SlideShare a Scribd company logo
1 of 4
Download to read offline
OIL / GAS FIRED BOILER
♦ Higher Thermal Efficiency of more than 88 % on NCV with Heat recovery
♦ 3 Pass Fully Wet Back
♦ Package Skid Mounted
♦ Fully Automatic with turndown ratio of 1:4
♦ Pressure 10.54 Kgs/cm2
to 17.5 Kgs/cm2
. OR to suit client’s requirement
IBR OIL/GAS FIRED BOILERS
1. Fully wet-back design effectively
absorbs radiant heat into the
water, keeping tube ends and
rear side of boiler cooler than in
dry back design.
2. Three passes extract maximum
usable heat from the fuel.
3. Large water-surrounded furnace
assures complete combustion
and heat absorption without
Flame impingement.
MODEL EBPL EBPL EBPL EBPL EBPL EBPL EBPL EBPL EBPL EBPL EBPL EBPL EBPL EBPL EBPL
0-I 0-II 0-III 0-IV 0-V 0-VI 0-VII 0-VIII 0-IX 0-X 0-XI 0-XII 0-XIII 0-XIV 0-XV
STEAM OUTPUT
TONS/HR
(FROM & AT 1000
.C)
0.5 0.75 1.0 1.5 2.0 2.5 3.0 3.5 4.0 5.0 6.0 8.0 10.0 12.0 14.0
OVERALL LENGTH
MTRS
3.80 4.00 4.20 4.30 4.60 5.10 5.25 5.54 5.85 6.20 7.00 8.00 8.80 9.50 9.50
OVERALL WIDTH
MTRS
2.20 2.20 2.35 2.45 2.55 2.70 2.75 2.77 2.93 3.12 3.20 3.30 3.60 3.90 4.00
OVERALL HEIGHT
MTRS
3.00 3.10 3.20 3.37 3.50 3.67 3.75 3.80 4.00 4.10 4.20 4.35 4.50 5.00 5.20
FLUE GAS DUCT
SIZE MM
225 225 250 250 300 300 300 300 400 400 475 550 650 750 800
FURNACE OIL KGS/HR 32 48 64 96 128 160 192 224 256 320 384 512 640 768 896
NATURAL GAS
NM3
/HR
36 54 72 108 114 180 216 252 288 360 432 576 720 864 1008
FUEL - Furnace Oil – 9650 Kcal/Kgs. Natural Gas – 8500 Kcal/NM3
CONSTRUCTION
ENERGYPACK Boilers are three pass wet back, horizontal, smoke tube type fusion welded. Boilers
are made to IBR/DIN/BS/ASME-code. Components are engineered for maximum safety, highest
efficiency, dependability and quiet operation. Wet back models eliminate rear end refractory and its
inherent maintenance cost, reduces stress of rear tube sheet and ligament cracking, radiant heat is
eliminated, lengthening tube life and reducing heat loss from rear turnaround.
Unique design features
♦ Fully automatic pressure jet Burner – Boiler furnace design suitable for Imported Weishaupt/
Reillo & Indian modulating burner.
♦ Efficiency enhancement – Optional accessories such as air preheater and economizer can be
Integrated with the main unit.
♦ Automation with Programmable Logic Controllers (PLC) with Supervisory Control and Data
Acquisition (SCADA) system can also be offered at an extra cost. Standard boilers are supplied
with fully automatic operation with safety interlocks & alarm.
ERECTION & MAINTENANCE
“Energypack” Boilers are shop assembled and no special foundation is required. Each unit is a
complete package ready for quick installation and connection for your service lines. For easy internal
maintenance and cleaning, Manholes & Mudholes are well placed. Boiler tubes are easy to inspect as
hinged front & back doors enable quick and easy Maintenance, inspection or cleaning. Spares are
easily available.
PERFORMANCE
Efficiency of oil fired boiler on N.C.V. is 88% with B.S./DIN tolerance on a very wide working range
and higher figures are not un-common. Steam of high purity and dryness fraction is generated as
Heat Transfer surfaces in the boiler is judiciously accommodated.
CUSTOMISED INSTALLATION
Our boiler is tested before shipment including a complete check of controls. Energypack offer start-
up adjustments to your fuel and steam load. Special training of operator is available.
STEAM RAISING TIME
After overnight shut down only twenty minutes are required to raise steam to maximum continuous
rating From 5 Kg/cm2 to 10.54 Kg/cm2 (150 psig) in standard package smoke tube boilers.
STANDARD FLOW DIAGRAM OIL/GAS FIRED BOILER
Office :
UTECH PROJECTS PVT LTD.
9/10, Dattani 5A, Shivaji Road,
Kandivali (West), Mumbai - 400067.
Maharashtra, India.
Telefax: +91 - 22 - 28642832 / 28642833
E mail : utechprojects@gmail.com
sales@utechprojects.com
Website : www.utechprojects.com
Registered Office & Works of Principle Manufacturer:
ENERGYPACK BOILERS PVT LTD.
24-P, Baska - Uijeti Road, Village Uijeti,
Taluka: Halol, Jilla, Panchamahal, Gujarat - 389350.
Telefax: +91 - 02676 - 247055 / 247247
Mumbai Off No: +91 22 26854233 / 26854957
E mail : yogesh@energypackboilers.com
response@energypackboilers.com
Website : www.energypackboilers.com
Exclusively Marketed By
OTHER PRODUCTS
♦ Self Supported Chimneys.
♦ Hot water Boilers.
♦ Heat Exchangers (TEMA).
♦ Pressure Vessels (ASME).
♦ Waste Heat Boilers.
♦ Electrode Boilers.
♦ Dewaxing Autoclave Boilers.
♦ Incinerators.
IBR & NON IBR STEAM BOILERS
Hot Air Circulation Autoclave  Explosion Proof Control Panel 
M/S ENERGYPACK BOILERS PVT LTD
Self Supported Chimney 

More Related Content

What's hot

Boiler auxillaries in a coal fired power plant
Boiler auxillaries in a coal fired power plantBoiler auxillaries in a coal fired power plant
Boiler auxillaries in a coal fired power plantBoben Anto Chemmannoor
 
An introduction to Fired Heaters.pdf
An introduction to Fired Heaters.pdfAn introduction to Fired Heaters.pdf
An introduction to Fired Heaters.pdfKarnav Rana
 
DESIGN OF AIR PRE HEATER AND ECONOMIZER
DESIGN OF AIR PRE HEATER AND ECONOMIZERDESIGN OF AIR PRE HEATER AND ECONOMIZER
DESIGN OF AIR PRE HEATER AND ECONOMIZERGopi Chand
 
AFBC BOILERS PERFORMANCE IMPROVEMENT
AFBC BOILERS PERFORMANCE IMPROVEMENTAFBC BOILERS PERFORMANCE IMPROVEMENT
AFBC BOILERS PERFORMANCE IMPROVEMENTManohar Tatwawadi
 
Boiler design-calculation 3
Boiler design-calculation 3Boiler design-calculation 3
Boiler design-calculation 3Ebra21
 
How to Improve Steam Turbine Head Rate and Increase Output
How to Improve Steam Turbine Head Rate and Increase OutputHow to Improve Steam Turbine Head Rate and Increase Output
How to Improve Steam Turbine Head Rate and Increase OutputMargaret Harrison
 
Boiler efficiency by loss Method
Boiler efficiency by loss MethodBoiler efficiency by loss Method
Boiler efficiency by loss MethodRajeev Saini
 
Performance calculation for feed water heater
Performance calculation  for feed water heaterPerformance calculation  for feed water heater
Performance calculation for feed water heaterSHIVAJI CHOUDHURY
 
Economiser & air preheater
Economiser & air preheaterEconomiser & air preheater
Economiser & air preheaterdishti7
 
Supercritical steam generators
Supercritical steam generatorsSupercritical steam generators
Supercritical steam generatorsAshutosh Katti
 
Fired Heater Operation and Trouble Shooting.pdf
Fired Heater  Operation and Trouble Shooting.pdfFired Heater  Operation and Trouble Shooting.pdf
Fired Heater Operation and Trouble Shooting.pdfMuhammadNaeem191352
 
The Coal mill performance monitoring
The Coal mill performance monitoringThe Coal mill performance monitoring
The Coal mill performance monitoringManohar Tatwawadi
 
Heat rate audit in thermal power plant
Heat rate audit in thermal power plantHeat rate audit in thermal power plant
Heat rate audit in thermal power plantSHIVAJI CHOUDHURY
 
Cfb boiler basic design, operation and maintenance
Cfb boiler basic design, operation and maintenanceCfb boiler basic design, operation and maintenance
Cfb boiler basic design, operation and maintenancePichai Chaibamrung
 
GAS SWEETENING PROCESSES
GAS SWEETENING PROCESSESGAS SWEETENING PROCESSES
GAS SWEETENING PROCESSESRisman Hatibi
 
Fired Heaters-Key to Efficient Operation of Refineries and Petrochemicals
Fired Heaters-Key to Efficient Operation of Refineries and PetrochemicalsFired Heaters-Key to Efficient Operation of Refineries and Petrochemicals
Fired Heaters-Key to Efficient Operation of Refineries and PetrochemicalsAshutosh Garg
 
A Brief Introduction to Boilers
A Brief Introduction to BoilersA Brief Introduction to Boilers
A Brief Introduction to BoilersSATYAKAM MOHAPATRA
 

What's hot (20)

Boiler auxillaries in a coal fired power plant
Boiler auxillaries in a coal fired power plantBoiler auxillaries in a coal fired power plant
Boiler auxillaries in a coal fired power plant
 
An introduction to Fired Heaters.pdf
An introduction to Fired Heaters.pdfAn introduction to Fired Heaters.pdf
An introduction to Fired Heaters.pdf
 
DESIGN OF AIR PRE HEATER AND ECONOMIZER
DESIGN OF AIR PRE HEATER AND ECONOMIZERDESIGN OF AIR PRE HEATER AND ECONOMIZER
DESIGN OF AIR PRE HEATER AND ECONOMIZER
 
AFBC BOILERS PERFORMANCE IMPROVEMENT
AFBC BOILERS PERFORMANCE IMPROVEMENTAFBC BOILERS PERFORMANCE IMPROVEMENT
AFBC BOILERS PERFORMANCE IMPROVEMENT
 
Boiler design-calculation 3
Boiler design-calculation 3Boiler design-calculation 3
Boiler design-calculation 3
 
Industrial fan(ID FD Fans)
Industrial fan(ID FD Fans)Industrial fan(ID FD Fans)
Industrial fan(ID FD Fans)
 
How to Improve Steam Turbine Head Rate and Increase Output
How to Improve Steam Turbine Head Rate and Increase OutputHow to Improve Steam Turbine Head Rate and Increase Output
How to Improve Steam Turbine Head Rate and Increase Output
 
Boiler efficiency by loss Method
Boiler efficiency by loss MethodBoiler efficiency by loss Method
Boiler efficiency by loss Method
 
Performance calculation for feed water heater
Performance calculation  for feed water heaterPerformance calculation  for feed water heater
Performance calculation for feed water heater
 
Economiser & air preheater
Economiser & air preheaterEconomiser & air preheater
Economiser & air preheater
 
Supercritical steam generators
Supercritical steam generatorsSupercritical steam generators
Supercritical steam generators
 
Fired Heater Operation and Trouble Shooting.pdf
Fired Heater  Operation and Trouble Shooting.pdfFired Heater  Operation and Trouble Shooting.pdf
Fired Heater Operation and Trouble Shooting.pdf
 
The Coal mill performance monitoring
The Coal mill performance monitoringThe Coal mill performance monitoring
The Coal mill performance monitoring
 
Heat rate audit in thermal power plant
Heat rate audit in thermal power plantHeat rate audit in thermal power plant
Heat rate audit in thermal power plant
 
Orsat apparatus
Orsat apparatusOrsat apparatus
Orsat apparatus
 
01 kern's method.
01 kern's method.01 kern's method.
01 kern's method.
 
Cfb boiler basic design, operation and maintenance
Cfb boiler basic design, operation and maintenanceCfb boiler basic design, operation and maintenance
Cfb boiler basic design, operation and maintenance
 
GAS SWEETENING PROCESSES
GAS SWEETENING PROCESSESGAS SWEETENING PROCESSES
GAS SWEETENING PROCESSES
 
Fired Heaters-Key to Efficient Operation of Refineries and Petrochemicals
Fired Heaters-Key to Efficient Operation of Refineries and PetrochemicalsFired Heaters-Key to Efficient Operation of Refineries and Petrochemicals
Fired Heaters-Key to Efficient Operation of Refineries and Petrochemicals
 
A Brief Introduction to Boilers
A Brief Introduction to BoilersA Brief Introduction to Boilers
A Brief Introduction to Boilers
 

Similar to Oil fired boiler | diesel fired boiler | furnace oil fired boiler | high speed diesel fired boiler | gas fired boiler | cng fired boiler | png fired boiler | natural gas fired boiler

2013 en sg_light
2013 en sg_light2013 en sg_light
2013 en sg_lightmilos639
 
Husk based power plant 6 t 32 kg fbc with single stage turbine for finance,...
Husk based power plant 6 t 32 kg fbc with single stage turbine   for finance,...Husk based power plant 6 t 32 kg fbc with single stage turbine   for finance,...
Husk based power plant 6 t 32 kg fbc with single stage turbine for finance,...Radha Krishna Sahoo
 
54666070 kiln-operation
54666070 kiln-operation54666070 kiln-operation
54666070 kiln-operationDin Sokreach
 
Improving Efficiency for Boiler and Steam System
Improving Efficiency for Boiler and Steam SystemImproving Efficiency for Boiler and Steam System
Improving Efficiency for Boiler and Steam SystemKamlesh Hariyani
 
Soot Blowing Optimization- Field Experience
Soot Blowing Optimization- Field ExperienceSoot Blowing Optimization- Field Experience
Soot Blowing Optimization- Field ExperiencePooja Agarwal
 
Thermo Tech Engineering (Tte)1
Thermo Tech Engineering (Tte)1Thermo Tech Engineering (Tte)1
Thermo Tech Engineering (Tte)1rajputdanish
 
Compact Muffle Furnace (1700 °C) by ACMAS Technologies Pvt Ltd.
Compact Muffle Furnace (1700 °C) by ACMAS Technologies Pvt Ltd.Compact Muffle Furnace (1700 °C) by ACMAS Technologies Pvt Ltd.
Compact Muffle Furnace (1700 °C) by ACMAS Technologies Pvt Ltd.Acmas Technologies Pvt. Ltd.
 
Pre-designed Steam Turbines_EN
Pre-designed Steam Turbines_ENPre-designed Steam Turbines_EN
Pre-designed Steam Turbines_ENFran Dubois
 
Brochure gas turbine sgt 300 for power generation
Brochure gas turbine sgt 300 for power generationBrochure gas turbine sgt 300 for power generation
Brochure gas turbine sgt 300 for power generationceshesol71
 
Biomass pellet stoves and boilers brochure - Docherty Group
Biomass pellet stoves and boilers brochure - Docherty GroupBiomass pellet stoves and boilers brochure - Docherty Group
Biomass pellet stoves and boilers brochure - Docherty GroupDocherty Group
 
Inplant training report
Inplant training reportInplant training report
Inplant training reportapplesam8
 
Marine incinerator-tb-ab-aqua-datasheet
Marine incinerator-tb-ab-aqua-datasheetMarine incinerator-tb-ab-aqua-datasheet
Marine incinerator-tb-ab-aqua-datasheetaddfield
 
Ingersoll Rand MT250 Microturbine Product Spec 080LTb
Ingersoll Rand MT250 Microturbine Product Spec 080LTbIngersoll Rand MT250 Microturbine Product Spec 080LTb
Ingersoll Rand MT250 Microturbine Product Spec 080LTbShaun Sullivan
 

Similar to Oil fired boiler | diesel fired boiler | furnace oil fired boiler | high speed diesel fired boiler | gas fired boiler | cng fired boiler | png fired boiler | natural gas fired boiler (20)

2013 en sg_light
2013 en sg_light2013 en sg_light
2013 en sg_light
 
Ace boilers
Ace boilersAce boilers
Ace boilers
 
Husk based power plant 6 t 32 kg fbc with single stage turbine for finance,...
Husk based power plant 6 t 32 kg fbc with single stage turbine   for finance,...Husk based power plant 6 t 32 kg fbc with single stage turbine   for finance,...
Husk based power plant 6 t 32 kg fbc with single stage turbine for finance,...
 
Kalsi industries
Kalsi industriesKalsi industries
Kalsi industries
 
54666070 kiln-operation
54666070 kiln-operation54666070 kiln-operation
54666070 kiln-operation
 
Improving Efficiency for Boiler and Steam System
Improving Efficiency for Boiler and Steam SystemImproving Efficiency for Boiler and Steam System
Improving Efficiency for Boiler and Steam System
 
temp
temptemp
temp
 
Soot Blowing Optimization- Field Experience
Soot Blowing Optimization- Field ExperienceSoot Blowing Optimization- Field Experience
Soot Blowing Optimization- Field Experience
 
Presentation On Boiler Analysis
Presentation On Boiler AnalysisPresentation On Boiler Analysis
Presentation On Boiler Analysis
 
Thermo Tech Engineering (Tte)1
Thermo Tech Engineering (Tte)1Thermo Tech Engineering (Tte)1
Thermo Tech Engineering (Tte)1
 
thermalcracking.pptx
thermalcracking.pptxthermalcracking.pptx
thermalcracking.pptx
 
Compact Muffle Furnace (1700 °C) by ACMAS Technologies Pvt Ltd.
Compact Muffle Furnace (1700 °C) by ACMAS Technologies Pvt Ltd.Compact Muffle Furnace (1700 °C) by ACMAS Technologies Pvt Ltd.
Compact Muffle Furnace (1700 °C) by ACMAS Technologies Pvt Ltd.
 
Pre-designed Steam Turbines_EN
Pre-designed Steam Turbines_ENPre-designed Steam Turbines_EN
Pre-designed Steam Turbines_EN
 
Siemens Steam Turbines 45kW-12MW
Siemens Steam Turbines 45kW-12MWSiemens Steam Turbines 45kW-12MW
Siemens Steam Turbines 45kW-12MW
 
Brochure gas turbine sgt 300 for power generation
Brochure gas turbine sgt 300 for power generationBrochure gas turbine sgt 300 for power generation
Brochure gas turbine sgt 300 for power generation
 
Biomass pellet stoves and boilers brochure - Docherty Group
Biomass pellet stoves and boilers brochure - Docherty GroupBiomass pellet stoves and boilers brochure - Docherty Group
Biomass pellet stoves and boilers brochure - Docherty Group
 
Inplant training report
Inplant training reportInplant training report
Inplant training report
 
Marine incinerator-tb-ab-aqua-datasheet
Marine incinerator-tb-ab-aqua-datasheetMarine incinerator-tb-ab-aqua-datasheet
Marine incinerator-tb-ab-aqua-datasheet
 
ntpc unchahar
ntpc unchaharntpc unchahar
ntpc unchahar
 
Ingersoll Rand MT250 Microturbine Product Spec 080LTb
Ingersoll Rand MT250 Microturbine Product Spec 080LTbIngersoll Rand MT250 Microturbine Product Spec 080LTb
Ingersoll Rand MT250 Microturbine Product Spec 080LTb
 

Recently uploaded

Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
DATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage exampleDATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage examplePragyanshuParadkar1
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
pipeline in computer architecture design
pipeline in computer architecture  designpipeline in computer architecture  design
pipeline in computer architecture designssuser87fa0c1
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 

Recently uploaded (20)

Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
DATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage exampleDATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage example
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
pipeline in computer architecture design
pipeline in computer architecture  designpipeline in computer architecture  design
pipeline in computer architecture design
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 

Oil fired boiler | diesel fired boiler | furnace oil fired boiler | high speed diesel fired boiler | gas fired boiler | cng fired boiler | png fired boiler | natural gas fired boiler

  • 1. OIL / GAS FIRED BOILER ♦ Higher Thermal Efficiency of more than 88 % on NCV with Heat recovery ♦ 3 Pass Fully Wet Back ♦ Package Skid Mounted ♦ Fully Automatic with turndown ratio of 1:4 ♦ Pressure 10.54 Kgs/cm2 to 17.5 Kgs/cm2 . OR to suit client’s requirement
  • 2. IBR OIL/GAS FIRED BOILERS 1. Fully wet-back design effectively absorbs radiant heat into the water, keeping tube ends and rear side of boiler cooler than in dry back design. 2. Three passes extract maximum usable heat from the fuel. 3. Large water-surrounded furnace assures complete combustion and heat absorption without Flame impingement. MODEL EBPL EBPL EBPL EBPL EBPL EBPL EBPL EBPL EBPL EBPL EBPL EBPL EBPL EBPL EBPL 0-I 0-II 0-III 0-IV 0-V 0-VI 0-VII 0-VIII 0-IX 0-X 0-XI 0-XII 0-XIII 0-XIV 0-XV STEAM OUTPUT TONS/HR (FROM & AT 1000 .C) 0.5 0.75 1.0 1.5 2.0 2.5 3.0 3.5 4.0 5.0 6.0 8.0 10.0 12.0 14.0 OVERALL LENGTH MTRS 3.80 4.00 4.20 4.30 4.60 5.10 5.25 5.54 5.85 6.20 7.00 8.00 8.80 9.50 9.50 OVERALL WIDTH MTRS 2.20 2.20 2.35 2.45 2.55 2.70 2.75 2.77 2.93 3.12 3.20 3.30 3.60 3.90 4.00 OVERALL HEIGHT MTRS 3.00 3.10 3.20 3.37 3.50 3.67 3.75 3.80 4.00 4.10 4.20 4.35 4.50 5.00 5.20 FLUE GAS DUCT SIZE MM 225 225 250 250 300 300 300 300 400 400 475 550 650 750 800 FURNACE OIL KGS/HR 32 48 64 96 128 160 192 224 256 320 384 512 640 768 896 NATURAL GAS NM3 /HR 36 54 72 108 114 180 216 252 288 360 432 576 720 864 1008 FUEL - Furnace Oil – 9650 Kcal/Kgs. Natural Gas – 8500 Kcal/NM3 CONSTRUCTION ENERGYPACK Boilers are three pass wet back, horizontal, smoke tube type fusion welded. Boilers are made to IBR/DIN/BS/ASME-code. Components are engineered for maximum safety, highest efficiency, dependability and quiet operation. Wet back models eliminate rear end refractory and its inherent maintenance cost, reduces stress of rear tube sheet and ligament cracking, radiant heat is eliminated, lengthening tube life and reducing heat loss from rear turnaround. Unique design features ♦ Fully automatic pressure jet Burner – Boiler furnace design suitable for Imported Weishaupt/ Reillo & Indian modulating burner. ♦ Efficiency enhancement – Optional accessories such as air preheater and economizer can be Integrated with the main unit. ♦ Automation with Programmable Logic Controllers (PLC) with Supervisory Control and Data Acquisition (SCADA) system can also be offered at an extra cost. Standard boilers are supplied with fully automatic operation with safety interlocks & alarm.
  • 3. ERECTION & MAINTENANCE “Energypack” Boilers are shop assembled and no special foundation is required. Each unit is a complete package ready for quick installation and connection for your service lines. For easy internal maintenance and cleaning, Manholes & Mudholes are well placed. Boiler tubes are easy to inspect as hinged front & back doors enable quick and easy Maintenance, inspection or cleaning. Spares are easily available. PERFORMANCE Efficiency of oil fired boiler on N.C.V. is 88% with B.S./DIN tolerance on a very wide working range and higher figures are not un-common. Steam of high purity and dryness fraction is generated as Heat Transfer surfaces in the boiler is judiciously accommodated. CUSTOMISED INSTALLATION Our boiler is tested before shipment including a complete check of controls. Energypack offer start- up adjustments to your fuel and steam load. Special training of operator is available. STEAM RAISING TIME After overnight shut down only twenty minutes are required to raise steam to maximum continuous rating From 5 Kg/cm2 to 10.54 Kg/cm2 (150 psig) in standard package smoke tube boilers. STANDARD FLOW DIAGRAM OIL/GAS FIRED BOILER
  • 4. Office : UTECH PROJECTS PVT LTD. 9/10, Dattani 5A, Shivaji Road, Kandivali (West), Mumbai - 400067. Maharashtra, India. Telefax: +91 - 22 - 28642832 / 28642833 E mail : utechprojects@gmail.com sales@utechprojects.com Website : www.utechprojects.com Registered Office & Works of Principle Manufacturer: ENERGYPACK BOILERS PVT LTD. 24-P, Baska - Uijeti Road, Village Uijeti, Taluka: Halol, Jilla, Panchamahal, Gujarat - 389350. Telefax: +91 - 02676 - 247055 / 247247 Mumbai Off No: +91 22 26854233 / 26854957 E mail : yogesh@energypackboilers.com response@energypackboilers.com Website : www.energypackboilers.com Exclusively Marketed By OTHER PRODUCTS ♦ Self Supported Chimneys. ♦ Hot water Boilers. ♦ Heat Exchangers (TEMA). ♦ Pressure Vessels (ASME). ♦ Waste Heat Boilers. ♦ Electrode Boilers. ♦ Dewaxing Autoclave Boilers. ♦ Incinerators. IBR & NON IBR STEAM BOILERS Hot Air Circulation Autoclave  Explosion Proof Control Panel  M/S ENERGYPACK BOILERS PVT LTD Self Supported Chimney