A Fairfax County, VA, publication
Department of Public Works and Environmental Services
Working for You!
Task Order No. 87
Contract No. CN19124137
Project No. 2G40-087-011
Dranesville District
Tax Map No. 31-1
July 24, 2020
GEORGETOWN PIKE AT DOLLEY MADISON
BOULEVARD PEDESTRIAN IMPROVEMENTS
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Georgetown Pike at Dolley Madison Boulevard Pedestrian
Improvements
Project Details
Georgetown Pike and Dolley Madison Boulevard Pedestrian Improvements
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Description:
The Georgetown Pike and Dolley Madison Boulevard Pedestrian Improvements project has been
substantially completed. This project consists of the design of pedestrian improvements at the
intersection of Georgetown Pike and Dolley Madison Boulevard. Improvements include installing
300 LF of concrete sidewalk and approximately 750 LF of shared use asphalt trail, curb and gutter,
concrete curb ramps, refuge island, milling and asphalt paving near the intersection. Drainage
improvements include replacement of an existing 139 LF stormwater with a larger elliptical
concrete pipe.
Project Team:
• Department of Transportation – Seyed Nabavi
• Utilities Design and Construction Division (UDCD) – Deepak Bhinge
• UDCD Inspections – Keith Ferrell, Ken Giles and Hammad Hashmi,
• Land Survey Branch – Mike Perry and Cody Harp-Taylor
• Land Acquisition Division – John Honnick
• Engineer – Kimley-Horn & Associates
• Contractor – Ashburn Contracting Corporation
Georgetown Pike and Dolley Madison Boulevard Pedestrian Improvements
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Dranesville District, Tax Map 31-1
Project
Location
Project
Location
Georgetown Pike at Dolley Madison Boulevard Pedestrian Improvements
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Pre-Existing Conditions
Georgetown Pike and Dolley Madison Boulevard Pedestrian Improvements
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Pre-Existing Conditions
Georgetown Pike at Dolley Madison Boulevard Pedestrian Improvements
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Pre-Existing Conditions
Georgetown Pike at Dolley Madison Boulevard Pedestrian Improvements
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Grading New Path for Asphalt Trail
Georgetown Pike at Dolley Madison Boulevard Pedestrian Improvements
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Installation of Concrete Sidewalk Forms
Georgetown Pike at Dolley Madison Boulevard Pedestrian Improvements
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Grading of Storm Drainage Ditch
Georgetown Pike at Dolley Madison Boulevard Pedestrian Improvements
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Installation of Asphalt Trail
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Georgetown Pike at Dolley Madison Boulevard Pedestrian
Improvements
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Georgetown Pike at Dolley Madison Boulevard Pedestrian
Improvements
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Georgetown Pike at Dolley Madison Boulevard Pedestrian
Improvements
Before After
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Georgetown Pike at Dolley Madison Boulevard Pedestrian Improvements
Before After
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Georgetown Pike at Dolley Madison Boulevard Pedestrian Improvements
Before After
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Georgetown Pike at Dolley Madison Boulevard Pedestrian Improvements
Additional Information
For additional Information, please call
www.fairfaxcounty.gov/publicworks
Georgetown Pike at Dolley Madison Boulevard Pedestrian Improvements
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Irene Haske, Public Information Officer
703-324-5500, TTY 711
Irene.Haske@fairfaxcounty.gov

More Related Content

What's hot

Scotts Run Trail to McLean Metro Station January 2021
Scotts Run Trail to McLean Metro Station January 2021Scotts Run Trail to McLean Metro Station January 2021
Scotts Run Trail to McLean Metro Station January 2021Fairfax County
 
Workhouse Arts Foundation Cross-County Trail
Workhouse Arts Foundation Cross-County TrailWorkhouse Arts Foundation Cross-County Trail
Workhouse Arts Foundation Cross-County TrailFairfax County
 
Fair Lakes Boulevard Walkway from Stringfellow Road to Fair Lakes Shopping Ce...
Fair Lakes Boulevard Walkway from Stringfellow Road to Fair Lakes Shopping Ce...Fair Lakes Boulevard Walkway from Stringfellow Road to Fair Lakes Shopping Ce...
Fair Lakes Boulevard Walkway from Stringfellow Road to Fair Lakes Shopping Ce...Fairfax County
 
Braddock Road Walkway - Carlbern Drive to Clubside Lane
Braddock Road Walkway - Carlbern Drive to Clubside LaneBraddock Road Walkway - Carlbern Drive to Clubside Lane
Braddock Road Walkway - Carlbern Drive to Clubside LaneFairfax County
 
Elm Street at Dolley Madison Boulevard Pedestrian Improvements
Elm Street at Dolley Madison Boulevard Pedestrian ImprovementsElm Street at Dolley Madison Boulevard Pedestrian Improvements
Elm Street at Dolley Madison Boulevard Pedestrian ImprovementsFairfax County
 
Bus Stop Safety and Accessibility Improvements
Bus Stop Safety and Accessibility ImprovementsBus Stop Safety and Accessibility Improvements
Bus Stop Safety and Accessibility ImprovementsFairfax County
 
Pedestrian Improvements at Highland Street, Backlick Road, Amherst Ave. Inter...
Pedestrian Improvements at Highland Street, Backlick Road, Amherst Ave. Inter...Pedestrian Improvements at Highland Street, Backlick Road, Amherst Ave. Inter...
Pedestrian Improvements at Highland Street, Backlick Road, Amherst Ave. Inter...Fairfax County
 
Sunrise Valley Dr. Sidewalk Improvements -River Birch Rd. to Legacy Circle
Sunrise Valley Dr. Sidewalk Improvements -River Birch Rd. to Legacy CircleSunrise Valley Dr. Sidewalk Improvements -River Birch Rd. to Legacy Circle
Sunrise Valley Dr. Sidewalk Improvements -River Birch Rd. to Legacy CircleFairfax County
 
Great Falls St. Sidewalk Improvements December 2020
Great Falls St. Sidewalk Improvements December 2020Great Falls St. Sidewalk Improvements December 2020
Great Falls St. Sidewalk Improvements December 2020Fairfax County
 
North Beauregard Street at North Chambliss Street Spot Improvement
North Beauregard Street at North Chambliss Street Spot ImprovementNorth Beauregard Street at North Chambliss Street Spot Improvement
North Beauregard Street at North Chambliss Street Spot ImprovementFairfax County
 
Silverbrook Road at Monacan Road Walkway Project
Silverbrook Road at Monacan Road Walkway ProjectSilverbrook Road at Monacan Road Walkway Project
Silverbrook Road at Monacan Road Walkway ProjectFairfax County
 
Old Keene Mill Road Walkway at Carrleigh Pkwy
Old Keene Mill Road Walkway at Carrleigh PkwyOld Keene Mill Road Walkway at Carrleigh Pkwy
Old Keene Mill Road Walkway at Carrleigh PkwyFairfax County
 
Pohick Road - South Run Road Walkway Pedestrian Improvements
Pohick Road - South Run Road Walkway Pedestrian ImprovementsPohick Road - South Run Road Walkway Pedestrian Improvements
Pohick Road - South Run Road Walkway Pedestrian ImprovementsFairfax County
 
Hunter Mill Road and Sunrise Valley Drive Pedestrian Improvements
Hunter Mill Road and Sunrise Valley Drive Pedestrian ImprovementsHunter Mill Road and Sunrise Valley Drive Pedestrian Improvements
Hunter Mill Road and Sunrise Valley Drive Pedestrian ImprovementsFairfax County
 
Fairfax County Little River Turnpike Walkway August 2020
Fairfax County Little River Turnpike Walkway August 2020Fairfax County Little River Turnpike Walkway August 2020
Fairfax County Little River Turnpike Walkway August 2020Fairfax County
 
Lanier St. Bicycle and Pedestrian Connection
Lanier St. Bicycle and Pedestrian ConnectionLanier St. Bicycle and Pedestrian Connection
Lanier St. Bicycle and Pedestrian ConnectionFairfax County
 
Fairfax County Fleet Drive Walkway Improvements Sept 2020
Fairfax County Fleet Drive Walkway Improvements Sept 2020Fairfax County Fleet Drive Walkway Improvements Sept 2020
Fairfax County Fleet Drive Walkway Improvements Sept 2020Fairfax County
 
Chesterbrook Road Walkway Improvement Project August 2020
Chesterbrook Road Walkway Improvement Project August 2020Chesterbrook Road Walkway Improvement Project August 2020
Chesterbrook Road Walkway Improvement Project August 2020Fairfax County
 

What's hot (20)

Scotts Run Trail to McLean Metro Station January 2021
Scotts Run Trail to McLean Metro Station January 2021Scotts Run Trail to McLean Metro Station January 2021
Scotts Run Trail to McLean Metro Station January 2021
 
Workhouse Arts Foundation Cross-County Trail
Workhouse Arts Foundation Cross-County TrailWorkhouse Arts Foundation Cross-County Trail
Workhouse Arts Foundation Cross-County Trail
 
Fair Lakes Boulevard Walkway from Stringfellow Road to Fair Lakes Shopping Ce...
Fair Lakes Boulevard Walkway from Stringfellow Road to Fair Lakes Shopping Ce...Fair Lakes Boulevard Walkway from Stringfellow Road to Fair Lakes Shopping Ce...
Fair Lakes Boulevard Walkway from Stringfellow Road to Fair Lakes Shopping Ce...
 
Braddock Road Walkway - Carlbern Drive to Clubside Lane
Braddock Road Walkway - Carlbern Drive to Clubside LaneBraddock Road Walkway - Carlbern Drive to Clubside Lane
Braddock Road Walkway - Carlbern Drive to Clubside Lane
 
Elm Street at Dolley Madison Boulevard Pedestrian Improvements
Elm Street at Dolley Madison Boulevard Pedestrian ImprovementsElm Street at Dolley Madison Boulevard Pedestrian Improvements
Elm Street at Dolley Madison Boulevard Pedestrian Improvements
 
Bus Stop Safety and Accessibility Improvements
Bus Stop Safety and Accessibility ImprovementsBus Stop Safety and Accessibility Improvements
Bus Stop Safety and Accessibility Improvements
 
Pedestrian Improvements at Highland Street, Backlick Road, Amherst Ave. Inter...
Pedestrian Improvements at Highland Street, Backlick Road, Amherst Ave. Inter...Pedestrian Improvements at Highland Street, Backlick Road, Amherst Ave. Inter...
Pedestrian Improvements at Highland Street, Backlick Road, Amherst Ave. Inter...
 
Sunrise Valley Dr. Sidewalk Improvements -River Birch Rd. to Legacy Circle
Sunrise Valley Dr. Sidewalk Improvements -River Birch Rd. to Legacy CircleSunrise Valley Dr. Sidewalk Improvements -River Birch Rd. to Legacy Circle
Sunrise Valley Dr. Sidewalk Improvements -River Birch Rd. to Legacy Circle
 
Great Falls St. Sidewalk Improvements December 2020
Great Falls St. Sidewalk Improvements December 2020Great Falls St. Sidewalk Improvements December 2020
Great Falls St. Sidewalk Improvements December 2020
 
North Beauregard Street at North Chambliss Street Spot Improvement
North Beauregard Street at North Chambliss Street Spot ImprovementNorth Beauregard Street at North Chambliss Street Spot Improvement
North Beauregard Street at North Chambliss Street Spot Improvement
 
Silverbrook Road at Monacan Road Walkway Project
Silverbrook Road at Monacan Road Walkway ProjectSilverbrook Road at Monacan Road Walkway Project
Silverbrook Road at Monacan Road Walkway Project
 
Old Keene Mill Road Walkway at Carrleigh Pkwy
Old Keene Mill Road Walkway at Carrleigh PkwyOld Keene Mill Road Walkway at Carrleigh Pkwy
Old Keene Mill Road Walkway at Carrleigh Pkwy
 
Pohick Road - South Run Road Walkway Pedestrian Improvements
Pohick Road - South Run Road Walkway Pedestrian ImprovementsPohick Road - South Run Road Walkway Pedestrian Improvements
Pohick Road - South Run Road Walkway Pedestrian Improvements
 
Center Road sidewalk
Center Road sidewalkCenter Road sidewalk
Center Road sidewalk
 
Hunter Mill Road and Sunrise Valley Drive Pedestrian Improvements
Hunter Mill Road and Sunrise Valley Drive Pedestrian ImprovementsHunter Mill Road and Sunrise Valley Drive Pedestrian Improvements
Hunter Mill Road and Sunrise Valley Drive Pedestrian Improvements
 
Fairfax County Little River Turnpike Walkway August 2020
Fairfax County Little River Turnpike Walkway August 2020Fairfax County Little River Turnpike Walkway August 2020
Fairfax County Little River Turnpike Walkway August 2020
 
FDOT SR-997/Krome Avenue Safety Improvement Projects Status Update
FDOT SR-997/Krome Avenue Safety Improvement Projects Status UpdateFDOT SR-997/Krome Avenue Safety Improvement Projects Status Update
FDOT SR-997/Krome Avenue Safety Improvement Projects Status Update
 
Lanier St. Bicycle and Pedestrian Connection
Lanier St. Bicycle and Pedestrian ConnectionLanier St. Bicycle and Pedestrian Connection
Lanier St. Bicycle and Pedestrian Connection
 
Fairfax County Fleet Drive Walkway Improvements Sept 2020
Fairfax County Fleet Drive Walkway Improvements Sept 2020Fairfax County Fleet Drive Walkway Improvements Sept 2020
Fairfax County Fleet Drive Walkway Improvements Sept 2020
 
Chesterbrook Road Walkway Improvement Project August 2020
Chesterbrook Road Walkway Improvement Project August 2020Chesterbrook Road Walkway Improvement Project August 2020
Chesterbrook Road Walkway Improvement Project August 2020
 

Similar to Fairfax County pedestrian improvements

Innovation Ave Walkway (Innovation Metro Station to Dulles Greene blvd)
Innovation Ave Walkway (Innovation Metro Station to Dulles Greene blvd)Innovation Ave Walkway (Innovation Metro Station to Dulles Greene blvd)
Innovation Ave Walkway (Innovation Metro Station to Dulles Greene blvd)Fairfax County
 
Braddock Rd. and Roberts Rd. Intersection and Sidewalk Improvements
Braddock Rd. and Roberts Rd. Intersection and Sidewalk ImprovementsBraddock Rd. and Roberts Rd. Intersection and Sidewalk Improvements
Braddock Rd. and Roberts Rd. Intersection and Sidewalk ImprovementsFairfax County
 
Dolley Madison Boulevard Sidewalk - Old Dominion Road to Beverly Road
Dolley Madison Boulevard Sidewalk - Old Dominion Road to Beverly RoadDolley Madison Boulevard Sidewalk - Old Dominion Road to Beverly Road
Dolley Madison Boulevard Sidewalk - Old Dominion Road to Beverly RoadFairfax County
 
Fairfax County Old Courthouse Road Walkway Improvements August 2020
Fairfax County Old Courthouse Road Walkway Improvements August 2020Fairfax County Old Courthouse Road Walkway Improvements August 2020
Fairfax County Old Courthouse Road Walkway Improvements August 2020Fairfax County
 
Chain Bridge Road Walkway from Niblick Drive to Horse Shoe Drive
Chain Bridge Road Walkway from Niblick Drive to Horse Shoe DriveChain Bridge Road Walkway from Niblick Drive to Horse Shoe Drive
Chain Bridge Road Walkway from Niblick Drive to Horse Shoe DriveFairfax County
 
Fairfax County Glade Dr. Walkway Improvements August 2020
Fairfax County Glade Dr. Walkway Improvements August 2020Fairfax County Glade Dr. Walkway Improvements August 2020
Fairfax County Glade Dr. Walkway Improvements August 2020Fairfax County
 
Dolley Madison Sidewalk - Chain Bridge Road to Kurtz Road
Dolley Madison Sidewalk - Chain Bridge Road to Kurtz RoadDolley Madison Sidewalk - Chain Bridge Road to Kurtz Road
Dolley Madison Sidewalk - Chain Bridge Road to Kurtz RoadFairfax County
 
Tysons Boulevard and Galleria Drive Pedestrian Access Improvements
Tysons Boulevard and Galleria Drive Pedestrian Access ImprovementsTysons Boulevard and Galleria Drive Pedestrian Access Improvements
Tysons Boulevard and Galleria Drive Pedestrian Access ImprovementsFairfax County
 
Medford Drive Walkway Improvements
Medford Drive Walkway ImprovementsMedford Drive Walkway Improvements
Medford Drive Walkway ImprovementsFairfax County
 
Lee Chapel Rd. Walkway Burke Lake Rd. to Britford Dr. July 2020
Lee Chapel Rd. Walkway Burke Lake Rd. to Britford Dr. July 2020Lee Chapel Rd. Walkway Burke Lake Rd. to Britford Dr. July 2020
Lee Chapel Rd. Walkway Burke Lake Rd. to Britford Dr. July 2020Fairfax County
 
Edsall Road Walkway Pedestrian Improvements
Edsall Road Walkway Pedestrian ImprovementsEdsall Road Walkway Pedestrian Improvements
Edsall Road Walkway Pedestrian ImprovementsFairfax County
 
Cinder Bed Road Realignment
Cinder Bed Road RealignmentCinder Bed Road Realignment
Cinder Bed Road RealignmentFairfax County
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22Fairfax County
 
Glade Drive Walkway - Middle Creek Lane to Glade Bank Way
Glade Drive Walkway - Middle Creek Lane to Glade Bank WayGlade Drive Walkway - Middle Creek Lane to Glade Bank Way
Glade Drive Walkway - Middle Creek Lane to Glade Bank WayFairfax County
 
Route 123 and Jermantown Rd. Intersection Improvements November 2020
Route 123 and Jermantown Rd. Intersection Improvements November 2020Route 123 and Jermantown Rd. Intersection Improvements November 2020
Route 123 and Jermantown Rd. Intersection Improvements November 2020Fairfax County
 
Sunrise Valley Dr. from Glade Dr. to Reston Parkway Sidewalk July 2020
Sunrise Valley Dr. from Glade Dr. to Reston Parkway Sidewalk July 2020 Sunrise Valley Dr. from Glade Dr. to Reston Parkway Sidewalk July 2020
Sunrise Valley Dr. from Glade Dr. to Reston Parkway Sidewalk July 2020 Fairfax County
 
Tysons Blvd.Temporary NB Single Lane Closure June 8, 2020
Tysons Blvd.Temporary NB Single Lane Closure June 8, 2020Tysons Blvd.Temporary NB Single Lane Closure June 8, 2020
Tysons Blvd.Temporary NB Single Lane Closure June 8, 2020Fairfax County
 
North Shore Sidewalk Improvements
North Shore Sidewalk ImprovementsNorth Shore Sidewalk Improvements
North Shore Sidewalk ImprovementsFairfax County
 
Tysons East Sidewalk - South Side of Route 123
Tysons East Sidewalk - South Side of Route 123Tysons East Sidewalk - South Side of Route 123
Tysons East Sidewalk - South Side of Route 123Fairfax County
 
Substantial Completion: Lorton Road Project
Substantial Completion: Lorton Road ProjectSubstantial Completion: Lorton Road Project
Substantial Completion: Lorton Road ProjectFairfax County
 

Similar to Fairfax County pedestrian improvements (20)

Innovation Ave Walkway (Innovation Metro Station to Dulles Greene blvd)
Innovation Ave Walkway (Innovation Metro Station to Dulles Greene blvd)Innovation Ave Walkway (Innovation Metro Station to Dulles Greene blvd)
Innovation Ave Walkway (Innovation Metro Station to Dulles Greene blvd)
 
Braddock Rd. and Roberts Rd. Intersection and Sidewalk Improvements
Braddock Rd. and Roberts Rd. Intersection and Sidewalk ImprovementsBraddock Rd. and Roberts Rd. Intersection and Sidewalk Improvements
Braddock Rd. and Roberts Rd. Intersection and Sidewalk Improvements
 
Dolley Madison Boulevard Sidewalk - Old Dominion Road to Beverly Road
Dolley Madison Boulevard Sidewalk - Old Dominion Road to Beverly RoadDolley Madison Boulevard Sidewalk - Old Dominion Road to Beverly Road
Dolley Madison Boulevard Sidewalk - Old Dominion Road to Beverly Road
 
Fairfax County Old Courthouse Road Walkway Improvements August 2020
Fairfax County Old Courthouse Road Walkway Improvements August 2020Fairfax County Old Courthouse Road Walkway Improvements August 2020
Fairfax County Old Courthouse Road Walkway Improvements August 2020
 
Chain Bridge Road Walkway from Niblick Drive to Horse Shoe Drive
Chain Bridge Road Walkway from Niblick Drive to Horse Shoe DriveChain Bridge Road Walkway from Niblick Drive to Horse Shoe Drive
Chain Bridge Road Walkway from Niblick Drive to Horse Shoe Drive
 
Fairfax County Glade Dr. Walkway Improvements August 2020
Fairfax County Glade Dr. Walkway Improvements August 2020Fairfax County Glade Dr. Walkway Improvements August 2020
Fairfax County Glade Dr. Walkway Improvements August 2020
 
Dolley Madison Sidewalk - Chain Bridge Road to Kurtz Road
Dolley Madison Sidewalk - Chain Bridge Road to Kurtz RoadDolley Madison Sidewalk - Chain Bridge Road to Kurtz Road
Dolley Madison Sidewalk - Chain Bridge Road to Kurtz Road
 
Tysons Boulevard and Galleria Drive Pedestrian Access Improvements
Tysons Boulevard and Galleria Drive Pedestrian Access ImprovementsTysons Boulevard and Galleria Drive Pedestrian Access Improvements
Tysons Boulevard and Galleria Drive Pedestrian Access Improvements
 
Medford Drive Walkway Improvements
Medford Drive Walkway ImprovementsMedford Drive Walkway Improvements
Medford Drive Walkway Improvements
 
Lee Chapel Rd. Walkway Burke Lake Rd. to Britford Dr. July 2020
Lee Chapel Rd. Walkway Burke Lake Rd. to Britford Dr. July 2020Lee Chapel Rd. Walkway Burke Lake Rd. to Britford Dr. July 2020
Lee Chapel Rd. Walkway Burke Lake Rd. to Britford Dr. July 2020
 
Edsall Road Walkway Pedestrian Improvements
Edsall Road Walkway Pedestrian ImprovementsEdsall Road Walkway Pedestrian Improvements
Edsall Road Walkway Pedestrian Improvements
 
Cinder Bed Road Realignment
Cinder Bed Road RealignmentCinder Bed Road Realignment
Cinder Bed Road Realignment
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22
 
Glade Drive Walkway - Middle Creek Lane to Glade Bank Way
Glade Drive Walkway - Middle Creek Lane to Glade Bank WayGlade Drive Walkway - Middle Creek Lane to Glade Bank Way
Glade Drive Walkway - Middle Creek Lane to Glade Bank Way
 
Route 123 and Jermantown Rd. Intersection Improvements November 2020
Route 123 and Jermantown Rd. Intersection Improvements November 2020Route 123 and Jermantown Rd. Intersection Improvements November 2020
Route 123 and Jermantown Rd. Intersection Improvements November 2020
 
Sunrise Valley Dr. from Glade Dr. to Reston Parkway Sidewalk July 2020
Sunrise Valley Dr. from Glade Dr. to Reston Parkway Sidewalk July 2020 Sunrise Valley Dr. from Glade Dr. to Reston Parkway Sidewalk July 2020
Sunrise Valley Dr. from Glade Dr. to Reston Parkway Sidewalk July 2020
 
Tysons Blvd.Temporary NB Single Lane Closure June 8, 2020
Tysons Blvd.Temporary NB Single Lane Closure June 8, 2020Tysons Blvd.Temporary NB Single Lane Closure June 8, 2020
Tysons Blvd.Temporary NB Single Lane Closure June 8, 2020
 
North Shore Sidewalk Improvements
North Shore Sidewalk ImprovementsNorth Shore Sidewalk Improvements
North Shore Sidewalk Improvements
 
Tysons East Sidewalk - South Side of Route 123
Tysons East Sidewalk - South Side of Route 123Tysons East Sidewalk - South Side of Route 123
Tysons East Sidewalk - South Side of Route 123
 
Substantial Completion: Lorton Road Project
Substantial Completion: Lorton Road ProjectSubstantial Completion: Lorton Road Project
Substantial Completion: Lorton Road Project
 

More from Fairfax County

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementFairfax County
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS Fairfax County
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxFairfax County
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19 Fairfax County
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationFairfax County
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction ProgressFairfax County
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxFairfax County
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IVFairfax County
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Fairfax County
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxFairfax County
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilFairfax County
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptxFairfax County
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT Fairfax County
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap UpFairfax County
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Fairfax County
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Fairfax County
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectFairfax County
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Fairfax County
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual ArtsFairfax County
 
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022Fairfax County
 

More from Fairfax County (20)

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer Replacement
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction Progress
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IV
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick Offpptx
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing Council
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap Up
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction Project
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual Arts
 
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022
 

Recently uploaded

HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 

Recently uploaded (20)

HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 

Fairfax County pedestrian improvements

  • 1. A Fairfax County, VA, publication Department of Public Works and Environmental Services Working for You! Task Order No. 87 Contract No. CN19124137 Project No. 2G40-087-011 Dranesville District Tax Map No. 31-1 July 24, 2020 GEORGETOWN PIKE AT DOLLEY MADISON BOULEVARD PEDESTRIAN IMPROVEMENTS
  • 2. Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch Georgetown Pike at Dolley Madison Boulevard Pedestrian Improvements
  • 3. Project Details Georgetown Pike and Dolley Madison Boulevard Pedestrian Improvements Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch Description: The Georgetown Pike and Dolley Madison Boulevard Pedestrian Improvements project has been substantially completed. This project consists of the design of pedestrian improvements at the intersection of Georgetown Pike and Dolley Madison Boulevard. Improvements include installing 300 LF of concrete sidewalk and approximately 750 LF of shared use asphalt trail, curb and gutter, concrete curb ramps, refuge island, milling and asphalt paving near the intersection. Drainage improvements include replacement of an existing 139 LF stormwater with a larger elliptical concrete pipe. Project Team: • Department of Transportation – Seyed Nabavi • Utilities Design and Construction Division (UDCD) – Deepak Bhinge • UDCD Inspections – Keith Ferrell, Ken Giles and Hammad Hashmi, • Land Survey Branch – Mike Perry and Cody Harp-Taylor • Land Acquisition Division – John Honnick • Engineer – Kimley-Horn & Associates • Contractor – Ashburn Contracting Corporation
  • 4. Georgetown Pike and Dolley Madison Boulevard Pedestrian Improvements Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch Dranesville District, Tax Map 31-1 Project Location Project Location
  • 5. Georgetown Pike at Dolley Madison Boulevard Pedestrian Improvements Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch Pre-Existing Conditions
  • 6. Georgetown Pike and Dolley Madison Boulevard Pedestrian Improvements Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch Pre-Existing Conditions
  • 7. Georgetown Pike at Dolley Madison Boulevard Pedestrian Improvements Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch Pre-Existing Conditions
  • 8. Georgetown Pike at Dolley Madison Boulevard Pedestrian Improvements Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch Grading New Path for Asphalt Trail
  • 9. Georgetown Pike at Dolley Madison Boulevard Pedestrian Improvements Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch Installation of Concrete Sidewalk Forms
  • 10. Georgetown Pike at Dolley Madison Boulevard Pedestrian Improvements Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch Grading of Storm Drainage Ditch
  • 11. Georgetown Pike at Dolley Madison Boulevard Pedestrian Improvements Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch Installation of Asphalt Trail
  • 12. Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch Georgetown Pike at Dolley Madison Boulevard Pedestrian Improvements
  • 13. Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch Georgetown Pike at Dolley Madison Boulevard Pedestrian Improvements
  • 14. Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch Georgetown Pike at Dolley Madison Boulevard Pedestrian Improvements
  • 15. Before After Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch Georgetown Pike at Dolley Madison Boulevard Pedestrian Improvements
  • 16. Before After Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch Georgetown Pike at Dolley Madison Boulevard Pedestrian Improvements
  • 17. Before After Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch Georgetown Pike at Dolley Madison Boulevard Pedestrian Improvements
  • 18. Additional Information For additional Information, please call www.fairfaxcounty.gov/publicworks Georgetown Pike at Dolley Madison Boulevard Pedestrian Improvements Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch Irene Haske, Public Information Officer 703-324-5500, TTY 711 Irene.Haske@fairfaxcounty.gov