COMMUNITY DEVELOPMENT
Presented by:
Buddy Kuhn
City Manager
ARB CASE NO.796F
COMPATIBILITY – 202 INSLEE
ITEM # 9
MAY 11, 2020
PROPERTY
 SF-A
 Inslee Ave
 @ Columbine St
 New Construction
 Background
 Emergency Demolition March
06, 2019 due to fire
PROPOSED SITE PLAN
STREET ELEVATION
• Height – 28ft
• Materials –
• Composition Shingle Roof
• Stucco
SIDE STREET ELEVATION
SIDE ELEVATION
ROOF PLAN
PROPOSED STREETSCAPE
POLICY ANALYSIS
LOT COVERAGE EXISTING PROPOSED
Lot Area 7,598 7,598
Main House Footprint 1,399 2,167
Front Porch
Rear Porch
Garage Footprint 288 462
Carport Footprint 209 0
Breezeways 57
Covered Patio 247
Other Accessory 15
Lot Coverage/Lot Area 1,896/7,598 2,948/7,598
Total Lot Coverage: 24.9% 38.7%
FLOOR AREA RATIO EXISTING PROPOSED
Lot Area 7,598 7,598
Main House – 1st Floor 1,399 2,167
Main House – 2nd Flr 0 970
Garage – 1st Floor 0 462
Total FAR/Lot Area 1,399/7,598 3,599/7,598
Total FAR: 18.4% 47.3%
*2% Bonus received for single story accessory structure
*2% Bonus received for side street access
POLICY ANALYSIS
 Reviewed by ARB on April 21, 2020
 Found no historic or architectural significance
 Recommended approval of design as compatible
with following stipulations regarding the proposed east
elevation: 1) rotate bedroom window to vertical aspect
and 2) have at least one vertical window on the first
floor to be consistent with those on the front façade.
PUBLIC NOTIFICATION
 Postcards - mailed to property owners within a
200-foot radius
 Notices posted - City website and on property
 Responses received:
 Support: (2) Neutral: (0)
 Oppose: (0)

AH CCM 5.11.20

  • 1.
    COMMUNITY DEVELOPMENT Presented by: BuddyKuhn City Manager ARB CASE NO.796F COMPATIBILITY – 202 INSLEE ITEM # 9 MAY 11, 2020
  • 2.
    PROPERTY  SF-A  InsleeAve  @ Columbine St  New Construction  Background  Emergency Demolition March 06, 2019 due to fire
  • 3.
  • 4.
    STREET ELEVATION • Height– 28ft • Materials – • Composition Shingle Roof • Stucco
  • 5.
  • 6.
  • 7.
  • 8.
  • 9.
    POLICY ANALYSIS LOT COVERAGEEXISTING PROPOSED Lot Area 7,598 7,598 Main House Footprint 1,399 2,167 Front Porch Rear Porch Garage Footprint 288 462 Carport Footprint 209 0 Breezeways 57 Covered Patio 247 Other Accessory 15 Lot Coverage/Lot Area 1,896/7,598 2,948/7,598 Total Lot Coverage: 24.9% 38.7% FLOOR AREA RATIO EXISTING PROPOSED Lot Area 7,598 7,598 Main House – 1st Floor 1,399 2,167 Main House – 2nd Flr 0 970 Garage – 1st Floor 0 462 Total FAR/Lot Area 1,399/7,598 3,599/7,598 Total FAR: 18.4% 47.3% *2% Bonus received for single story accessory structure *2% Bonus received for side street access
  • 10.
    POLICY ANALYSIS  Reviewedby ARB on April 21, 2020  Found no historic or architectural significance  Recommended approval of design as compatible with following stipulations regarding the proposed east elevation: 1) rotate bedroom window to vertical aspect and 2) have at least one vertical window on the first floor to be consistent with those on the front façade.
  • 11.
    PUBLIC NOTIFICATION  Postcards- mailed to property owners within a 200-foot radius  Notices posted - City website and on property  Responses received:  Support: (2) Neutral: (0)  Oppose: (0)