Curriculum Vitae
KHIZER ABBAS
Civil Engineer
Contact no: +96891039049
Contact no.: +96895856972
Contact no.: +923360751373
Email: khizer_arain@hotmail.com
Driving license: Light (LTV) Omani & Defensive Driving.
To become a key member of a growing organization having ample opportunities for exposure
and growth. To work with devotion and enthusiasm in order to achieve the organization’s
objectives and goals as well as to improve my own capabilities and experience to become
successful and prosperous in future life.
 Bachelor of Technologyin civil Engineering (4 Years)
From NICE University, Islamabad Campus . (2010)
CGPA 3.03 out of 4. (76%)
 DIPLOMAOF ASSOCIATE ENGINEER CIVIL
 From PBTE Lahore, GCT Multan Campus. (2006)
Marks 2447 out of 3350. (73%)
 Matriculation from DG Khan Board, Muzaffar Garh Campus. (2003)
Marks 599 out of 850. (70%)
APPROVED CIVIL ENGINEER (OMAN GAS COMPANY)
 PETROJET LLC MUSCAT OMAN
1 Project: Oman Gas Company EPC 32 “GAS SALALAH LOOPLINE (85 kilometers)
Location: PDO NIMAR TO MURMOL.
Consultancy: OGC/ VELOSI A+ CONSULTANTY LLC.
Post: Construction Engineer.
DATE: February 2016 to date.
Work done,
 Trenching work for 32 “gas pipe line.
 Trench backfilling with soft sand.
OBJECTIVE
ACADEMIC QUALIFICATION
WORK EXPERIENCE
 Earth backfilling work of trench with screen (sieve material) 100 mm down.
 Stringing work.
 Pipe lowering in the trench.
 Levelling work for trench.
 Concerting work for cover and base preparation at wadi area.
 Wadi concerting and mash with 35 OPC grade.
 Grader road preparation for inspection route.
 Proposed the gas pipeline route as per site condition.
 Submitted the survey setting out report for proposal.
 General Administration.
 Contractual correspondence.
 Employee management.
 Supervision of Work at projects.
 Quality and Quantity Inspection.
 Specification and drawing implementation.
 Excellent time management skills to meet project target
 OMAN FIBER OPTIC S.A.O.G COMPANY MUSCAT OMAN.
1 Project: SUPPLY & INSTALLATION OF FIBER OPTIC CABLE (270 kms)(OGC &PDO).
Location: Muryarat Muscat to Fahud PDO Area.
Consultancy: OGC/ VELOSI A+ CONSULTANTY LLC.
Post: Construction Engineer
DATE: MAY 2015 TO January 2016.
Work done,
 Trenching work for FO cable of OGC & PDO Networking
Trench backfilling with soft sand.
 Earth backfilling work of trench with screen (sieve material) 100 mm down.
 Manhole Installation for cable bellowing.
 Manhole concerting work for cover and base preparation.
 Installation of PVC pipe 4” duct laying work at wadi area.
 Wadi concerting with 35 OPC grade.
 Grader road preparation for inspection route.
 Proposed the FO cable route as per site condition.
 Submitted the survey setting out report for proposal.
 Supervision of DIT for OGC&PDO 50 mm ducting.
 General Administration.
 Contractual correspondence.
 Employee management.
 Supervision of Work at projects.
 Quality and Quantity Inspection.
 Specification and drawing implementation.
 Excellent time management skills to meet project target
BURJ MIDDEL EAST LLC MUSCAT SULTANTEOF OMAN
1 Project: SOHAR OIL REFENRY IMPROVEMENT PROJECT (SRIP).
MAIN CONTRACTOR: AL HASSAN ENGINEERING S.A.O.G OMAN.
Location: SOHAR INDUSTRIAL PORT.
Consultancy: DALIAM PETROFAC (DPJV).
Post: Construction Engineer/QA-QCI Civil.
DATE: June 2014 to May 2015.
Project Scope Earth Work, Road and pipeline construction Work.
 Asphalt road work Seven km inside the ORPIC new plant area and site
preparation.
 Asphalt work 5 cm bending course.
 Asphalt work 5 cm wearing course.
 Road junction mina round about to maritine college road 5 km.
 Grader road constructed inside the plant area.
 Earth Work Cutting Filling Grading Levelling Compacting work.
 Earth stripping /removing work 600000 M2.
 Earth work cutting area 350000 M3.
 Earth work mixing filling278000 M3 with (95% compaction factor ASTM).
 Excavated earth filling work 300000 M3.
 40” Pipe line for oil excavation and pipe laying work.(1.5 km scope of work)
 20” Pipe line for gas excavation and pipe laying work (2.00 km scope of work)
 Put the RFI TO Client and maintained the documents.
 Project planning.
 Attending Client.
 General Administration.
 Contractual correspondence.
 Employee management.
 Supervision of Work at projects.
 Quality and Quantity Inspection.
 Specification and drawing implementation.
 Excellent time management skills to meet project target
 Al Tajawab Trade & Con.Co (Salalah)Sultanate of Oman
 4 Projects: ENABLING WORKS FOR THE PREPARATION OF SITES
AFFECTED BY AL BATINAH COASTAL ROAD PROJECT.
Location: SUWAIQ MASCAT
Consultancy: MINISTRY OF HOUSING OMAN
Post: Project Engineer
DATE: April 2014-June 2014
 3 Projects: JUNOOT PROJECT (SIGHN BOARD).
Location: JUNOOT (SHUMMYIA).
Consultancy: KUWIT UNITED REAL ESTATE CO. OMAN.
Post: Project Engineer.
DATE: NOVEMBER 2013 DECEMBER 2013
 2 Projects: 3 NOs BOREWELL ZEENAT AL SAHARA.
Location: ZEENAT AL SAHRA OMAN.
Consultancy: THE ROYAL COURT AFFAIRS.
Post: Site Engineer
DATE: NOVEMBER 2013 to April 2014.
Work done:
• Major Work pumps stations electrical panel rooms constructed.
• 5 km HPVC pipe line work for water supply purpose (drip irrigation system)
• Lying of 3 km 3 core rubber compound electrical cable work.
• 3 No’s bore well boring work 360 meter depth for water purpose.
 1 Project: Water Supply Network Block C, D, E& I.
Location: North South Sahlnoot salalah Oman.
Consultancy: The Ministry of Water Supply state & Governorate of dhofar.
Post: Site Engineer/Site in charge
DATE: April 2013 to 30 November 2013.
Work done:
• 96 km water supply lines HDPE pipe line 250mm, 180mm, 110mm dia.
• Excavation work for pipeline.
• Pipe laying work
• HDPE pipe jointing work with different type bends and coupler 45 dgr 90 dgr.
• Backfilling work with soft sand.
• Backfilling work with screened material 80 mm down Sieve.
• Manhole construction for air valves pressure valves.
• Installation of fire hydrates pillar type and underground type.
• Project planning.
• Attending Client.
• General Administration.
• Contractual correspondence.
• Employee management.
• Sub-contract handling.
• Supervision of Work at projects.
• Quality and Quantity Inspection.
• Specification and drawing implementation.
• Estimation works at structures.
• Layout at structures.
 Rabi Baghdad Trade & Co (Salalah)Sultanate of Oman.
Project: Private buildings.
Location: Mad al Saadha Block (A) salalah Oman.
Consultancy: Salalah engineering Consultancy.
Post: Site Engineer.
DATE: December 2012 to 04 April 2013
Work done:
 500 meter 2 three story frame structure building.
 Block work.
 Steel work.
 Shuttering and concrete work with 40 OPC Grade.
 Attending Client.
 General Administration.
 Contractual correspondence.
 Employee management.
 Sub-contract handling.
 Supervision of Work at projects.
 Quality and Quantity Inspection.
 Specification and drawing implementation.
 Estimation works at structures.
 Layout at structures.
 Excellent time management skills to meet project target.
 Punjab Irrigation and Drainage Authority (Part-B P-53 Project)J/V by Govt. of
Punjab and Japan International Corporation Agency (JICA)
Monitoring and Evaluation cell Area Water Board LCC (East) Circle Faisalabad
From 16 August 2011 to 15 December 2012.
Post: Field Inspector M & E
Descriptions:
 Rehabilitation works at canals(Part-B P-53 Project)
 Research at drip irrigation system in Punjab with Japan International Corporation
Agency (JICA).
 Supervision of Laying of Pipe for drip irrigation system.
 Supervision of Excavation work at canals and drip irrigation system.
 Quality and Quantity Inspection.
 Specification and drawing implementation
 Monitoring of lining works at structures.
 Sample testing of material at different stages and record keeping.
 Project it will also help to improve the quality of work at site.
 Excellent time management skills to meet project target.
 Checking of RCC Work Estimates at structures (Bridges, fall, Meter Flumes,
Service Roads).
 Submitted field inspection reports prescribed formats.
 LAGAN-HUSNAIN (formerly Husnain construction pvt Ltd) Islamabad PAKISTAN.
Projects: Construction of new Islamabad International airport.
Location: ISLAMABAD.
Consultancy: NESPAK.
Post: Site Engineer
DATE: 15 January 2010 to 30 July 2011.
Job Descriptions:
 8 km run way and other asphalt road inside the airport.
 Preparation of sab grade and sab base with
 Asphalt work bending course 5 cm with asphalt paver.
 Asphalt work wearing course 5 cm.
 Construction of waste water drain and sewerage system for run way area.
 Protection work for runway and drain system.
 Installation of PVC ducts for electrical purpose.
 Foundation work steel and shuttering work for culverts of drain system.
 Pile foundation /friction pile work for terminal building.
 Specification and drawing implementation.
 Layout at structures.
 Excellent time management skills to meet project target.
 Supervision of Concrete Works at structures.
 Estimation works at structures.
 Submitted field Works reports prescribed formats
 Time Management
 Job Hunting Skills
 Carrier Guidance
 Books Reading
 Playing Cricket
 Diploma In information Technology (6th Month)
Jinnah College of Engineering & Technology Muzzafar Garh
 Auto Cade (2D-3D)
 Microsoft Word
 Microsoft Excel
 Microsoft PowerPoint
 Net Browsing
 Defensive driving course (2015) to Occupational training institute Muscat Oman.
 H2S escape and awareness Course to Occupational training institute Muscat
Oman.
 First aider training course .2014
National training institute sohar sultanate of Oman.
Under the daliam petrofac (DPJV) /Al-Hassan Engineering S.A.O.G for sohar oil refinery
improvement project sohar sultanate of Oman.
 Research Work
The World Bank project of LPP at Loddharran (Multan) 2006
 Research at water quality control
 Research at sewerage system
 Research at tube well system (SCARP)
Thesis (2): submitted to Department of civil engineering, University of the Newport
Institute of communication and Economics.
Topic of the StudyB Tech (Hons) Civil Engineering.
Faisalabad Development authority city Housing Scheme Project at Faisalabad.
Thesis (1): submitted to Department of civil engineering, University of the Newport
Institute of communication and Economics.
Topic of the Study B Tech (Pass) Civil Engineering.
12km Road Construction Project Aziz Hotel choke to Vehari choke Multan at Multan
ACTIVITIES & INTERESTS
COMPUTER KNOWLEDGE
HONORS & ACHIEVEMENTS
 Urdu
 Punjabi
 English
 Arabic
Proficient in Reading, Writing, Listening and speaking skills
References will be furnished upon request
Date of birth 4th
January1988
Nationality Pakistani
Father’s Name Manzoor Hussain
Sex Male
Religion Islam
Marital status Married
Oman Residence no 93595461
Visa title Employment (civil Engineer)
LANGUAGES
PERSONAL INFORMATION

Khizer CV 2016

  • 1.
    Curriculum Vitae KHIZER ABBAS CivilEngineer Contact no: +96891039049 Contact no.: +96895856972 Contact no.: +923360751373 Email: khizer_arain@hotmail.com Driving license: Light (LTV) Omani & Defensive Driving. To become a key member of a growing organization having ample opportunities for exposure and growth. To work with devotion and enthusiasm in order to achieve the organization’s objectives and goals as well as to improve my own capabilities and experience to become successful and prosperous in future life.  Bachelor of Technologyin civil Engineering (4 Years) From NICE University, Islamabad Campus . (2010) CGPA 3.03 out of 4. (76%)  DIPLOMAOF ASSOCIATE ENGINEER CIVIL  From PBTE Lahore, GCT Multan Campus. (2006) Marks 2447 out of 3350. (73%)  Matriculation from DG Khan Board, Muzaffar Garh Campus. (2003) Marks 599 out of 850. (70%) APPROVED CIVIL ENGINEER (OMAN GAS COMPANY)  PETROJET LLC MUSCAT OMAN 1 Project: Oman Gas Company EPC 32 “GAS SALALAH LOOPLINE (85 kilometers) Location: PDO NIMAR TO MURMOL. Consultancy: OGC/ VELOSI A+ CONSULTANTY LLC. Post: Construction Engineer. DATE: February 2016 to date. Work done,  Trenching work for 32 “gas pipe line.  Trench backfilling with soft sand. OBJECTIVE ACADEMIC QUALIFICATION WORK EXPERIENCE
  • 2.
     Earth backfillingwork of trench with screen (sieve material) 100 mm down.  Stringing work.  Pipe lowering in the trench.  Levelling work for trench.  Concerting work for cover and base preparation at wadi area.  Wadi concerting and mash with 35 OPC grade.  Grader road preparation for inspection route.  Proposed the gas pipeline route as per site condition.  Submitted the survey setting out report for proposal.  General Administration.  Contractual correspondence.  Employee management.  Supervision of Work at projects.  Quality and Quantity Inspection.  Specification and drawing implementation.  Excellent time management skills to meet project target  OMAN FIBER OPTIC S.A.O.G COMPANY MUSCAT OMAN. 1 Project: SUPPLY & INSTALLATION OF FIBER OPTIC CABLE (270 kms)(OGC &PDO). Location: Muryarat Muscat to Fahud PDO Area. Consultancy: OGC/ VELOSI A+ CONSULTANTY LLC. Post: Construction Engineer DATE: MAY 2015 TO January 2016. Work done,  Trenching work for FO cable of OGC & PDO Networking Trench backfilling with soft sand.  Earth backfilling work of trench with screen (sieve material) 100 mm down.  Manhole Installation for cable bellowing.  Manhole concerting work for cover and base preparation.  Installation of PVC pipe 4” duct laying work at wadi area.  Wadi concerting with 35 OPC grade.  Grader road preparation for inspection route.  Proposed the FO cable route as per site condition.  Submitted the survey setting out report for proposal.  Supervision of DIT for OGC&PDO 50 mm ducting.  General Administration.  Contractual correspondence.  Employee management.  Supervision of Work at projects.  Quality and Quantity Inspection.  Specification and drawing implementation.  Excellent time management skills to meet project target BURJ MIDDEL EAST LLC MUSCAT SULTANTEOF OMAN 1 Project: SOHAR OIL REFENRY IMPROVEMENT PROJECT (SRIP). MAIN CONTRACTOR: AL HASSAN ENGINEERING S.A.O.G OMAN. Location: SOHAR INDUSTRIAL PORT.
  • 3.
    Consultancy: DALIAM PETROFAC(DPJV). Post: Construction Engineer/QA-QCI Civil. DATE: June 2014 to May 2015. Project Scope Earth Work, Road and pipeline construction Work.  Asphalt road work Seven km inside the ORPIC new plant area and site preparation.  Asphalt work 5 cm bending course.  Asphalt work 5 cm wearing course.  Road junction mina round about to maritine college road 5 km.  Grader road constructed inside the plant area.  Earth Work Cutting Filling Grading Levelling Compacting work.  Earth stripping /removing work 600000 M2.  Earth work cutting area 350000 M3.  Earth work mixing filling278000 M3 with (95% compaction factor ASTM).  Excavated earth filling work 300000 M3.  40” Pipe line for oil excavation and pipe laying work.(1.5 km scope of work)  20” Pipe line for gas excavation and pipe laying work (2.00 km scope of work)  Put the RFI TO Client and maintained the documents.  Project planning.  Attending Client.  General Administration.  Contractual correspondence.  Employee management.  Supervision of Work at projects.  Quality and Quantity Inspection.  Specification and drawing implementation.  Excellent time management skills to meet project target  Al Tajawab Trade & Con.Co (Salalah)Sultanate of Oman  4 Projects: ENABLING WORKS FOR THE PREPARATION OF SITES AFFECTED BY AL BATINAH COASTAL ROAD PROJECT. Location: SUWAIQ MASCAT Consultancy: MINISTRY OF HOUSING OMAN Post: Project Engineer DATE: April 2014-June 2014  3 Projects: JUNOOT PROJECT (SIGHN BOARD). Location: JUNOOT (SHUMMYIA). Consultancy: KUWIT UNITED REAL ESTATE CO. OMAN. Post: Project Engineer. DATE: NOVEMBER 2013 DECEMBER 2013  2 Projects: 3 NOs BOREWELL ZEENAT AL SAHARA. Location: ZEENAT AL SAHRA OMAN. Consultancy: THE ROYAL COURT AFFAIRS. Post: Site Engineer DATE: NOVEMBER 2013 to April 2014. Work done:
  • 4.
    • Major Workpumps stations electrical panel rooms constructed. • 5 km HPVC pipe line work for water supply purpose (drip irrigation system) • Lying of 3 km 3 core rubber compound electrical cable work. • 3 No’s bore well boring work 360 meter depth for water purpose.  1 Project: Water Supply Network Block C, D, E& I. Location: North South Sahlnoot salalah Oman. Consultancy: The Ministry of Water Supply state & Governorate of dhofar. Post: Site Engineer/Site in charge DATE: April 2013 to 30 November 2013. Work done: • 96 km water supply lines HDPE pipe line 250mm, 180mm, 110mm dia. • Excavation work for pipeline. • Pipe laying work • HDPE pipe jointing work with different type bends and coupler 45 dgr 90 dgr. • Backfilling work with soft sand. • Backfilling work with screened material 80 mm down Sieve. • Manhole construction for air valves pressure valves. • Installation of fire hydrates pillar type and underground type. • Project planning. • Attending Client. • General Administration. • Contractual correspondence. • Employee management. • Sub-contract handling. • Supervision of Work at projects. • Quality and Quantity Inspection. • Specification and drawing implementation. • Estimation works at structures. • Layout at structures.  Rabi Baghdad Trade & Co (Salalah)Sultanate of Oman. Project: Private buildings. Location: Mad al Saadha Block (A) salalah Oman. Consultancy: Salalah engineering Consultancy. Post: Site Engineer. DATE: December 2012 to 04 April 2013 Work done:  500 meter 2 three story frame structure building.  Block work.  Steel work.  Shuttering and concrete work with 40 OPC Grade.  Attending Client.  General Administration.  Contractual correspondence.  Employee management.  Sub-contract handling.  Supervision of Work at projects.  Quality and Quantity Inspection.  Specification and drawing implementation.
  • 5.
     Estimation worksat structures.  Layout at structures.  Excellent time management skills to meet project target.  Punjab Irrigation and Drainage Authority (Part-B P-53 Project)J/V by Govt. of Punjab and Japan International Corporation Agency (JICA) Monitoring and Evaluation cell Area Water Board LCC (East) Circle Faisalabad From 16 August 2011 to 15 December 2012. Post: Field Inspector M & E Descriptions:  Rehabilitation works at canals(Part-B P-53 Project)  Research at drip irrigation system in Punjab with Japan International Corporation Agency (JICA).  Supervision of Laying of Pipe for drip irrigation system.  Supervision of Excavation work at canals and drip irrigation system.  Quality and Quantity Inspection.  Specification and drawing implementation  Monitoring of lining works at structures.  Sample testing of material at different stages and record keeping.  Project it will also help to improve the quality of work at site.  Excellent time management skills to meet project target.  Checking of RCC Work Estimates at structures (Bridges, fall, Meter Flumes, Service Roads).  Submitted field inspection reports prescribed formats.  LAGAN-HUSNAIN (formerly Husnain construction pvt Ltd) Islamabad PAKISTAN. Projects: Construction of new Islamabad International airport. Location: ISLAMABAD. Consultancy: NESPAK. Post: Site Engineer DATE: 15 January 2010 to 30 July 2011. Job Descriptions:  8 km run way and other asphalt road inside the airport.  Preparation of sab grade and sab base with  Asphalt work bending course 5 cm with asphalt paver.  Asphalt work wearing course 5 cm.  Construction of waste water drain and sewerage system for run way area.  Protection work for runway and drain system.  Installation of PVC ducts for electrical purpose.  Foundation work steel and shuttering work for culverts of drain system.  Pile foundation /friction pile work for terminal building.  Specification and drawing implementation.  Layout at structures.  Excellent time management skills to meet project target.  Supervision of Concrete Works at structures.  Estimation works at structures.  Submitted field Works reports prescribed formats
  • 6.
     Time Management Job Hunting Skills  Carrier Guidance  Books Reading  Playing Cricket  Diploma In information Technology (6th Month) Jinnah College of Engineering & Technology Muzzafar Garh  Auto Cade (2D-3D)  Microsoft Word  Microsoft Excel  Microsoft PowerPoint  Net Browsing  Defensive driving course (2015) to Occupational training institute Muscat Oman.  H2S escape and awareness Course to Occupational training institute Muscat Oman.  First aider training course .2014 National training institute sohar sultanate of Oman. Under the daliam petrofac (DPJV) /Al-Hassan Engineering S.A.O.G for sohar oil refinery improvement project sohar sultanate of Oman.  Research Work The World Bank project of LPP at Loddharran (Multan) 2006  Research at water quality control  Research at sewerage system  Research at tube well system (SCARP) Thesis (2): submitted to Department of civil engineering, University of the Newport Institute of communication and Economics. Topic of the StudyB Tech (Hons) Civil Engineering. Faisalabad Development authority city Housing Scheme Project at Faisalabad. Thesis (1): submitted to Department of civil engineering, University of the Newport Institute of communication and Economics. Topic of the Study B Tech (Pass) Civil Engineering. 12km Road Construction Project Aziz Hotel choke to Vehari choke Multan at Multan ACTIVITIES & INTERESTS COMPUTER KNOWLEDGE HONORS & ACHIEVEMENTS
  • 7.
     Urdu  Punjabi English  Arabic Proficient in Reading, Writing, Listening and speaking skills References will be furnished upon request Date of birth 4th January1988 Nationality Pakistani Father’s Name Manzoor Hussain Sex Male Religion Islam Marital status Married Oman Residence no 93595461 Visa title Employment (civil Engineer) LANGUAGES PERSONAL INFORMATION