Introduction to Construction Industry | FNBE 0115 | Final Project
Cherilyn Chia | 0321986 | Pn Hasmanira
THE PROPOSAL – MINI SPORTS COMPLEX
CONCEPTOF THE PROJECT
Through the site analysis, it was found that the area lack of sports facilities. Being
surrounded by many residential areas and commercial areas, the site is suitable to be
developed to serve as a recreation area and commercial area.
Referring to the list of popular sports among the students and residents in the area, it was
found that there is a lack of basketball courts, badminton courts and tennis courts. The
futsal court was proposed in order to solve the problems of children playing soccer at
unsuitable places.
Since the area of the site is quite limited, there should be sufficient parking spaces for the
users. As a solution, a basement parking can be built to overcome the problems faced.
Besides focusing on the sports facilities, the management office is required to ensure the
operation of the sports complex can go on smoothly.
RATIONALEOF THEDEVELOPMENT
Seeing that the site is placed at a strategic place, where the residential area, commercial
area and a large recreational park is found near to the site, the land has a great potential of
being developed as a mini sports complex. The project also serves a great solution to reduce
the time travel to the nearest club house to use the sports facilities. Besides, it provides a
better alternative place for the people to enjoy sports.
Introduction to Construction Industry | FNBE 0115 | Final Project
Cherilyn Chia | 0321986 | Pn Hasmanira
ELEMENTS IN THE MINI SPORTS COMPLEX
FUTSAL COURT
The futsal court has a dimension of 18 m by 38 m. It is situated at the east end of the land. It
serves as a place for futsal lovers to spend their time here as well as allowing school goers to
have friendly competitions here.
BASKETBALL COURT
The proposed basketball court is 15 m x 28 m in size. It is an outdoor basketball court with
roofing to allow people to use it during rain or shine. It is situated next to the futsal court.
Introduction to Construction Industry | FNBE 0115 | Final Project
Cherilyn Chia | 0321986 | Pn Hasmanira
TENNIS COURT
A shaded tennis court is placed next to the basketball court. Since this sports is quite well-
known and many have come to learn the skills, it serves best to all tennis fans in the
neighbourhood. As there is only one tennis court in the site, people who want to use the
facility have to do advance booking at the management office.
BADMINTON COURT
Above the basement parking is the badminton court. The area consists of 8 badminton
courts with a total area of 643.2 m2. Even though the courts are situated outdoor, there is a
huge roofing above the courts to overcome weather problems and to attract people to use
it anytime.
Introduction to Construction Industry | FNBE 0115 | Final Project
Cherilyn Chia | 0321986 | Pn Hasmanira
BASEMENT PARKING
There is a total of 3 levels of basement parking beneath the badminton courts. Each level
consists of 20 parking lots. The employers and visitors can use the parking lots when the
limited outdoor parking spaces are fully occupied. Each level of basement parking has two
elevators to direct the people to the ground floor.
MANAGEMENT OFFICE
The management office is situated next to the badminton courts. Workers are hired to
manage the condition of the facilities and allow the operation of the mini sports complex to
run smoothly. Any advance bookings are to be made at the management office and visitors
are required to register at the specified counters. Payments for bicycle rentals are also done
at the office.
Introduction to Construction Industry | FNBE 0115 | Final Project
Cherilyn Chia | 0321986 | Pn Hasmanira
CHANGING ROOMS AND STORAGE AREA
Lockers and changing rooms are situated near the centre of the site. This is to allow better
access to the different facilities and provide a place for the users to keep their belongings
and change their attires.
CAFETERIA
A small cafeteria is placed next to the changing room and storage area. It is designed to
serve as a place to rest and relax from the tiring sports activities. The cafeteria also
encourages the fellowship between the consumers and provide a place for the employers to
have their lunch breaks.
Introduction to Construction Industry | FNBE 0115 | Final Project
Cherilyn Chia | 0321986 | Pn Hasmanira
BICYCLE RENTAL AREA & ROUTES
A small bicycle rental area is proposed in front of the management office. This is to provide
convenience to those who need to walk further to the desired facilities. This also
encourages people to exercise and allows kids to cycle around the mini sports complex
while the adults compete in the courts.
Bicycle routes are found around the courts to ensure the accessibility of the different
facilities in the mini sports complex.
Introduction to Construction Industry | FNBE 0115 | Final Project
Cherilyn Chia | 0321986 | Pn Hasmanira
BENEFITS OF THE DEVELOPMENT OF A MINI SPORTS COMPLEX
1. Since the site is surrounded by many residential areas, the propose development can
encourage the residents to participate in sports activities.
2. The development of the sports complex can also be used by nearby schools to organize
sports events.
3. This project can provide convenience to the residents so that they do not have to travel
further to use the sports facilities.
4. The management office and the cafeteria in the sports complex can provide job
opportunities to the people around the area.
5. This development can also overcome the lack of facilities in the nearby club house.
Introduction to Construction Industry | FNBE 0115 | Final Project
Cherilyn Chia | 0321986 | Pn Hasmanira
IMPACT OF THE PROJECT IN DIFFERENT AREAS
1. During the construction period of the basement parking, there will be sound pollution
created which disrupts the quality of living of the residents nearby.
2. The construction of the project will cause air pollution as the debris created from the
construction is difficult to handle and often ignored by the construction team.
3. After the project is done and the sports complex starts operating, there might be traffic
congestion caused by the overwhelming visitors in the area. This can be the result of the
one way traffic systemat the area as well.
4. Since the parking spaces are quite limited, the visitors may resolve in parking illegally on
the streets.
5. The facilities may also cause students to skip classes to play at the site.

More Related Content

Viewers also liked (10)

ICI Project 2 - Building and process & sample document
ICI Project 2 - Building and process & sample documentICI Project 2 - Building and process & sample document
ICI Project 2 - Building and process & sample document
 
ICI Magazine Project 1
ICI Magazine Project 1ICI Magazine Project 1
ICI Magazine Project 1
 
Itd, ici, oral presentation slides
Itd, ici, oral presentation slidesItd, ici, oral presentation slides
Itd, ici, oral presentation slides
 
Ici project 2
Ici project 2Ici project 2
Ici project 2
 
Project 1 integration january 2015_revised
Project 1 integration january 2015_revisedProject 1 integration january 2015_revised
Project 1 integration january 2015_revised
 
ICI site analysis
ICI site analysisICI site analysis
ICI site analysis
 
Ici project 2 brief
Ici project 2 briefIci project 2 brief
Ici project 2 brief
 
ICI Project 2 Company profile 2013
ICI Project 2 Company profile 2013ICI Project 2 Company profile 2013
ICI Project 2 Company profile 2013
 
Construction Digest - Structural Engineers
Construction Digest - Structural EngineersConstruction Digest - Structural Engineers
Construction Digest - Structural Engineers
 
Project brief
Project brief Project brief
Project brief
 

Similar to My individual proposal (20)

Introduction to-site-ici
Introduction to-site-iciIntroduction to-site-ici
Introduction to-site-ici
 
10657284 10201912537654101 877687459_n
10657284 10201912537654101 877687459_n10657284 10201912537654101 877687459_n
10657284 10201912537654101 877687459_n
 
FNBE 0814 ICI FINAL PROJECT
FNBE 0814 ICI FINAL PROJECT FNBE 0814 ICI FINAL PROJECT
FNBE 0814 ICI FINAL PROJECT
 
chun's
chun'schun's
chun's
 
ICI FINAL PROJECT (INDIVIDUAL) MARCH'15
ICI FINAL PROJECT (INDIVIDUAL) MARCH'15ICI FINAL PROJECT (INDIVIDUAL) MARCH'15
ICI FINAL PROJECT (INDIVIDUAL) MARCH'15
 
ICI Final project proposal
ICI Final project proposalICI Final project proposal
ICI Final project proposal
 
ICI Proposal
ICI ProposalICI Proposal
ICI Proposal
 
ICI
ICIICI
ICI
 
Ici
IciIci
Ici
 
ICI Development Proposal
ICI Development ProposalICI Development Proposal
ICI Development Proposal
 
ICI FINAL PROJECT
ICI FINAL PROJECT ICI FINAL PROJECT
ICI FINAL PROJECT
 
Ici- final project
Ici- final projectIci- final project
Ici- final project
 
ICI PROPOSAL
ICI PROPOSALICI PROPOSAL
ICI PROPOSAL
 
ICI FInal Project FNBE March 2015
ICI FInal Project FNBE March 2015ICI FInal Project FNBE March 2015
ICI FInal Project FNBE March 2015
 
Ici final project super
Ici final project superIci final project super
Ici final project super
 
ICI Tam Zhao Wei's Proposal
ICI Tam Zhao Wei's ProposalICI Tam Zhao Wei's Proposal
ICI Tam Zhao Wei's Proposal
 
ICI 6. tam zhao wei
ICI 6. tam zhao weiICI 6. tam zhao wei
ICI 6. tam zhao wei
 
Individual final 2
Individual final 2Individual final 2
Individual final 2
 
Ici final project
Ici final projectIci final project
Ici final project
 
Ici final project
Ici final projectIci final project
Ici final project
 

More from Cherilyn Chia (20)

Mpa hall
Mpa hallMpa hall
Mpa hall
 
The Stairs
The StairsThe Stairs
The Stairs
 
Maranatha hall
Maranatha hallMaranatha hall
Maranatha hall
 
Hall 1
Hall 1Hall 1
Hall 1
 
The Fountain
The FountainThe Fountain
The Fountain
 
The Cross
The CrossThe Cross
The Cross
 
Garden chapel
Garden chapelGarden chapel
Garden chapel
 
Fish window
Fish windowFish window
Fish window
 
The Lobby
The LobbyThe Lobby
The Lobby
 
Prayer tower
Prayer towerPrayer tower
Prayer tower
 
ITD COMPILATION
ITD COMPILATIONITD COMPILATION
ITD COMPILATION
 
Maths slides
Maths slidesMaths slides
Maths slides
 
Maths infographic poster
Maths infographic posterMaths infographic poster
Maths infographic poster
 
Maths survey report
Maths survey reportMaths survey report
Maths survey report
 
Math survey
Math surveyMath survey
Math survey
 
Design design process journal brief
Design design process journal briefDesign design process journal brief
Design design process journal brief
 
Design project two brief b
Design project two brief bDesign project two brief b
Design project two brief b
 
Design project one full brief
Design project one full briefDesign project one full brief
Design project one full brief
 
Artistic cover final
Artistic cover final Artistic cover final
Artistic cover final
 
kick ass ant man film essay
kick ass ant man film essaykick ass ant man film essay
kick ass ant man film essay
 

Recently uploaded

Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
kauryashika82
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
Chris Hunter
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
heathfieldcps1
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
PECB
 

Recently uploaded (20)

How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 

My individual proposal

  • 1. Introduction to Construction Industry | FNBE 0115 | Final Project Cherilyn Chia | 0321986 | Pn Hasmanira THE PROPOSAL – MINI SPORTS COMPLEX CONCEPTOF THE PROJECT Through the site analysis, it was found that the area lack of sports facilities. Being surrounded by many residential areas and commercial areas, the site is suitable to be developed to serve as a recreation area and commercial area. Referring to the list of popular sports among the students and residents in the area, it was found that there is a lack of basketball courts, badminton courts and tennis courts. The futsal court was proposed in order to solve the problems of children playing soccer at unsuitable places. Since the area of the site is quite limited, there should be sufficient parking spaces for the users. As a solution, a basement parking can be built to overcome the problems faced. Besides focusing on the sports facilities, the management office is required to ensure the operation of the sports complex can go on smoothly. RATIONALEOF THEDEVELOPMENT Seeing that the site is placed at a strategic place, where the residential area, commercial area and a large recreational park is found near to the site, the land has a great potential of being developed as a mini sports complex. The project also serves a great solution to reduce the time travel to the nearest club house to use the sports facilities. Besides, it provides a better alternative place for the people to enjoy sports.
  • 2. Introduction to Construction Industry | FNBE 0115 | Final Project Cherilyn Chia | 0321986 | Pn Hasmanira ELEMENTS IN THE MINI SPORTS COMPLEX FUTSAL COURT The futsal court has a dimension of 18 m by 38 m. It is situated at the east end of the land. It serves as a place for futsal lovers to spend their time here as well as allowing school goers to have friendly competitions here. BASKETBALL COURT The proposed basketball court is 15 m x 28 m in size. It is an outdoor basketball court with roofing to allow people to use it during rain or shine. It is situated next to the futsal court.
  • 3. Introduction to Construction Industry | FNBE 0115 | Final Project Cherilyn Chia | 0321986 | Pn Hasmanira TENNIS COURT A shaded tennis court is placed next to the basketball court. Since this sports is quite well- known and many have come to learn the skills, it serves best to all tennis fans in the neighbourhood. As there is only one tennis court in the site, people who want to use the facility have to do advance booking at the management office. BADMINTON COURT Above the basement parking is the badminton court. The area consists of 8 badminton courts with a total area of 643.2 m2. Even though the courts are situated outdoor, there is a huge roofing above the courts to overcome weather problems and to attract people to use it anytime.
  • 4. Introduction to Construction Industry | FNBE 0115 | Final Project Cherilyn Chia | 0321986 | Pn Hasmanira BASEMENT PARKING There is a total of 3 levels of basement parking beneath the badminton courts. Each level consists of 20 parking lots. The employers and visitors can use the parking lots when the limited outdoor parking spaces are fully occupied. Each level of basement parking has two elevators to direct the people to the ground floor. MANAGEMENT OFFICE The management office is situated next to the badminton courts. Workers are hired to manage the condition of the facilities and allow the operation of the mini sports complex to run smoothly. Any advance bookings are to be made at the management office and visitors are required to register at the specified counters. Payments for bicycle rentals are also done at the office.
  • 5. Introduction to Construction Industry | FNBE 0115 | Final Project Cherilyn Chia | 0321986 | Pn Hasmanira CHANGING ROOMS AND STORAGE AREA Lockers and changing rooms are situated near the centre of the site. This is to allow better access to the different facilities and provide a place for the users to keep their belongings and change their attires. CAFETERIA A small cafeteria is placed next to the changing room and storage area. It is designed to serve as a place to rest and relax from the tiring sports activities. The cafeteria also encourages the fellowship between the consumers and provide a place for the employers to have their lunch breaks.
  • 6. Introduction to Construction Industry | FNBE 0115 | Final Project Cherilyn Chia | 0321986 | Pn Hasmanira BICYCLE RENTAL AREA & ROUTES A small bicycle rental area is proposed in front of the management office. This is to provide convenience to those who need to walk further to the desired facilities. This also encourages people to exercise and allows kids to cycle around the mini sports complex while the adults compete in the courts. Bicycle routes are found around the courts to ensure the accessibility of the different facilities in the mini sports complex.
  • 7. Introduction to Construction Industry | FNBE 0115 | Final Project Cherilyn Chia | 0321986 | Pn Hasmanira BENEFITS OF THE DEVELOPMENT OF A MINI SPORTS COMPLEX 1. Since the site is surrounded by many residential areas, the propose development can encourage the residents to participate in sports activities. 2. The development of the sports complex can also be used by nearby schools to organize sports events. 3. This project can provide convenience to the residents so that they do not have to travel further to use the sports facilities. 4. The management office and the cafeteria in the sports complex can provide job opportunities to the people around the area. 5. This development can also overcome the lack of facilities in the nearby club house.
  • 8. Introduction to Construction Industry | FNBE 0115 | Final Project Cherilyn Chia | 0321986 | Pn Hasmanira IMPACT OF THE PROJECT IN DIFFERENT AREAS 1. During the construction period of the basement parking, there will be sound pollution created which disrupts the quality of living of the residents nearby. 2. The construction of the project will cause air pollution as the debris created from the construction is difficult to handle and often ignored by the construction team. 3. After the project is done and the sports complex starts operating, there might be traffic congestion caused by the overwhelming visitors in the area. This can be the result of the one way traffic systemat the area as well. 4. Since the parking spaces are quite limited, the visitors may resolve in parking illegally on the streets. 5. The facilities may also cause students to skip classes to play at the site.