PLANiTULSA
Vision Overview
and Strategies
Discussion

September 2009
Community Workshops


1                     More than 1,500 participated
                               200 maps!




          2


                           3
Scenario Survey Results

      A TRENDS CONTINUE   B MAIN STREETS




      C NEW CENTERS       D CENTERED CITY
PLANiTULSA
Scenario Survey Results
    •   5,887 total responses
         – 4,339 submitted online
         – 1,548 filled out paper
    •   1.5% of the City’s Population filled out a survey
    •   58% were between 19 and 49 years of age

                                      Respondents by Age
                40%
                35%
                30%
                25%
                20%
                15%
                10%
                  5%
                  0%
                         Under 19   19 – 29   30 – 49   50 – 64   65 +
*Of those who answered
        question
Understanding the Validity of the Scenario Survey


Unlike the upfront poll,
   the survey is NOT
   statistically valid.

It is directionally valid,
                                            21%
     like a huge focus        4%            15%
     group.
                                  4%
                                            40%         9%
The data is not
   geographically
                             3%                         24%
                             1%             21%
   proportionate.
   Meaning some
   areas of town are               3%
   over-represented                                       Share of Survey
   and some under.
                                       5%     19%             Responses
                                                  30%
                                                              Area’s share of
*Of those who answered                                        city population
        question
PLANiTulsa Scenario Survey Responses

    • Respondents represented the racial and ethnic make-up of
      the city, for the most part
        80%
        70%
        60%
        50%
        40%
        30%
        20%
        10%
         0%
                     African           Native            Asian   Caucasian or   Hispanic *   Other
                    American          American                      White


*Hispanic respondents may also identify as other races
PLANiTulsa Scenario Survey Responses


                            Which scenario do you like the
About half (49%) of                 best, overall?
all respondents
                      50%
chose Scenario D as
their favorite        40%

Another third (29%)   30%
chose Scenario C as
their favorite        20%

                      10%

                      0%
                            A        B        C        D

 Citywide
PLANiTulsa Scenario Survey Responses


                              Which scenario do you like the
When asked what                   second best, overall?
their second choice
                    50%
would be, 38% chose
Scenario C and 32% 40%
chose Scenario B
                        30%
Scenario A was the
least popular overall   20%

                        10%

                        0%
                              A        B        C        D

 Citywide
Modeling the Scenarios
                         Owner                  Renter                     Year 2000

  350,000

  300,000                                                                                43%

  250,000                                                            57%

  200,000

  150,000
                                                                           Vision 2030

  100,000

  50,000
                                                                    48%
     -                                                                                    52%
            SF Det    SF Att     MF   SF Det     SF Att      MF

                     Year 2000                 Vision 2030




              Market Constraints                                                                            Sustainability
            Development Program                                                                             Urban Design
             Commercial Demand
               Housing Needs




Land Use Scenario
  Development
                                                                                                Transportation Analysis
                                                                                                   Roadway Impact
                                                                                                      Ridership
The Vision: Overview

What ‘s in the Vision
•   The Vision of Tulsa’s Future
•   Vision Maps
•   The Plan Chapters
    – Land Use
    – Transportation
    – Economic Development
    – Housing
    – Parks
    – Open Space
    – Sustainability & Built Environment
•   How We Will Achieve the Vision
    – Proposed Strategies
•   Next Steps & Plan Structure
•   PLANiTULSA Process
The Vision: Overview

What ‘s in the Vision
•   The Vision of Tulsa’s Future
•   Vision Maps
•   The Plan Chapters
    – Land Use
    – Transportation
    – Economic Development
    – Housing
    – Parks
    – Open Space
    – Sustainability & Built Environment
•   How We Will Achieve the Vision
    – Proposed Strategies
•   Next Steps & Plan Structure
•   PLANiTULSA Process
Vision



Land Use Plan



Stability and Change Map
The Vision: Overview

The Vision Map

•   Guides policymaking
•   Is not a regulatory
    document
•   Will remain a stable, as
    it reflects long-term
    goals
•   Will be used to build a
    land use plan
Tulsa
Freight Corridor
High Capacity Bus Transit
Downtown Tulsa
Main City Centers
Neighborhood Centers
Areas of Stability and Change

• This map is a conceptual
  illustration of which parts
  of the city are likely to
  change and remain the
  same over the life of the
  plan.
                                                DRAFT EXAMPLE

• A more detailed and
  comprehensive map will be
  developed as part of the
  Policy Plan document.
                                Vacant land,      Existing
                                 corridors,    Neighborhoods
                                 downtown
Areas of Stability
and Change (Draft)
The Vision: Overview

What ‘s in the Vision
•   The Vision of Tulsa’s Future
•   Vision Maps
•   The Plan Chapters
    – Land Use
    – Transportation
    – Economic Development
    – Housing
    – Parks
    – Open Space
    – Sustainability & Built Environment
•   How We Will Achieve the Vision
    – Proposed Strategies
•   Next Steps & Plan Structure
•   PLANiTULSA Process
Plan Chapter: Land Use

The Building Blocks
     Tulsa’s future land uses will be broadly organized under
     five main building blocks


•    Downtown
•    Corridors
•    New Centers
•    New Neighborhoods
•    Existing Neighborhoods
Plan Chapter: Land Use

Downtown
•   Downtown Tulsa will be the place to see
    a concert, go shopping, or have a night
    out on the town
•   Plentiful office space and a great transit
    system will make it easy for employers to
    serve their clients and attract great talent
•   Higher density housing in
    condominiums, apartments, live-work
    lofts, and town homes
Plan Chapter: Land Use




 Boulder Avenue
Plan Chapter: Land Use

Corridors
     Corridors serve as both travel routes
     and destinations


High-capacity Arterial Streets
•    Commercial corridors
•    Auto-dominated
•    Multimodal arterials
Main Streets
•    Lower volume
•    Serve neighbors and visitors alike
Plan Chapter: Land Use

Corridors
High-capacity
  Arterial Streets

•   Will be upgraded to
    accommodate cars,
    transit, bikes and
    pedestrians

•   Key centers will have
    more pedestrian and
    transit amenities

•   New mixed-use
    development will also
    serve existing
    surrounding
    neighborhoods
Plan Chapter: Land Use

Corridors
Main Streets

•   Narrower streets,
    generally lower traffic
    volume

•   Park once and walk to
    multiple destinations

•   Linear neighborhood
    centers

•   Attractive, interesting
    places with wide
    sidewalks and on-
    street parking
Plan Chapter: Land Use

New Centers

Eastgate Metroplex
  Example

•   Enhanced by transit
    services

•   Add retail, grocery stores,
    mixed-use residential to
    enrich the area

•   Build mix of housing
    types on surrounding
    vacant land
Plan Chapter: Land Use

Existing Neighborhoods
•    Are one of Tulsa’s strongest
     assets, and will be preserved

•    Are considered areas of stability

•    Most enhancements will be
     through improvements to
     surrounding main streets and
     arterials

•    These will add more amenities
     and improve connectivity to the
     rest of the city
Plan Chapter: Transportation

Transportation
•   Tulsans will have a wide variety
    of transportation choices for
    getting around town.
•   Drive, bike, or catch a quick and
    reliable bus or streetcar to just
    about anywhere.
•   The network of transit options,
    large arterials, pedestrian-
    friendly neighborhoods and
    employment centers will result
    in one of the safest, most
    efficient transportation systems
    in the country.
Plan Chapter: Transportation

Transit
•   Emphasis will be on building a
    strong system with continuous
    improvement to build support
    and ridership

•   Focus on 2-3 key corridors that
    serve Downtown, North and
    East Tulsa

•   As ridership grows, expand
    frequent service across the grid
    to support new centers and
    neighborhoods
Plan Chapter: Transportation

Highways and Freight
•   Freight access should be
    improved through investments
    to disentangle it from local
    traffic

•   Utilize the Gilcrease
    Expressway Extension to an
    intermodal hub northeast of
    Tulsa International Airport

•   Investing in city streets and
    arterials and expanding
    accessibility will also help
    relieve highway congestion
Plan Chapter: Transportation

Walking and Biking
•   Will make many improvements
    to existing neighborhoods and
    along main streets and
    corridors

•   Continue to expand Tulsa’s
    existing network of paths and
    trails

•   Bicycle travel, especially during
    good weather, make up a
    significant share of
    transportation trips
Matching Street Design to Land Use
One size does not fit all
Streets should respond to the land uses around them
Plan Chapter: Transportation

Smart Parking
•   Tulsans will still, by and large, drive
    their cars

•   City’s approach will be to optimize
    the efficiency of parking, instead of
    requiring too much

•   New development will be allowed to
    utilize on-street parking, and the city
    will plan for parking districts with
    shared lots

•   Mixed use parking garages with
    retail on the ground floor blend in
    well with surrounding buildings
Plan Chapter: Economic Development

Economic Development
•   Tulsa will need a vigorous and strategic
    approach to economic development

•   Coordinated with land use, housing,
    transportation and the factors that affect
    residents’ quality of life like parks, open space
    and education.

•   Tulsa must nurture its entrepreneurial
    enterprises, ensure room for growth, and be
    an attractive place to move or establish a
    business
Plan Chapter: Housing

Housing
•   The PLANiTULSA forecast and housing
    analysis highlighted the need for some
    additional housing choice

•   40,000 household goad with diverse mix

•   Most of Tulsa’s housing stock is and will
    continue to be single-family homes

•   But there will be many households who will
    prefer townhomes, condos and apartments
    (especially downtown)
Plan Chapter: Parks

Parks
•    Most Tulsans will live near a park and will
     be able to walk or bike there

•    Schools and parks will make use of the
     same facilities

•    Downtown will feature urban parks with
     fountains, playgrounds, and other
     amenities to bring nature into the city

•    PLANiTULSA will coordinate with the 2009
     City of Tulsa Master Parks Plan now in
     production
Plan Chapter: Open Space

Open Space
•   Tulsa’s natural environments – waterways,
    floodplains and open space – provide a break
    from the hustle and bustle of living in an urban
    environment.

•   Tulsa will work to bring nature to the city, and
    connect Tulsans with the Arkansas River, Turkey
    Mountain Urban Wilderness Area, and other
    open spaces

•   Tulsa will continue to be a leader in integrating
    stormwater management with development
Plan Chapter: Sustainability

Sustainability and the Built
  Environment
     In the energy-constrained world of the future,
     Tulsa will be a major leader in creating high
     quality places for people to live, work, and
     play … but with a small footprint on the
     environment.


•    Building design will emphasize energy
     and water efficiency and make use of
     renewable building materials

•    Continue and enhance the storm water
     and hazard mitigation plans of the City
Next Steps
October
•   Public meeting – Vision Presentation and Feedback - October 29th
•   Draft Land Use, Transportation, Economics and Housing Policies/Chapters to staff – end of October

November
•  Remaining plan components (Implementation and Strategies) drafted - end of November
•  Brief TMAPC and Council on Vision and draft policies
•  Public forum for Vision input – interactive meeting with automated feedback – November 17

December
•  Citizens’ Team – December 16
•  TMAPC Work Session and City Council briefing on final Vision, policies and strategies

January
•   Draft Comprehensive Plan presented to TMAPC and Strategic Plan to City Council week of January 11th
•   TMAPC work sessions on Comprehensive Plan
•   City Council briefing on Comprehensive Plan and Strategic Plan

February
•   TMAPC public hearings on Comprehensive Plan
•   TMAPC action on Comprehensive Plan
•   City Council briefings and work sessions on Comprehensive Plan and Strategic Plan

March/April
•  City Council public hearings and action on Comprehensive Plan and Strategic Plan
Strategic Plan Preview


How We Will Achieve Our Vision
    While creating the vision is a critically important step,
    effective implementation will be the measure of its
    success.


•   Remove barriers to desired actions

•   Coordinate public investments

•   Create new strategic partnerships
Strategic Plan Preview

Proposed Strategies
    Specific implementation strategies to reshape fundamental aspects of Tulsa’s
    approach to land use, transportation, and economic development will build on
    and sustain the vision.

•   Step 1: Revise the Zoning Code

•   Step 2: Create a Redevelopment Strategy

•   Step 3: Develop a New Transportation Strategy

•   Step 4: Conduct Neighborhood and Small Area Planning in Key Areas

•   Step 5: Develop PLANiTULSA Innovative Buildings as Demonstration Projects

•   Step 6: Organize Planning and Development Functions for Implementation
Achieving the Vision: Strategies

Step 1: Revise the Zoning Code
  Update the Code to align with the goals of the Plan


Tulsa’s zoning code should:
• Be Easy to Use
• Allow More Diverse Building Types
• Enable Innovative Parking Solutions
• Align Development Incentives with
  Goals of Plan
Zoning Code Issues

An example
from Brookside
                        31st Street

31st and Peoria




                      Peoria
Plans and Implementation

District Plan 6: Brookside Special
Districts

Northern Brookside Business Area

Pg 6-11
The Brookside area is an urban village with its own
special identity, sense of community, pattern of
development and unique characteristics. The
protection, preservation and enhancement of this
urban village are of paramount importance. There are
certain design policies and standards appropriate for
improvements in the study area…
Plans and Implementation

An additional plan for the area:

Brookside Infill Neighborhood
Detailed Implementation Plan
(2002)

In general, this plan addresses:

• Public realm and streetscape
design

• Infill development design
Plans and Implementation

Public realm and
streetscape design

Plan seeks to preserve pedestrian-
oriented and high-quality urban
design character.

Outlines Policies for
• sidewalks and pedestrian crossings
• street furniture
• lighting and street trees

It establishes a “look and feel” that
will serve the neighborhood well, if
implemented
Plans and Implementation
The plan does
recommend creating a
shared parking facility in
the district.

But the District 6 Plan,
which is also in effect,
states that new
development or reuse of
buildings must provide
off-street parking as
required by the code
Zoning Code Issues

Brooks Restaurant and Bar

11,000 square foot dining
establishment




Photo: www.brooksrestaurant.com
Zoning Code Issues

Currently, the restaurant
shares a lot with a bank
next door
Zoning Code Issues

…But according to the
existing code, a developer
would have to assemble
over an acre of land for the
restaurant alone

                               48,530 Square
                                    Feet
Zoning Code Issues

If built as a mixed-use
project with 20, 2-
bedroom apartments
above*

…A developer would have
to assemble over 1½ acres    68,416 Square
                                  Feet
of land


*(2 parking spaces / unit)
Zoning Code Issues

Vision Map:
Cherry Street (15th Street)
Zoning Code Issues

An example from Cherry Street and
Quincy

There are three establishments in
this building, allowed by right

Offices, studios, support services
    Aquarian Age Massage
Shopping goods and services
    Peace of Mind Bookstore
Bar or Tavern
    Kilkenny’s Irish Pub
Zoning Code Issues

…Currently, the building
is served by a lot to the
rear
Zoning Code Issues

…But a developer would
have to assemble an
30,256 square feet of land
                             30,256
for parking if building it   Square
today                         Feet
Zoning Code Issues

If the top story were to be
converted to ten, 2-
bedroom apartments*
                              36,756
                              Square
…A developer would have        Feet

to assemble an 36,756
square feet of land for
parking


*(2 parking spaces / unit)
Zoning Code Issues



Car Wash
• no parking spaces are
required
Zoning Code Issues



Mini Storage
• 1 parking space per 5,000
square feet of storage
Zoning Code Issues
An Example from East Pine and North Peoria




                                             Peoria
                                                      East Pine
Zoning Code Issues
Our Vision for Tulsa: East Pine and North Peoria

 Revitalized
 neighborhood
 and mixed use
 center
Zoning Code Issues
What is most likely is that this project would
have obtain a zone change to PUD

For a key revitalization area, this raises barriers
and reduces certainty for the developer and
neighborhood
Modified Zoning Code Chapters
Use a Combination
of Graphics and
Standards
Design Zoning Code around Building Prototypes
Shared Parking Districts
 Requirements often exceed demand
                        Required Minimum Parking                                               Shared Parking Utilization




                                                                 Parking Spaces Used
Parking Spaces




                 5000                                                                  5,000
                 4000
   Required




                                                                                       4,000
                 3000                              Hotel                               3,000                                Hotel
                 2000                                                                  2,000
                                                   Office                                                                   Office
                 1000                                                                  1,000
                    0                              Residential                           -                                  Residential
                                                   Retail                                                                   Retail




                                                                                        3: PM
                                                                                        5: PM
                                                                                        7: PM
                                                                                        9: PM

                                                                                          :0 M
                                                                                        1: PM
                                                                                        1: AM
                  3: PM
                  5: PM
                  7: PM
                  9: PM

                    :0 M




                                                                                        7: AM
                                                                                        9: AM

                                                                                         :0 M




                                                                                              AM
                  1: PM
                  1: AM




                        AM
                  7: AM
                  9: AM

                   :0 M




                                                                                       11 0 P
                 11 0 P




                                                                                       11 0 A
                 11 A




                                                                                           00
                                                                                           00
                                                                                           00
                                                                                           00



                                                                                            0
                     00
                     00
                     00
                     00




                                                                                            0
                      0




                                                                                          00
                                                                                          00




                                                                                          00
                      0




                    00
                    00
                    00
                    00




                                                   Restaurant                                                               Restaurant




                                                                                           0
                     0




                                                                                          0
                                                                                        5:
                  5:




                               Time of Day                                                            Time of Day
Model Parking
A sample from Long Beach, CA:
• Analysis showed sufficient supply when a combination
strategies were used

                 3,500

                                                                 Existing Regulations
                 3,000

                 2,500   3,120                                   ULI Demand Estimate
                                 2,812
                 2,000
                                         2,671                   With Shared Parking
                                                 2,305
                 1,500
                                                         2,045
                                                                 With Shared Parking,
                 1,000                                           Mode Split

                  500                                            With Shared Parking,
                                                                 Mode Split, Internal
                                                                 Capture
                    0
                                   Parking Spaces
Achieving the Vision: Strategies

Step 2: Create a Redevelopment Strategy
• Forge a redevelopment future for Tulsa
   – Broaden the range of housing options
   – Create new kinds of workspaces
   – Make efficient use of existing infrastructure

• Reclaim and reinvest in
   – Downtown Tulsa
   – Urban corridors
   – Former industrial sites
   – Struggling urban
     neighborhoods
   – New town centers
Achieving the Vision: Strategies

Step 3: Develop a New Transportation Strategy
  Making the transportation-land use connection


• Create Livable Networks
• Improve Transportation Modeling
   Techniques
• Manage Transportation Assets
• Use Context Sensitive Solutions
• Modernize Transportation Funding
Achieving the Vision: Strategies

•   Create livable networks
    –   Use Tulsa’s legacy of a great grid network
    –   Rethink emphasis on moving cars
    –   Focus on helping people get where they want to go and serving
        surrounding communities
    –   Transform corridors into places as well as transportation facilities
Context Sensitive Solutions
Context Sensitive Solutions
Achieving the Vision: Strategies

Step 4: Conduct Neighborhood and Small Area
  Planning in Key Areas
  Neighborhood planning is key to redevelopment
• Redevelopment will need to be
  carefully designed to work with
  existing communities
• Each plan should have measurable
  performance indicators and include
  funding and implementation plans

• Compatible zoning and parking solutions should be
  adopted in conjunction with the plan
Achieving the Vision: Strategies

Step 5: Develop Key PLANiTULSA Prototypes as
  Demonstration Projects
•   Begin with projects that have a high
    likelihood of success
                                             #2

•   Engage the development community              #1
                                             #3
    and set up for success before tackling
    more difficult projects

•   Don’t try for home runs – start with
    base hits

•   Work to establish a development
    process that will enable similar
    projects to be built by the private
    sector
Mixed Use Residential & Retail (4 Story)
$16 per foot
Achieving the Vision: Strategies

 Step 6: Organize Planning and Development
   Functions for Implementation
   Our ambitious agenda for change requires a high degree of coordination and skill


• Organization matters!
• Tulsa’s planning and development
  functions are spread between many
  agencies and departments
• Consider consolidation or closer
  coordination between planning, zoning,
  permits, economic development, capital
  planning, redevelopment
Vision



Land Use Plan



Stability and Change Map



Small Area Plans



Zoning and Implementation
     –   Investment
     –   Public Private Partnerships
     –   Demonstration Projects
     –   Building Prototypes
     –   Return on Investment
     –   Shared Parking
Small Area Plans

Zoning and Implementation
    –   Investment
    –   Public Private Partnerships
    –   Demonstration Projects
    –   Building Prototypes
    –   Return on Investment
    –   Shared Parking
The Future

The Future Is in Our Hands
 The PLANiTULSA process illustrates our vision in the future.
 A consensus vision, based on input from thousands of
 participating Tulsans show how the Tulsa of tomorrow will
 offer more choices and opportunities if we take action
 today.

       Capturing our vision was the easy part.
 Making that dream a reality will require Leadership,
 Dedication, Hard Work, and Cooperation among people
 with different perspectives, opinions and expertise.

 Together Tulsa can set things in motion – we can
 accomplish amazing results that will move our city toward
 a bright future.

More Related Content

Similar to PLANiTULSA Our Vision Overview & Implementation Pc

LTC, Jack R. Widmeyer Transportation Research Conference, Going to San Bernar...
LTC, Jack R. Widmeyer Transportation Research Conference, Going to San Bernar...LTC, Jack R. Widmeyer Transportation Research Conference, Going to San Bernar...
LTC, Jack R. Widmeyer Transportation Research Conference, Going to San Bernar...
LTC @ CSUSB
 
2015 Information Forum - Ken Bowers
2015 Information Forum - Ken Bowers2015 Information Forum - Ken Bowers
2015 Information Forum - Ken Bowers
Mcrpc Staff
 
2012 11-29 presentation
2012 11-29 presentation2012 11-29 presentation
2012 11-29 presentation
Metropolitan Area Planning Council
 
Introducing PLANiTULSA, a presentation by John Fregonese
Introducing PLANiTULSA, a presentation by John FregoneseIntroducing PLANiTULSA, a presentation by John Fregonese
Introducing PLANiTULSA, a presentation by John Fregonese
Janet Tharp
 
Susan Parnell - Macro-demographic trends of significance for health and devel...
Susan Parnell - Macro-demographic trends of significance for health and devel...Susan Parnell - Macro-demographic trends of significance for health and devel...
Susan Parnell - Macro-demographic trends of significance for health and devel...
Jeff Knezovich
 
Transit-Oriented Development Zoning Study
Transit-Oriented Development Zoning StudyTransit-Oriented Development Zoning Study
Transit-Oriented Development Zoning Study
Cuyahoga County Planning Commission
 
Dr. Clos Presentation at Clatham House, London 6 Feb
Dr. Clos Presentation at Clatham House, London 6 FebDr. Clos Presentation at Clatham House, London 6 Feb
Dr. Clos Presentation at Clatham House, London 6 Feb
UN-Habitat
 
Horizon March 2010
Horizon March 2010Horizon March 2010
Horizon March 2010
Muki Haklay
 
2010 Downtown KC Resident Survey Results
2010 Downtown KC Resident Survey Results2010 Downtown KC Resident Survey Results
2010 Downtown KC Resident Survey Results
DTC
 
Urban Settlement and Urbanization
Urban Settlement and UrbanizationUrban Settlement and Urbanization
Urban Settlement and Urbanization
Yonas Gemeda
 
Contribution of public transport to urban accessibility in the Netherlands
Contribution of public transport to urban accessibility in the NetherlandsContribution of public transport to urban accessibility in the Netherlands
Contribution of public transport to urban accessibility in the Netherlands
AMTU
 
Complete Streets
Complete StreetsComplete Streets
Complete Streets
edh2025
 
2012 College Station Citizen Survey
2012 College Station Citizen Survey2012 College Station Citizen Survey
2012 College Station Citizen Survey
City of College Station
 
Rural Urban Transformation in Pakistan: A spatial analysis of urbanization a...
Rural Urban Transformation in Pakistan:  A spatial analysis of urbanization a...Rural Urban Transformation in Pakistan:  A spatial analysis of urbanization a...
Rural Urban Transformation in Pakistan: A spatial analysis of urbanization a...
International Food Policy Research Institute
 
Planning Tools for Linking Rural Development and Transportation
Planning Tools for Linking Rural Development and TransportationPlanning Tools for Linking Rural Development and Transportation
Planning Tools for Linking Rural Development and Transportation
RPO America
 
R003 cimigo net citizens-2012
R003 cimigo net citizens-2012R003 cimigo net citizens-2012
R003 cimigo net citizens-2012
Chanh Kieu Vong
 
Cimigo Netcitizens 2012
Cimigo Netcitizens 2012Cimigo Netcitizens 2012
Cimigo Netcitizens 2012
Dung Tri
 
Cimigo net citizens 2012
Cimigo net citizens 2012Cimigo net citizens 2012
Cimigo net citizens 2012
Hua Linh
 
Vietnam NetCitizens 2012 (Cimigo)
Vietnam NetCitizens 2012 (Cimigo)Vietnam NetCitizens 2012 (Cimigo)
Vietnam NetCitizens 2012 (Cimigo)
Calvin Nguyen
 
Vietnam NetCitizens 2012 (Cimigo)
Vietnam NetCitizens 2012 (Cimigo)Vietnam NetCitizens 2012 (Cimigo)
Vietnam NetCitizens 2012 (Cimigo)
Topica Founder Institute
 

Similar to PLANiTULSA Our Vision Overview & Implementation Pc (20)

LTC, Jack R. Widmeyer Transportation Research Conference, Going to San Bernar...
LTC, Jack R. Widmeyer Transportation Research Conference, Going to San Bernar...LTC, Jack R. Widmeyer Transportation Research Conference, Going to San Bernar...
LTC, Jack R. Widmeyer Transportation Research Conference, Going to San Bernar...
 
2015 Information Forum - Ken Bowers
2015 Information Forum - Ken Bowers2015 Information Forum - Ken Bowers
2015 Information Forum - Ken Bowers
 
2012 11-29 presentation
2012 11-29 presentation2012 11-29 presentation
2012 11-29 presentation
 
Introducing PLANiTULSA, a presentation by John Fregonese
Introducing PLANiTULSA, a presentation by John FregoneseIntroducing PLANiTULSA, a presentation by John Fregonese
Introducing PLANiTULSA, a presentation by John Fregonese
 
Susan Parnell - Macro-demographic trends of significance for health and devel...
Susan Parnell - Macro-demographic trends of significance for health and devel...Susan Parnell - Macro-demographic trends of significance for health and devel...
Susan Parnell - Macro-demographic trends of significance for health and devel...
 
Transit-Oriented Development Zoning Study
Transit-Oriented Development Zoning StudyTransit-Oriented Development Zoning Study
Transit-Oriented Development Zoning Study
 
Dr. Clos Presentation at Clatham House, London 6 Feb
Dr. Clos Presentation at Clatham House, London 6 FebDr. Clos Presentation at Clatham House, London 6 Feb
Dr. Clos Presentation at Clatham House, London 6 Feb
 
Horizon March 2010
Horizon March 2010Horizon March 2010
Horizon March 2010
 
2010 Downtown KC Resident Survey Results
2010 Downtown KC Resident Survey Results2010 Downtown KC Resident Survey Results
2010 Downtown KC Resident Survey Results
 
Urban Settlement and Urbanization
Urban Settlement and UrbanizationUrban Settlement and Urbanization
Urban Settlement and Urbanization
 
Contribution of public transport to urban accessibility in the Netherlands
Contribution of public transport to urban accessibility in the NetherlandsContribution of public transport to urban accessibility in the Netherlands
Contribution of public transport to urban accessibility in the Netherlands
 
Complete Streets
Complete StreetsComplete Streets
Complete Streets
 
2012 College Station Citizen Survey
2012 College Station Citizen Survey2012 College Station Citizen Survey
2012 College Station Citizen Survey
 
Rural Urban Transformation in Pakistan: A spatial analysis of urbanization a...
Rural Urban Transformation in Pakistan:  A spatial analysis of urbanization a...Rural Urban Transformation in Pakistan:  A spatial analysis of urbanization a...
Rural Urban Transformation in Pakistan: A spatial analysis of urbanization a...
 
Planning Tools for Linking Rural Development and Transportation
Planning Tools for Linking Rural Development and TransportationPlanning Tools for Linking Rural Development and Transportation
Planning Tools for Linking Rural Development and Transportation
 
R003 cimigo net citizens-2012
R003 cimigo net citizens-2012R003 cimigo net citizens-2012
R003 cimigo net citizens-2012
 
Cimigo Netcitizens 2012
Cimigo Netcitizens 2012Cimigo Netcitizens 2012
Cimigo Netcitizens 2012
 
Cimigo net citizens 2012
Cimigo net citizens 2012Cimigo net citizens 2012
Cimigo net citizens 2012
 
Vietnam NetCitizens 2012 (Cimigo)
Vietnam NetCitizens 2012 (Cimigo)Vietnam NetCitizens 2012 (Cimigo)
Vietnam NetCitizens 2012 (Cimigo)
 
Vietnam NetCitizens 2012 (Cimigo)
Vietnam NetCitizens 2012 (Cimigo)Vietnam NetCitizens 2012 (Cimigo)
Vietnam NetCitizens 2012 (Cimigo)
 

More from fregoneseassociates

Beaverton civic plan city council 030111 forweb
Beaverton civic plan city council 030111 forwebBeaverton civic plan city council 030111 forweb
Beaverton civic plan city council 030111 forweb
fregoneseassociates
 
Beaverton Civic Plan October 27th Open House Polling Results
Beaverton Civic Plan October 27th Open House Polling ResultsBeaverton Civic Plan October 27th Open House Polling Results
Beaverton Civic Plan October 27th Open House Polling Results
fregoneseassociates
 
Beaverton Civic Plan Workshop Results
Beaverton Civic Plan Workshop ResultsBeaverton Civic Plan Workshop Results
Beaverton Civic Plan Workshop Results
fregoneseassociates
 
Beaverton workshop results rbmv2jf
Beaverton workshop results rbmv2jfBeaverton workshop results rbmv2jf
Beaverton workshop results rbmv2jf
fregoneseassociates
 
Coastal Best Practices - July21
Coastal Best Practices - July21Coastal Best Practices - July21
Coastal Best Practices - July21
fregoneseassociates
 
Superstition Vistas - Scenario A-D Comparison
Superstition Vistas - Scenario A-D ComparisonSuperstition Vistas - Scenario A-D Comparison
Superstition Vistas - Scenario A-D Comparison
fregoneseassociates
 
Sv interim report presentation compress
Sv interim report presentation compressSv interim report presentation compress
Sv interim report presentation compress
fregoneseassociates
 
Scenario Survey Results
Scenario Survey ResultsScenario Survey Results
Scenario Survey Results
fregoneseassociates
 
Scenarios S and X
Scenarios S and XScenarios S and X
Scenarios S and X
fregoneseassociates
 
Ebr Open House 040210 Forweb
Ebr Open House 040210 ForwebEbr Open House 040210 Forweb
Ebr Open House 040210 Forweb
fregoneseassociates
 
Waco Plan Draft Presentation022410v2
Waco Plan Draft Presentation022410v2Waco Plan Draft Presentation022410v2
Waco Plan Draft Presentation022410v2
fregoneseassociates
 
Ebr Dec 2009
Ebr Dec 2009Ebr Dec 2009
Ebr Dec 2009
fregoneseassociates
 
Rclco Draft Market Findings092909
Rclco Draft Market Findings092909Rclco Draft Market Findings092909
Rclco Draft Market Findings092909
fregoneseassociates
 
Workshoprunthrough092909
Workshoprunthrough092909Workshoprunthrough092909
Workshoprunthrough092909
fregoneseassociates
 
Stakeholder Meeting Csss092909
Stakeholder Meeting Csss092909Stakeholder Meeting Csss092909
Stakeholder Meeting Csss092909
fregoneseassociates
 
Imagine Waco Workshop Presentation, 10/26/09
Imagine Waco Workshop Presentation, 10/26/09Imagine Waco Workshop Presentation, 10/26/09
Imagine Waco Workshop Presentation, 10/26/09
fregoneseassociates
 
SV Updated Clicker Results 1029
SV Updated Clicker Results 1029SV Updated Clicker Results 1029
SV Updated Clicker Results 1029
fregoneseassociates
 
Pc Comp Plan Draft 081809 Ph
Pc Comp Plan Draft 081809 PhPc Comp Plan Draft 081809 Ph
Pc Comp Plan Draft 081809 Ph
fregoneseassociates
 
Waco Committee Meeting Presentation 071509 Short
Waco Committee Meeting Presentation 071509 ShortWaco Committee Meeting Presentation 071509 Short
Waco Committee Meeting Presentation 071509 Short
fregoneseassociates
 
PlaNiTulsa Scenarios Transportation Highlights 051509
PlaNiTulsa Scenarios Transportation Highlights 051509PlaNiTulsa Scenarios Transportation Highlights 051509
PlaNiTulsa Scenarios Transportation Highlights 051509
fregoneseassociates
 

More from fregoneseassociates (20)

Beaverton civic plan city council 030111 forweb
Beaverton civic plan city council 030111 forwebBeaverton civic plan city council 030111 forweb
Beaverton civic plan city council 030111 forweb
 
Beaverton Civic Plan October 27th Open House Polling Results
Beaverton Civic Plan October 27th Open House Polling ResultsBeaverton Civic Plan October 27th Open House Polling Results
Beaverton Civic Plan October 27th Open House Polling Results
 
Beaverton Civic Plan Workshop Results
Beaverton Civic Plan Workshop ResultsBeaverton Civic Plan Workshop Results
Beaverton Civic Plan Workshop Results
 
Beaverton workshop results rbmv2jf
Beaverton workshop results rbmv2jfBeaverton workshop results rbmv2jf
Beaverton workshop results rbmv2jf
 
Coastal Best Practices - July21
Coastal Best Practices - July21Coastal Best Practices - July21
Coastal Best Practices - July21
 
Superstition Vistas - Scenario A-D Comparison
Superstition Vistas - Scenario A-D ComparisonSuperstition Vistas - Scenario A-D Comparison
Superstition Vistas - Scenario A-D Comparison
 
Sv interim report presentation compress
Sv interim report presentation compressSv interim report presentation compress
Sv interim report presentation compress
 
Scenario Survey Results
Scenario Survey ResultsScenario Survey Results
Scenario Survey Results
 
Scenarios S and X
Scenarios S and XScenarios S and X
Scenarios S and X
 
Ebr Open House 040210 Forweb
Ebr Open House 040210 ForwebEbr Open House 040210 Forweb
Ebr Open House 040210 Forweb
 
Waco Plan Draft Presentation022410v2
Waco Plan Draft Presentation022410v2Waco Plan Draft Presentation022410v2
Waco Plan Draft Presentation022410v2
 
Ebr Dec 2009
Ebr Dec 2009Ebr Dec 2009
Ebr Dec 2009
 
Rclco Draft Market Findings092909
Rclco Draft Market Findings092909Rclco Draft Market Findings092909
Rclco Draft Market Findings092909
 
Workshoprunthrough092909
Workshoprunthrough092909Workshoprunthrough092909
Workshoprunthrough092909
 
Stakeholder Meeting Csss092909
Stakeholder Meeting Csss092909Stakeholder Meeting Csss092909
Stakeholder Meeting Csss092909
 
Imagine Waco Workshop Presentation, 10/26/09
Imagine Waco Workshop Presentation, 10/26/09Imagine Waco Workshop Presentation, 10/26/09
Imagine Waco Workshop Presentation, 10/26/09
 
SV Updated Clicker Results 1029
SV Updated Clicker Results 1029SV Updated Clicker Results 1029
SV Updated Clicker Results 1029
 
Pc Comp Plan Draft 081809 Ph
Pc Comp Plan Draft 081809 PhPc Comp Plan Draft 081809 Ph
Pc Comp Plan Draft 081809 Ph
 
Waco Committee Meeting Presentation 071509 Short
Waco Committee Meeting Presentation 071509 ShortWaco Committee Meeting Presentation 071509 Short
Waco Committee Meeting Presentation 071509 Short
 
PlaNiTulsa Scenarios Transportation Highlights 051509
PlaNiTulsa Scenarios Transportation Highlights 051509PlaNiTulsa Scenarios Transportation Highlights 051509
PlaNiTulsa Scenarios Transportation Highlights 051509
 

PLANiTULSA Our Vision Overview & Implementation Pc

  • 2. Community Workshops 1 More than 1,500 participated 200 maps! 2 3
  • 3. Scenario Survey Results A TRENDS CONTINUE B MAIN STREETS C NEW CENTERS D CENTERED CITY
  • 5. Scenario Survey Results • 5,887 total responses – 4,339 submitted online – 1,548 filled out paper • 1.5% of the City’s Population filled out a survey • 58% were between 19 and 49 years of age Respondents by Age 40% 35% 30% 25% 20% 15% 10% 5% 0% Under 19 19 – 29 30 – 49 50 – 64 65 + *Of those who answered question
  • 6. Understanding the Validity of the Scenario Survey Unlike the upfront poll, the survey is NOT statistically valid. It is directionally valid, 21% like a huge focus 4% 15% group. 4% 40% 9% The data is not geographically 3% 24% 1% 21% proportionate. Meaning some areas of town are 3% over-represented Share of Survey and some under. 5% 19% Responses 30% Area’s share of *Of those who answered city population question
  • 7. PLANiTulsa Scenario Survey Responses • Respondents represented the racial and ethnic make-up of the city, for the most part 80% 70% 60% 50% 40% 30% 20% 10% 0% African Native Asian Caucasian or Hispanic * Other American American White *Hispanic respondents may also identify as other races
  • 8. PLANiTulsa Scenario Survey Responses Which scenario do you like the About half (49%) of best, overall? all respondents 50% chose Scenario D as their favorite 40% Another third (29%) 30% chose Scenario C as their favorite 20% 10% 0% A B C D Citywide
  • 9. PLANiTulsa Scenario Survey Responses Which scenario do you like the When asked what second best, overall? their second choice 50% would be, 38% chose Scenario C and 32% 40% chose Scenario B 30% Scenario A was the least popular overall 20% 10% 0% A B C D Citywide
  • 10. Modeling the Scenarios Owner Renter Year 2000 350,000 300,000 43% 250,000 57% 200,000 150,000 Vision 2030 100,000 50,000 48% - 52% SF Det SF Att MF SF Det SF Att MF Year 2000 Vision 2030 Market Constraints Sustainability Development Program Urban Design Commercial Demand Housing Needs Land Use Scenario Development Transportation Analysis Roadway Impact Ridership
  • 11. The Vision: Overview What ‘s in the Vision • The Vision of Tulsa’s Future • Vision Maps • The Plan Chapters – Land Use – Transportation – Economic Development – Housing – Parks – Open Space – Sustainability & Built Environment • How We Will Achieve the Vision – Proposed Strategies • Next Steps & Plan Structure • PLANiTULSA Process
  • 12. The Vision: Overview What ‘s in the Vision • The Vision of Tulsa’s Future • Vision Maps • The Plan Chapters – Land Use – Transportation – Economic Development – Housing – Parks – Open Space – Sustainability & Built Environment • How We Will Achieve the Vision – Proposed Strategies • Next Steps & Plan Structure • PLANiTULSA Process
  • 14. The Vision: Overview The Vision Map • Guides policymaking • Is not a regulatory document • Will remain a stable, as it reflects long-term goals • Will be used to build a land use plan
  • 15. Tulsa
  • 17. High Capacity Bus Transit
  • 21. Areas of Stability and Change • This map is a conceptual illustration of which parts of the city are likely to change and remain the same over the life of the plan. DRAFT EXAMPLE • A more detailed and comprehensive map will be developed as part of the Policy Plan document. Vacant land, Existing corridors, Neighborhoods downtown
  • 22. Areas of Stability and Change (Draft)
  • 23. The Vision: Overview What ‘s in the Vision • The Vision of Tulsa’s Future • Vision Maps • The Plan Chapters – Land Use – Transportation – Economic Development – Housing – Parks – Open Space – Sustainability & Built Environment • How We Will Achieve the Vision – Proposed Strategies • Next Steps & Plan Structure • PLANiTULSA Process
  • 24. Plan Chapter: Land Use The Building Blocks Tulsa’s future land uses will be broadly organized under five main building blocks • Downtown • Corridors • New Centers • New Neighborhoods • Existing Neighborhoods
  • 25. Plan Chapter: Land Use Downtown • Downtown Tulsa will be the place to see a concert, go shopping, or have a night out on the town • Plentiful office space and a great transit system will make it easy for employers to serve their clients and attract great talent • Higher density housing in condominiums, apartments, live-work lofts, and town homes
  • 26. Plan Chapter: Land Use Boulder Avenue
  • 27. Plan Chapter: Land Use Corridors Corridors serve as both travel routes and destinations High-capacity Arterial Streets • Commercial corridors • Auto-dominated • Multimodal arterials Main Streets • Lower volume • Serve neighbors and visitors alike
  • 28. Plan Chapter: Land Use Corridors High-capacity Arterial Streets • Will be upgraded to accommodate cars, transit, bikes and pedestrians • Key centers will have more pedestrian and transit amenities • New mixed-use development will also serve existing surrounding neighborhoods
  • 29.
  • 30. Plan Chapter: Land Use Corridors Main Streets • Narrower streets, generally lower traffic volume • Park once and walk to multiple destinations • Linear neighborhood centers • Attractive, interesting places with wide sidewalks and on- street parking
  • 31. Plan Chapter: Land Use New Centers Eastgate Metroplex Example • Enhanced by transit services • Add retail, grocery stores, mixed-use residential to enrich the area • Build mix of housing types on surrounding vacant land
  • 32.
  • 33. Plan Chapter: Land Use Existing Neighborhoods • Are one of Tulsa’s strongest assets, and will be preserved • Are considered areas of stability • Most enhancements will be through improvements to surrounding main streets and arterials • These will add more amenities and improve connectivity to the rest of the city
  • 34. Plan Chapter: Transportation Transportation • Tulsans will have a wide variety of transportation choices for getting around town. • Drive, bike, or catch a quick and reliable bus or streetcar to just about anywhere. • The network of transit options, large arterials, pedestrian- friendly neighborhoods and employment centers will result in one of the safest, most efficient transportation systems in the country.
  • 35.
  • 36. Plan Chapter: Transportation Transit • Emphasis will be on building a strong system with continuous improvement to build support and ridership • Focus on 2-3 key corridors that serve Downtown, North and East Tulsa • As ridership grows, expand frequent service across the grid to support new centers and neighborhoods
  • 37. Plan Chapter: Transportation Highways and Freight • Freight access should be improved through investments to disentangle it from local traffic • Utilize the Gilcrease Expressway Extension to an intermodal hub northeast of Tulsa International Airport • Investing in city streets and arterials and expanding accessibility will also help relieve highway congestion
  • 38. Plan Chapter: Transportation Walking and Biking • Will make many improvements to existing neighborhoods and along main streets and corridors • Continue to expand Tulsa’s existing network of paths and trails • Bicycle travel, especially during good weather, make up a significant share of transportation trips
  • 39. Matching Street Design to Land Use One size does not fit all Streets should respond to the land uses around them
  • 40. Plan Chapter: Transportation Smart Parking • Tulsans will still, by and large, drive their cars • City’s approach will be to optimize the efficiency of parking, instead of requiring too much • New development will be allowed to utilize on-street parking, and the city will plan for parking districts with shared lots • Mixed use parking garages with retail on the ground floor blend in well with surrounding buildings
  • 41. Plan Chapter: Economic Development Economic Development • Tulsa will need a vigorous and strategic approach to economic development • Coordinated with land use, housing, transportation and the factors that affect residents’ quality of life like parks, open space and education. • Tulsa must nurture its entrepreneurial enterprises, ensure room for growth, and be an attractive place to move or establish a business
  • 42. Plan Chapter: Housing Housing • The PLANiTULSA forecast and housing analysis highlighted the need for some additional housing choice • 40,000 household goad with diverse mix • Most of Tulsa’s housing stock is and will continue to be single-family homes • But there will be many households who will prefer townhomes, condos and apartments (especially downtown)
  • 43. Plan Chapter: Parks Parks • Most Tulsans will live near a park and will be able to walk or bike there • Schools and parks will make use of the same facilities • Downtown will feature urban parks with fountains, playgrounds, and other amenities to bring nature into the city • PLANiTULSA will coordinate with the 2009 City of Tulsa Master Parks Plan now in production
  • 44. Plan Chapter: Open Space Open Space • Tulsa’s natural environments – waterways, floodplains and open space – provide a break from the hustle and bustle of living in an urban environment. • Tulsa will work to bring nature to the city, and connect Tulsans with the Arkansas River, Turkey Mountain Urban Wilderness Area, and other open spaces • Tulsa will continue to be a leader in integrating stormwater management with development
  • 45. Plan Chapter: Sustainability Sustainability and the Built Environment In the energy-constrained world of the future, Tulsa will be a major leader in creating high quality places for people to live, work, and play … but with a small footprint on the environment. • Building design will emphasize energy and water efficiency and make use of renewable building materials • Continue and enhance the storm water and hazard mitigation plans of the City
  • 46. Next Steps October • Public meeting – Vision Presentation and Feedback - October 29th • Draft Land Use, Transportation, Economics and Housing Policies/Chapters to staff – end of October November • Remaining plan components (Implementation and Strategies) drafted - end of November • Brief TMAPC and Council on Vision and draft policies • Public forum for Vision input – interactive meeting with automated feedback – November 17 December • Citizens’ Team – December 16 • TMAPC Work Session and City Council briefing on final Vision, policies and strategies January • Draft Comprehensive Plan presented to TMAPC and Strategic Plan to City Council week of January 11th • TMAPC work sessions on Comprehensive Plan • City Council briefing on Comprehensive Plan and Strategic Plan February • TMAPC public hearings on Comprehensive Plan • TMAPC action on Comprehensive Plan • City Council briefings and work sessions on Comprehensive Plan and Strategic Plan March/April • City Council public hearings and action on Comprehensive Plan and Strategic Plan
  • 47. Strategic Plan Preview How We Will Achieve Our Vision While creating the vision is a critically important step, effective implementation will be the measure of its success. • Remove barriers to desired actions • Coordinate public investments • Create new strategic partnerships
  • 48. Strategic Plan Preview Proposed Strategies Specific implementation strategies to reshape fundamental aspects of Tulsa’s approach to land use, transportation, and economic development will build on and sustain the vision. • Step 1: Revise the Zoning Code • Step 2: Create a Redevelopment Strategy • Step 3: Develop a New Transportation Strategy • Step 4: Conduct Neighborhood and Small Area Planning in Key Areas • Step 5: Develop PLANiTULSA Innovative Buildings as Demonstration Projects • Step 6: Organize Planning and Development Functions for Implementation
  • 49. Achieving the Vision: Strategies Step 1: Revise the Zoning Code Update the Code to align with the goals of the Plan Tulsa’s zoning code should: • Be Easy to Use • Allow More Diverse Building Types • Enable Innovative Parking Solutions • Align Development Incentives with Goals of Plan
  • 50. Zoning Code Issues An example from Brookside 31st Street 31st and Peoria Peoria
  • 51. Plans and Implementation District Plan 6: Brookside Special Districts Northern Brookside Business Area Pg 6-11 The Brookside area is an urban village with its own special identity, sense of community, pattern of development and unique characteristics. The protection, preservation and enhancement of this urban village are of paramount importance. There are certain design policies and standards appropriate for improvements in the study area…
  • 52. Plans and Implementation An additional plan for the area: Brookside Infill Neighborhood Detailed Implementation Plan (2002) In general, this plan addresses: • Public realm and streetscape design • Infill development design
  • 53. Plans and Implementation Public realm and streetscape design Plan seeks to preserve pedestrian- oriented and high-quality urban design character. Outlines Policies for • sidewalks and pedestrian crossings • street furniture • lighting and street trees It establishes a “look and feel” that will serve the neighborhood well, if implemented
  • 54. Plans and Implementation The plan does recommend creating a shared parking facility in the district. But the District 6 Plan, which is also in effect, states that new development or reuse of buildings must provide off-street parking as required by the code
  • 55. Zoning Code Issues Brooks Restaurant and Bar 11,000 square foot dining establishment Photo: www.brooksrestaurant.com
  • 56. Zoning Code Issues Currently, the restaurant shares a lot with a bank next door
  • 57. Zoning Code Issues …But according to the existing code, a developer would have to assemble over an acre of land for the restaurant alone 48,530 Square Feet
  • 58. Zoning Code Issues If built as a mixed-use project with 20, 2- bedroom apartments above* …A developer would have to assemble over 1½ acres 68,416 Square Feet of land *(2 parking spaces / unit)
  • 59. Zoning Code Issues Vision Map: Cherry Street (15th Street)
  • 60. Zoning Code Issues An example from Cherry Street and Quincy There are three establishments in this building, allowed by right Offices, studios, support services Aquarian Age Massage Shopping goods and services Peace of Mind Bookstore Bar or Tavern Kilkenny’s Irish Pub
  • 61. Zoning Code Issues …Currently, the building is served by a lot to the rear
  • 62. Zoning Code Issues …But a developer would have to assemble an 30,256 square feet of land 30,256 for parking if building it Square today Feet
  • 63. Zoning Code Issues If the top story were to be converted to ten, 2- bedroom apartments* 36,756 Square …A developer would have Feet to assemble an 36,756 square feet of land for parking *(2 parking spaces / unit)
  • 64. Zoning Code Issues Car Wash • no parking spaces are required
  • 65. Zoning Code Issues Mini Storage • 1 parking space per 5,000 square feet of storage
  • 66. Zoning Code Issues An Example from East Pine and North Peoria Peoria East Pine
  • 67. Zoning Code Issues Our Vision for Tulsa: East Pine and North Peoria Revitalized neighborhood and mixed use center
  • 68. Zoning Code Issues What is most likely is that this project would have obtain a zone change to PUD For a key revitalization area, this raises barriers and reduces certainty for the developer and neighborhood
  • 70. Use a Combination of Graphics and Standards
  • 71. Design Zoning Code around Building Prototypes
  • 72. Shared Parking Districts Requirements often exceed demand Required Minimum Parking Shared Parking Utilization Parking Spaces Used Parking Spaces 5000 5,000 4000 Required 4,000 3000 Hotel 3,000 Hotel 2000 2,000 Office Office 1000 1,000 0 Residential - Residential Retail Retail 3: PM 5: PM 7: PM 9: PM :0 M 1: PM 1: AM 3: PM 5: PM 7: PM 9: PM :0 M 7: AM 9: AM :0 M AM 1: PM 1: AM AM 7: AM 9: AM :0 M 11 0 P 11 0 P 11 0 A 11 A 00 00 00 00 0 00 00 00 00 0 0 00 00 00 0 00 00 00 00 Restaurant Restaurant 0 0 0 5: 5: Time of Day Time of Day
  • 73. Model Parking A sample from Long Beach, CA: • Analysis showed sufficient supply when a combination strategies were used 3,500 Existing Regulations 3,000 2,500 3,120 ULI Demand Estimate 2,812 2,000 2,671 With Shared Parking 2,305 1,500 2,045 With Shared Parking, 1,000 Mode Split 500 With Shared Parking, Mode Split, Internal Capture 0 Parking Spaces
  • 74. Achieving the Vision: Strategies Step 2: Create a Redevelopment Strategy • Forge a redevelopment future for Tulsa – Broaden the range of housing options – Create new kinds of workspaces – Make efficient use of existing infrastructure • Reclaim and reinvest in – Downtown Tulsa – Urban corridors – Former industrial sites – Struggling urban neighborhoods – New town centers
  • 75. Achieving the Vision: Strategies Step 3: Develop a New Transportation Strategy Making the transportation-land use connection • Create Livable Networks • Improve Transportation Modeling Techniques • Manage Transportation Assets • Use Context Sensitive Solutions • Modernize Transportation Funding
  • 76. Achieving the Vision: Strategies • Create livable networks – Use Tulsa’s legacy of a great grid network – Rethink emphasis on moving cars – Focus on helping people get where they want to go and serving surrounding communities – Transform corridors into places as well as transportation facilities
  • 79. Achieving the Vision: Strategies Step 4: Conduct Neighborhood and Small Area Planning in Key Areas Neighborhood planning is key to redevelopment • Redevelopment will need to be carefully designed to work with existing communities • Each plan should have measurable performance indicators and include funding and implementation plans • Compatible zoning and parking solutions should be adopted in conjunction with the plan
  • 80. Achieving the Vision: Strategies Step 5: Develop Key PLANiTULSA Prototypes as Demonstration Projects • Begin with projects that have a high likelihood of success #2 • Engage the development community #1 #3 and set up for success before tackling more difficult projects • Don’t try for home runs – start with base hits • Work to establish a development process that will enable similar projects to be built by the private sector
  • 81. Mixed Use Residential & Retail (4 Story) $16 per foot
  • 82. Achieving the Vision: Strategies Step 6: Organize Planning and Development Functions for Implementation Our ambitious agenda for change requires a high degree of coordination and skill • Organization matters! • Tulsa’s planning and development functions are spread between many agencies and departments • Consider consolidation or closer coordination between planning, zoning, permits, economic development, capital planning, redevelopment
  • 83.
  • 84. Vision Land Use Plan Stability and Change Map Small Area Plans Zoning and Implementation – Investment – Public Private Partnerships – Demonstration Projects – Building Prototypes – Return on Investment – Shared Parking
  • 85. Small Area Plans Zoning and Implementation – Investment – Public Private Partnerships – Demonstration Projects – Building Prototypes – Return on Investment – Shared Parking
  • 86. The Future The Future Is in Our Hands The PLANiTULSA process illustrates our vision in the future. A consensus vision, based on input from thousands of participating Tulsans show how the Tulsa of tomorrow will offer more choices and opportunities if we take action today. Capturing our vision was the easy part. Making that dream a reality will require Leadership, Dedication, Hard Work, and Cooperation among people with different perspectives, opinions and expertise. Together Tulsa can set things in motion – we can accomplish amazing results that will move our city toward a bright future.