringpresentationAliHasan202
 
Scott Miller Resume
Scott Miller ResumeScott Miller Resume
Scott Miller ResumeScott Miller
 
GT Resume June 2016 (generic)
GT Resume June 2016 (generic)GT Resume June 2016 (generic)
GT Resume June 2016 (generic)Gontran Tibere
 
GT Resume June 2016 (generic)
GT Resume June 2016 (generic)GT Resume June 2016 (generic)
GT Resume June 2016 (generic)Gontran Tibere
 
GT Resume June 2016 (generic)
GT Resume June 2016 (generic)GT Resume June 2016 (generic)
GT Resume June 2016 (generic)Gontran Tibere
 
Austin C Mattson_II_resume_May 2013
Austin C  Mattson_II_resume_May 2013Austin C  Mattson_II_resume_May 2013
Austin C Mattson_II_resume_May 2013Austin C. Mattson II
 
RHLEE49_Resume
RHLEE49_ResumeRHLEE49_Resume
RHLEE49_Resumerhlee46
 

Similar to Debahis CV (20)

Sanchit Dubey CV.
Sanchit Dubey CV.Sanchit Dubey CV.
Sanchit Dubey CV.
 
Bruce Billington resume - July 2016
Bruce Billington resume - July 2016Bruce Billington resume - July 2016
Bruce Billington resume - July 2016
 
Suresh Babu G P Resume
Suresh Babu G P ResumeSuresh Babu G P Resume
Suresh Babu G P Resume
 
Palicka steven 4 3
Palicka steven 4 3Palicka steven 4 3
Palicka steven 4 3
 
Dinesh Kumar: Experienced Medical Device Project Manager Resume
Dinesh Kumar: Experienced Medical Device Project Manager ResumeDinesh Kumar: Experienced Medical Device Project Manager Resume
Dinesh Kumar: Experienced Medical Device Project Manager Resume
 
RamkumarMV15
RamkumarMV15RamkumarMV15
RamkumarMV15
 
Sonali D Bisurkar
Sonali D BisurkarSonali D Bisurkar
Sonali D Bisurkar
 
Rsume
RsumeRsume
Rsume
 
Resume - Brigido Salgado Sr Mechanical Engineer 1
Resume - Brigido Salgado Sr Mechanical Engineer 1Resume - Brigido Salgado Sr Mechanical Engineer 1
Resume - Brigido Salgado Sr Mechanical Engineer 1
 
Resume
ResumeResume
Resume
 
GVK- Resume
GVK- ResumeGVK- Resume
GVK- Resume
 
Pranshu Resume (Jan16)
Pranshu Resume (Jan16)Pranshu Resume (Jan16)
Pranshu Resume (Jan16)
 
Industrialengineeringpresentation
IndustrialengineeringpresentationIndustrialengineeringpresentation
Industrialengineeringpresentation
 
Scott Miller Resume
Scott Miller ResumeScott Miller Resume
Scott Miller Resume
 
Purush_16Yrs and 8months Exp.
Purush_16Yrs and 8months Exp.Purush_16Yrs and 8months Exp.
Purush_16Yrs and 8months Exp.
 
GT Resume June 2016 (generic)
GT Resume June 2016 (generic)GT Resume June 2016 (generic)
GT Resume June 2016 (generic)
 
GT Resume June 2016 (generic)
GT Resume June 2016 (generic)GT Resume June 2016 (generic)
GT Resume June 2016 (generic)
 
GT Resume June 2016 (generic)
GT Resume June 2016 (generic)GT Resume June 2016 (generic)
GT Resume June 2016 (generic)
 
Austin C Mattson_II_resume_May 2013
Austin C  Mattson_II_resume_May 2013Austin C  Mattson_II_resume_May 2013
Austin C Mattson_II_resume_May 2013
 
RHLEE49_Resume
RHLEE49_ResumeRHLEE49_Resume
RHLEE49_Resume
 

Debahis CV

  • 1. DEBASHIS DAS. Project Management & NPD Engineer.Project Management & NPD Engineer. (Scope Management/Communication Management/ Risk Management/Project Execution and Monitoring) Contact No.: +91 8277022796 Email: devmechi108@gmail.com A dynamic, team spirited and performance driven engineering professional with an extraordinary blend of leadership, business acumen and industrial knowledge. Ability to communicate and motivate team members to enhance strategic goals and achieve objectives.  Project management  Injection molding, Machining  Six Sigma – Black belt Casting & Sheet metal processing  Design of experiments Tool Design verification &  Powder Metallurgy Validation Organisational Experience Aug’2015– Till Date Mann And Hummel Filter. – Bangalore COMPANY PROFILE: MANN+HUMMEL has displayed an impressive track record 1.000 research & development specialists, continuous growth and more than 16 filter elements produced per second over 70 years. With a clear vision of "Leadership in Filtration" the Group´s product portfolio includes air filter systems, intake manifold systems, liquid filter systems, cabin filters and sound-design components called symposer, as well as filter elements for motor vehicles maintenance. For general engineering, process engineering and industrial applications, the product range includes industrial filters, membrane filters for water filtration and filter systems Roles and responsibilities: • Project Kick-off meeting, understand the project requirement & define the detail project scope. • Assisted in developing business plans that were based on the efficiency of the Six Sigma methods. • Apart from project giving training on Six Sigma Green belt and helping in other project to solve manufacturing issues through six sigma tool. • Conduct Contract Review meeting with the team and other stakeholders/Customers. • Conduct Project Kick off Meeting with the team. • Project Scope Management o Creating/Updating WBS (Work Breakdown Structure) using MS Project. o Create SOW (Statement of Work). o Involved in creating MSA along with Senior Management. o Defining activities, calendars-definition and estimate duration using both MS Project and MS Excel. o Preparing resource sheets and allocating resources to activities. • Project Planning and scheduling. • Project Execution and Monitoring. o Handling customer queries. o Consolidating various processes like, process sheets, Tool Data Sheet (TDS) and route card from engineering team. And Control Plan, bal coning and inspecting plan from Quality Team. • Conducting Risk Analysis meeting with engineering and quality teams. • Coordinated with teams in achieving the target before deadline, • Used various tools to identify the project failure, co-ordinated meetings for failure study • Had communication from the base level to the top level of management; suppliers to Customers in executing various projects. • Participated in summits and presented our products, where we interacted with our competitors.
  • 2. Jun’2011– Aug’2015 INDO-US MIM TEC PVT LTD. – Bangalore COMPANY PROFILE: Indo-MIM is a ISO/TS 16949:2002leading global supplier of precision-engineered products using Metal Injection Molding (MIM) as the core manufacturing technology. The MIM process combines the design flexibility of plastic injection molding with the strength and integrity of wrought metals to offer cost effective solutions for highly complex part geometries. The major customers are Leatherman Tool Group-U.S, Honeywell Turbo Technology- France, Grace Engineering-U.S, South co-U.S Roles and responsibilities: • Leading cross functional team coordination to support shared corporate suppliers across sites designing, developing, implementing, and maintaining a process for the management of as per the AIAG methods meeting with ts 16949:2009 requirements. • Coordinates and facilitates, as required, the supplier corrective actions to improve processes, quality, capability, etc. This includes process recommendations as well as surveillance as required. • Initiate corrective or preventive actions to prevent re-occurrence or occurrence of non-conformities related to system deviation • Design and development of Poka-yoke gauges and fixtures required for new products as well for the improving the production. • Identify current and new vectors of supplier quality intelligence and utilize for developing tangible, clear, and concise supplier quality information for the Develop and implement tools, Key Performance Indicators (KPI’s), and metrics to measure and evaluate supplier quality risk. • Preparation of PPAP documents as per the customer requirement and getting approval from the customer. • Participate on all internal/external supplier validation efforts (as applicable), including but not limited to, assessing supplier quality programs, and follow up with internal and external functions as needed. • Conducting gauge R&R, ISIR and Process capability studies for new projects. • Actively participate in association meetings to develop relationship and build further supplier quality intelligence on upcoming regulatory changes or competitive intelligences. • Implementing cost saving initiatives; achieving cost reduction through value engineering, reduction in breakdown, rework and waste elimination. • Work towards reduction of cycle time & improve quality of the processes. • Reduce Manufacturing cost and improve quality of the processes/product by implementing Lean systems and kaizen activities. • Support the Operation team to successfully deliver the Solution during the Mass production stage of Project Core Competencies – New Product Development  Interfacing with CFT / Parent company for necessary modifications in component design for manufacturability of components and getting into the customer delight.  Handling process planning for new products; developing and introducing new processes.  Establishing work norms using time study & motion measurements (MOST Techniques) for the various working atmosphere. Relationship Management  Leading, managing and monitoring the performance of multi-skilled work force.  Establishing and motivating team culture in the productivity improvements.  Attending Customers,& Certifying Bodies and implementing there voice on the project and process. Quality / Method Improvement  Ensuring adherence to the quality standards as per TS 16949 and establishing charts / statistical tools to minimize the scrap / reworks in ongoing processes as well systematic quality audits.  Implementing cost saving initiatives; achieving cost reduction through value
  • 3. engineering, reduction in breakdown, rework and waste elimination.  Pending corrective actions (8D’s) and also measure the effectiveness of corrective actions of corrective actions implemented. Achievements:  Successfully implemented 5Kaizen projects and giving sustenance result.  Worked with program/project managers involving steering and tracking of project according to the master plan thereby acquired knowledge of Project Management.  Youngest VAVE and CFT member and got appreciation from management for providing innovative ideas for product development and cost saving.  Acted as the managing in charge for “the packaging and material handling” and “testing” for various projects, where I did cost saving by six sigma tool and got wide appreciation. Training programs undergone:  Advanced Lean Six Sigma green belt program form QMG Bangalore (Sept 2013 – Dec – 2013).  Advance Product quality Planning (APQP) given by Bosch.  8D’s by Stanadyne.  Lean Process by Boston Group.  Green Belt Project: 1) Optimizing the feedstock particle size for metal injection molding to reduce the molding defects and improve the yield of MIM parts. 2) Develop a DOE by considering all the noise factors and main factors to execute the new programs with minimum risk through MIM process.  Certified Six Sigma Black belt by MSME. 1) Improved product performance of cellulose filter through process improvement benefiting of 5lakhs profit per month. Educational Qualification  B.Tech (Mechanical Engineering) from C.E.B, BHUBANESWAR (BIJUPATTNAIK UNIVERSITY OF TECHNOLOGY) with First class (6.87 CGPA) in AUG 2011.  Intermediate in science from Baripada College, Baripada securing first class (60.44%).  SSLC from Bileipada high School, keonjhar securing first class (72.4%). Computer Knowledge  Operating Systems : MS office, Windows98, 2000, XP,2007  Software Skill : SAP erp system Personal Information  Date of birth: July 2nd 1989.  Languages known: Oriya, Bengali, English, Hindi.  Passport#:-M4064739  Correspondence Address: HOUSE#-13/13,FIRST FLOOR 1ST MAIN ROAD CHIKKABOMMASANDRA POST-G.K.V.K, BANGALORE 560065 Yours sincerely, Debashis Das