WHAT IS BHEL ? 
• BHEL stands for Bharat Heavy Electricals 
Limited. 
• It is one of the most important PSUs of our 
country. 
• It manufactures a wide range of electrical 
equipment like generators, motors, exciters 
and other power plant accessories.
• BHEL business operations cater to core sectors 
of the Indian Economy like: 
Power 
Industry 
Transportation 
Transmission 
Defence
MANUFACTURING DIVISIONS OF BHEL 
 Heavy Electrical Plant, Piplani, Bhopal 
 Electrical Machines Repair Plant (EMRP), 
Mumbai 
 Transformer Plant P.O. BHEL, Jhansi 
 Heavy Electrical Equipment Plant Ranipur, 
Haridwar 
 Central Foundry Forge Plant Ranipur, Haridwar 
 Heavy Equipment Repair Plant, Varanasi 
 Insulator Plant, Jagdishpur, Distt. Sultanpur
 Heavy Power Equipment Plant, Ramachandra 
Puram,Hyderabad 
 High Pressure Boiler Plant & Seamless Steel 
Tube Plant,Tiruchirappalli 
 Boiler Auxiliaries Plant, Indira Gandhi 
Industrial Complex, Ranipet 
 Industrial Valves Plant, Goindwal 
 Electronics Division, Bangalore 
 Component Fabrication Plant, Rudrapur 
 Piping Centre, Chennai 
 Regional Operations Division, New Delhi
BHEL HARIDWAR 
• It is divided in 2 units i.e. Heavy Electrical 
Equipment Plant (HEEP) and Central Foundry 
Forge Plant (CFFP). 
• We did our training at HEEP plant. 
• HEEP plant is divided into 8 blocks. 
• Turbo generators are manufactured at HEEP 
plant. 
• Each block manufactures different 
components of a turbo generator.
BHEL HEEP PLANT, HARIDWAR
VARIOUS BLOCKS AT HEEP 
1) Block 1 
In block 1 mainly stator, rotor shaft and exciter 
are manufactured and assembled for LSTG 
(Large Size Turbo Generators). 
2) Block 2 
In block two large size fabricated 
assemblies/components for power equipment 
are manufactured & assembled.
3) Block 3 
In block -3 steam turbines, gas turbines and turbines 
blade are manufactured and assembled. 
4) Block 4 
In block -4 winding for turbo generator, insulating 
components for turbo generator are manufactured & 
assembled. 
5) Block 5 
In block -5 fabricated parts of steam turbine are 
manufactured & assembled.
6) Block 6 
In block -6 fabricated oil tanks, hollow guide blades, 
rings, stator frames, rotor spiders are manufactured 
& assembled. 
7) Block 7 
In block -7 all types of dies including stamping dies, 
stamping for generators & motors are 
manufactured & assembled. 
8) Block 8 
In block -8 LP heaters, ejectors, steam coolers, oil 
coolers, ACG coolers, oil tanks are manufactured & 
assembled.
TYPES OF TURBO GENERATORS 
The generator may be classified based upon the 
cooling system used in the generators such as: 
THRI, TARI, THDI, THDD, THDF, THFF, THW 
 T = Turbo Generator 
 H/A/W = Hydrogen, Air, Water 
 D/F/I = Radial, Indirect, Forced 
 W = (Water) cooling media used for cooling of 
stator coil
COMPLETE TURBO GENERATOR SET 
• Stator 
• Rotor 
• Turbine 
• Exciter
STATOR OF TURBO GENERATOR 
• The stator of a turbo generator consists mainly 
of stator core and stator winding. 
• The stator winding is the armature winding. 
• When rotor rotates a 3 phase emf is induced 
in the armature winding. 
• Basically hydrogen gas may be filled inside 
stator for cooling purpose.
STATOR CORE 
• A stator core looks like:-
• The stator core has slots in it so that the stator 
winding can be housed in the stator. 
• The stator core is made up of ferromagnetic 
material so as to allow maximum amount of 
flux through it. 
• Since the flux passing through the stator is 
varying, the stator core is made up of thin 
laminations to avoid eddy current losses in the 
core.
STATOR WINDING 
• The stator has 3 phase, double layer, short 
pitched and bar type of windings having two 
parallel paths. 
• Each slot accommodates 2 bars. 
• Each bar consists of hollow as well as solid 
conductors. 
• Hollow conductors are used to make water 
flow through them for cooling purpose.
• The hollow and solid conductors are arranged 
in alternate arrangements. 
• A picture showing stator winding bars :-
TURBO GENERATOR ROTOR 
The rotor comprises of following components:- 
• Rotor shaft 
• Rotor winding 
• Rotor wedges 
• Fans 
• Field lead connections
ROTOR SHAFT 
• Turbo generators are high speed generators 
since they are used in steam and gas power 
plants. 
• Because of high speed the diameter of turbo 
generator rotor has to be less. 
• Therefore, the turbo generator rotor is of 
cylindrical type. 
• The rotor shaft is made of high quality steel so 
as to permit flow of magnetic flux through it.
• The rotor shaft is machined and slots are cut 
into the cylindrical structure for rotor winding. 
• For better accuracy and flawless machining, 
Computerised Numeric Control (CNC) lathe 
machines were being used for cutting, boring, 
etc.
A ROTOR SHAFT
A CNC LATHE MACHINE
ROTOR WINDING 
• Slots are cut into the cylindrical rotor along 
the axis for placing rotor winding. 
• The rotor winding is excited by dc supply from 
an exciter. 
• The rotor is cooled by the hydrogen gas filled 
in the stator. 
• Field connections are taken out from the rotor 
to supply dc.
TURBINES 
The various types of turbines are :- 
• High speed turbines 
• Low speed turbines 
• Intermediate speed turbines 
A turbine is connected to the rotor shaft of the 
generator. When highly pressurized steam/gas 
falls on the turbine, it rotates. This makes the 
rotor to rotate and emf is induced in stator 
windings.
A LOW SPEED TURBINE
A HIGH SPEED TURBINE
EXCITER 
• An exciter is a dc generator which is used to 
provide dc supply to the field winding of the 
rotor. 
• The exciter is connected to the rotor shaft and 
rotates with the rotor. 
• An ac generator may also be used as an exciter 
and in that case the output of the exciter is 
first rectified and then given to the field 
winding of the rotor.
AN EXCITER
CONCLUSION 
• BHEL has now started manufacturing Large 
Size Turbo Generators (LSTG) of capacity as 
large as 800MW and this company has been 
earning profits since its inception. It has been 
a fruitful experience to undergo training 
program at BHEL Haridwar and it has truly 
made me aware to the work environment of 
the industry.
Training at BHEL Haridwar

More Related Content

What's hot

PROJECT REPORT ON BHEL BHOPAL FOR MECHANICAL
PROJECT REPORT ON BHEL BHOPAL FOR MECHANICALPROJECT REPORT ON BHEL BHOPAL FOR MECHANICAL
PROJECT REPORT ON BHEL BHOPAL FOR MECHANICAL
Rohitsen21
 
Bhel haridwar vocational training report block 1
Bhel haridwar vocational training report block 1Bhel haridwar vocational training report block 1
Bhel haridwar vocational training report block 1
khemraj298
 
BHEL Vocational training report Haridwar
BHEL Vocational training report HaridwarBHEL Vocational training report Haridwar
BHEL Vocational training report Haridwar
Ishant Gautam.
 
BHEL summer internship report
BHEL summer internship reportBHEL summer internship report
BHEL summer internship report
Shivam Teotia
 
Bhel training report
Bhel training reportBhel training report
Bhel training report
k,l polytechnic roorkee
 
Training report on Steam Turbine Manufacturing at BHEL Bhopal
Training report on Steam Turbine Manufacturing at BHEL BhopalTraining report on Steam Turbine Manufacturing at BHEL Bhopal
Training report on Steam Turbine Manufacturing at BHEL Bhopal
Abhishek .
 
bhel report file on turbine shop & blade
 bhel report file on turbine shop & blade bhel report file on turbine shop & blade
bhel report file on turbine shop & blade
ABHISHEK SINGH
 
Report on water turbine manufacturing
Report on water turbine manufacturingReport on water turbine manufacturing
Report on water turbine manufacturing
Shubham Rai
 
BHEL summer training report on ROLE OF CNC MACHINE IN MANUFACTURING OF 500/60...
BHEL summer training report on ROLE OF CNC MACHINE IN MANUFACTURING OF 500/60...BHEL summer training report on ROLE OF CNC MACHINE IN MANUFACTURING OF 500/60...
BHEL summer training report on ROLE OF CNC MACHINE IN MANUFACTURING OF 500/60...Nawneet Thakur
 
Bhel(HERP),Varanasi
Bhel(HERP),VaranasiBhel(HERP),Varanasi
Bhel(HERP),Varanasi
Prince Dubey
 
Report on Steamt Turbines, BHEL HYDERABAD.
Report on Steamt Turbines, BHEL HYDERABAD.Report on Steamt Turbines, BHEL HYDERABAD.
Report on Steamt Turbines, BHEL HYDERABAD.
Viswanath Raju Indukuri
 
BHEL Final Report
BHEL Final ReportBHEL Final Report
BHEL Final Report
Bharti Airtel Ltd.
 
Bhel report nikhil
Bhel  report nikhilBhel  report nikhil
Bhel report nikhil
NikhilkumarDeshmukh
 
BHEL Trainning Report
BHEL Trainning ReportBHEL Trainning Report
BHEL Trainning Report
Pradip Goswami
 
Bhel vocational training report_1301
Bhel vocational training report_1301Bhel vocational training report_1301
Bhel vocational training report_1301
Shubham Yadav
 
PPT on summer training BHEL BHOPAL by Chetan Sahu
PPT on summer training BHEL BHOPAL by Chetan SahuPPT on summer training BHEL BHOPAL by Chetan Sahu
PPT on summer training BHEL BHOPAL by Chetan Sahu
Chetan Sahu
 
BHEL PPT
BHEL PPTBHEL PPT
BHEL PPT
BHEL PPTBHEL PPT
BHEL Vocational Training
BHEL Vocational TrainingBHEL Vocational Training
BHEL Vocational TrainingRehan Fazal
 
Industrial training report of NTPC
Industrial training report of NTPC Industrial training report of NTPC
Industrial training report of NTPC
Shivam Singh
 

What's hot (20)

PROJECT REPORT ON BHEL BHOPAL FOR MECHANICAL
PROJECT REPORT ON BHEL BHOPAL FOR MECHANICALPROJECT REPORT ON BHEL BHOPAL FOR MECHANICAL
PROJECT REPORT ON BHEL BHOPAL FOR MECHANICAL
 
Bhel haridwar vocational training report block 1
Bhel haridwar vocational training report block 1Bhel haridwar vocational training report block 1
Bhel haridwar vocational training report block 1
 
BHEL Vocational training report Haridwar
BHEL Vocational training report HaridwarBHEL Vocational training report Haridwar
BHEL Vocational training report Haridwar
 
BHEL summer internship report
BHEL summer internship reportBHEL summer internship report
BHEL summer internship report
 
Bhel training report
Bhel training reportBhel training report
Bhel training report
 
Training report on Steam Turbine Manufacturing at BHEL Bhopal
Training report on Steam Turbine Manufacturing at BHEL BhopalTraining report on Steam Turbine Manufacturing at BHEL Bhopal
Training report on Steam Turbine Manufacturing at BHEL Bhopal
 
bhel report file on turbine shop & blade
 bhel report file on turbine shop & blade bhel report file on turbine shop & blade
bhel report file on turbine shop & blade
 
Report on water turbine manufacturing
Report on water turbine manufacturingReport on water turbine manufacturing
Report on water turbine manufacturing
 
BHEL summer training report on ROLE OF CNC MACHINE IN MANUFACTURING OF 500/60...
BHEL summer training report on ROLE OF CNC MACHINE IN MANUFACTURING OF 500/60...BHEL summer training report on ROLE OF CNC MACHINE IN MANUFACTURING OF 500/60...
BHEL summer training report on ROLE OF CNC MACHINE IN MANUFACTURING OF 500/60...
 
Bhel(HERP),Varanasi
Bhel(HERP),VaranasiBhel(HERP),Varanasi
Bhel(HERP),Varanasi
 
Report on Steamt Turbines, BHEL HYDERABAD.
Report on Steamt Turbines, BHEL HYDERABAD.Report on Steamt Turbines, BHEL HYDERABAD.
Report on Steamt Turbines, BHEL HYDERABAD.
 
BHEL Final Report
BHEL Final ReportBHEL Final Report
BHEL Final Report
 
Bhel report nikhil
Bhel  report nikhilBhel  report nikhil
Bhel report nikhil
 
BHEL Trainning Report
BHEL Trainning ReportBHEL Trainning Report
BHEL Trainning Report
 
Bhel vocational training report_1301
Bhel vocational training report_1301Bhel vocational training report_1301
Bhel vocational training report_1301
 
PPT on summer training BHEL BHOPAL by Chetan Sahu
PPT on summer training BHEL BHOPAL by Chetan SahuPPT on summer training BHEL BHOPAL by Chetan Sahu
PPT on summer training BHEL BHOPAL by Chetan Sahu
 
BHEL PPT
BHEL PPTBHEL PPT
BHEL PPT
 
BHEL PPT
BHEL PPTBHEL PPT
BHEL PPT
 
BHEL Vocational Training
BHEL Vocational TrainingBHEL Vocational Training
BHEL Vocational Training
 
Industrial training report of NTPC
Industrial training report of NTPC Industrial training report of NTPC
Industrial training report of NTPC
 

Similar to Training at BHEL Haridwar

Bhel,hardwar PPT by M R MEENA
Bhel,hardwar PPT by M R MEENA Bhel,hardwar PPT by M R MEENA
Bhel,hardwar PPT by M R MEENA
Manraj Meena
 
bhel haridwr training ppt k-10655
bhel haridwr training ppt k-10655bhel haridwr training ppt k-10655
bhel haridwr training ppt k-10655
Hariom Rathore
 
ESP Overview .pdf
ESP Overview .pdfESP Overview .pdf
ESP Overview .pdf
Hari Prasetyo Utomo
 
Generator Baisc Construction.pptx
Generator Baisc Construction.pptxGenerator Baisc Construction.pptx
Generator Baisc Construction.pptx
SunnyBhardwaj32
 
BHELppt
BHELpptBHELppt
BHELppt
Kamal Tiwari
 
Harshit agarwal
Harshit agarwalHarshit agarwal
Harshit agarwal
IIT Roorkee
 
Bhel ppt
Bhel pptBhel ppt
Bhel ppt
S PARVEEN SINGH
 
Manufacturing process of TURBO GENERATOR
Manufacturing process of TURBO GENERATORManufacturing process of TURBO GENERATOR
Manufacturing process of TURBO GENERATOR
VinitMP
 
Traction machine shed
Traction machine shedTraction machine shed
Traction machine shed
Neeraj Kumar
 
BHEL steam turbine manufacturing
BHEL steam turbine manufacturingBHEL steam turbine manufacturing
BHEL steam turbine manufacturing
Sakshyam Rai
 
Presentation (BHEL)
Presentation (BHEL)Presentation (BHEL)
Presentation (BHEL)
Akanksha Gupta
 
practical training report on turbogenerator
practical training report on turbogeneratorpractical training report on turbogenerator
practical training report on turbogenerator
Priyank Bisht
 
btp.ppt
btp.pptbtp.ppt
Vocational training at mejia thermal power plant
Vocational training at mejia thermal power plantVocational training at mejia thermal power plant
Vocational training at mejia thermal power plant
Nipak Banerjee
 
Bhel training ppt_v[1] at bawana
Bhel training ppt_v[1] at bawanaBhel training ppt_v[1] at bawana
Bhel training ppt_v[1] at bawana
VisheshKumar55
 
Bhel steam turbine manufacturing
Bhel steam turbine manufacturingBhel steam turbine manufacturing
Bhel steam turbine manufacturing
Home
 
Industrial training ppt bhel bhopal
Industrial training ppt bhel bhopalIndustrial training ppt bhel bhopal
Industrial training ppt bhel bhopal
PRAVEENKUMARSINGH87
 
Bhel vocational training
Bhel vocational trainingBhel vocational training
Bhel vocational trainingRajeev Kumar
 
IPGCL/PPCL Training presentation
IPGCL/PPCL Training presentationIPGCL/PPCL Training presentation
IPGCL/PPCL Training presentation
Shubhra Dhyani
 

Similar to Training at BHEL Haridwar (20)

Bhel,hardwar PPT by M R MEENA
Bhel,hardwar PPT by M R MEENA Bhel,hardwar PPT by M R MEENA
Bhel,hardwar PPT by M R MEENA
 
bhel haridwr training ppt k-10655
bhel haridwr training ppt k-10655bhel haridwr training ppt k-10655
bhel haridwr training ppt k-10655
 
ESP Overview .pdf
ESP Overview .pdfESP Overview .pdf
ESP Overview .pdf
 
Generator Baisc Construction.pptx
Generator Baisc Construction.pptxGenerator Baisc Construction.pptx
Generator Baisc Construction.pptx
 
BHELppt
BHELpptBHELppt
BHELppt
 
Harshit agarwal
Harshit agarwalHarshit agarwal
Harshit agarwal
 
Bhel ppt
Bhel pptBhel ppt
Bhel ppt
 
Manufacturing process of TURBO GENERATOR
Manufacturing process of TURBO GENERATORManufacturing process of TURBO GENERATOR
Manufacturing process of TURBO GENERATOR
 
Traction machine shed
Traction machine shedTraction machine shed
Traction machine shed
 
BHEL steam turbine manufacturing
BHEL steam turbine manufacturingBHEL steam turbine manufacturing
BHEL steam turbine manufacturing
 
Presentation (BHEL)
Presentation (BHEL)Presentation (BHEL)
Presentation (BHEL)
 
GenDesign
GenDesignGenDesign
GenDesign
 
practical training report on turbogenerator
practical training report on turbogeneratorpractical training report on turbogenerator
practical training report on turbogenerator
 
btp.ppt
btp.pptbtp.ppt
btp.ppt
 
Vocational training at mejia thermal power plant
Vocational training at mejia thermal power plantVocational training at mejia thermal power plant
Vocational training at mejia thermal power plant
 
Bhel training ppt_v[1] at bawana
Bhel training ppt_v[1] at bawanaBhel training ppt_v[1] at bawana
Bhel training ppt_v[1] at bawana
 
Bhel steam turbine manufacturing
Bhel steam turbine manufacturingBhel steam turbine manufacturing
Bhel steam turbine manufacturing
 
Industrial training ppt bhel bhopal
Industrial training ppt bhel bhopalIndustrial training ppt bhel bhopal
Industrial training ppt bhel bhopal
 
Bhel vocational training
Bhel vocational trainingBhel vocational training
Bhel vocational training
 
IPGCL/PPCL Training presentation
IPGCL/PPCL Training presentationIPGCL/PPCL Training presentation
IPGCL/PPCL Training presentation
 

Recently uploaded

一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
ssuser36d3051
 
Water billing management system project report.pdf
Water billing management system project report.pdfWater billing management system project report.pdf
Water billing management system project report.pdf
Kamal Acharya
 
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
dxobcob
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
Rahul
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
gestioneergodomus
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 
Online aptitude test management system project report.pdf
Online aptitude test management system project report.pdfOnline aptitude test management system project report.pdf
Online aptitude test management system project report.pdf
Kamal Acharya
 
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.pptPROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
bhadouriyakaku
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
yokeleetan1
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
nooriasukmaningtyas
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
anoopmanoharan2
 
Fundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptxFundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptx
manasideore6
 
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
ssuser7dcef0
 
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
Mukeshwaran Balu
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
bank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdfbank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdf
Divyam548318
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
Dr Ramhari Poudyal
 

Recently uploaded (20)

一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
 
Water billing management system project report.pdf
Water billing management system project report.pdfWater billing management system project report.pdf
Water billing management system project report.pdf
 
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 
Online aptitude test management system project report.pdf
Online aptitude test management system project report.pdfOnline aptitude test management system project report.pdf
Online aptitude test management system project report.pdf
 
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.pptPROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
 
Fundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptxFundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptx
 
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
 
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
bank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdfbank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdf
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
 

Training at BHEL Haridwar

  • 1. A PPT ON TRAINING DONE AT BHEL HARIDWAR SUBMITTED TO : PROF. NARAYAN RAM PATEL SUBMITTED BY: DEEPAK SINGH 11EJIEE015 7th SEM
  • 2. WHAT IS BHEL ? • BHEL stands for Bharat Heavy Electricals Limited. • It is one of the most important PSUs of our country. • It manufactures a wide range of electrical equipment like generators, motors, exciters and other power plant accessories.
  • 3. • BHEL business operations cater to core sectors of the Indian Economy like: Power Industry Transportation Transmission Defence
  • 4. MANUFACTURING DIVISIONS OF BHEL  Heavy Electrical Plant, Piplani, Bhopal  Electrical Machines Repair Plant (EMRP), Mumbai  Transformer Plant P.O. BHEL, Jhansi  Heavy Electrical Equipment Plant Ranipur, Haridwar  Central Foundry Forge Plant Ranipur, Haridwar  Heavy Equipment Repair Plant, Varanasi  Insulator Plant, Jagdishpur, Distt. Sultanpur
  • 5.  Heavy Power Equipment Plant, Ramachandra Puram,Hyderabad  High Pressure Boiler Plant & Seamless Steel Tube Plant,Tiruchirappalli  Boiler Auxiliaries Plant, Indira Gandhi Industrial Complex, Ranipet  Industrial Valves Plant, Goindwal  Electronics Division, Bangalore  Component Fabrication Plant, Rudrapur  Piping Centre, Chennai  Regional Operations Division, New Delhi
  • 6. BHEL HARIDWAR • It is divided in 2 units i.e. Heavy Electrical Equipment Plant (HEEP) and Central Foundry Forge Plant (CFFP). • We did our training at HEEP plant. • HEEP plant is divided into 8 blocks. • Turbo generators are manufactured at HEEP plant. • Each block manufactures different components of a turbo generator.
  • 7. BHEL HEEP PLANT, HARIDWAR
  • 8. VARIOUS BLOCKS AT HEEP 1) Block 1 In block 1 mainly stator, rotor shaft and exciter are manufactured and assembled for LSTG (Large Size Turbo Generators). 2) Block 2 In block two large size fabricated assemblies/components for power equipment are manufactured & assembled.
  • 9. 3) Block 3 In block -3 steam turbines, gas turbines and turbines blade are manufactured and assembled. 4) Block 4 In block -4 winding for turbo generator, insulating components for turbo generator are manufactured & assembled. 5) Block 5 In block -5 fabricated parts of steam turbine are manufactured & assembled.
  • 10. 6) Block 6 In block -6 fabricated oil tanks, hollow guide blades, rings, stator frames, rotor spiders are manufactured & assembled. 7) Block 7 In block -7 all types of dies including stamping dies, stamping for generators & motors are manufactured & assembled. 8) Block 8 In block -8 LP heaters, ejectors, steam coolers, oil coolers, ACG coolers, oil tanks are manufactured & assembled.
  • 11. TYPES OF TURBO GENERATORS The generator may be classified based upon the cooling system used in the generators such as: THRI, TARI, THDI, THDD, THDF, THFF, THW  T = Turbo Generator  H/A/W = Hydrogen, Air, Water  D/F/I = Radial, Indirect, Forced  W = (Water) cooling media used for cooling of stator coil
  • 12. COMPLETE TURBO GENERATOR SET • Stator • Rotor • Turbine • Exciter
  • 13. STATOR OF TURBO GENERATOR • The stator of a turbo generator consists mainly of stator core and stator winding. • The stator winding is the armature winding. • When rotor rotates a 3 phase emf is induced in the armature winding. • Basically hydrogen gas may be filled inside stator for cooling purpose.
  • 14. STATOR CORE • A stator core looks like:-
  • 15. • The stator core has slots in it so that the stator winding can be housed in the stator. • The stator core is made up of ferromagnetic material so as to allow maximum amount of flux through it. • Since the flux passing through the stator is varying, the stator core is made up of thin laminations to avoid eddy current losses in the core.
  • 16. STATOR WINDING • The stator has 3 phase, double layer, short pitched and bar type of windings having two parallel paths. • Each slot accommodates 2 bars. • Each bar consists of hollow as well as solid conductors. • Hollow conductors are used to make water flow through them for cooling purpose.
  • 17. • The hollow and solid conductors are arranged in alternate arrangements. • A picture showing stator winding bars :-
  • 18. TURBO GENERATOR ROTOR The rotor comprises of following components:- • Rotor shaft • Rotor winding • Rotor wedges • Fans • Field lead connections
  • 19. ROTOR SHAFT • Turbo generators are high speed generators since they are used in steam and gas power plants. • Because of high speed the diameter of turbo generator rotor has to be less. • Therefore, the turbo generator rotor is of cylindrical type. • The rotor shaft is made of high quality steel so as to permit flow of magnetic flux through it.
  • 20. • The rotor shaft is machined and slots are cut into the cylindrical structure for rotor winding. • For better accuracy and flawless machining, Computerised Numeric Control (CNC) lathe machines were being used for cutting, boring, etc.
  • 22. A CNC LATHE MACHINE
  • 23. ROTOR WINDING • Slots are cut into the cylindrical rotor along the axis for placing rotor winding. • The rotor winding is excited by dc supply from an exciter. • The rotor is cooled by the hydrogen gas filled in the stator. • Field connections are taken out from the rotor to supply dc.
  • 24. TURBINES The various types of turbines are :- • High speed turbines • Low speed turbines • Intermediate speed turbines A turbine is connected to the rotor shaft of the generator. When highly pressurized steam/gas falls on the turbine, it rotates. This makes the rotor to rotate and emf is induced in stator windings.
  • 25. A LOW SPEED TURBINE
  • 26. A HIGH SPEED TURBINE
  • 27. EXCITER • An exciter is a dc generator which is used to provide dc supply to the field winding of the rotor. • The exciter is connected to the rotor shaft and rotates with the rotor. • An ac generator may also be used as an exciter and in that case the output of the exciter is first rectified and then given to the field winding of the rotor.
  • 29. CONCLUSION • BHEL has now started manufacturing Large Size Turbo Generators (LSTG) of capacity as large as 800MW and this company has been earning profits since its inception. It has been a fruitful experience to undergo training program at BHEL Haridwar and it has truly made me aware to the work environment of the industry.