SlideShare a Scribd company logo
Working together
for a safer world
Optimising equipment Safety, Operations and Cost performance.
Pieter van Asten - Maintenance, Risk and reliability
How technology and innovation drive optimisation AND safety.
Lloyd’s Register Energy
Agenda
• Introduction
• Risk and Reliability modelling
• Key to optimization
• Data quality and quantity
• Reliability model principle
• Application for BOP annular close function
• Application for Mud pump fluid end parts
Lloyd’s Register Energy
Introduction
• Prevention of over / under maintenance of safety and operational critical equipment is
often encountered as problematic without loss of performance.
• Combined with cost efficiency of keeping up with safety and operational performance
adds an extra layer of complexity to the problem.
• They seem to be conflicting factors.
• A key aspect to this problem is awareness and knowledge about risk exposure
involved.
• This presentation will highlight a proven solution to create an optimal balance between
cost, NPT and safety.
Lloyd’s Register Energy
Risk and Reliability modelling
• Risk is defined as the probability of failure multiplied by the effect of that failure.
• Probability of failure: how often something fails. (Knowing how it fails or what makes it fail is
equally important for effective maintenance = reliability improvement)
• Effects are for example safety, compliance, NPT (pulling a BOP), loss of income, etc
Lloyd’s Register Energy
Risk and Reliability modelling: working in tandem
Operational success (Safety increase / NPT decrease ) is strongly dependent on the
reliability of technical equipment and related through risk reduction.
Unsuccesful
performance Major Accident
Hazards : Top
Event
Non Productive
Time : NPT /
CostsSuccesful
performance
Safety
Uptime :
Income
Sustained operational and safety performance,
addressing NPT root cause and costs:
Safety - NPT reduction
Effective asset management: risk / reliability
based information and prioritization of safety and
operational critical components.
Risk reduction
Lloyd’s Register Energy
The key to optimisation
• A reliable system assures safe and efficient operations: lower overall risk exposure.
o Reliability can be achieved in either the design or by maintenance that affects equipment
failure.
o Reliability is measured through failure probability
o Reliability affects both safety and operational equipment performance at ‘x’ cost.
o Maintenance can often only being done within a certain (operational-)timeframe.
Reliability management is very suitable to optimise NPT
and safety on a cost basis as all are risk aspects and
form a perfect balance beam:
cost of the risk of failure vs. the cost of failure prevention.
Lloyd’s Register Energy
The key to optimisation
• Risk and its associated cost are key to optimise between over and / or under maintenance
for safety and operational performance.
o Component risk of failure is dependant on the system and its functionality that component
operates in.
o Component risk of failure is dependant on the level of redundancy of these components in that
system.
o The effect of component failure, expressed in cost, is therefore different for different functionality.
• Lloyd’s Register Energy Reliability model takes these differentiations into account.
Lloyd’s Register Energy
The key to optimisation
• The main focus of Lloyd’s Register Energy’s Reliability model is to assist in cost balance
without loss of critical equipment functionality in future operations:
Safe and effective delivery of a well with a focus on cost optimisation.
• The essence of Lloyd’s Register Energy’s Reliability model is the ability to balance cost of
the risk failure with the cost of failure prevention.
• Typical statements for our reliability model:
“Lacking data quantity or quality is not a reason not to start”
“Is the value of the risk that was prevented equal or higher as the cost of preventing (i.e.
maintenance)?”
“Forecasting what needs to be done now to prevent future component failures leading to NPT or
unsafe situations”
“Prioritisation of maintenance work that has the highest effect on risk prevention: replacing now or
later, what is the effect of replacement or maintenance, on future operations and cost-wise?”
Lloyd’s Register Energy
Data quality and quantity
• Successful application of reliability modelling depends on data quality and quantity.
• Improved data quality allows for more accurate reliability calculations, prediction and
decisions.
• Data quantity, also from different sources, mixed and matched (time and usage based)
leverage data quality and quantity.
• Data quality improves due to focussed data collection upon the start of a reliability
project.
• Data maturing cycle:
Lloyd’s Register Energy
Data quality and quantity: using small data samples
• How does it look like: raw failure data from asset management system.
• Using only corrective maintenance (failure) data leads to a too conservative MTTF.
Lloyd’s Register Energy
Reliability model principle
• Example of reliability model principle (input can be time, usage (i.e. cycles, miles))
Net. expected positive
difference on cost of risk:
$ 330 000
Lloyd’s Register Energy
Reliability model
• The optimal effect is achieved when focussing on component failure analysis to optimize
functional (reliability) performance and success.
• This allows for demonstration of maintenance effect and cost motivation against
operational success or cost of being unsuccessful.
• Combination of functions and components
• Optimised component reliability = optimised performance = optimised function =
operational success .
• Adding cost of repair, spares and cost of risk of failure
allows for a cost balance: a means to align operations
and maintenance departments talking a similar language:
less confusion: better decision motivation.
Lloyd’s Register Energy
Reliability model applied for a BOP annular function
• Example of BOP operational usage in 7 scenarios.
Lloyd’s Register Energy
Reliability model applied for a BOP annular function
• Maintenance and Inspection reliability based prioritisation
• Maintenance matrix: risk based urgency
• Maintenance Plan Reliability informed (Reliability – System contribution – Cost)
• T5 / 110 days
• T6 / 185 days
• T7 / 210 days
Lloyd’s Register Energy
Reliability model applied for a BOP annular function
How does it look like:
Lloyd’s Register Energy
Reliability model applied for mud pump maintenance
• Mud Pump 1 & 2
• Each mud pump has three cylinders, numbered 1, 2 and 3.
• Each cylinder has one piston liner and one piston.
• Each cylinder can be configured with a combination of piston and liner of
a specific size. The rig uses 5-inch, 6-inch, and 6½-inch liner diameters.
• Two mud pumps need to be used for 12¼ inches holes and larger.
• Costs consumables
Component Diameter/type Price [Euro] Note
Liners 5” 2200 Ceramic
6” 2160 Ceramic
6.5” 510 Steel
Pistons 5” 90
6” 110
6.5” 205
Valves Suction & Discharge 120
Seats Suction & Discharge 85
Lloyd’s Register Energy
Reliability model applied for mud pump maintenance
• Only 1,5 years of data
• Different types valves, seat, pistons and liners.
• Data sets merged to increase accuracy.
Lloyd’s Register Energy
Reliability model applied for mud pump maintenance
• Preventive replacement because of uninterrupted operation required for both mud
pumps (minimum flow requirement 12¼ inch hole):
• Cost of spare parts vs. cost of down time
• Figure below assumes a one hour repair
• Preventive replacement is cost efficient from a usage of 250 hours.
Lloyd’s Register and variants of it are trading names of Lloyd’s Register Group Limited, its subsidiaries and affiliates.
Copyright © Lloyd’s Register Energy Drilling. 2014. A member of the Lloyd’s Register group.
Dr. Gerard Gaal
Senior Reliability Consultant
Reliability Engineering
E gerard.gaal@lr.org
Lloyd’s Register Energy Drilling
Gapingseweg 1A, 4353 JA Serooskerke, Netherlands
T +31 118 563 050
Working together
for a safer world
Pieter van Asten
Senior Concepts manager – Innovation
E: pieter.vanasten@lr.org

More Related Content

What's hot

Webinar: Hoe houdt u de marge op peil bij de huidige record hoge energieprijzen
Webinar: Hoe houdt u de marge op peil bij de huidige record hoge energieprijzenWebinar: Hoe houdt u de marge op peil bij de huidige record hoge energieprijzen
Webinar: Hoe houdt u de marge op peil bij de huidige record hoge energieprijzen
Stork
 
Webinar | GE & Stork | APM Best Practices - Mechanical Integrity
Webinar | GE & Stork | APM Best Practices - Mechanical IntegrityWebinar | GE & Stork | APM Best Practices - Mechanical Integrity
Webinar | GE & Stork | APM Best Practices - Mechanical Integrity
Stork
 
Simmco Presentation
Simmco PresentationSimmco Presentation
Simmco Presentation
simmco
 
Boyd Beal Biography 01242017
Boyd Beal Biography 01242017Boyd Beal Biography 01242017
Boyd Beal Biography 01242017Boyd Beal
 
Introduction to The Augustus Group and RBI
Introduction to The Augustus Group and RBIIntroduction to The Augustus Group and RBI
Introduction to The Augustus Group and RBI
Edwin A Merrick
 
Eric Bostwick's resume 5-10-16
Eric Bostwick's resume 5-10-16Eric Bostwick's resume 5-10-16
Eric Bostwick's resume 5-10-16Eric Bostwick
 
2014 PV Reliability O&M Workshop: PV Operations & Maintenance - An Independen...
2014 PV Reliability O&M Workshop: PV Operations & Maintenance - An Independen...2014 PV Reliability O&M Workshop: PV Operations & Maintenance - An Independen...
2014 PV Reliability O&M Workshop: PV Operations & Maintenance - An Independen...
Sandia National Laboratories: Energy & Climate: Renewables
 
ETI Wastewater Consulting Presentation
ETI Wastewater Consulting PresentationETI Wastewater Consulting Presentation
ETI Wastewater Consulting Presentation
BasilDonaldson
 
Bringing transparency to buildings.
Bringing transparency to buildings.Bringing transparency to buildings.
Bringing transparency to buildings.
Cimetrics Inc
 
General Presentation On Augustus
General Presentation On AugustusGeneral Presentation On Augustus
General Presentation On Augustus
Edwin A Merrick
 
I ChemE Presentation
I ChemE PresentationI ChemE Presentation
I ChemE Presentation
TheonLtd
 
Case studies: Predictive maintenance in the petrochemical industry
Case studies: Predictive maintenance in the petrochemical industryCase studies: Predictive maintenance in the petrochemical industry
Case studies: Predictive maintenance in the petrochemical industry
Advisian
 
QC_Supplier Management_ALL En
QC_Supplier Management_ALL EnQC_Supplier Management_ALL En
QC_Supplier Management_ALL EnJorge Torres
 
DustinNordell_DDSDIntern_Summer2015
DustinNordell_DDSDIntern_Summer2015DustinNordell_DDSDIntern_Summer2015
DustinNordell_DDSDIntern_Summer2015Dustin Nordell
 
Supplier Management Service
Supplier Management ServiceSupplier Management Service
Supplier Management Service
Jorge Torres
 
What Is a HERS Rating? | Home Efficiency Santa Fe
What Is a HERS Rating? | Home Efficiency Santa FeWhat Is a HERS Rating? | Home Efficiency Santa Fe
What Is a HERS Rating? | Home Efficiency Santa Fe
Palo Santo Designs
 
Wind farm re-powering, life extension and decommissioning
Wind farm re-powering, life extension and decommissioningWind farm re-powering, life extension and decommissioning
Wind farm re-powering, life extension and decommissioning
Advisian
 

What's hot (20)

Webinar: Hoe houdt u de marge op peil bij de huidige record hoge energieprijzen
Webinar: Hoe houdt u de marge op peil bij de huidige record hoge energieprijzenWebinar: Hoe houdt u de marge op peil bij de huidige record hoge energieprijzen
Webinar: Hoe houdt u de marge op peil bij de huidige record hoge energieprijzen
 
Webinar | GE & Stork | APM Best Practices - Mechanical Integrity
Webinar | GE & Stork | APM Best Practices - Mechanical IntegrityWebinar | GE & Stork | APM Best Practices - Mechanical Integrity
Webinar | GE & Stork | APM Best Practices - Mechanical Integrity
 
Cliff Resume 2016
Cliff Resume 2016Cliff Resume 2016
Cliff Resume 2016
 
Simmco Presentation
Simmco PresentationSimmco Presentation
Simmco Presentation
 
Boyd Beal Biography 01242017
Boyd Beal Biography 01242017Boyd Beal Biography 01242017
Boyd Beal Biography 01242017
 
Introduction to The Augustus Group and RBI
Introduction to The Augustus Group and RBIIntroduction to The Augustus Group and RBI
Introduction to The Augustus Group and RBI
 
Eric Bostwick's resume 5-10-16
Eric Bostwick's resume 5-10-16Eric Bostwick's resume 5-10-16
Eric Bostwick's resume 5-10-16
 
2014 PV Reliability O&M Workshop: PV Operations & Maintenance - An Independen...
2014 PV Reliability O&M Workshop: PV Operations & Maintenance - An Independen...2014 PV Reliability O&M Workshop: PV Operations & Maintenance - An Independen...
2014 PV Reliability O&M Workshop: PV Operations & Maintenance - An Independen...
 
ETI Wastewater Consulting Presentation
ETI Wastewater Consulting PresentationETI Wastewater Consulting Presentation
ETI Wastewater Consulting Presentation
 
Bringing transparency to buildings.
Bringing transparency to buildings.Bringing transparency to buildings.
Bringing transparency to buildings.
 
General Presentation On Augustus
General Presentation On AugustusGeneral Presentation On Augustus
General Presentation On Augustus
 
I ChemE Presentation
I ChemE PresentationI ChemE Presentation
I ChemE Presentation
 
Case studies: Predictive maintenance in the petrochemical industry
Case studies: Predictive maintenance in the petrochemical industryCase studies: Predictive maintenance in the petrochemical industry
Case studies: Predictive maintenance in the petrochemical industry
 
RCx
RCxRCx
RCx
 
QC_Supplier Management_ALL En
QC_Supplier Management_ALL EnQC_Supplier Management_ALL En
QC_Supplier Management_ALL En
 
DustinNordell_DDSDIntern_Summer2015
DustinNordell_DDSDIntern_Summer2015DustinNordell_DDSDIntern_Summer2015
DustinNordell_DDSDIntern_Summer2015
 
Supplier Management Service
Supplier Management ServiceSupplier Management Service
Supplier Management Service
 
GulfConst-Performance
GulfConst-PerformanceGulfConst-Performance
GulfConst-Performance
 
What Is a HERS Rating? | Home Efficiency Santa Fe
What Is a HERS Rating? | Home Efficiency Santa FeWhat Is a HERS Rating? | Home Efficiency Santa Fe
What Is a HERS Rating? | Home Efficiency Santa Fe
 
Wind farm re-powering, life extension and decommissioning
Wind farm re-powering, life extension and decommissioningWind farm re-powering, life extension and decommissioning
Wind farm re-powering, life extension and decommissioning
 

Similar to Optimising equipment Safety, Operations and Cost performance

Offshore Europe 2015 1.0 LRED
Offshore Europe 2015 1.0  LREDOffshore Europe 2015 1.0  LRED
Offshore Europe 2015 1.0 LREDPieter van Asten
 
Duke Energy - Case Study
Duke Energy - Case StudyDuke Energy - Case Study
Duke Energy - Case Study
Sentient Science
 
Optimisation of maintenance strategies for offshore wind farms
Optimisation of maintenance strategies for offshore wind farmsOptimisation of maintenance strategies for offshore wind farms
Optimisation of maintenance strategies for offshore wind farms
Lloyd's Register Energy
 
Reliability Engineering in Biomanufacturing - Presentation by Michael Andrews
Reliability Engineering in Biomanufacturing - Presentation by Michael AndrewsReliability Engineering in Biomanufacturing - Presentation by Michael Andrews
Reliability Engineering in Biomanufacturing - Presentation by Michael Andrews
WPICPE
 
Operational Efficiency Based on Innovative Automation, Industry Expertise, En...
Operational Efficiency Based on Innovative Automation, Industry Expertise, En...Operational Efficiency Based on Innovative Automation, Industry Expertise, En...
Operational Efficiency Based on Innovative Automation, Industry Expertise, En...
Sergey Mishin
 
Asset Managment
Asset ManagmentAsset Managment
Asset Managment
Michelle Kleiber-Viglione
 
[Oil & Gas White Paper] Optimizing Pipeline Energy Consumption
[Oil & Gas White Paper] Optimizing Pipeline Energy Consumption[Oil & Gas White Paper] Optimizing Pipeline Energy Consumption
[Oil & Gas White Paper] Optimizing Pipeline Energy Consumption
Schneider Electric
 
Energy Savings & Green Considerations in Motion Control Webinar
Energy Savings & Green Considerations in Motion Control WebinarEnergy Savings & Green Considerations in Motion Control Webinar
Energy Savings & Green Considerations in Motion Control Webinar
Design World
 
8A_5_RE_India19_079_presentation_Doug_Waters.pdf
8A_5_RE_India19_079_presentation_Doug_Waters.pdf8A_5_RE_India19_079_presentation_Doug_Waters.pdf
8A_5_RE_India19_079_presentation_Doug_Waters.pdf
hiiarindam
 
IADC Sept 2015 -RCM-Print PDF
IADC Sept 2015 -RCM-Print PDFIADC Sept 2015 -RCM-Print PDF
IADC Sept 2015 -RCM-Print PDFPieter van Asten
 
Stork Presentation on Migration (Willem Hazenberg)
Stork Presentation on Migration (Willem Hazenberg)Stork Presentation on Migration (Willem Hazenberg)
Stork Presentation on Migration (Willem Hazenberg)
ARC Advisory Group
 
Reliability, Maintainability and Levellised Cost of Offshore Wave Energy
Reliability, Maintainability and Levellised Cost of Offshore Wave EnergyReliability, Maintainability and Levellised Cost of Offshore Wave Energy
Reliability, Maintainability and Levellised Cost of Offshore Wave Energy
malcoldr
 
Reliability Levels of Subsea Production Systems During Operations
Reliability Levels of Subsea Production Systems During OperationsReliability Levels of Subsea Production Systems During Operations
Reliability Levels of Subsea Production Systems During Operations
Lloyd's Register Energy
 
Enhance your aged infrastructure without impacting operations
Enhance your aged infrastructure without impacting operationsEnhance your aged infrastructure without impacting operations
Enhance your aged infrastructure without impacting operations
Eaton Electrical
 
Condition Based Asset Management R K Gupta
Condition Based Asset Management R K GuptaCondition Based Asset Management R K Gupta
Condition Based Asset Management R K Gupta
RajuGupta88
 
Economics cvp analysis
Economics cvp analysisEconomics cvp analysis
Economics cvp analysis
ReenaR8
 
Preventive maintenance
Preventive maintenancePreventive maintenance
Preventive maintenance
Dr. Munthear Alqaderi
 

Similar to Optimising equipment Safety, Operations and Cost performance (20)

Offshore Europe 2015 1.0 LRED
Offshore Europe 2015 1.0  LREDOffshore Europe 2015 1.0  LRED
Offshore Europe 2015 1.0 LRED
 
Duke Energy - Case Study
Duke Energy - Case StudyDuke Energy - Case Study
Duke Energy - Case Study
 
Optimisation of maintenance strategies for offshore wind farms
Optimisation of maintenance strategies for offshore wind farmsOptimisation of maintenance strategies for offshore wind farms
Optimisation of maintenance strategies for offshore wind farms
 
Cotopaxi Presentation - India
Cotopaxi Presentation - IndiaCotopaxi Presentation - India
Cotopaxi Presentation - India
 
Reliability Engineering in Biomanufacturing - Presentation by Michael Andrews
Reliability Engineering in Biomanufacturing - Presentation by Michael AndrewsReliability Engineering in Biomanufacturing - Presentation by Michael Andrews
Reliability Engineering in Biomanufacturing - Presentation by Michael Andrews
 
Operational Efficiency Based on Innovative Automation, Industry Expertise, En...
Operational Efficiency Based on Innovative Automation, Industry Expertise, En...Operational Efficiency Based on Innovative Automation, Industry Expertise, En...
Operational Efficiency Based on Innovative Automation, Industry Expertise, En...
 
Asset Managment
Asset ManagmentAsset Managment
Asset Managment
 
[Oil & Gas White Paper] Optimizing Pipeline Energy Consumption
[Oil & Gas White Paper] Optimizing Pipeline Energy Consumption[Oil & Gas White Paper] Optimizing Pipeline Energy Consumption
[Oil & Gas White Paper] Optimizing Pipeline Energy Consumption
 
Abby-Watson-Gamesa
Abby-Watson-GamesaAbby-Watson-Gamesa
Abby-Watson-Gamesa
 
Energy Savings & Green Considerations in Motion Control Webinar
Energy Savings & Green Considerations in Motion Control WebinarEnergy Savings & Green Considerations in Motion Control Webinar
Energy Savings & Green Considerations in Motion Control Webinar
 
8A_5_RE_India19_079_presentation_Doug_Waters.pdf
8A_5_RE_India19_079_presentation_Doug_Waters.pdf8A_5_RE_India19_079_presentation_Doug_Waters.pdf
8A_5_RE_India19_079_presentation_Doug_Waters.pdf
 
IADC Sept 2015 -RCM-Print PDF
IADC Sept 2015 -RCM-Print PDFIADC Sept 2015 -RCM-Print PDF
IADC Sept 2015 -RCM-Print PDF
 
Stork Presentation on Migration (Willem Hazenberg)
Stork Presentation on Migration (Willem Hazenberg)Stork Presentation on Migration (Willem Hazenberg)
Stork Presentation on Migration (Willem Hazenberg)
 
Reliability, Maintainability and Levellised Cost of Offshore Wave Energy
Reliability, Maintainability and Levellised Cost of Offshore Wave EnergyReliability, Maintainability and Levellised Cost of Offshore Wave Energy
Reliability, Maintainability and Levellised Cost of Offshore Wave Energy
 
Reliability Levels of Subsea Production Systems During Operations
Reliability Levels of Subsea Production Systems During OperationsReliability Levels of Subsea Production Systems During Operations
Reliability Levels of Subsea Production Systems During Operations
 
Enhance your aged infrastructure without impacting operations
Enhance your aged infrastructure without impacting operationsEnhance your aged infrastructure without impacting operations
Enhance your aged infrastructure without impacting operations
 
Condition Based Asset Management R K Gupta
Condition Based Asset Management R K GuptaCondition Based Asset Management R K Gupta
Condition Based Asset Management R K Gupta
 
Economics cvp analysis
Economics cvp analysisEconomics cvp analysis
Economics cvp analysis
 
Presentation maintenance (lcc)
Presentation maintenance (lcc)Presentation maintenance (lcc)
Presentation maintenance (lcc)
 
Preventive maintenance
Preventive maintenancePreventive maintenance
Preventive maintenance
 

More from Lloyd's Register Energy

What's new in IP 4.4
What's new in IP 4.4What's new in IP 4.4
What's new in IP 4.4
Lloyd's Register Energy
 
Whats new in IC 2016?
Whats new in IC 2016?Whats new in IC 2016?
Whats new in IC 2016?
Lloyd's Register Energy
 
Nova directiva de equipamentos sob pressão 2014 68-ue-seminario
Nova directiva de equipamentos sob pressão 2014 68-ue-seminarioNova directiva de equipamentos sob pressão 2014 68-ue-seminario
Nova directiva de equipamentos sob pressão 2014 68-ue-seminario
Lloyd's Register Energy
 
LR en 1090 energy-presentation_cmm_coimbra
LR en 1090 energy-presentation_cmm_coimbraLR en 1090 energy-presentation_cmm_coimbra
LR en 1090 energy-presentation_cmm_coimbra
Lloyd's Register Energy
 
REGLAMENTO DE PRODUCTOS DE LA CONSTRUCCIÓN Nº305/2011
REGLAMENTO DE PRODUCTOS DE LA CONSTRUCCIÓN Nº305/2011REGLAMENTO DE PRODUCTOS DE LA CONSTRUCCIÓN Nº305/2011
REGLAMENTO DE PRODUCTOS DE LA CONSTRUCCIÓN Nº305/2011
Lloyd's Register Energy
 
Certification of Laser Powder Additive Manufactured Components for Industrial...
Certification of Laser Powder Additive Manufactured Components for Industrial...Certification of Laser Powder Additive Manufactured Components for Industrial...
Certification of Laser Powder Additive Manufactured Components for Industrial...
Lloyd's Register Energy
 
RBI Embedded within Maximo
RBI Embedded within MaximoRBI Embedded within Maximo
RBI Embedded within Maximo
Lloyd's Register Energy
 
Better prediction and better production - from every angle
Better prediction and better production - from every angleBetter prediction and better production - from every angle
Better prediction and better production - from every angle
Lloyd's Register Energy
 
Strategic approach to managing Environmentally Critical Elements within SECEs.
Strategic approach to managing Environmentally Critical Elements within SECEs.Strategic approach to managing Environmentally Critical Elements within SECEs.
Strategic approach to managing Environmentally Critical Elements within SECEs.
Lloyd's Register Energy
 
Introduction to the Revised UK Offshore Safety Legislation as Impacted by the...
Introduction to the Revised UK Offshore Safety Legislation as Impacted by the...Introduction to the Revised UK Offshore Safety Legislation as Impacted by the...
Introduction to the Revised UK Offshore Safety Legislation as Impacted by the...
Lloyd's Register Energy
 
Clearing up material traceability: Confusion and myths in oil and gas manufac...
Clearing up material traceability: Confusion and myths in oil and gas manufac...Clearing up material traceability: Confusion and myths in oil and gas manufac...
Clearing up material traceability: Confusion and myths in oil and gas manufac...
Lloyd's Register Energy
 
Functional Safety (SIL) in the Subsea and Drilling Industry
Functional Safety (SIL) in the Subsea and Drilling IndustryFunctional Safety (SIL) in the Subsea and Drilling Industry
Functional Safety (SIL) in the Subsea and Drilling Industry
Lloyd's Register Energy
 
Dynamic Positioning & Power Management Awareness Training
Dynamic Positioning & Power Management Awareness TrainingDynamic Positioning & Power Management Awareness Training
Dynamic Positioning & Power Management Awareness Training
Lloyd's Register Energy
 
Embed RBI in your EAM
Embed RBI in your EAMEmbed RBI in your EAM
Embed RBI in your EAM
Lloyd's Register Energy
 
Lloyd's Register Energy: Cumplimiento del marcado ce para estructuras de acer...
Lloyd's Register Energy: Cumplimiento del marcado ce para estructuras de acer...Lloyd's Register Energy: Cumplimiento del marcado ce para estructuras de acer...
Lloyd's Register Energy: Cumplimiento del marcado ce para estructuras de acer...Lloyd's Register Energy
 
“Big data” – hva betyr dette i forhold til gjennomføring av olje og gass
“Big data” – hva betyr dette i forhold til gjennomføring av olje og gass“Big data” – hva betyr dette i forhold til gjennomføring av olje og gass
“Big data” – hva betyr dette i forhold til gjennomføring av olje og gass
Lloyd's Register Energy
 
Knowledge based asset integrity for wind farms
Knowledge based asset integrity for wind farmsKnowledge based asset integrity for wind farms
Knowledge based asset integrity for wind farms
Lloyd's Register Energy
 
Competence assessment
Competence assessmentCompetence assessment
Competence assessment
Lloyd's Register Energy
 
Asset maintenance and integrity solutions
Asset maintenance and integrity solutionsAsset maintenance and integrity solutions
Asset maintenance and integrity solutions
Lloyd's Register Energy
 
Asset maintenance and integrity solutions
Asset maintenance and integrity solutionsAsset maintenance and integrity solutions
Asset maintenance and integrity solutions
Lloyd's Register Energy
 

More from Lloyd's Register Energy (20)

What's new in IP 4.4
What's new in IP 4.4What's new in IP 4.4
What's new in IP 4.4
 
Whats new in IC 2016?
Whats new in IC 2016?Whats new in IC 2016?
Whats new in IC 2016?
 
Nova directiva de equipamentos sob pressão 2014 68-ue-seminario
Nova directiva de equipamentos sob pressão 2014 68-ue-seminarioNova directiva de equipamentos sob pressão 2014 68-ue-seminario
Nova directiva de equipamentos sob pressão 2014 68-ue-seminario
 
LR en 1090 energy-presentation_cmm_coimbra
LR en 1090 energy-presentation_cmm_coimbraLR en 1090 energy-presentation_cmm_coimbra
LR en 1090 energy-presentation_cmm_coimbra
 
REGLAMENTO DE PRODUCTOS DE LA CONSTRUCCIÓN Nº305/2011
REGLAMENTO DE PRODUCTOS DE LA CONSTRUCCIÓN Nº305/2011REGLAMENTO DE PRODUCTOS DE LA CONSTRUCCIÓN Nº305/2011
REGLAMENTO DE PRODUCTOS DE LA CONSTRUCCIÓN Nº305/2011
 
Certification of Laser Powder Additive Manufactured Components for Industrial...
Certification of Laser Powder Additive Manufactured Components for Industrial...Certification of Laser Powder Additive Manufactured Components for Industrial...
Certification of Laser Powder Additive Manufactured Components for Industrial...
 
RBI Embedded within Maximo
RBI Embedded within MaximoRBI Embedded within Maximo
RBI Embedded within Maximo
 
Better prediction and better production - from every angle
Better prediction and better production - from every angleBetter prediction and better production - from every angle
Better prediction and better production - from every angle
 
Strategic approach to managing Environmentally Critical Elements within SECEs.
Strategic approach to managing Environmentally Critical Elements within SECEs.Strategic approach to managing Environmentally Critical Elements within SECEs.
Strategic approach to managing Environmentally Critical Elements within SECEs.
 
Introduction to the Revised UK Offshore Safety Legislation as Impacted by the...
Introduction to the Revised UK Offshore Safety Legislation as Impacted by the...Introduction to the Revised UK Offshore Safety Legislation as Impacted by the...
Introduction to the Revised UK Offshore Safety Legislation as Impacted by the...
 
Clearing up material traceability: Confusion and myths in oil and gas manufac...
Clearing up material traceability: Confusion and myths in oil and gas manufac...Clearing up material traceability: Confusion and myths in oil and gas manufac...
Clearing up material traceability: Confusion and myths in oil and gas manufac...
 
Functional Safety (SIL) in the Subsea and Drilling Industry
Functional Safety (SIL) in the Subsea and Drilling IndustryFunctional Safety (SIL) in the Subsea and Drilling Industry
Functional Safety (SIL) in the Subsea and Drilling Industry
 
Dynamic Positioning & Power Management Awareness Training
Dynamic Positioning & Power Management Awareness TrainingDynamic Positioning & Power Management Awareness Training
Dynamic Positioning & Power Management Awareness Training
 
Embed RBI in your EAM
Embed RBI in your EAMEmbed RBI in your EAM
Embed RBI in your EAM
 
Lloyd's Register Energy: Cumplimiento del marcado ce para estructuras de acer...
Lloyd's Register Energy: Cumplimiento del marcado ce para estructuras de acer...Lloyd's Register Energy: Cumplimiento del marcado ce para estructuras de acer...
Lloyd's Register Energy: Cumplimiento del marcado ce para estructuras de acer...
 
“Big data” – hva betyr dette i forhold til gjennomføring av olje og gass
“Big data” – hva betyr dette i forhold til gjennomføring av olje og gass“Big data” – hva betyr dette i forhold til gjennomføring av olje og gass
“Big data” – hva betyr dette i forhold til gjennomføring av olje og gass
 
Knowledge based asset integrity for wind farms
Knowledge based asset integrity for wind farmsKnowledge based asset integrity for wind farms
Knowledge based asset integrity for wind farms
 
Competence assessment
Competence assessmentCompetence assessment
Competence assessment
 
Asset maintenance and integrity solutions
Asset maintenance and integrity solutionsAsset maintenance and integrity solutions
Asset maintenance and integrity solutions
 
Asset maintenance and integrity solutions
Asset maintenance and integrity solutionsAsset maintenance and integrity solutions
Asset maintenance and integrity solutions
 

Recently uploaded

Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
SupreethSP4
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
BrazilAccount1
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
ongomchris
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
Vijay Dialani, PhD
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
AmarGB2
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 

Recently uploaded (20)

Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 

Optimising equipment Safety, Operations and Cost performance

  • 1. Working together for a safer world Optimising equipment Safety, Operations and Cost performance. Pieter van Asten - Maintenance, Risk and reliability How technology and innovation drive optimisation AND safety.
  • 2. Lloyd’s Register Energy Agenda • Introduction • Risk and Reliability modelling • Key to optimization • Data quality and quantity • Reliability model principle • Application for BOP annular close function • Application for Mud pump fluid end parts
  • 3. Lloyd’s Register Energy Introduction • Prevention of over / under maintenance of safety and operational critical equipment is often encountered as problematic without loss of performance. • Combined with cost efficiency of keeping up with safety and operational performance adds an extra layer of complexity to the problem. • They seem to be conflicting factors. • A key aspect to this problem is awareness and knowledge about risk exposure involved. • This presentation will highlight a proven solution to create an optimal balance between cost, NPT and safety.
  • 4. Lloyd’s Register Energy Risk and Reliability modelling • Risk is defined as the probability of failure multiplied by the effect of that failure. • Probability of failure: how often something fails. (Knowing how it fails or what makes it fail is equally important for effective maintenance = reliability improvement) • Effects are for example safety, compliance, NPT (pulling a BOP), loss of income, etc
  • 5. Lloyd’s Register Energy Risk and Reliability modelling: working in tandem Operational success (Safety increase / NPT decrease ) is strongly dependent on the reliability of technical equipment and related through risk reduction. Unsuccesful performance Major Accident Hazards : Top Event Non Productive Time : NPT / CostsSuccesful performance Safety Uptime : Income Sustained operational and safety performance, addressing NPT root cause and costs: Safety - NPT reduction Effective asset management: risk / reliability based information and prioritization of safety and operational critical components. Risk reduction
  • 6. Lloyd’s Register Energy The key to optimisation • A reliable system assures safe and efficient operations: lower overall risk exposure. o Reliability can be achieved in either the design or by maintenance that affects equipment failure. o Reliability is measured through failure probability o Reliability affects both safety and operational equipment performance at ‘x’ cost. o Maintenance can often only being done within a certain (operational-)timeframe. Reliability management is very suitable to optimise NPT and safety on a cost basis as all are risk aspects and form a perfect balance beam: cost of the risk of failure vs. the cost of failure prevention.
  • 7. Lloyd’s Register Energy The key to optimisation • Risk and its associated cost are key to optimise between over and / or under maintenance for safety and operational performance. o Component risk of failure is dependant on the system and its functionality that component operates in. o Component risk of failure is dependant on the level of redundancy of these components in that system. o The effect of component failure, expressed in cost, is therefore different for different functionality. • Lloyd’s Register Energy Reliability model takes these differentiations into account.
  • 8. Lloyd’s Register Energy The key to optimisation • The main focus of Lloyd’s Register Energy’s Reliability model is to assist in cost balance without loss of critical equipment functionality in future operations: Safe and effective delivery of a well with a focus on cost optimisation. • The essence of Lloyd’s Register Energy’s Reliability model is the ability to balance cost of the risk failure with the cost of failure prevention. • Typical statements for our reliability model: “Lacking data quantity or quality is not a reason not to start” “Is the value of the risk that was prevented equal or higher as the cost of preventing (i.e. maintenance)?” “Forecasting what needs to be done now to prevent future component failures leading to NPT or unsafe situations” “Prioritisation of maintenance work that has the highest effect on risk prevention: replacing now or later, what is the effect of replacement or maintenance, on future operations and cost-wise?”
  • 9. Lloyd’s Register Energy Data quality and quantity • Successful application of reliability modelling depends on data quality and quantity. • Improved data quality allows for more accurate reliability calculations, prediction and decisions. • Data quantity, also from different sources, mixed and matched (time and usage based) leverage data quality and quantity. • Data quality improves due to focussed data collection upon the start of a reliability project. • Data maturing cycle:
  • 10. Lloyd’s Register Energy Data quality and quantity: using small data samples • How does it look like: raw failure data from asset management system. • Using only corrective maintenance (failure) data leads to a too conservative MTTF.
  • 11. Lloyd’s Register Energy Reliability model principle • Example of reliability model principle (input can be time, usage (i.e. cycles, miles)) Net. expected positive difference on cost of risk: $ 330 000
  • 12. Lloyd’s Register Energy Reliability model • The optimal effect is achieved when focussing on component failure analysis to optimize functional (reliability) performance and success. • This allows for demonstration of maintenance effect and cost motivation against operational success or cost of being unsuccessful. • Combination of functions and components • Optimised component reliability = optimised performance = optimised function = operational success . • Adding cost of repair, spares and cost of risk of failure allows for a cost balance: a means to align operations and maintenance departments talking a similar language: less confusion: better decision motivation.
  • 13. Lloyd’s Register Energy Reliability model applied for a BOP annular function • Example of BOP operational usage in 7 scenarios.
  • 14. Lloyd’s Register Energy Reliability model applied for a BOP annular function • Maintenance and Inspection reliability based prioritisation • Maintenance matrix: risk based urgency • Maintenance Plan Reliability informed (Reliability – System contribution – Cost) • T5 / 110 days • T6 / 185 days • T7 / 210 days
  • 15. Lloyd’s Register Energy Reliability model applied for a BOP annular function How does it look like:
  • 16. Lloyd’s Register Energy Reliability model applied for mud pump maintenance • Mud Pump 1 & 2 • Each mud pump has three cylinders, numbered 1, 2 and 3. • Each cylinder has one piston liner and one piston. • Each cylinder can be configured with a combination of piston and liner of a specific size. The rig uses 5-inch, 6-inch, and 6½-inch liner diameters. • Two mud pumps need to be used for 12¼ inches holes and larger. • Costs consumables Component Diameter/type Price [Euro] Note Liners 5” 2200 Ceramic 6” 2160 Ceramic 6.5” 510 Steel Pistons 5” 90 6” 110 6.5” 205 Valves Suction & Discharge 120 Seats Suction & Discharge 85
  • 17. Lloyd’s Register Energy Reliability model applied for mud pump maintenance • Only 1,5 years of data • Different types valves, seat, pistons and liners. • Data sets merged to increase accuracy.
  • 18. Lloyd’s Register Energy Reliability model applied for mud pump maintenance • Preventive replacement because of uninterrupted operation required for both mud pumps (minimum flow requirement 12¼ inch hole): • Cost of spare parts vs. cost of down time • Figure below assumes a one hour repair • Preventive replacement is cost efficient from a usage of 250 hours.
  • 19. Lloyd’s Register and variants of it are trading names of Lloyd’s Register Group Limited, its subsidiaries and affiliates. Copyright © Lloyd’s Register Energy Drilling. 2014. A member of the Lloyd’s Register group. Dr. Gerard Gaal Senior Reliability Consultant Reliability Engineering E gerard.gaal@lr.org Lloyd’s Register Energy Drilling Gapingseweg 1A, 4353 JA Serooskerke, Netherlands T +31 118 563 050 Working together for a safer world Pieter van Asten Senior Concepts manager – Innovation E: pieter.vanasten@lr.org