NEC4 overview: key changes and impacts - London, September 2017Browne Jacobson LLP
This seminar looked at the changes to the NEC structrure, changes in approach following the change to the structure, and the introduction of two new contracts to the suite.
Planning and Project Controls under NEC4 – the choice isn’t yours! by "Glenn ...Project Controls Expo
Planning and Project Controls under NEC4 – the choice isn’t yours! by Glenn Hide - Director for GMH Planning Ltd, UK
Hezron Ricketts - Senior Manager, Senior Counsel to the Board for Th3rd Curve, UK at at Project Controls Expo 2017, Arsenal Stadium, London
NEC4 overview: key changes and impacts - Nottingham, September 2017Browne Jacobson LLP
This seminar looked at changes to the NEC structure, changes in approach following the change to the structure, and the introduction of two new contracts to the suite.
NEC4 overview: key changes and impacts - London, September 2017Browne Jacobson LLP
This seminar looked at the changes to the NEC structrure, changes in approach following the change to the structure, and the introduction of two new contracts to the suite.
Planning and Project Controls under NEC4 – the choice isn’t yours! by "Glenn ...Project Controls Expo
Planning and Project Controls under NEC4 – the choice isn’t yours! by Glenn Hide - Director for GMH Planning Ltd, UK
Hezron Ricketts - Senior Manager, Senior Counsel to the Board for Th3rd Curve, UK at at Project Controls Expo 2017, Arsenal Stadium, London
NEC4 overview: key changes and impacts - Nottingham, September 2017Browne Jacobson LLP
This seminar looked at changes to the NEC structure, changes in approach following the change to the structure, and the introduction of two new contracts to the suite.
Planning and development club providing a construction law update, an overview of the housing white paper and advice on wayleaves, easements and substation transfers.
NEC4 overview: key changes and impacts - Birmingham, September 2017Browne Jacobson LLP
This seminar looked at changes to the NEC structure, changes in approach following the change to the structure, and the introduction of two new contracts to the suite.
This was a presentation delivered by Robert Langley, partner and head of the construction and engineering team at Muckle LLP, on Tuesday 7th October. The event was organised and hosted by the APM North East branch and was entitled 'Project contracts and how they support collaborative working'. It was held at the Radisson Blu hotel in Durham.
Recent UK court judgments shed light on the application and interpretation of some of the NEC3 ECC and PSC clauses. Hong Kong has adopted the NEC3 contract for almost a decade. Users should be aroused of their contractual rights and potential pitfalls to avoid disputes.
An APM webinar sponsored by the Thames Valley Branch on 20 July 2021.
NEC contracts have better and more proscriptive requirements for programme than any other contract. Known as 'the beating heart' of the NEC, the programme is critical for day to day management and for the assessment of compensation events. This session will give you the details.
Speaker: Richard Patterson, NEC4 drafter and Procurement & NEC Specialist at Mott MacDonald
Richard is a chartered civil engineer, Fellow of the Institution of Civil Engineers (FICE) and procurement and NEC specialist with global development, engineering and management consultant, Mott MacDonald.
Richard was part of the drafting team for NEC4.
Richard advised on possibly Mott’s first use of the NEC when he moved to their contracts/procurement team in 1996 and has worked with the NEC ever since. He advises Motts teams and their clients on NEC in all sectors including the Halley VI research station on the Antarctic, Transnet in South Africa and the Jumeriah Golf Estates in Dubai. In Hong Kong, he has supported the Mott MacDonald’s Hong Kong team on its commissions, advising various departments of the Government of Hong Kong first on their trial projects using NEC, and is happy now to see NEC as ‘business as usual’ in Hong Kong.
Through Mott MacDonald, Richard delivers in-house and client training and training for NEC Training, including the four day ECC Project Manager accreditation course.
Richard has contributed to two NEC books, had seven NEC papers published in ICE’s Proceedings and sat on the Editorial Advisory Panel of the ICE’s journal, Management, Procurement and Law. He is a also a frequent contributor to the NEC website and newsletter (34 articles at the last count) . Most of his articles are linked from his Linked-in page.
https://www.apm.org.uk/news/nec-contracts-programmes-under-ecc-and-psc-webinar/
https://youtu.be/_lymxkMz7Kc
APM webinar held on 24 November 2021, sponsored by the Thames Valley branch.
A summary of the key changes from NEC3 to NEC4 as issued in 2017. Focuses on the ECC but many of the changes are rolled out across the other contracts. We also looked at the key payment changes in PSC4.
Speaker: Richard Patterson, NEC4 drafter and Procurement & NEC Specialist at Mott MacDonald
https://www.apm.org.uk/news/nec3-to-nec4-webinar/
https://youtu.be/hGJKYh1iXYg
Training Slides of Extension of Time (EOT) & Related Costs in Construction, in fullfillment of Delay Claim Expert.
Some Key-Points:
- Contentious Issues in Delay Analysis
- The SLC Protocol
For further information regarding the course, please contact:
info@asia-masters.com
www.asia-masters.com
Project Controls Expo 18th Nov 2014 - "PACING DELAY The Practical Effect on C...Project Controls Expo
This paper is focused on pacing delay, a controversial delay issue in the construction industry. Currently there is little literature on pacing delay and case law is a bit sparse. Thus, owners and contractors often find themselves at odds with one another over the practical effect of pacing delay in a delay claim situation. This paper defines the term; identifies what constitutes pacing delay; and sets forth the contractor’s legal right to pace an owner caused delay and addresses the practical impact of a pacing delay, both to the project as well as to a delay claim. This paper is intended to assist in a better understanding of pacing delay and how the issue may be dealt with by both owners and contractors.
Advanced training for construction management: CONTRACTS MANAGEMENT part 2 (...Antonio Coladarce
PART 2 is dedicated to an experiences section of CONTRACTS MANAGEMENT (active and passive contracts, i.e. those with final customers and with subcontractors, respectively).
Presentation is prepared for an advanced course dedicated to Construction Management, refer to PART 1 also. There is a lesson for both parts not fully translated in English (course was for Italian speaking Construction Engineers, Managers and Site Mnagers)
Planning and development club providing a construction law update, an overview of the housing white paper and advice on wayleaves, easements and substation transfers.
NEC4 overview: key changes and impacts - Birmingham, September 2017Browne Jacobson LLP
This seminar looked at changes to the NEC structure, changes in approach following the change to the structure, and the introduction of two new contracts to the suite.
This was a presentation delivered by Robert Langley, partner and head of the construction and engineering team at Muckle LLP, on Tuesday 7th October. The event was organised and hosted by the APM North East branch and was entitled 'Project contracts and how they support collaborative working'. It was held at the Radisson Blu hotel in Durham.
Recent UK court judgments shed light on the application and interpretation of some of the NEC3 ECC and PSC clauses. Hong Kong has adopted the NEC3 contract for almost a decade. Users should be aroused of their contractual rights and potential pitfalls to avoid disputes.
An APM webinar sponsored by the Thames Valley Branch on 20 July 2021.
NEC contracts have better and more proscriptive requirements for programme than any other contract. Known as 'the beating heart' of the NEC, the programme is critical for day to day management and for the assessment of compensation events. This session will give you the details.
Speaker: Richard Patterson, NEC4 drafter and Procurement & NEC Specialist at Mott MacDonald
Richard is a chartered civil engineer, Fellow of the Institution of Civil Engineers (FICE) and procurement and NEC specialist with global development, engineering and management consultant, Mott MacDonald.
Richard was part of the drafting team for NEC4.
Richard advised on possibly Mott’s first use of the NEC when he moved to their contracts/procurement team in 1996 and has worked with the NEC ever since. He advises Motts teams and their clients on NEC in all sectors including the Halley VI research station on the Antarctic, Transnet in South Africa and the Jumeriah Golf Estates in Dubai. In Hong Kong, he has supported the Mott MacDonald’s Hong Kong team on its commissions, advising various departments of the Government of Hong Kong first on their trial projects using NEC, and is happy now to see NEC as ‘business as usual’ in Hong Kong.
Through Mott MacDonald, Richard delivers in-house and client training and training for NEC Training, including the four day ECC Project Manager accreditation course.
Richard has contributed to two NEC books, had seven NEC papers published in ICE’s Proceedings and sat on the Editorial Advisory Panel of the ICE’s journal, Management, Procurement and Law. He is a also a frequent contributor to the NEC website and newsletter (34 articles at the last count) . Most of his articles are linked from his Linked-in page.
https://www.apm.org.uk/news/nec-contracts-programmes-under-ecc-and-psc-webinar/
https://youtu.be/_lymxkMz7Kc
APM webinar held on 24 November 2021, sponsored by the Thames Valley branch.
A summary of the key changes from NEC3 to NEC4 as issued in 2017. Focuses on the ECC but many of the changes are rolled out across the other contracts. We also looked at the key payment changes in PSC4.
Speaker: Richard Patterson, NEC4 drafter and Procurement & NEC Specialist at Mott MacDonald
https://www.apm.org.uk/news/nec3-to-nec4-webinar/
https://youtu.be/hGJKYh1iXYg
Training Slides of Extension of Time (EOT) & Related Costs in Construction, in fullfillment of Delay Claim Expert.
Some Key-Points:
- Contentious Issues in Delay Analysis
- The SLC Protocol
For further information regarding the course, please contact:
info@asia-masters.com
www.asia-masters.com
Project Controls Expo 18th Nov 2014 - "PACING DELAY The Practical Effect on C...Project Controls Expo
This paper is focused on pacing delay, a controversial delay issue in the construction industry. Currently there is little literature on pacing delay and case law is a bit sparse. Thus, owners and contractors often find themselves at odds with one another over the practical effect of pacing delay in a delay claim situation. This paper defines the term; identifies what constitutes pacing delay; and sets forth the contractor’s legal right to pace an owner caused delay and addresses the practical impact of a pacing delay, both to the project as well as to a delay claim. This paper is intended to assist in a better understanding of pacing delay and how the issue may be dealt with by both owners and contractors.
Advanced training for construction management: CONTRACTS MANAGEMENT part 2 (...Antonio Coladarce
PART 2 is dedicated to an experiences section of CONTRACTS MANAGEMENT (active and passive contracts, i.e. those with final customers and with subcontractors, respectively).
Presentation is prepared for an advanced course dedicated to Construction Management, refer to PART 1 also. There is a lesson for both parts not fully translated in English (course was for Italian speaking Construction Engineers, Managers and Site Mnagers)
Session W2 - Delay Claims and Analysis Based on FIDIC Forms of Contract
Similar to NEC4: Evolution of the ECC by "Ben Walker - NEC4 Contract Drafter, CEO for CEMAR, UK" at Project Controls Expo 2017, Arsenal Stadium, London
APM webinar sponsored by the Thames Valley Branch on 23 September 2022
Speaker: Richard Patterson, NEC4 drafter and Procurement & NEC Specialist at Mott MacDonald
A 'Framework' is a contract to let contracts. The NEC Framework Contract is a contract for suppliers under which the Client can let specific 'call off' contracts to those suppliers using any of the standard NEC contracts. This webinar was held on 23 September 2022.
The session covered how the NEC Framework contract is put together and used.
https://www.apm.org.uk/news/nec-framework-contract-webinar/
https://youtu.be/l7eRQdplJxs
Training Slides of An Overview of the FIDIC FORMS OF CONTRACTand Contracts Committee Activities .
For further information regarding the course, please contact:
info@asia-masters.com
www.asia-masters.com
Banking Industry Whitepaper: Implications of the Lease Accounting Changesjmeedzan
Banking Industry Whitepaper: This whitepaper presents the most important elements and implications of the Revised FASB and IASB Lease Accounting Change Exposure Draft at a high level to provide the reader with a basic understanding of the proposed lease accounting changes and the potential impact to banks as both a lender and a lessee. In the introductory pages we will review the background and details around the proposed changes to give the reader a historical recap over the past few years. We will then review how we see the proposed lease changes impacting the Banking industry.
A thorough analysis of FIDIC and it implication on COnstruction industry explained in this presentation for the beginners. It has been broken down to simplified version
Similar to NEC4: Evolution of the ECC by "Ben Walker - NEC4 Contract Drafter, CEO for CEMAR, UK" at Project Controls Expo 2017, Arsenal Stadium, London (20)
National Grids Project Controls Journey – past, present and futureProject Controls Expo
National Grids Project Controls Journey – past, present and future By, Tim Fenemore - Head of Project Controls for National Grid, UK
Sanjay Lodhia - Head of Governance & Assurance for National Grid, UK
Tony Abiad - Head of Estimating & Cost for National Grid, UK
Balancing burdens of proof in dispute avoidance and resolution by "Ari Isaacs...Project Controls Expo
Balancing burdens of proof in dispute avoidance and resolution by "Ari Isaacs - Founder and CEO for ShapeDo, Israel" at Project Controls Expo 2017, Arsenal Stadium, London
Managing Changes on a Capital Programme by "Iain Cameron - Technical Director...Project Controls Expo
Managing Changes on a Capital Programme by "Iain Cameron - Technical Director for LogiKal Projects, UK" at Project Controls Expo 2017, Arsenal Stadium, London
Managing the risk of change by "Simon White - Risk Management Consultant for ...Project Controls Expo
Managing the risk of change by "Simon White - Risk Management Consultant for Trigo White Ltd, UK" at Project Controls Expo 2017, Arsenal Stadium, London
Economic Value Chains - costing the impact of risk by "Colin Sandall - Senior...Project Controls Expo
Economic Value Chains - costing the impact of risk by "Colin Sandall - Senior Consultant for QinetiQ, UK" & "Peter Tart - Senior Consultant for QinetiQ, UK at Project Controls Expo 2017, Arsenal Stadium, London
What makes a good plan, and how do you know you’ve got one? by "Paul Kidston ...Project Controls Expo
What makes a good plan, and how do you know you’ve got one? by "Paul Kidston - Director of Project Controls for Costain Group PLC, UK" at Project Controls Expo 2017, Arsenal Stadium, London
Next Generation Planning for Mega Projects by "Dr. Dan Patterson - CEO and Fo...Project Controls Expo
Next Generation Planning for Mega Projects by "Dr. Dan Patterson - CEO and Founder for Basis PM, Texas, USA" at Project Controls Expo 2017, Arsenal Stadium, London
Governance: An Enabler? by " Ian Beaumont - Delivery Partner Programme Direc...Project Controls Expo
Governance: An Enabler? by " Ian Beaumont - Delivery Partner Programme Director for WSP, UK" & "Danny Vaughan - Head of Metrolink for TfGM, UK" at Project Controls Expo 2017, Arsenal Stadium, London
Governance and the art of decision making on Crossrail by "Walter Macharg - H...Project Controls Expo
Governance and the art of decision making on Crossrail by "Walter Macharg - Head of Change Control and Cost Assurance for Crossrail, UK" at Project Controls Expo 2017, Arsenal Stadium, London
Adding Value through the Lower Thames Crossing project by "Iain Minns - Partn...Project Controls Expo
Adding Value through the Lower Thames Crossing project by "Iain Minns - Partner, UK Head of Programme & Project Controls for Arcadis, UK" at Project Controls Expo 2017, Arsenal Stadium, London
Governance and Assurance for Nationally Significant Infrastructure Projects b...Project Controls Expo
Governance and Assurance for Nationally Significant Infrastructure Projects by "Terri Harrington"- Sponsorship Director - Complex Infrastructure Programme (CIP) for Highways England, UK at Project Controls Expo 2017, Arsenal Stadium, London
A review of whether interdependency exists in effective Project Control Metho...Project Controls Expo
A review of whether interdependency exists in effective Project Control Methods and project performance by "Michael Halliday" Director for HKA, UK at Project Controls Expo 2017, Arsenal Stadium, London
A Source of Project Cost Integration by "David Hurren - Technical Director fo...Project Controls Expo
A Source of Project Cost Integration by "David Hurren - Technical Director for RPCuk, UK Marie Trembacki - Associate Director for Faithful+Gould, UK" at Project Controls Expo 2017, Arsenal Stadium, London
Programmatic Controls Approach to; Fast track Disaster Recovery by "Saurabh B...Project Controls Expo
Programmatic Controls Approach to; Fast track Disaster Recovery by "Saurabh Bhandari - Technical Principal - Project & Programme Controls for Mott MacDonald, UK" at Project Controls Expo 2017, Arsenal Stadium, London
Enterprise Scheduling and Risk Management at Los Angeles Metro by "Julie Owen...Project Controls Expo
Enterprise Scheduling and Risk Management at Los Angeles Metro by "Julie Owen - DEO Program Management for LA Metro, Los Angeles" at Project Controls Expo 2017, Arsenal Stadium, London
Enterprise Project Management Solutions - Install and train, job done? by "Da...Project Controls Expo
Enterprise Project Management Solutions - Install and train, job done? by "David Dunning - Chairman for CPS, UK" at Project Controls Expo 2017, Arsenal Stadium, London
Sharpen existing tools or get a new toolbox? Contemporary cluster initiatives...Orkestra
UIIN Conference, Madrid, 27-29 May 2024
James Wilson, Orkestra and Deusto Business School
Emily Wise, Lund University
Madeline Smith, The Glasgow School of Art
This presentation by Morris Kleiner (University of Minnesota), was made during the discussion “Competition and Regulation in Professions and Occupations” held at the Working Party No. 2 on Competition and Regulation on 10 June 2024. More papers and presentations on the topic can be found out at oe.cd/crps.
This presentation was uploaded with the author’s consent.
Acorn Recovery: Restore IT infra within minutesIP ServerOne
Introducing Acorn Recovery as a Service, a simple, fast, and secure managed disaster recovery (DRaaS) by IP ServerOne. A DR solution that helps restore your IT infra within minutes.
0x01 - Newton's Third Law: Static vs. Dynamic AbusersOWASP Beja
f you offer a service on the web, odds are that someone will abuse it. Be it an API, a SaaS, a PaaS, or even a static website, someone somewhere will try to figure out a way to use it to their own needs. In this talk we'll compare measures that are effective against static attackers and how to battle a dynamic attacker who adapts to your counter-measures.
About the Speaker
===============
Diogo Sousa, Engineering Manager @ Canonical
An opinionated individual with an interest in cryptography and its intersection with secure software development.
Have you ever wondered how search works while visiting an e-commerce site, internal website, or searching through other types of online resources? Look no further than this informative session on the ways that taxonomies help end-users navigate the internet! Hear from taxonomists and other information professionals who have first-hand experience creating and working with taxonomies that aid in navigation, search, and discovery across a range of disciplines.
This presentation, created by Syed Faiz ul Hassan, explores the profound influence of media on public perception and behavior. It delves into the evolution of media from oral traditions to modern digital and social media platforms. Key topics include the role of media in information propagation, socialization, crisis awareness, globalization, and education. The presentation also examines media influence through agenda setting, propaganda, and manipulative techniques used by advertisers and marketers. Furthermore, it highlights the impact of surveillance enabled by media technologies on personal behavior and preferences. Through this comprehensive overview, the presentation aims to shed light on how media shapes collective consciousness and public opinion.
6. Core clauses: 1 General: Clause 15, early warnings
NEC4 ECC: Key changes affecting the management of the contract 6
• Now clause 15 and reflects what should have happened anyway!:
• Project Manager prepares a first Early Warning Register within one week of the
starting date
• First ‘early warning meeting’ held within two weeks of the starting date
• Later early warning meetings held when required and, in any case, no longer than
the interval stated in the Contract Data
• Express mention of a Subcontractor potentially needing to attend
8. Core clauses: 3 Time
8
• Clause 31.2 – format of programme to be stated in Scope
• ’Deemed acceptance’ protocol built into clause 31.3.
• If the Project Manager does not respond to a submitted programme within the two
weeks
• the Contractor may prompt re that failure to respond
• If no response in a further week, the programme is ‘treated as accepted’
NEC4 ECC: Key changes affecting the management of the contract
17. Secondary Options: Key changes
17
Ref Title Description
W1 &
W2
Resolving and avoiding disputes Used when Adjudication is method of dispute resolution ‐
includes an initial referral to Senior Representative’s
W3 Resolving and avoiding disputes Used when Dispute Avoidance Board is method of dispute
resolution – not used where HGCRA applies
X4 Ultimate holding company guarantee
X8 Undertaking to the Client or Others Effectively collateral warranties
X9 Transfer of rights Transfer of rights over material prepared for the design
X10 Information modelling ‘BIM’
NEC4 ECC: Key changes affecting the management of the contract
Secondary Options and Options for resolving and avoiding disputes
18. Secondary Options: Key changes
18
Ref Title Description
X11 Termination by the Client Ability to terminate for any reason
X12 Multiparty collaboration Collaboration of multiple parties as ECC3, just renamed
X15 The Contractor’s design Similar to ECC3, limits liability to “skill and care”. Also includes use
of material, retention of documents and requirement for PII
X21 Whole life cost Allows a ’deal’ for considering a change to the Scope for a
betterment in whole life cost
X22 Early Contractor involvement (C & E) Enables a two stage process – stage one being ECI, as previously
published
NEC4 ECC: Key changes affecting the management of the contract
Secondary Options and Options for resolving and avoiding disputes
19. Summary
19
• In our view:
• Evolution, not revolution
• ECC4 is a better reflection of how effective teams applied ECC3 (e.g. Project
Manager instigated risk management, responded to the programme and undertook
timely Defined Cost audit under C, D, E & F)
• It is more practical – People Rates under A & B, Subcontractors now part of the
Schedules of Cost Components, no people overhead or Working Areas overhead
• Provides greater clarity on use of programme for compensation events & ‘dividing
date’
• Facilitates more proactive management of projects – Contractor’s proposals, whole
life costing proposals
NEC4 ECC: Key changes affecting the management of the contract