This document is a permit for confined space work. It provides information such as the work location, job description, dates and times of validity for the permit, and a checklist of safety items that must be checked and addressed before work can begin. The checklist includes requirements like ventilation, isolation of machines, acceptable gas readings, use of safety equipment, and having standby personnel on site. Authorized signatures are needed to issue the permit after inspection and to terminate it after work is completed or stopped due to a safety violation.
This training authorize to work in confined space as the awareness has been given in the training about the hazards & risks during the work in confined space
1. Project Information: (To be filled by initiator/originator)
Project Name: Permit No.:
Project Location:
Requesting Contractor/Company
2. Permit Issuance Details: (To be filled by initiator/originator)
THIS PERMIT IS ONLY FOR ONE SHIFT AND NOT EXTENDABLE
Description of Task:
Detail of Surroundings:
Permit Validity:
Time (from): __________Hrs.
Time (To): __________Hrs.
Date:
3. Excavation Details: (To be filled by initiator/originator)
Location of Excavation:
Click here to enter text.
Excavation Dimensions:
☐ Depth: Enter Depth
☐ Width: Enter Width
☐ Length: Enter Length
☐ Other(s): Enter Others
Type of Excavation: ☐ Ditches
☐ Trenches
☐ Shafts
☐ Tunneling (drilling /Boring)
☐ Well
☐ Post Driving
☐ Other(s): Enter Others
Excavation Tools/ Equipment ☐ Hand Shovel
☐ Pickaxe
☐ Excavator
☐ Shovel
☐ Skid steer Loader
☐ Backhoe Loader
☐ Other(s): Enter Others
Identified Underground Service(s): ☐ Electrical
☐ Sewer/ Water
☐ Drainage
☐ Communication/Data
☐ Gas
☐ Other(s): Enter Others
Underground Condition(s): ☐ Water Table, Depth: Enter Depth
☐ Tanks
☐ Vaults
☐ Wells
☐ Void & structure
☐ Chemicals
☐ Volatile Fuels
☐ Toxic Gases
☐ Other(s): Enter Others
Excavation Protection(s) By: ☐ Slope, (in degrees from horizontal) Enter Angle as per soil condition
☐ Benching
☐ Sheet, Waling, Strutting
☐ Soldier piling
☐ Void & structure
☐ Proprietary support system
☐ Other(s): Enter Others
Notification(s) given to( If Required): ☐ Relevant Authorities: Click here to enter text.
☐ Utility Service Provider(s): Click here to enter text.
☐ Owner Of Adjoining Properties :
☐ Other(s): Click here to enter text.
4. Control Measures: (To be filled by initiator/originator and verified by Evaluator)
Checks Yes-No-NA Checks Yes-No-NA
Applicable NOCs available ☐ ☐ ☐
Safe means of access/egress provided ☐ ☐ ☐
Method statement & Risk assessment developed, approved & communicated? ☐ ☐ ☐
Ladder are secured, fixed & maintained ☐ ☐ ☐
Operatives are trained and competent? ☐ ☐ ☐
Workplace appropriately illuminated ☐ ☐ ☐
Site is surveyed correctly, marked and identified ☐ ☐ ☐
Ventilation means are available ☐ ☐ ☐
All underground services checked & validated ☐ ☐ ☐
Proper signage are posted ☐ ☐ ☐
Certified cable detector used to verify above ☐ ☐ ☐
Adequate barricade to prevent fall of person/vehicle ☐ ☐ ☐
Ground conditions are examined with bore/trial pit ☐ ☐ ☐
Flash light are fixed on the barricades ☐ ☐ ☐
Water table is located ☐ ☐ ☐
Trained flagman deputed to caution traffic ☐ ☐ ☐
Adjacent properties/services exist? Inspected? ☐ ☐ ☐
Adequate traffic diversion is provided ☐ ☐ ☐
Stability of adjacent property structure ensured/secured ☐ ☐ ☐
Trained banksman available for plants ☐ ☐ ☐
Adequate arrangement to prevent Cave-in ☐ ☐ ☐
Mandatory/specific good condition PPEs are available ☐ ☐ ☐
Dewatering arrangem
This training authorize to work in confined space as the awareness has been given in the training about the hazards & risks during the work in confined space
1. Project Information: (To be filled by initiator/originator)
Project Name: Permit No.:
Project Location:
Requesting Contractor/Company
2. Permit Issuance Details: (To be filled by initiator/originator)
THIS PERMIT IS ONLY FOR ONE SHIFT AND NOT EXTENDABLE
Description of Task:
Detail of Surroundings:
Permit Validity:
Time (from): __________Hrs.
Time (To): __________Hrs.
Date:
3. Excavation Details: (To be filled by initiator/originator)
Location of Excavation:
Click here to enter text.
Excavation Dimensions:
☐ Depth: Enter Depth
☐ Width: Enter Width
☐ Length: Enter Length
☐ Other(s): Enter Others
Type of Excavation: ☐ Ditches
☐ Trenches
☐ Shafts
☐ Tunneling (drilling /Boring)
☐ Well
☐ Post Driving
☐ Other(s): Enter Others
Excavation Tools/ Equipment ☐ Hand Shovel
☐ Pickaxe
☐ Excavator
☐ Shovel
☐ Skid steer Loader
☐ Backhoe Loader
☐ Other(s): Enter Others
Identified Underground Service(s): ☐ Electrical
☐ Sewer/ Water
☐ Drainage
☐ Communication/Data
☐ Gas
☐ Other(s): Enter Others
Underground Condition(s): ☐ Water Table, Depth: Enter Depth
☐ Tanks
☐ Vaults
☐ Wells
☐ Void & structure
☐ Chemicals
☐ Volatile Fuels
☐ Toxic Gases
☐ Other(s): Enter Others
Excavation Protection(s) By: ☐ Slope, (in degrees from horizontal) Enter Angle as per soil condition
☐ Benching
☐ Sheet, Waling, Strutting
☐ Soldier piling
☐ Void & structure
☐ Proprietary support system
☐ Other(s): Enter Others
Notification(s) given to( If Required): ☐ Relevant Authorities: Click here to enter text.
☐ Utility Service Provider(s): Click here to enter text.
☐ Owner Of Adjoining Properties :
☐ Other(s): Click here to enter text.
4. Control Measures: (To be filled by initiator/originator and verified by Evaluator)
Checks Yes-No-NA Checks Yes-No-NA
Applicable NOCs available ☐ ☐ ☐
Safe means of access/egress provided ☐ ☐ ☐
Method statement & Risk assessment developed, approved & communicated? ☐ ☐ ☐
Ladder are secured, fixed & maintained ☐ ☐ ☐
Operatives are trained and competent? ☐ ☐ ☐
Workplace appropriately illuminated ☐ ☐ ☐
Site is surveyed correctly, marked and identified ☐ ☐ ☐
Ventilation means are available ☐ ☐ ☐
All underground services checked & validated ☐ ☐ ☐
Proper signage are posted ☐ ☐ ☐
Certified cable detector used to verify above ☐ ☐ ☐
Adequate barricade to prevent fall of person/vehicle ☐ ☐ ☐
Ground conditions are examined with bore/trial pit ☐ ☐ ☐
Flash light are fixed on the barricades ☐ ☐ ☐
Water table is located ☐ ☐ ☐
Trained flagman deputed to caution traffic ☐ ☐ ☐
Adjacent properties/services exist? Inspected? ☐ ☐ ☐
Adequate traffic diversion is provided ☐ ☐ ☐
Stability of adjacent property structure ensured/secured ☐ ☐ ☐
Trained banksman available for plants ☐ ☐ ☐
Adequate arrangement to prevent Cave-in ☐ ☐ ☐
Mandatory/specific good condition PPEs are available ☐ ☐ ☐
Dewatering arrangem
المرحلة الأولي من برنامج التوعية بأنظمة الصحة والسلامة المهنية والبيئة والتى إقيمت بموقع مستودعات البترول براس غارب بمحافظة البحر الأحمر بحضور ممثلي شركات تنفيذ المشروع وهي PETROJET، Enppi ، ALREHAB ، HILAL ، OETROMINT ، ENERGYA ، IEMSA ، MMC وذلك خلال شهر سبتمبر 2020 الجاري وقد حضر البرنامج أكثر من 180 مشارك من الشركات المنفذة للمشروع
اليكم دليل
توقع ما هو غير متوقع - ما يجب مراعاته عند التخطيط لمكان العمل
حالات الطوارئ هو قسم المعايير والموارد الفنية باللغة الانجليزية OR-OSHA
What to consider in planning for workplace
المرحلة الأولي من برنامج التوعية بأنظمة الصحة والسلامة المهنية والبيئة والتى إقيمت بموقع مستودعات البترول براس غارب بمحافظة البحر الأحمر بحضور ممثلي شركات تنفيذ المشروع وهي PETROJET، Enppi ، ALREHAB ، HILAL ، OETROMINT ، ENERGYA ، IEMSA ، MMC وذلك خلال شهر سبتمبر 2020 الجاري وقد حضر البرنامج أكثر من 180 مشارك من الشركات المنفذة للمشروع
اليكم دليل
توقع ما هو غير متوقع - ما يجب مراعاته عند التخطيط لمكان العمل
حالات الطوارئ هو قسم المعايير والموارد الفنية باللغة الانجليزية OR-OSHA
What to consider in planning for workplace
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfKamal Acharya
The College Bus Management system is completely developed by Visual Basic .NET Version. The application is connect with most secured database language MS SQL Server. The application is develop by using best combination of front-end and back-end languages. The application is totally design like flat user interface. This flat user interface is more attractive user interface in 2017. The application is gives more important to the system functionality. The application is to manage the student’s details, driver’s details, bus details, bus route details, bus fees details and more. The application has only one unit for admin. The admin can manage the entire application. The admin can login into the application by using username and password of the admin. The application is develop for big and small colleges. It is more user friendly for non-computer person. Even they can easily learn how to manage the application within hours. The application is more secure by the admin. The system will give an effective output for the VB.Net and SQL Server given as input to the system. The compiled java program given as input to the system, after scanning the program will generate different reports. The application generates the report for users. The admin can view and download the report of the data. The application deliver the excel format reports. Because, excel formatted reports is very easy to understand the income and expense of the college bus. This application is mainly develop for windows operating system users. In 2017, 73% of people enterprises are using windows operating system. So the application will easily install for all the windows operating system users. The application-developed size is very low. The application consumes very low space in disk. Therefore, the user can allocate very minimum local disk space for this application.
Cosmetic shop management system project report.pdfKamal Acharya
Buying new cosmetic products is difficult. It can even be scary for those who have sensitive skin and are prone to skin trouble. The information needed to alleviate this problem is on the back of each product, but it's thought to interpret those ingredient lists unless you have a background in chemistry.
Instead of buying and hoping for the best, we can use data science to help us predict which products may be good fits for us. It includes various function programs to do the above mentioned tasks.
Data file handling has been effectively used in the program.
The automated cosmetic shop management system should deal with the automation of general workflow and administration process of the shop. The main processes of the system focus on customer's request where the system is able to search the most appropriate products and deliver it to the customers. It should help the employees to quickly identify the list of cosmetic product that have reached the minimum quantity and also keep a track of expired date for each cosmetic product. It should help the employees to find the rack number in which the product is placed.It is also Faster and more efficient way.
Immunizing Image Classifiers Against Localized Adversary Attacksgerogepatton
This paper addresses the vulnerability of deep learning models, particularly convolutional neural networks
(CNN)s, to adversarial attacks and presents a proactive training technique designed to counter them. We
introduce a novel volumization algorithm, which transforms 2D images into 3D volumetric representations.
When combined with 3D convolution and deep curriculum learning optimization (CLO), itsignificantly improves
the immunity of models against localized universal attacks by up to 40%. We evaluate our proposed approach
using contemporary CNN architectures and the modified Canadian Institute for Advanced Research (CIFAR-10
and CIFAR-100) and ImageNet Large Scale Visual Recognition Challenge (ILSVRC12) datasets, showcasing
accuracy improvements over previous techniques. The results indicate that the combination of the volumetric
input and curriculum learning holds significant promise for mitigating adversarial attacks without necessitating
adversary training.
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
Student information management system project report ii.pdfKamal Acharya
Our project explains about the student management. This project mainly explains the various actions related to student details. This project shows some ease in adding, editing and deleting the student details. It also provides a less time consuming process for viewing, adding, editing and deleting the marks of the students.
Water scarcity is the lack of fresh water resources to meet the standard water demand. There are two type of water scarcity. One is physical. The other is economic water scarcity.
Automobile Management System Project Report.pdfKamal Acharya
The proposed project is developed to manage the automobile in the automobile dealer company. The main module in this project is login, automobile management, customer management, sales, complaints and reports. The first module is the login. The automobile showroom owner should login to the project for usage. The username and password are verified and if it is correct, next form opens. If the username and password are not correct, it shows the error message.
When a customer search for a automobile, if the automobile is available, they will be taken to a page that shows the details of the automobile including automobile name, automobile ID, quantity, price etc. “Automobile Management System” is useful for maintaining automobiles, customers effectively and hence helps for establishing good relation between customer and automobile organization. It contains various customized modules for effectively maintaining automobiles and stock information accurately and safely.
When the automobile is sold to the customer, stock will be reduced automatically. When a new purchase is made, stock will be increased automatically. While selecting automobiles for sale, the proposed software will automatically check for total number of available stock of that particular item, if the total stock of that particular item is less than 5, software will notify the user to purchase the particular item.
Also when the user tries to sale items which are not in stock, the system will prompt the user that the stock is not enough. Customers of this system can search for a automobile; can purchase a automobile easily by selecting fast. On the other hand the stock of automobiles can be maintained perfectly by the automobile shop manager overcoming the drawbacks of existing system.
Vaccine management system project report documentation..pdfKamal Acharya
The Division of Vaccine and Immunization is facing increasing difficulty monitoring vaccines and other commodities distribution once they have been distributed from the national stores. With the introduction of new vaccines, more challenges have been anticipated with this additions posing serious threat to the already over strained vaccine supply chain system in Kenya.
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
Halogenation process of chemical process industries
Permit to confined_space_work
1. Tamer Sharaki For Training & Consultancy
TSTC
www.tstc.com.eg
Permit to Confined Space work
المحصورة األماكن فى العمل تصريح
Permit for: Confined space تصريحدخولتـنكات/مكانمحدود Sr. No. Permit No.
Date:
Validity period: FROM:_____Hours on Date:_________ UNTIL:_____Hours on Date:__________
Work location:
Job description:
I declare that it is safe and human worthy for carrying out the work in this enclosed space.
Name of Gas inspector: Signature: Time: Date:
The following items must be checked and the area made safe for the job prior to issuing the
permit
Item Done N/A Item Done N/A
Safety Toolbox Briefing talk conducted Metal / Rope Ladders
ساللممعدنية/حبال
Depressurised &/or Drained تمالتفريغ/التصفية Lifting Basketسلةانزاللالفراد
Steamed &/or Water Flushed تمالغسيلبالبخار/بالماء Goggles نظاراتسالمة
Ventilated by natural draft properly تمتالتهويةالطبيعية
الكافية
PVC Gloves قفازاتمطاطية
Isolated by Blinding/Disconnecting تمالعزلبواسطة
السد/الفصل
B.A.Sets اجهزةتنفسنقالة
Machines & Devices inside isolated & tagged
تمعزلاالالتواالجهزةبالداخلووضعتالبطاقات
Face Visors اقنعةحمايةالوجهة
Temp. Humidity. Air Velocity within Safe Limits
الحرارة-الرطوبة-سرعةالهواءفيالحدوداالمنة
Air Supplied Masks اجهزة
تنفسبالهواء
Air Blower to be kept Running for Ventilation تلزم
التهويةبتشغيلمروحةباستمرار
Chemical Resistant Clothing
مالبسمضادةللكيماويات
Process & Maint. Stand by Personnel on Site تمتوفير
اشخاصمنالتشغيلوالصيانةبالموقع
Safety Harness & Lifelines
احزمةسالمةوحبالانقاذ
Repeated / Continous Gas Monitoring needed يلزم
اجراءاختباراتغازاتدوريمستمرة /
Radio Sets اجهزةاتصال
Lifting Machine Tested on Recommended time تم
اختبارالةالرفعفيالموعدالمقرر
Lighting Lines > 50 V خطوط
اضاءةاقلمن50فولت
Area Clean & Safe المنطقةنظيفةوامنة Other Safety Require or Action:
Name / ID of Watchman
Name / ID of: Supervisor
Name / ID of the appointed Safety Inspector for this section of the structure:
I am satisfied that it safe to carry out the work described above and the permit is issued. I Certify that I have
inspected the Site and it is Safe for Entry Work to Start
Name of authorizing
authority:
Signature: Time: Date:
The work is completed / stopped due to a safety violation / and the permit is terminated.
Name of job /
inspection authority
Signature: Time: Date:
Signe In/Out Sheet to be located in job location with Gas Test Records الغاز إختبار
Gases
الغازات
Acceptable Readings
المقبوله القراءات
Actual Readings
الفعليه القراءات
Signed by Competent Person, Gas Testing إختبار , المؤهل الشخص طريق عن موقعه
الغاز
Toxic
سامه
Zeroصفر
Flammable
لإلشتعال قابله
Zero صفر
Oxygen
األكسجين
Between 19.5%
and 21%
بين19.5%و21%