OBJECTIVES
INTRODUTION OF I.L.
MANUFACTURING PRODUCTS AT I.L.
PCB and PCB CENTRE.
EQUIPMENTS USED IN ASSEMBLING AND
MANUFACTURING OF PCB.
MANUFACTURING TECHNIQUES.
ACTIVATION FLOW CHART OF CARD ASSEMBELY.
APPLICATIONS.
CONCLUSION.
 Instrumentation Ltd is a Public
Sector unit . it is Undertaking
Ministry of Heavy Industries.
 It is set up in kota April,1964.
it is based on C-DOT (Centre for
Development of Telematics) Tech.
 It has a Plant HQ at Kota with another
plant at Palakkad, Kerala.
 International office in Malaysia, Iran.
Gurukul Institute of Engineering & Technology, Kota
(2) TELECOM
DIVISION
(1) PCB CENTRE
(CARD ASSEMBELY)
(6) GAS
ANALYSER
(5) UPS
DEPARTMENT
(3)DEFENCE
PROJECT DEPT.
(4) RAILWAY
SIGNALLING
RELAY
DEPARTMENTS
AT I.L UNIT
The Major products that IL presently
manufacture:
Gurukul Institute of Engineering & Technology, Kota
(1)PCB(cards)
(2)UPS
(3)RSR
(4)Defence product
(5)Gas analyser
(6)SBC
PCB CENTRE:-
Gurukul Institute of Engineering & Technology, Kota
» Instrumentation Limited 's Electronic assemblies
plant at Kota assemble & test the PCBs.
» It is spread over 20,000 square feet.
» PTH and SMT Techniques are used for assembling.
» The unit has fully automatic programmable Pick &
Place machine.
Gurukul Institute of Engineering & Technology, Kota
WHAT IS PCB? Type 1 – Single Sided PCB
Type 2 – Double sided PCB
Type 3 – Multilayered PCB
 PCB, is used to mechanically support
and electrically connect electronic
components using conductive tracks.
» It is like a microwave oven.
» Used for testing the PCB for any type of defects(bending,breaking ,
removal of copper tracks ) by heating.
»Heating of the PCB done at 200-300 C.
Gurukul Institute of Engineering & Technology, Kota
Gurukul Institute of Engineering & Technology, Kota
»»
(1)Platted Through
Hole Technique(PTH)
(2) Surface Mount
Technique(SMT)
Gurukul Institute of Engineering & Technology, Kota
» In PTH technique
components are Mounted
on PCB by DRILLED hole.
» For mounting the
components wave-soldering
machine is used for soldering
through hole components .
Gurukul Institute of Engineering & Technology, Kota
Gurukul Institute of Engineering & Technology, Kota
FLUXING
ZONE
PRE-HEATING
ZONE
SOLDERING
ZONE
 In Surface mount technology
(SMT) the components are
mounted directly onto the surface
of Printed circuit board(PCB).
High-speed designs may require
SMT technology.
In this technique large no. of
small components are mounted.
Gurukul Institute of Engineering & Technology, Kota
(2)Software:-Window Base Operating system .
(1)Speed of M/c:- 20000 component/hour
Gurukul Institute of Engineering & Technology, Kota
COMPONENTS FROM STORE
COMPONENT
FORMING
ASSEMBLY
OF PCB’S
REWORK
SOLDERING
OF PCB’S
TO TESTING & REPAIR
CENTER
PRE-SOLDERING
INSPECTION
CLEANING POST SOLDERING INSPECTION
RECTIFICATION
APPLICATIONS:-
Gurukul Institute of Engineering & Technology, Kota
Class 1 - General
Electronics
Products
Class 2 - Dedicated
Service
Electronics
Class 3 – High
Reliability
Electronics
 Computer
 Digital watch
 Cellular phones
 Television
 Remote control
toys
 Videogames
 Point to Point Micro-
wave Transceivers
 Walkie Talkies
 Oscilloscopes
 Network Analyzers
 Ohm Meters
 Temperature meters
 Strain Gauges
 Ovens
 Spectrum Analyzers
 Inverters
 Military equipment
Heart Monitors
Breathing machine
Dialysis machine
Laser assisted
tooth whitening
machine
Laser
X-ray or CAT Scan
 equipment
MRI Imaging
equipment
Satellite systems
CONCLUSION
Training from INSTRUMENTATION LIMITED,
kota ,is a tremendous experience for me.
During my training session I get lot of knowledge
from I.L.
I get knowledge about manufacturing of
PCB,UPS,RSR,SBC etc.
 I also did practical that was the great experience
for me.
Gurukul Institute of Engineering & Technology, Kota
Gurukul Institute of Engineering & Technology, Kota

More Related Content

What's hot

Resume for the Instrumentation Engineer
Resume for the Instrumentation EngineerResume for the Instrumentation Engineer
Resume for the Instrumentation EngineerAkash Patel
 
Transcript Format for MDU (Maharshi Dayanand University) Rohtak
Transcript Format for MDU (Maharshi Dayanand University) RohtakTranscript Format for MDU (Maharshi Dayanand University) Rohtak
Transcript Format for MDU (Maharshi Dayanand University) Rohtak
Ankita Sharma
 
BEST INPLANT TRAINING CENTER CHENNAI-BEST INTERNSHIP TRAINING
BEST INPLANT TRAINING CENTER CHENNAI-BEST INTERNSHIP TRAININGBEST INPLANT TRAINING CENTER CHENNAI-BEST INTERNSHIP TRAINING
BEST INPLANT TRAINING CENTER CHENNAI-BEST INTERNSHIP TRAINING
ASHOKKUMAR RAMAR
 
CHENNAI BEST INPLANT TRAINING
CHENNAI BEST INPLANT TRAINING CHENNAI BEST INPLANT TRAINING
CHENNAI BEST INPLANT TRAINING
maasarun
 
EEE & ECE INPLANT TRAINING IN CHENNAI
EEE & ECE INPLANT TRAINING IN CHENNAI EEE & ECE INPLANT TRAINING IN CHENNAI
EEE & ECE INPLANT TRAINING IN CHENNAI
maasarun
 
EMBEDDED SYSTEM INPLANT TRAINING
EMBEDDED SYSTEM INPLANT TRAINING EMBEDDED SYSTEM INPLANT TRAINING
EMBEDDED SYSTEM INPLANT TRAINING
maasarun
 
Maas inplant training
Maas inplant trainingMaas inplant training
Maas inplant training
maasarun
 
ELECTRICAL INPLANT TRAINING
ELECTRICAL INPLANT TRAINING ELECTRICAL INPLANT TRAINING
ELECTRICAL INPLANT TRAINING
maasarun
 
BIG INPLANT TRAINING
BIG INPLANT TRAINING BIG INPLANT TRAINING
BIG INPLANT TRAINING
maasarun
 
curriculum-vitae_sampath_kumar_2
curriculum-vitae_sampath_kumar_2curriculum-vitae_sampath_kumar_2
curriculum-vitae_sampath_kumar_2sampath24533
 
Control System Engineer Resume
Control System Engineer ResumeControl System Engineer Resume
Control System Engineer Resume
darshankumartrivedi
 
INPLANT TRAINING IN MAASTECH PROJECT CENTER
INPLANT TRAINING IN MAASTECH PROJECT CENTERINPLANT TRAINING IN MAASTECH PROJECT CENTER
INPLANT TRAINING IN MAASTECH PROJECT CENTER
maasarun
 
Gunasekhar Karnatham_Profile_Continental
Gunasekhar Karnatham_Profile_ContinentalGunasekhar Karnatham_Profile_Continental
Gunasekhar Karnatham_Profile_ContinentalGunasekhar Karnatham
 
Electronic Circuit Assessment using Machine Learning (ML)
Electronic Circuit Assessment using Machine Learning (ML)Electronic Circuit Assessment using Machine Learning (ML)
Electronic Circuit Assessment using Machine Learning (ML)
vivatechijri
 
BIOMEDICAL APPLICATION EMBEDDED SYSTEMS INPLANT TRAINING
BIOMEDICAL APPLICATION EMBEDDED SYSTEMS INPLANT TRAINING BIOMEDICAL APPLICATION EMBEDDED SYSTEMS INPLANT TRAINING
BIOMEDICAL APPLICATION EMBEDDED SYSTEMS INPLANT TRAINING
maasarun
 
BIOMEDICAL BREATHING DEVICE
BIOMEDICAL BREATHING DEVICE BIOMEDICAL BREATHING DEVICE
BIOMEDICAL BREATHING DEVICE
maasarun
 

What's hot (20)

Resume for the Instrumentation Engineer
Resume for the Instrumentation EngineerResume for the Instrumentation Engineer
Resume for the Instrumentation Engineer
 
Yuvraj_Resume
Yuvraj_ResumeYuvraj_Resume
Yuvraj_Resume
 
Transcript Format for MDU (Maharshi Dayanand University) Rohtak
Transcript Format for MDU (Maharshi Dayanand University) RohtakTranscript Format for MDU (Maharshi Dayanand University) Rohtak
Transcript Format for MDU (Maharshi Dayanand University) Rohtak
 
BEST INPLANT TRAINING CENTER CHENNAI-BEST INTERNSHIP TRAINING
BEST INPLANT TRAINING CENTER CHENNAI-BEST INTERNSHIP TRAININGBEST INPLANT TRAINING CENTER CHENNAI-BEST INTERNSHIP TRAINING
BEST INPLANT TRAINING CENTER CHENNAI-BEST INTERNSHIP TRAINING
 
Arjun CV_12
Arjun CV_12Arjun CV_12
Arjun CV_12
 
CHENNAI BEST INPLANT TRAINING
CHENNAI BEST INPLANT TRAINING CHENNAI BEST INPLANT TRAINING
CHENNAI BEST INPLANT TRAINING
 
EEE & ECE INPLANT TRAINING IN CHENNAI
EEE & ECE INPLANT TRAINING IN CHENNAI EEE & ECE INPLANT TRAINING IN CHENNAI
EEE & ECE INPLANT TRAINING IN CHENNAI
 
Arjun CV_7 Aug 2015
Arjun CV_7 Aug 2015Arjun CV_7 Aug 2015
Arjun CV_7 Aug 2015
 
MuhammadImran(CV)
MuhammadImran(CV)MuhammadImran(CV)
MuhammadImran(CV)
 
EMBEDDED SYSTEM INPLANT TRAINING
EMBEDDED SYSTEM INPLANT TRAINING EMBEDDED SYSTEM INPLANT TRAINING
EMBEDDED SYSTEM INPLANT TRAINING
 
Maas inplant training
Maas inplant trainingMaas inplant training
Maas inplant training
 
ELECTRICAL INPLANT TRAINING
ELECTRICAL INPLANT TRAINING ELECTRICAL INPLANT TRAINING
ELECTRICAL INPLANT TRAINING
 
BIG INPLANT TRAINING
BIG INPLANT TRAINING BIG INPLANT TRAINING
BIG INPLANT TRAINING
 
curriculum-vitae_sampath_kumar_2
curriculum-vitae_sampath_kumar_2curriculum-vitae_sampath_kumar_2
curriculum-vitae_sampath_kumar_2
 
Control System Engineer Resume
Control System Engineer ResumeControl System Engineer Resume
Control System Engineer Resume
 
INPLANT TRAINING IN MAASTECH PROJECT CENTER
INPLANT TRAINING IN MAASTECH PROJECT CENTERINPLANT TRAINING IN MAASTECH PROJECT CENTER
INPLANT TRAINING IN MAASTECH PROJECT CENTER
 
Gunasekhar Karnatham_Profile_Continental
Gunasekhar Karnatham_Profile_ContinentalGunasekhar Karnatham_Profile_Continental
Gunasekhar Karnatham_Profile_Continental
 
Electronic Circuit Assessment using Machine Learning (ML)
Electronic Circuit Assessment using Machine Learning (ML)Electronic Circuit Assessment using Machine Learning (ML)
Electronic Circuit Assessment using Machine Learning (ML)
 
BIOMEDICAL APPLICATION EMBEDDED SYSTEMS INPLANT TRAINING
BIOMEDICAL APPLICATION EMBEDDED SYSTEMS INPLANT TRAINING BIOMEDICAL APPLICATION EMBEDDED SYSTEMS INPLANT TRAINING
BIOMEDICAL APPLICATION EMBEDDED SYSTEMS INPLANT TRAINING
 
BIOMEDICAL BREATHING DEVICE
BIOMEDICAL BREATHING DEVICE BIOMEDICAL BREATHING DEVICE
BIOMEDICAL BREATHING DEVICE
 

Viewers also liked

Pcb Cost Drivers
Pcb Cost DriversPcb Cost Drivers
Pcb Cost DriversTony Monaco
 
PCB Laminates 101
PCB Laminates 101PCB Laminates 101
PCB Laminates 101
Craig Myers
 
New corporate presentation july 2010
New corporate presentation july 2010New corporate presentation july 2010
New corporate presentation july 2010
Tony Monaco
 
Manufacturing of PCB
Manufacturing of PCBManufacturing of PCB
Manufacturing of PCB
Sujith J S
 
Technological Trends in the Field of Circuit Board Design and Manufacturing
Technological Trends in the Field of Circuit Board Design and ManufacturingTechnological Trends in the Field of Circuit Board Design and Manufacturing
Technological Trends in the Field of Circuit Board Design and Manufacturing
Toradex
 
Qpi Technology Development
Qpi Technology  DevelopmentQpi Technology  Development
Qpi Technology Developmentedwardsnelleman
 
Design for in-circuit test (vintage 1994)
Design for in-circuit test (vintage 1994)Design for in-circuit test (vintage 1994)
Design for in-circuit test (vintage 1994)
Richard Farr
 
Through hole pcb design considerations
Through hole pcb design considerationsThrough hole pcb design considerations
Through hole pcb design considerations
Shenzhen Southern Machinery Sales And Service Co., Ltd
 
Dfx design for_cost
Dfx design for_costDfx design for_cost
Dfx design for_cost
Marc Licciardi
 
PCB Manufacturer-Hpcb.com
PCB Manufacturer-Hpcb.com PCB Manufacturer-Hpcb.com
PCB Manufacturer-Hpcb.com
HPCB
 
PCB Manufacturing Equipment List
PCB Manufacturing Equipment ListPCB Manufacturing Equipment List
PCB Manufacturing Equipment List
QC PCB Zimnicky
 
Viasystems pcb101 dec 2012
Viasystems pcb101 dec 2012Viasystems pcb101 dec 2012
Viasystems pcb101 dec 2012
West Penn SMTA
 
3 ee414 - adv electroncs - lab 2 - loren schwappach
3   ee414 - adv electroncs - lab 2 - loren schwappach3   ee414 - adv electroncs - lab 2 - loren schwappach
3 ee414 - adv electroncs - lab 2 - loren schwappachLoren Schwappach
 
По святым местам Иерусалима
По святым местам ИерусалимаПо святым местам Иерусалима
По святым местам Иерусалима
Galina Poddubnaya
 
PWB Manufacturing Flow Chart
PWB Manufacturing Flow ChartPWB Manufacturing Flow Chart
PWB Manufacturing Flow Chart
Art Wood
 
Dioxines, PCB, Furanes et DR-CALUX
Dioxines, PCB, Furanes et DR-CALUXDioxines, PCB, Furanes et DR-CALUX
Dioxines, PCB, Furanes et DR-CALUX
Vincent PERRET
 
HOW TO MAKE A PRINTED CIRCUIT BOARD
HOW TO MAKE A PRINTED CIRCUIT BOARDHOW TO MAKE A PRINTED CIRCUIT BOARD
HOW TO MAKE A PRINTED CIRCUIT BOARD
Jitendra Jangid
 
PCB Manufacturer, Domestic Circuit Board Production and Prototype
PCB Manufacturer, Domestic Circuit Board Production and PrototypePCB Manufacturer, Domestic Circuit Board Production and Prototype
PCB Manufacturer, Domestic Circuit Board Production and Prototype
Domestic PCB Fabrication
 
Workshop on pcb
Workshop on pcbWorkshop on pcb
Workshop on pcb
Mahmudur Rana
 
Zen Voce PCB Presentation
Zen Voce PCB PresentationZen Voce PCB Presentation
Zen Voce PCB Presentation
bennytan
 

Viewers also liked (20)

Pcb Cost Drivers
Pcb Cost DriversPcb Cost Drivers
Pcb Cost Drivers
 
PCB Laminates 101
PCB Laminates 101PCB Laminates 101
PCB Laminates 101
 
New corporate presentation july 2010
New corporate presentation july 2010New corporate presentation july 2010
New corporate presentation july 2010
 
Manufacturing of PCB
Manufacturing of PCBManufacturing of PCB
Manufacturing of PCB
 
Technological Trends in the Field of Circuit Board Design and Manufacturing
Technological Trends in the Field of Circuit Board Design and ManufacturingTechnological Trends in the Field of Circuit Board Design and Manufacturing
Technological Trends in the Field of Circuit Board Design and Manufacturing
 
Qpi Technology Development
Qpi Technology  DevelopmentQpi Technology  Development
Qpi Technology Development
 
Design for in-circuit test (vintage 1994)
Design for in-circuit test (vintage 1994)Design for in-circuit test (vintage 1994)
Design for in-circuit test (vintage 1994)
 
Through hole pcb design considerations
Through hole pcb design considerationsThrough hole pcb design considerations
Through hole pcb design considerations
 
Dfx design for_cost
Dfx design for_costDfx design for_cost
Dfx design for_cost
 
PCB Manufacturer-Hpcb.com
PCB Manufacturer-Hpcb.com PCB Manufacturer-Hpcb.com
PCB Manufacturer-Hpcb.com
 
PCB Manufacturing Equipment List
PCB Manufacturing Equipment ListPCB Manufacturing Equipment List
PCB Manufacturing Equipment List
 
Viasystems pcb101 dec 2012
Viasystems pcb101 dec 2012Viasystems pcb101 dec 2012
Viasystems pcb101 dec 2012
 
3 ee414 - adv electroncs - lab 2 - loren schwappach
3   ee414 - adv electroncs - lab 2 - loren schwappach3   ee414 - adv electroncs - lab 2 - loren schwappach
3 ee414 - adv electroncs - lab 2 - loren schwappach
 
По святым местам Иерусалима
По святым местам ИерусалимаПо святым местам Иерусалима
По святым местам Иерусалима
 
PWB Manufacturing Flow Chart
PWB Manufacturing Flow ChartPWB Manufacturing Flow Chart
PWB Manufacturing Flow Chart
 
Dioxines, PCB, Furanes et DR-CALUX
Dioxines, PCB, Furanes et DR-CALUXDioxines, PCB, Furanes et DR-CALUX
Dioxines, PCB, Furanes et DR-CALUX
 
HOW TO MAKE A PRINTED CIRCUIT BOARD
HOW TO MAKE A PRINTED CIRCUIT BOARDHOW TO MAKE A PRINTED CIRCUIT BOARD
HOW TO MAKE A PRINTED CIRCUIT BOARD
 
PCB Manufacturer, Domestic Circuit Board Production and Prototype
PCB Manufacturer, Domestic Circuit Board Production and PrototypePCB Manufacturer, Domestic Circuit Board Production and Prototype
PCB Manufacturer, Domestic Circuit Board Production and Prototype
 
Workshop on pcb
Workshop on pcbWorkshop on pcb
Workshop on pcb
 
Zen Voce PCB Presentation
Zen Voce PCB PresentationZen Voce PCB Presentation
Zen Voce PCB Presentation
 

Similar to Pcb manufacturing

SIMULATE AND CIRCUIT ON GENERAL PURPOSE PCB OF HALF ADDER.pptx
SIMULATE AND CIRCUIT ON GENERAL PURPOSE PCB OF HALF ADDER.pptxSIMULATE AND CIRCUIT ON GENERAL PURPOSE PCB OF HALF ADDER.pptx
SIMULATE AND CIRCUIT ON GENERAL PURPOSE PCB OF HALF ADDER.pptx
Ashish Sadavarti
 
INTERNSHIP TRAINING CHENNAI-IPT FOR CSE/IT/ECE/E&I-MAASTECH
INTERNSHIP TRAINING CHENNAI-IPT FOR CSE/IT/ECE/E&I-MAASTECHINTERNSHIP TRAINING CHENNAI-IPT FOR CSE/IT/ECE/E&I-MAASTECH
INTERNSHIP TRAINING CHENNAI-IPT FOR CSE/IT/ECE/E&I-MAASTECHASHOKKUMAR RAMAR
 
INPLANT TRAINING IN CHENNAI FOR ECE STUDENTS,EEE STUDENTS
INPLANT TRAINING IN CHENNAI FOR ECE STUDENTS,EEE STUDENTSINPLANT TRAINING IN CHENNAI FOR ECE STUDENTS,EEE STUDENTS
INPLANT TRAINING IN CHENNAI FOR ECE STUDENTS,EEE STUDENTSASHOKKUMAR RAMAR
 
INPLANT TRAINING FOR 3RD YEAR STUDENTS-ECE/EEE/E&I/ICE/ETE-MAASTECH
INPLANT TRAINING FOR 3RD YEAR STUDENTS-ECE/EEE/E&I/ICE/ETE-MAASTECHINPLANT TRAINING FOR 3RD YEAR STUDENTS-ECE/EEE/E&I/ICE/ETE-MAASTECH
INPLANT TRAINING FOR 3RD YEAR STUDENTS-ECE/EEE/E&I/ICE/ETE-MAASTECHASHOKKUMAR RAMAR
 
INPLANT TRAINING-FUNDAMENTAL OF ELECTRONICS/EMBEDDED SYSTEMS
INPLANT TRAINING-FUNDAMENTAL OF ELECTRONICS/EMBEDDED SYSTEMSINPLANT TRAINING-FUNDAMENTAL OF ELECTRONICS/EMBEDDED SYSTEMS
INPLANT TRAINING-FUNDAMENTAL OF ELECTRONICS/EMBEDDED SYSTEMSASHOKKUMAR RAMAR
 
IPT CHENNAI:INPLANT TRAINING IN MATLAB/EMBEDDED SYSTEMS/ROBOTICS
IPT CHENNAI:INPLANT TRAINING IN MATLAB/EMBEDDED SYSTEMS/ROBOTICSIPT CHENNAI:INPLANT TRAINING IN MATLAB/EMBEDDED SYSTEMS/ROBOTICS
IPT CHENNAI:INPLANT TRAINING IN MATLAB/EMBEDDED SYSTEMS/ROBOTICS
ASHOKKUMAR RAMAR
 
INPLANT TRAINING FOR COMPUTER SCIENCE ENGINEERING&IT STUDENTS INPLANT TRAINING
INPLANT TRAINING FOR COMPUTER SCIENCE ENGINEERING&IT STUDENTS INPLANT TRAININGINPLANT TRAINING FOR COMPUTER SCIENCE ENGINEERING&IT STUDENTS INPLANT TRAINING
INPLANT TRAINING FOR COMPUTER SCIENCE ENGINEERING&IT STUDENTS INPLANT TRAINING
ASHOKKUMAR RAMAR
 
INPLANT TRAINING MECHANICAL ENGINEERING-MECHATRONICS INPLANT TRAINING
INPLANT TRAINING MECHANICAL ENGINEERING-MECHATRONICS INPLANT TRAININGINPLANT TRAINING MECHANICAL ENGINEERING-MECHATRONICS INPLANT TRAINING
INPLANT TRAINING MECHANICAL ENGINEERING-MECHATRONICS INPLANT TRAINING
ASHOKKUMAR RAMAR
 
IPT:INPLANT TRAINING(IPT) FOR CSE STUDENTS/IT STUDENTS,
IPT:INPLANT TRAINING(IPT) FOR CSE STUDENTS/IT STUDENTS,IPT:INPLANT TRAINING(IPT) FOR CSE STUDENTS/IT STUDENTS,
IPT:INPLANT TRAINING(IPT) FOR CSE STUDENTS/IT STUDENTS,
ASHOKKUMAR RAMAR
 
INPLANT TRAINING FOR EEE STUDENTS/ELECTRICAL STUDENTS INPLANT TRAINING
INPLANT TRAINING FOR EEE STUDENTS/ELECTRICAL STUDENTS INPLANT TRAININGINPLANT TRAINING FOR EEE STUDENTS/ELECTRICAL STUDENTS INPLANT TRAINING
INPLANT TRAINING FOR EEE STUDENTS/ELECTRICAL STUDENTS INPLANT TRAINING
ASHOKKUMAR RAMAR
 
INPLANT TRAINING:INPLANT TRAINING FOR ENGINEERING STUDENTS-CSE/IT/ECE/EEE
INPLANT TRAINING:INPLANT TRAINING FOR ENGINEERING STUDENTS-CSE/IT/ECE/EEEINPLANT TRAINING:INPLANT TRAINING FOR ENGINEERING STUDENTS-CSE/IT/ECE/EEE
INPLANT TRAINING:INPLANT TRAINING FOR ENGINEERING STUDENTS-CSE/IT/ECE/EEEASHOKKUMAR RAMAR
 
INPLANT TRAINING CHENNAI FOR CSE STUDENTS/IT STUDENTS
INPLANT TRAINING CHENNAI FOR CSE STUDENTS/IT STUDENTSINPLANT TRAINING CHENNAI FOR CSE STUDENTS/IT STUDENTS
INPLANT TRAINING CHENNAI FOR CSE STUDENTS/IT STUDENTS
ASHOKKUMAR RAMAR
 
IPT-INPLANT TRAINING FOR IT STUDENTS/CSE STUDENTS CHENNAI
IPT-INPLANT TRAINING FOR IT STUDENTS/CSE STUDENTS CHENNAIIPT-INPLANT TRAINING FOR IT STUDENTS/CSE STUDENTS CHENNAI
IPT-INPLANT TRAINING FOR IT STUDENTS/CSE STUDENTS CHENNAI
ASHOKKUMAR RAMAR
 
INPLANT TRAINING IN TAMILNADU-ECE/EEE/BIOMEDICAL/CSE/IT
INPLANT TRAINING IN TAMILNADU-ECE/EEE/BIOMEDICAL/CSE/ITINPLANT TRAINING IN TAMILNADU-ECE/EEE/BIOMEDICAL/CSE/IT
INPLANT TRAINING IN TAMILNADU-ECE/EEE/BIOMEDICAL/CSE/IT
ASHOKKUMAR RAMAR
 
inplant training for engineering students in chennai-INPLANT TRAINING CHENNAI
inplant training for engineering students in chennai-INPLANT TRAINING CHENNAIinplant training for engineering students in chennai-INPLANT TRAINING CHENNAI
inplant training for engineering students in chennai-INPLANT TRAINING CHENNAI
ASHOKKUMAR RAMAR
 
MECHANICAL INPLANT TRAINING-inplant training for mechanical engineering stude...
MECHANICAL INPLANT TRAINING-inplant training for mechanical engineering stude...MECHANICAL INPLANT TRAINING-inplant training for mechanical engineering stude...
MECHANICAL INPLANT TRAINING-inplant training for mechanical engineering stude...
ASHOKKUMAR RAMAR
 
Career Guidance for Freshers- 2013 Edition
Career Guidance for Freshers- 2013 EditionCareer Guidance for Freshers- 2013 Edition
Career Guidance for Freshers- 2013 Edition
Mohamed Uwaise, CAP®
 
Pcb
PcbPcb

Similar to Pcb manufacturing (20)

SIMULATE AND CIRCUIT ON GENERAL PURPOSE PCB OF HALF ADDER.pptx
SIMULATE AND CIRCUIT ON GENERAL PURPOSE PCB OF HALF ADDER.pptxSIMULATE AND CIRCUIT ON GENERAL PURPOSE PCB OF HALF ADDER.pptx
SIMULATE AND CIRCUIT ON GENERAL PURPOSE PCB OF HALF ADDER.pptx
 
INTERNSHIP TRAINING CHENNAI-IPT FOR CSE/IT/ECE/E&I-MAASTECH
INTERNSHIP TRAINING CHENNAI-IPT FOR CSE/IT/ECE/E&I-MAASTECHINTERNSHIP TRAINING CHENNAI-IPT FOR CSE/IT/ECE/E&I-MAASTECH
INTERNSHIP TRAINING CHENNAI-IPT FOR CSE/IT/ECE/E&I-MAASTECH
 
INPLANT TRAINING IN CHENNAI FOR ECE STUDENTS,EEE STUDENTS
INPLANT TRAINING IN CHENNAI FOR ECE STUDENTS,EEE STUDENTSINPLANT TRAINING IN CHENNAI FOR ECE STUDENTS,EEE STUDENTS
INPLANT TRAINING IN CHENNAI FOR ECE STUDENTS,EEE STUDENTS
 
INPLANT TRAINING FOR 3RD YEAR STUDENTS-ECE/EEE/E&I/ICE/ETE-MAASTECH
INPLANT TRAINING FOR 3RD YEAR STUDENTS-ECE/EEE/E&I/ICE/ETE-MAASTECHINPLANT TRAINING FOR 3RD YEAR STUDENTS-ECE/EEE/E&I/ICE/ETE-MAASTECH
INPLANT TRAINING FOR 3RD YEAR STUDENTS-ECE/EEE/E&I/ICE/ETE-MAASTECH
 
INPLANT TRAINING-FUNDAMENTAL OF ELECTRONICS/EMBEDDED SYSTEMS
INPLANT TRAINING-FUNDAMENTAL OF ELECTRONICS/EMBEDDED SYSTEMSINPLANT TRAINING-FUNDAMENTAL OF ELECTRONICS/EMBEDDED SYSTEMS
INPLANT TRAINING-FUNDAMENTAL OF ELECTRONICS/EMBEDDED SYSTEMS
 
IPT CHENNAI:INPLANT TRAINING IN MATLAB/EMBEDDED SYSTEMS/ROBOTICS
IPT CHENNAI:INPLANT TRAINING IN MATLAB/EMBEDDED SYSTEMS/ROBOTICSIPT CHENNAI:INPLANT TRAINING IN MATLAB/EMBEDDED SYSTEMS/ROBOTICS
IPT CHENNAI:INPLANT TRAINING IN MATLAB/EMBEDDED SYSTEMS/ROBOTICS
 
INPLANT TRAINING FOR COMPUTER SCIENCE ENGINEERING&IT STUDENTS INPLANT TRAINING
INPLANT TRAINING FOR COMPUTER SCIENCE ENGINEERING&IT STUDENTS INPLANT TRAININGINPLANT TRAINING FOR COMPUTER SCIENCE ENGINEERING&IT STUDENTS INPLANT TRAINING
INPLANT TRAINING FOR COMPUTER SCIENCE ENGINEERING&IT STUDENTS INPLANT TRAINING
 
INPLANT TRAINING MECHANICAL ENGINEERING-MECHATRONICS INPLANT TRAINING
INPLANT TRAINING MECHANICAL ENGINEERING-MECHATRONICS INPLANT TRAININGINPLANT TRAINING MECHANICAL ENGINEERING-MECHATRONICS INPLANT TRAINING
INPLANT TRAINING MECHANICAL ENGINEERING-MECHATRONICS INPLANT TRAINING
 
IPT:INPLANT TRAINING(IPT) FOR CSE STUDENTS/IT STUDENTS,
IPT:INPLANT TRAINING(IPT) FOR CSE STUDENTS/IT STUDENTS,IPT:INPLANT TRAINING(IPT) FOR CSE STUDENTS/IT STUDENTS,
IPT:INPLANT TRAINING(IPT) FOR CSE STUDENTS/IT STUDENTS,
 
INPLANT TRAINING FOR EEE STUDENTS/ELECTRICAL STUDENTS INPLANT TRAINING
INPLANT TRAINING FOR EEE STUDENTS/ELECTRICAL STUDENTS INPLANT TRAININGINPLANT TRAINING FOR EEE STUDENTS/ELECTRICAL STUDENTS INPLANT TRAINING
INPLANT TRAINING FOR EEE STUDENTS/ELECTRICAL STUDENTS INPLANT TRAINING
 
INPLANT TRAINING:INPLANT TRAINING FOR ENGINEERING STUDENTS-CSE/IT/ECE/EEE
INPLANT TRAINING:INPLANT TRAINING FOR ENGINEERING STUDENTS-CSE/IT/ECE/EEEINPLANT TRAINING:INPLANT TRAINING FOR ENGINEERING STUDENTS-CSE/IT/ECE/EEE
INPLANT TRAINING:INPLANT TRAINING FOR ENGINEERING STUDENTS-CSE/IT/ECE/EEE
 
INPLANT TRAINING CHENNAI FOR CSE STUDENTS/IT STUDENTS
INPLANT TRAINING CHENNAI FOR CSE STUDENTS/IT STUDENTSINPLANT TRAINING CHENNAI FOR CSE STUDENTS/IT STUDENTS
INPLANT TRAINING CHENNAI FOR CSE STUDENTS/IT STUDENTS
 
IPT-INPLANT TRAINING FOR IT STUDENTS/CSE STUDENTS CHENNAI
IPT-INPLANT TRAINING FOR IT STUDENTS/CSE STUDENTS CHENNAIIPT-INPLANT TRAINING FOR IT STUDENTS/CSE STUDENTS CHENNAI
IPT-INPLANT TRAINING FOR IT STUDENTS/CSE STUDENTS CHENNAI
 
INPLANT TRAINING IN TAMILNADU-ECE/EEE/BIOMEDICAL/CSE/IT
INPLANT TRAINING IN TAMILNADU-ECE/EEE/BIOMEDICAL/CSE/ITINPLANT TRAINING IN TAMILNADU-ECE/EEE/BIOMEDICAL/CSE/IT
INPLANT TRAINING IN TAMILNADU-ECE/EEE/BIOMEDICAL/CSE/IT
 
inplant training for engineering students in chennai-INPLANT TRAINING CHENNAI
inplant training for engineering students in chennai-INPLANT TRAINING CHENNAIinplant training for engineering students in chennai-INPLANT TRAINING CHENNAI
inplant training for engineering students in chennai-INPLANT TRAINING CHENNAI
 
Athar CV updated
Athar CV updatedAthar CV updated
Athar CV updated
 
MECHANICAL INPLANT TRAINING-inplant training for mechanical engineering stude...
MECHANICAL INPLANT TRAINING-inplant training for mechanical engineering stude...MECHANICAL INPLANT TRAINING-inplant training for mechanical engineering stude...
MECHANICAL INPLANT TRAINING-inplant training for mechanical engineering stude...
 
Career Guidance for Freshers- 2013 Edition
Career Guidance for Freshers- 2013 EditionCareer Guidance for Freshers- 2013 Edition
Career Guidance for Freshers- 2013 Edition
 
Cv pisalsart and attach file
Cv pisalsart and attach fileCv pisalsart and attach file
Cv pisalsart and attach file
 
Pcb
PcbPcb
Pcb
 

Recently uploaded

Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
abh.arya
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
ssuser9bd3ba
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
Kamal Acharya
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
DuvanRamosGarzon1
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
MuhammadTufail242431
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
PrashantGoswami42
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 

Recently uploaded (20)

Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 

Pcb manufacturing

  • 1. Submitted to: Submitted by: Er.Deepesh Namdev Name: Aveen Meena HOD cum Asso. Prof. Roll no.:10EGKEC011 (E&C, EE Department) DEPARTMENT OF ELECTRONICS & COMMUNICATION ENGG. Gurukul Institute of Engineering & Technology, Kota
  • 2. OBJECTIVES INTRODUTION OF I.L. MANUFACTURING PRODUCTS AT I.L. PCB and PCB CENTRE. EQUIPMENTS USED IN ASSEMBLING AND MANUFACTURING OF PCB. MANUFACTURING TECHNIQUES. ACTIVATION FLOW CHART OF CARD ASSEMBELY. APPLICATIONS. CONCLUSION.
  • 3.  Instrumentation Ltd is a Public Sector unit . it is Undertaking Ministry of Heavy Industries.  It is set up in kota April,1964. it is based on C-DOT (Centre for Development of Telematics) Tech.  It has a Plant HQ at Kota with another plant at Palakkad, Kerala.  International office in Malaysia, Iran. Gurukul Institute of Engineering & Technology, Kota
  • 4. (2) TELECOM DIVISION (1) PCB CENTRE (CARD ASSEMBELY) (6) GAS ANALYSER (5) UPS DEPARTMENT (3)DEFENCE PROJECT DEPT. (4) RAILWAY SIGNALLING RELAY DEPARTMENTS AT I.L UNIT The Major products that IL presently manufacture: Gurukul Institute of Engineering & Technology, Kota (1)PCB(cards) (2)UPS (3)RSR (4)Defence product (5)Gas analyser (6)SBC
  • 5. PCB CENTRE:- Gurukul Institute of Engineering & Technology, Kota » Instrumentation Limited 's Electronic assemblies plant at Kota assemble & test the PCBs. » It is spread over 20,000 square feet. » PTH and SMT Techniques are used for assembling. » The unit has fully automatic programmable Pick & Place machine.
  • 6. Gurukul Institute of Engineering & Technology, Kota WHAT IS PCB? Type 1 – Single Sided PCB Type 2 – Double sided PCB Type 3 – Multilayered PCB  PCB, is used to mechanically support and electrically connect electronic components using conductive tracks.
  • 7. » It is like a microwave oven. » Used for testing the PCB for any type of defects(bending,breaking , removal of copper tracks ) by heating. »Heating of the PCB done at 200-300 C. Gurukul Institute of Engineering & Technology, Kota
  • 8. Gurukul Institute of Engineering & Technology, Kota
  • 9. »» (1)Platted Through Hole Technique(PTH) (2) Surface Mount Technique(SMT) Gurukul Institute of Engineering & Technology, Kota
  • 10. » In PTH technique components are Mounted on PCB by DRILLED hole. » For mounting the components wave-soldering machine is used for soldering through hole components . Gurukul Institute of Engineering & Technology, Kota
  • 11. Gurukul Institute of Engineering & Technology, Kota FLUXING ZONE PRE-HEATING ZONE SOLDERING ZONE
  • 12.  In Surface mount technology (SMT) the components are mounted directly onto the surface of Printed circuit board(PCB). High-speed designs may require SMT technology. In this technique large no. of small components are mounted. Gurukul Institute of Engineering & Technology, Kota
  • 13. (2)Software:-Window Base Operating system . (1)Speed of M/c:- 20000 component/hour Gurukul Institute of Engineering & Technology, Kota
  • 14. COMPONENTS FROM STORE COMPONENT FORMING ASSEMBLY OF PCB’S REWORK SOLDERING OF PCB’S TO TESTING & REPAIR CENTER PRE-SOLDERING INSPECTION CLEANING POST SOLDERING INSPECTION RECTIFICATION
  • 15. APPLICATIONS:- Gurukul Institute of Engineering & Technology, Kota Class 1 - General Electronics Products Class 2 - Dedicated Service Electronics Class 3 – High Reliability Electronics  Computer  Digital watch  Cellular phones  Television  Remote control toys  Videogames  Point to Point Micro- wave Transceivers  Walkie Talkies  Oscilloscopes  Network Analyzers  Ohm Meters  Temperature meters  Strain Gauges  Ovens  Spectrum Analyzers  Inverters  Military equipment Heart Monitors Breathing machine Dialysis machine Laser assisted tooth whitening machine Laser X-ray or CAT Scan  equipment MRI Imaging equipment Satellite systems
  • 16. CONCLUSION Training from INSTRUMENTATION LIMITED, kota ,is a tremendous experience for me. During my training session I get lot of knowledge from I.L. I get knowledge about manufacturing of PCB,UPS,RSR,SBC etc.  I also did practical that was the great experience for me. Gurukul Institute of Engineering & Technology, Kota
  • 17.
  • 18. Gurukul Institute of Engineering & Technology, Kota