ICI | FINAL PROJECT | THE PROJECT BRIEF
LIM JEY SHEN 0319796 | LIM YANG KANG 0320538 | MS IFFA | TAYLOR’S UNIVERSITY
1
Project 3:
The Project Brief
INTRODUCTION TO THE CONSTRUCTION INDUSTRY | QSB 310105
LIM JEY SHEN | 0319796
LIM YANG KANG | 0320538
FNBE AUGUST 2014
MS. NOORUL IFFA BT MOHD NAYAN
ICI | FINAL PROJECT | THE PROJECT BRIEF
LIM JEY SHEN 0319796 | LIM YANG KANG 0320538 | MS IFFA | TAYLOR’S UNIVERSITY
2
Content
ICI | FINAL PROJECT | THE PROJECT BRIEF
LIM JEY SHEN 0319796 | LIM YANG KANG 0320538 | MS IFFA | TAYLOR’S UNIVERSITY
3
INTRODUCTION TO SITE
Sandakan is the second largest town in Sabah. The site is located in Bandar
Indah, Sandakan, Sabah. The size of this empty land is 100m x 220 m. Bandar Indah Jaya
is one of the satellite towns of Sandakan in Sabah. The site is a green area located in the
centre of the town and surrounded by commercial blocks. Behind the commercial blocks
are all residential area. The highway is on the west of the green area.
KEY PLAN
ICI | FINAL PROJECT | THE PROJECT BRIEF
LIM JEY SHEN 0319796 | LIM YANG KANG 0320538 | MS IFFA | TAYLOR’S UNIVERSITY
4
LOCATION PLAN
SITE PLAN
ICI | FINAL PROJECT | THE PROJECT BRIEF
LIM JEY SHEN 0319796 | LIM YANG KANG 0320538 | MS IFFA | TAYLOR’S UNIVERSITY
5
SITE CONTEX
ICI | FINAL PROJECT | THE PROJECT BRIEF
LIM JEY SHEN 0319796 | LIM YANG KANG 0320538 | MS IFFA | TAYLOR’S UNIVERSITY
6
SITE ANALYSIS
The land is empty since 2007 and it suitable to develop into a functional area. The green
area should be develop for the following reason:
It is located in the
centre of the town.
Circulation
Extra empty land
More parking
space
Utility
Flat land
ICI | FINAL PROJECT | THE PROJECT BRIEF
LIM JEY SHEN 0319796 | LIM YANG KANG 0320538 | MS IFFA | TAYLOR’S UNIVERSITY
7
Site observation
The site is a piece of 30m x 40m green area with extra spaces next to the site. The
site is a green area and located in the center of the Bandar Indah, Sandakan, Sabah.
Therefore the site is the green area without any development and remain
unoccupied till now.
Circulation
The site can be easily access by cars. From the North, South and West direction
can access to the site.
Utility
There is an electrical generator in at the side of site.
Conclusion
The site have the suitable potential to develop the recreation area and commercial
area.
ICI | FINAL PROJECT | THE PROJECT BRIEF
LIM JEY SHEN 0319796 | LIM YANG KANG 0320538 | MS IFFA | TAYLOR’S UNIVERSITY
8
LIM JEY SHEN | 0319796
RECREATION AREA
ICI | FINAL PROJECT | THE PROJECT BRIEF
LIM JEY SHEN 0319796 | LIM YANG KANG 0320538 | MS IFFA | TAYLOR’S UNIVERSITY
9
Type of development
Recreational Area
Aim
A better park for the public to relax and exercise.
Recreational Area
To create a park for the public to relax and maintain a healthy lifestyle. To have a green
scenery in the center of the residential and commercial area. A park function as the
“Green Lung’’ of a town.
The Site
The site is a green space without any development and remains unoccupied.
Targeted People
The park is created for the public and the residents in the specific area. Senior citizens
and the children are encourage to visit the park more often to practice a healthy lifestyle.
The park also includes 2 basketball courts for basketball lovers.
Activities in the Park
The park offers a variety of activities suitable for all age. Main activities for the senior
citizens are Tai - Chi, Low Impact Aerobics and Zumba Gold teaching in the park. Adult
may walk or jog in the park. Parents can also bring their children to play in the
playground. Gazebos are designed to let the parents to rest while looking after their
children. Basketball lovers and athlets may also use the basketball courts for games.
ICI | FINAL PROJECT | THE PROJECT BRIEF
LIM JEY SHEN 0319796 | LIM YANG KANG 0320538 | MS IFFA | TAYLOR’S UNIVERSITY
10
Benefits
A healthy community will be created. Green scenery will beautify the town and the
senior citizens can join the activities in the park but not only staying home. Adults and
children can also jog and play in the park. Kids can also play around the park and parents
can rest in the gazebo. Basketball lovers may use the basketball courts for game and
competition.
Extras Info
The park is fully equipped with drinking fountain and fitness equipments to be enjoy by
the visitors. Gazebos and basketball courts are also available and a public toilet is also
located in the center of the park for emergency use.
ICI | FINAL PROJECT | THE PROJECT BRIEF
LIM JEY SHEN 0319796 | LIM YANG KANG 0320538 | MS IFFA | TAYLOR’S UNIVERSITY
11
Materials and Price Estimation
2 Basketball courts
Outdoor Rubber Floor Tile
RM 33.47-100.41 / Square Meter
200 Square Meters (Min. Order)
100000 Square Meter/Square Meters per Month (Supply Ability)
ICI | FINAL PROJECT | THE PROJECT BRIEF
LIM JEY SHEN 0319796 | LIM YANG KANG 0320538 | MS IFFA | TAYLOR’S UNIVERSITY
12
Playground
RM 30,310.00
Ship To : Within Malaysia, ship by Courier Services, Self Collect, Normal Post
Weight : (kg or dimension) : 100000
Item at : Shah Alam / Selangor
Available Qty : 1
Pavement
RM 83.67- 93.72 / Square feet
100 square meters (Min .Order)
20,000 Square Meter/Square Meters per Month
ICI | FINAL PROJECT | THE PROJECT BRIEF
LIM JEY SHEN 0319796 | LIM YANG KANG 0320538 | MS IFFA | TAYLOR’S UNIVERSITY
13
Portable Toilets
RM 4513.43
Quantity: 1
Packaged Quantity: 1 each
Min. Order Qty: 1
Picnic Benches
RM 197.47
Postage: 73.63
ICI | FINAL PROJECT | THE PROJECT BRIEF
LIM JEY SHEN 0319796 | LIM YANG KANG 0320538 | MS IFFA | TAYLOR’S UNIVERSITY
14
Drinking Fountain
RM 2150.31 / unit
Gazebo
RM 8016.06
ICI | FINAL PROJECT | THE PROJECT BRIEF
LIM JEY SHEN 0319796 | LIM YANG KANG 0320538 | MS IFFA | TAYLOR’S UNIVERSITY
15
The bubble diagram of the park
ICI | FINAL PROJECT | THE PROJECT BRIEF
LIM JEY SHEN 0319796 | LIM YANG KANG 0320538 | MS IFFA | TAYLOR’S UNIVERSITY
16
The master planof the park
ICI | FINAL PROJECT | THE PROJECT BRIEF
LIM JEY SHEN 0319796 | LIM YANG KANG 0320538 | MS IFFA | TAYLOR’S UNIVERSITY
17
LIM YANG KANG | 0320538
COMMERCIAL AREA
ICI | FINAL PROJECT | THE PROJECT BRIEF
LIM JEY SHEN 0319796 | LIM YANG KANG 0320538 | MS IFFA | TAYLOR’S UNIVERSITY
18
Type of development
Commercial area
Aim
To change the abandoned wasteland become the relax and comfortable “Knowledge Café”
for all the public of Bandar Indah, Sandakan, Sabah.
Project Description
This site is suitable and potential to be the “Knowledge Café” because it is surrounded by
the commercial block, school and residential area. The “Knowledge Café” is divided into
indoor and outdoor. The open space of the café is full of the trees.
Benefits of creating the “Knowledge Café”
It is a good place to create “Knowledge Café” because it can let people have a comfortable place
to study and get closer to each other. Besides that, the open space of the café is full of plants and
it can let the public to breath in the fresh air and feel well. Not only that, the café also have
provide the live band performance at the outdoor part of the café,the live band performance is
open for all the public and give the opportunity to all the public that love music.
ICI | FINAL PROJECT | THE PROJECT BRIEF
LIM JEY SHEN 0319796 | LIM YANG KANG 0320538 | MS IFFA | TAYLOR’S UNIVERSITY
19
The Concept of the “Knowledge Café”
The concept of the “Knowledge Café” is the modern green café design. The design of the
café is a cube and the surrounded by the trees. The energy supply the café all is using the
renewable energy such as solar energy.
Bubble diagram of the “Knowledge Café”
The exterior design of the “Knowledge Café”
ICI | FINAL PROJECT | THE PROJECT BRIEF
LIM JEY SHEN 0319796 | LIM YANG KANG 0320538 | MS IFFA | TAYLOR’S UNIVERSITY
20
The interior design of the “Knowledge Café”
Renewable energy of the “Knowledge Café”- Solar energy
The energy supply of the “Knowledge Café” is 100% from the solar energy system. Solar
energy system allow to capture free sunlight and convert it into usable power. Having a
system that creates solar energy means use less electricity from the utility company, and
that can contribute to lower heating and cooling costs.
ICI | FINAL PROJECT | THE PROJECT BRIEF
LIM JEY SHEN 0319796 | LIM YANG KANG 0320538 | MS IFFA | TAYLOR’S UNIVERSITY
21
Furniture of the “Knowledge Café”
The “MODERN” chair and table design
For looks modern the material of the chair and table is stainless steel. Stainless steel does
not readily corrode, rust or stain with water as ordinary steel does. However, it is not
fully stain-proof in low-oxygen, high-salinity, or poor air-circulation environments. There
are different grades and surface finishes of stainless steel to suit the environment the alloy
must endure. Stainless steel is used where both the properties of steel and corrosion
resistance are required.
ICI | FINAL PROJECT | THE PROJECT BRIEF
LIM JEY SHEN 0319796 | LIM YANG KANG 0320538 | MS IFFA | TAYLOR’S UNIVERSITY
22
The wall of the “Knowledge Café”
The wall of the “Knowledge Café” is made by cement. Cement is divided into two types
which are hydraulic cement and non - hydraulic cement. Hydraulic cement is chosen
because refers to any cement that uses water to begin a chemical reaction that hardens the
mixture and, when fully formed, creates a water resistant product. It is a very versatile
construction material. Most all cements used today are hydraulic cements. The
environmental benefits of concrete, among others, are strength and durability, versatility,
low maintenance, affordability, fire-resistance, relatively low emissions of carbon dioxide,
energy efficiency in production, excellent thermal mass, locally produced and used and
albedo effect.
ICI | FINAL PROJECT | THE PROJECT BRIEF
LIM JEY SHEN 0319796 | LIM YANG KANG 0320538 | MS IFFA | TAYLOR’S UNIVERSITY
23
Types of the trees used for the “Knowledge Café”
Rain Tree (Samanea Saman)
Large, fast-growing, deciduous tree of up to 25 m tall, it has a very wide umbrella-
shaped crown so that it is big enough to block sunlight. People can sit under the trees
to have a rest and read books. Sometimes, people can also have a picnic at there. It is
easy to take care.
ICI | FINAL PROJECT | THE PROJECT BRIEF
LIM JEY SHEN 0319796 | LIM YANG KANG 0320538 | MS IFFA | TAYLOR’S UNIVERSITY
24
Bamboo
Bamboos are some of the fastest-growing plants in the world, due to a unique rhizome-
dependent system. Certain species of bamboo can grow 35 inches within a 24 hour period,
at a rate of 0.00003 km/h (0.00002 mph).Bamboos are of notable economic and cultural
significance in South Asia, Southeast Asia and East Asia, being used for building materials,
as a food source, and as a versatile raw product. Bamboo has a higher compressive strength
than wood, brick or concrete and a tensile strength that rivals steel.
ICI | FINAL PROJECT | THE PROJECT BRIEF
LIM JEY SHEN 0319796 | LIM YANG KANG 0320538 | MS IFFA | TAYLOR’S UNIVERSITY
25
Master Plan of the “Knowledge Café”
ICI | FINAL PROJECT | THE PROJECT BRIEF
LIM JEY SHEN 0319796 | LIM YANG KANG 0320538 | MS IFFA | TAYLOR’S UNIVERSITY
26
Costing
Number Item Quantity Unit Rate(RM) Total(RM)
1 𝐿𝑎𝑛𝑑 𝑃𝑢𝑟𝑐ℎ𝑎𝑠𝑒𝑠 1200 m2 2,000 1,800,000
2 𝐵𝑟𝑖𝑐𝑘𝑠 6000 pieces 4 24,000
3 𝐶𝑒𝑚𝑒𝑛𝑡 500 50kg/bag 18.50 9,250
4 𝑊𝑎𝑙𝑛𝑢𝑡 𝑊𝑜𝑜𝑑 100 Board feet 33 3,300
5 𝐵𝑎𝑚𝑏𝑜𝑜 50 each 300 15,000
6 𝑅𝑎𝑖𝑛 𝑇𝑟𝑒𝑒 31 each 700 21,700
7 𝐿𝑎𝑘𝑒 250 m2 1,500 375,000
8 𝑇𝑢𝑟𝑓 2152 Square feet 25 53,800
9 Furniture 1000 - 40 40,000
10 𝑊𝑜𝑟𝑘𝑒𝑟𝑠 𝑓𝑒𝑒𝑠 7 - 800 5,600
11 𝐹𝑖𝑠ℎ𝑒𝑠 𝑓𝑜𝑟 𝑙𝑎𝑘𝑒 500 - 2 1,000
Total 2,348,650
References
1. http://en.wikipedia.org/wiki/List_of_coffee_beverages
2. http://www.facebook.com/l.php?u=http%3A%2F%2Fwww.powerhousemuseum.c
om%2Fpdf%2Feducation%2Fscamper_design_activity.pdf&h=JAQFpUsKF
3. http://www.facebook.com/l.php?u=http%3A%2F%2Fdesignjournalsos.blogspot.c
om%2F2013%2F01%2Fwhat-is-scamper.html&h=oAQEaBSon
4. http://www.facebook.com/l.php?u=http%3A%2F%2Fraskisimani.files.wordpress.
com%2F2013%2F01%2Fsamanea-
ICI | FINAL PROJECT | THE PROJECT BRIEF
LIM JEY SHEN 0319796 | LIM YANG KANG 0320538 | MS IFFA | TAYLOR’S UNIVERSITY
27
raintree.pdfhttp%3A%2F%2Fraskisimani.files.wordpress.com%2F2013%2F01%
2Fsamanea-
raintree.pdfhttp%3A%2F%2Fraskisimani.files.wordpress.com%2F2013%2F01%
2Fsamanea-raintree.pdf&h=QAQFuJ0np
5. http://www.euro-inox.org/pdf/map/Tables_TechnicalProperties_EN.pdf
6. http://www.continentalcement.com/web/technical/uploads/Cement_Properties_an
d_Characteristics.pdf
7. http://www.mps.sabah.gov.my/borangkepuasanpelanggan.cfm
8. http://en.wikipedia.org/wiki/Recreation_area
9. http://www.allmodern.com/Tables-C438831.html
10. http://www.modernhouse.co/
11. http://www.houseplans.com/collection/modern-house-plans
12. http://www.bhg.com/gardening/plant-dictionary/tree/
13. http://www.landscapingnetwork.com/trees/

More Related Content

Viewers also liked

Integrasi mte aida
Integrasi mte aidaIntegrasi mte aida
Integrasi mte aidaaida_mohdnor
 
El dia del conte
El dia del conteEl dia del conte
El dia del contecanmisses
 
Jimmy gonzaga,alan roman.jhon peñaloza
Jimmy gonzaga,alan roman.jhon peñalozaJimmy gonzaga,alan roman.jhon peñaloza
Jimmy gonzaga,alan roman.jhon peñalozaJimmy Javier Gonzaga
 
A Multidimensional Approach to the Study of Human-information
A Multidimensional Approach to the Study of Human-informationA Multidimensional Approach to the Study of Human-information
A Multidimensional Approach to the Study of Human-informationYeseul Song
 
Cream un conte
Cream un conteCream un conte
Cream un contecanmisses
 
Lakefront Beauty
Lakefront BeautyLakefront Beauty
Lakefront BeautyJoe Kovich
 
Julio Caro Baroja's 100 Anniversary
Julio Caro Baroja's 100 AnniversaryJulio Caro Baroja's 100 Anniversary
Julio Caro Baroja's 100 AnniversaryJ. Carlos Martínez
 
PIB Congreso - III Trimestre 2014
PIB Congreso - III Trimestre 2014PIB Congreso - III Trimestre 2014
PIB Congreso - III Trimestre 2014Patricia Bullrich
 
Business Migration GGI South Africa World Conference
Business Migration  GGI South Africa World ConferenceBusiness Migration  GGI South Africa World Conference
Business Migration GGI South Africa World ConferenceRowbotham & Company LLP
 
Italy Alexandra Alford
Italy Alexandra AlfordItaly Alexandra Alford
Italy Alexandra Alfordaealford
 
交點高雄Vol.4 - 袁乾鑫 - 榮總的醫療
交點高雄Vol.4 - 袁乾鑫 - 榮總的醫療交點高雄Vol.4 - 袁乾鑫 - 榮總的醫療
交點高雄Vol.4 - 袁乾鑫 - 榮總的醫療交點
 
EXTRANJEROS EN LA ETAPA REPUBLICANA
EXTRANJEROS EN LA ETAPA REPUBLICANAEXTRANJEROS EN LA ETAPA REPUBLICANA
EXTRANJEROS EN LA ETAPA REPUBLICANAGonzalo Rivas Flores
 
¿Cuáles son los derechos que tengo como trabajador en una empresa?
¿Cuáles son los derechos que tengo como trabajador en una empresa?¿Cuáles son los derechos que tengo como trabajador en una empresa?
¿Cuáles son los derechos que tengo como trabajador en una empresa?Brayan Martin Silva Velazquez
 
Integrating WordPress With Web APIs
Integrating WordPress With Web APIsIntegrating WordPress With Web APIs
Integrating WordPress With Web APIsrandyhoyt
 

Viewers also liked (20)

Integrasi mte aida
Integrasi mte aidaIntegrasi mte aida
Integrasi mte aida
 
El dia del conte
El dia del conteEl dia del conte
El dia del conte
 
Presentación sin título
Presentación sin títuloPresentación sin título
Presentación sin título
 
Jimmy gonzaga,alan roman.jhon peñaloza
Jimmy gonzaga,alan roman.jhon peñalozaJimmy gonzaga,alan roman.jhon peñaloza
Jimmy gonzaga,alan roman.jhon peñaloza
 
A Multidimensional Approach to the Study of Human-information
A Multidimensional Approach to the Study of Human-informationA Multidimensional Approach to the Study of Human-information
A Multidimensional Approach to the Study of Human-information
 
Cream un conte
Cream un conteCream un conte
Cream un conte
 
Lakefront Beauty
Lakefront BeautyLakefront Beauty
Lakefront Beauty
 
Julio Caro Baroja's 100 Anniversary
Julio Caro Baroja's 100 AnniversaryJulio Caro Baroja's 100 Anniversary
Julio Caro Baroja's 100 Anniversary
 
PIB Congreso - III Trimestre 2014
PIB Congreso - III Trimestre 2014PIB Congreso - III Trimestre 2014
PIB Congreso - III Trimestre 2014
 
Business Migration GGI South Africa World Conference
Business Migration  GGI South Africa World ConferenceBusiness Migration  GGI South Africa World Conference
Business Migration GGI South Africa World Conference
 
Maya
MayaMaya
Maya
 
guia basica
guia basica guia basica
guia basica
 
M3 s3 redes de aprendizaje
M3 s3 redes de aprendizajeM3 s3 redes de aprendizaje
M3 s3 redes de aprendizaje
 
Italy Alexandra Alford
Italy Alexandra AlfordItaly Alexandra Alford
Italy Alexandra Alford
 
交點高雄Vol.4 - 袁乾鑫 - 榮總的醫療
交點高雄Vol.4 - 袁乾鑫 - 榮總的醫療交點高雄Vol.4 - 袁乾鑫 - 榮總的醫療
交點高雄Vol.4 - 袁乾鑫 - 榮總的醫療
 
Trabajo de conmputacion
Trabajo de conmputacionTrabajo de conmputacion
Trabajo de conmputacion
 
EXTRANJEROS EN LA ETAPA REPUBLICANA
EXTRANJEROS EN LA ETAPA REPUBLICANAEXTRANJEROS EN LA ETAPA REPUBLICANA
EXTRANJEROS EN LA ETAPA REPUBLICANA
 
Normas de dibujo tecnico y normalizacion
Normas  de dibujo tecnico y normalizacionNormas  de dibujo tecnico y normalizacion
Normas de dibujo tecnico y normalizacion
 
¿Cuáles son los derechos que tengo como trabajador en una empresa?
¿Cuáles son los derechos que tengo como trabajador en una empresa?¿Cuáles son los derechos que tengo como trabajador en una empresa?
¿Cuáles son los derechos que tengo como trabajador en una empresa?
 
Integrating WordPress With Web APIs
Integrating WordPress With Web APIsIntegrating WordPress With Web APIs
Integrating WordPress With Web APIs
 

Similar to 10657284 10201912537654101 877687459_n

ICI FINAL PROJECT
ICI FINAL PROJECT ICI FINAL PROJECT
ICI FINAL PROJECT Arissa Loh
 
ICI Development Proposal
ICI Development ProposalICI Development Proposal
ICI Development Proposaljisunfoo
 
Introduction to construction landscape
Introduction to construction landscapeIntroduction to construction landscape
Introduction to construction landscapeJadyn Choo
 
My individual proposal
My individual proposalMy individual proposal
My individual proposalCherilyn Chia
 
ICI Proposal
ICI ProposalICI Proposal
ICI Proposalmasonsth
 
Ici - final project
Ici - final projectIci - final project
Ici - final projectleejanett3
 
Ici final project
Ici   final projectIci   final project
Ici final projectJoeylau97
 
ici copy
ici copyici copy
ici copyjie0117
 
ICI FINAL PROJECT
ICI FINAL PROJECT ICI FINAL PROJECT
ICI FINAL PROJECT Yip Xiaojung
 
Introduction to-site-ici
Introduction to-site-iciIntroduction to-site-ici
Introduction to-site-iciChan Yifung
 
ICI Tam Zhao Wei's Proposal
ICI Tam Zhao Wei's ProposalICI Tam Zhao Wei's Proposal
ICI Tam Zhao Wei's ProposalTamZhaoWei
 
ICI 6. tam zhao wei
ICI 6. tam zhao weiICI 6. tam zhao wei
ICI 6. tam zhao weiashleyyeap
 
Final Project - Development Proposal
Final Project - Development ProposalFinal Project - Development Proposal
Final Project - Development ProposalEave0222
 
PROPOSAL OF CO-LEARNING VISITOR CENTER
PROPOSAL OF CO-LEARNING VISITOR CENTERPROPOSAL OF CO-LEARNING VISITOR CENTER
PROPOSAL OF CO-LEARNING VISITOR CENTERYen Min Khor
 
ICI - The project proposal
ICI - The project proposalICI - The project proposal
ICI - The project proposal_NabilaHanim
 
CSI INITIAL PROPOSAL DOCUMENT
CSI INITIAL PROPOSAL DOCUMENT CSI INITIAL PROPOSAL DOCUMENT
CSI INITIAL PROPOSAL DOCUMENT Darshiini Vig
 

Similar to 10657284 10201912537654101 877687459_n (20)

ICI FINAL PROJECT
ICI FINAL PROJECT ICI FINAL PROJECT
ICI FINAL PROJECT
 
Ici baba
Ici babaIci baba
Ici baba
 
ICI Development Proposal
ICI Development ProposalICI Development Proposal
ICI Development Proposal
 
Introduction to construction landscape
Introduction to construction landscapeIntroduction to construction landscape
Introduction to construction landscape
 
My individual proposal
My individual proposalMy individual proposal
My individual proposal
 
group ici
group icigroup ici
group ici
 
chun's
chun'schun's
chun's
 
ICI Proposal
ICI ProposalICI Proposal
ICI Proposal
 
Ici - final project
Ici - final projectIci - final project
Ici - final project
 
Ici final project
Ici   final projectIci   final project
Ici final project
 
ici copy
ici copyici copy
ici copy
 
ICI FINAL PROJECT
ICI FINAL PROJECT ICI FINAL PROJECT
ICI FINAL PROJECT
 
Introduction to-site-ici
Introduction to-site-iciIntroduction to-site-ici
Introduction to-site-ici
 
ICI Tam Zhao Wei's Proposal
ICI Tam Zhao Wei's ProposalICI Tam Zhao Wei's Proposal
ICI Tam Zhao Wei's Proposal
 
ICI 6. tam zhao wei
ICI 6. tam zhao weiICI 6. tam zhao wei
ICI 6. tam zhao wei
 
Final Project - Development Proposal
Final Project - Development ProposalFinal Project - Development Proposal
Final Project - Development Proposal
 
PROPOSAL OF CO-LEARNING VISITOR CENTER
PROPOSAL OF CO-LEARNING VISITOR CENTERPROPOSAL OF CO-LEARNING VISITOR CENTER
PROPOSAL OF CO-LEARNING VISITOR CENTER
 
ICI_FP
ICI_FPICI_FP
ICI_FP
 
ICI - The project proposal
ICI - The project proposalICI - The project proposal
ICI - The project proposal
 
CSI INITIAL PROPOSAL DOCUMENT
CSI INITIAL PROPOSAL DOCUMENT CSI INITIAL PROPOSAL DOCUMENT
CSI INITIAL PROPOSAL DOCUMENT
 

More from Json96

Report
ReportReport
ReportJson96
 
Project 1 0814 brief with tgc 1-
Project 1 0814 brief with tgc  1-Project 1 0814 brief with tgc  1-
Project 1 0814 brief with tgc 1-Json96
 
Assignment 2 research report-
Assignment 2  research report-Assignment 2  research report-
Assignment 2 research report-Json96
 
Assignment 1 fnbe jan- -1-
Assignment 1  fnbe jan- -1-Assignment 1  fnbe jan- -1-
Assignment 1 fnbe jan- -1-Json96
 
Finaleng
FinalengFinaleng
FinalengJson96
 
Cendol power-point
Cendol power-pointCendol power-point
Cendol power-pointJson96
 
123123123
123123123123123123
123123123Json96
 
Enbe cover6
Enbe cover6Enbe cover6
Enbe cover6Json96
 
Enbe cover4
Enbe cover4Enbe cover4
Enbe cover4Json96
 
Enbe cover2
Enbe cover2Enbe cover2
Enbe cover2Json96
 
Enbe cover
Enbe coverEnbe cover
Enbe coverJson96
 
Enbe cover
Enbe coverEnbe cover
Enbe coverJson96
 
10741175 10201912453652001 2034964853_n
10741175 10201912453652001 2034964853_n10741175 10201912453652001 2034964853_n
10741175 10201912453652001 2034964853_nJson96
 
Group 4 experiential landscape
Group 4   experiential landscapeGroup 4   experiential landscape
Group 4 experiential landscapeJson96
 
Reference
ReferenceReference
ReferenceJson96
 
Reference
ReferenceReference
ReferenceJson96
 

More from Json96 (20)

Report
ReportReport
Report
 
Project 1 0814 brief with tgc 1-
Project 1 0814 brief with tgc  1-Project 1 0814 brief with tgc  1-
Project 1 0814 brief with tgc 1-
 
Assignment 2 research report-
Assignment 2  research report-Assignment 2  research report-
Assignment 2 research report-
 
Assignment 1 fnbe jan- -1-
Assignment 1  fnbe jan- -1-Assignment 1  fnbe jan- -1-
Assignment 1 fnbe jan- -1-
 
Finaleng
FinalengFinaleng
Finaleng
 
Cendol power-point
Cendol power-pointCendol power-point
Cendol power-point
 
123123123
123123123123123123
123123123
 
Enbe cover6
Enbe cover6Enbe cover6
Enbe cover6
 
Enbe cover4
Enbe cover4Enbe cover4
Enbe cover4
 
Enbe cover2
Enbe cover2Enbe cover2
Enbe cover2
 
Enbe cover
Enbe coverEnbe cover
Enbe cover
 
Enbe cover
Enbe coverEnbe cover
Enbe cover
 
10741175 10201912453652001 2034964853_n
10741175 10201912453652001 2034964853_n10741175 10201912453652001 2034964853_n
10741175 10201912453652001 2034964853_n
 
Ici
IciIci
Ici
 
Ici
IciIci
Ici
 
Ici
IciIci
Ici
 
Ici
IciIci
Ici
 
Group 4 experiential landscape
Group 4   experiential landscapeGroup 4   experiential landscape
Group 4 experiential landscape
 
Reference
ReferenceReference
Reference
 
Reference
ReferenceReference
Reference
 

10657284 10201912537654101 877687459_n

  • 1. ICI | FINAL PROJECT | THE PROJECT BRIEF LIM JEY SHEN 0319796 | LIM YANG KANG 0320538 | MS IFFA | TAYLOR’S UNIVERSITY 1 Project 3: The Project Brief INTRODUCTION TO THE CONSTRUCTION INDUSTRY | QSB 310105 LIM JEY SHEN | 0319796 LIM YANG KANG | 0320538 FNBE AUGUST 2014 MS. NOORUL IFFA BT MOHD NAYAN
  • 2. ICI | FINAL PROJECT | THE PROJECT BRIEF LIM JEY SHEN 0319796 | LIM YANG KANG 0320538 | MS IFFA | TAYLOR’S UNIVERSITY 2 Content
  • 3. ICI | FINAL PROJECT | THE PROJECT BRIEF LIM JEY SHEN 0319796 | LIM YANG KANG 0320538 | MS IFFA | TAYLOR’S UNIVERSITY 3 INTRODUCTION TO SITE Sandakan is the second largest town in Sabah. The site is located in Bandar Indah, Sandakan, Sabah. The size of this empty land is 100m x 220 m. Bandar Indah Jaya is one of the satellite towns of Sandakan in Sabah. The site is a green area located in the centre of the town and surrounded by commercial blocks. Behind the commercial blocks are all residential area. The highway is on the west of the green area. KEY PLAN
  • 4. ICI | FINAL PROJECT | THE PROJECT BRIEF LIM JEY SHEN 0319796 | LIM YANG KANG 0320538 | MS IFFA | TAYLOR’S UNIVERSITY 4 LOCATION PLAN SITE PLAN
  • 5. ICI | FINAL PROJECT | THE PROJECT BRIEF LIM JEY SHEN 0319796 | LIM YANG KANG 0320538 | MS IFFA | TAYLOR’S UNIVERSITY 5 SITE CONTEX
  • 6. ICI | FINAL PROJECT | THE PROJECT BRIEF LIM JEY SHEN 0319796 | LIM YANG KANG 0320538 | MS IFFA | TAYLOR’S UNIVERSITY 6 SITE ANALYSIS The land is empty since 2007 and it suitable to develop into a functional area. The green area should be develop for the following reason: It is located in the centre of the town. Circulation Extra empty land More parking space Utility Flat land
  • 7. ICI | FINAL PROJECT | THE PROJECT BRIEF LIM JEY SHEN 0319796 | LIM YANG KANG 0320538 | MS IFFA | TAYLOR’S UNIVERSITY 7 Site observation The site is a piece of 30m x 40m green area with extra spaces next to the site. The site is a green area and located in the center of the Bandar Indah, Sandakan, Sabah. Therefore the site is the green area without any development and remain unoccupied till now. Circulation The site can be easily access by cars. From the North, South and West direction can access to the site. Utility There is an electrical generator in at the side of site. Conclusion The site have the suitable potential to develop the recreation area and commercial area.
  • 8. ICI | FINAL PROJECT | THE PROJECT BRIEF LIM JEY SHEN 0319796 | LIM YANG KANG 0320538 | MS IFFA | TAYLOR’S UNIVERSITY 8 LIM JEY SHEN | 0319796 RECREATION AREA
  • 9. ICI | FINAL PROJECT | THE PROJECT BRIEF LIM JEY SHEN 0319796 | LIM YANG KANG 0320538 | MS IFFA | TAYLOR’S UNIVERSITY 9 Type of development Recreational Area Aim A better park for the public to relax and exercise. Recreational Area To create a park for the public to relax and maintain a healthy lifestyle. To have a green scenery in the center of the residential and commercial area. A park function as the “Green Lung’’ of a town. The Site The site is a green space without any development and remains unoccupied. Targeted People The park is created for the public and the residents in the specific area. Senior citizens and the children are encourage to visit the park more often to practice a healthy lifestyle. The park also includes 2 basketball courts for basketball lovers. Activities in the Park The park offers a variety of activities suitable for all age. Main activities for the senior citizens are Tai - Chi, Low Impact Aerobics and Zumba Gold teaching in the park. Adult may walk or jog in the park. Parents can also bring their children to play in the playground. Gazebos are designed to let the parents to rest while looking after their children. Basketball lovers and athlets may also use the basketball courts for games.
  • 10. ICI | FINAL PROJECT | THE PROJECT BRIEF LIM JEY SHEN 0319796 | LIM YANG KANG 0320538 | MS IFFA | TAYLOR’S UNIVERSITY 10 Benefits A healthy community will be created. Green scenery will beautify the town and the senior citizens can join the activities in the park but not only staying home. Adults and children can also jog and play in the park. Kids can also play around the park and parents can rest in the gazebo. Basketball lovers may use the basketball courts for game and competition. Extras Info The park is fully equipped with drinking fountain and fitness equipments to be enjoy by the visitors. Gazebos and basketball courts are also available and a public toilet is also located in the center of the park for emergency use.
  • 11. ICI | FINAL PROJECT | THE PROJECT BRIEF LIM JEY SHEN 0319796 | LIM YANG KANG 0320538 | MS IFFA | TAYLOR’S UNIVERSITY 11 Materials and Price Estimation 2 Basketball courts Outdoor Rubber Floor Tile RM 33.47-100.41 / Square Meter 200 Square Meters (Min. Order) 100000 Square Meter/Square Meters per Month (Supply Ability)
  • 12. ICI | FINAL PROJECT | THE PROJECT BRIEF LIM JEY SHEN 0319796 | LIM YANG KANG 0320538 | MS IFFA | TAYLOR’S UNIVERSITY 12 Playground RM 30,310.00 Ship To : Within Malaysia, ship by Courier Services, Self Collect, Normal Post Weight : (kg or dimension) : 100000 Item at : Shah Alam / Selangor Available Qty : 1 Pavement RM 83.67- 93.72 / Square feet 100 square meters (Min .Order) 20,000 Square Meter/Square Meters per Month
  • 13. ICI | FINAL PROJECT | THE PROJECT BRIEF LIM JEY SHEN 0319796 | LIM YANG KANG 0320538 | MS IFFA | TAYLOR’S UNIVERSITY 13 Portable Toilets RM 4513.43 Quantity: 1 Packaged Quantity: 1 each Min. Order Qty: 1 Picnic Benches RM 197.47 Postage: 73.63
  • 14. ICI | FINAL PROJECT | THE PROJECT BRIEF LIM JEY SHEN 0319796 | LIM YANG KANG 0320538 | MS IFFA | TAYLOR’S UNIVERSITY 14 Drinking Fountain RM 2150.31 / unit Gazebo RM 8016.06
  • 15. ICI | FINAL PROJECT | THE PROJECT BRIEF LIM JEY SHEN 0319796 | LIM YANG KANG 0320538 | MS IFFA | TAYLOR’S UNIVERSITY 15 The bubble diagram of the park
  • 16. ICI | FINAL PROJECT | THE PROJECT BRIEF LIM JEY SHEN 0319796 | LIM YANG KANG 0320538 | MS IFFA | TAYLOR’S UNIVERSITY 16 The master planof the park
  • 17. ICI | FINAL PROJECT | THE PROJECT BRIEF LIM JEY SHEN 0319796 | LIM YANG KANG 0320538 | MS IFFA | TAYLOR’S UNIVERSITY 17 LIM YANG KANG | 0320538 COMMERCIAL AREA
  • 18. ICI | FINAL PROJECT | THE PROJECT BRIEF LIM JEY SHEN 0319796 | LIM YANG KANG 0320538 | MS IFFA | TAYLOR’S UNIVERSITY 18 Type of development Commercial area Aim To change the abandoned wasteland become the relax and comfortable “Knowledge Café” for all the public of Bandar Indah, Sandakan, Sabah. Project Description This site is suitable and potential to be the “Knowledge Café” because it is surrounded by the commercial block, school and residential area. The “Knowledge Café” is divided into indoor and outdoor. The open space of the café is full of the trees. Benefits of creating the “Knowledge Café” It is a good place to create “Knowledge Café” because it can let people have a comfortable place to study and get closer to each other. Besides that, the open space of the café is full of plants and it can let the public to breath in the fresh air and feel well. Not only that, the café also have provide the live band performance at the outdoor part of the café,the live band performance is open for all the public and give the opportunity to all the public that love music.
  • 19. ICI | FINAL PROJECT | THE PROJECT BRIEF LIM JEY SHEN 0319796 | LIM YANG KANG 0320538 | MS IFFA | TAYLOR’S UNIVERSITY 19 The Concept of the “Knowledge Café” The concept of the “Knowledge Café” is the modern green café design. The design of the café is a cube and the surrounded by the trees. The energy supply the café all is using the renewable energy such as solar energy. Bubble diagram of the “Knowledge Café” The exterior design of the “Knowledge Café”
  • 20. ICI | FINAL PROJECT | THE PROJECT BRIEF LIM JEY SHEN 0319796 | LIM YANG KANG 0320538 | MS IFFA | TAYLOR’S UNIVERSITY 20 The interior design of the “Knowledge Café” Renewable energy of the “Knowledge Café”- Solar energy The energy supply of the “Knowledge Café” is 100% from the solar energy system. Solar energy system allow to capture free sunlight and convert it into usable power. Having a system that creates solar energy means use less electricity from the utility company, and that can contribute to lower heating and cooling costs.
  • 21. ICI | FINAL PROJECT | THE PROJECT BRIEF LIM JEY SHEN 0319796 | LIM YANG KANG 0320538 | MS IFFA | TAYLOR’S UNIVERSITY 21 Furniture of the “Knowledge Café” The “MODERN” chair and table design For looks modern the material of the chair and table is stainless steel. Stainless steel does not readily corrode, rust or stain with water as ordinary steel does. However, it is not fully stain-proof in low-oxygen, high-salinity, or poor air-circulation environments. There are different grades and surface finishes of stainless steel to suit the environment the alloy must endure. Stainless steel is used where both the properties of steel and corrosion resistance are required.
  • 22. ICI | FINAL PROJECT | THE PROJECT BRIEF LIM JEY SHEN 0319796 | LIM YANG KANG 0320538 | MS IFFA | TAYLOR’S UNIVERSITY 22 The wall of the “Knowledge Café” The wall of the “Knowledge Café” is made by cement. Cement is divided into two types which are hydraulic cement and non - hydraulic cement. Hydraulic cement is chosen because refers to any cement that uses water to begin a chemical reaction that hardens the mixture and, when fully formed, creates a water resistant product. It is a very versatile construction material. Most all cements used today are hydraulic cements. The environmental benefits of concrete, among others, are strength and durability, versatility, low maintenance, affordability, fire-resistance, relatively low emissions of carbon dioxide, energy efficiency in production, excellent thermal mass, locally produced and used and albedo effect.
  • 23. ICI | FINAL PROJECT | THE PROJECT BRIEF LIM JEY SHEN 0319796 | LIM YANG KANG 0320538 | MS IFFA | TAYLOR’S UNIVERSITY 23 Types of the trees used for the “Knowledge Café” Rain Tree (Samanea Saman) Large, fast-growing, deciduous tree of up to 25 m tall, it has a very wide umbrella- shaped crown so that it is big enough to block sunlight. People can sit under the trees to have a rest and read books. Sometimes, people can also have a picnic at there. It is easy to take care.
  • 24. ICI | FINAL PROJECT | THE PROJECT BRIEF LIM JEY SHEN 0319796 | LIM YANG KANG 0320538 | MS IFFA | TAYLOR’S UNIVERSITY 24 Bamboo Bamboos are some of the fastest-growing plants in the world, due to a unique rhizome- dependent system. Certain species of bamboo can grow 35 inches within a 24 hour period, at a rate of 0.00003 km/h (0.00002 mph).Bamboos are of notable economic and cultural significance in South Asia, Southeast Asia and East Asia, being used for building materials, as a food source, and as a versatile raw product. Bamboo has a higher compressive strength than wood, brick or concrete and a tensile strength that rivals steel.
  • 25. ICI | FINAL PROJECT | THE PROJECT BRIEF LIM JEY SHEN 0319796 | LIM YANG KANG 0320538 | MS IFFA | TAYLOR’S UNIVERSITY 25 Master Plan of the “Knowledge Café”
  • 26. ICI | FINAL PROJECT | THE PROJECT BRIEF LIM JEY SHEN 0319796 | LIM YANG KANG 0320538 | MS IFFA | TAYLOR’S UNIVERSITY 26 Costing Number Item Quantity Unit Rate(RM) Total(RM) 1 𝐿𝑎𝑛𝑑 𝑃𝑢𝑟𝑐ℎ𝑎𝑠𝑒𝑠 1200 m2 2,000 1,800,000 2 𝐵𝑟𝑖𝑐𝑘𝑠 6000 pieces 4 24,000 3 𝐶𝑒𝑚𝑒𝑛𝑡 500 50kg/bag 18.50 9,250 4 𝑊𝑎𝑙𝑛𝑢𝑡 𝑊𝑜𝑜𝑑 100 Board feet 33 3,300 5 𝐵𝑎𝑚𝑏𝑜𝑜 50 each 300 15,000 6 𝑅𝑎𝑖𝑛 𝑇𝑟𝑒𝑒 31 each 700 21,700 7 𝐿𝑎𝑘𝑒 250 m2 1,500 375,000 8 𝑇𝑢𝑟𝑓 2152 Square feet 25 53,800 9 Furniture 1000 - 40 40,000 10 𝑊𝑜𝑟𝑘𝑒𝑟𝑠 𝑓𝑒𝑒𝑠 7 - 800 5,600 11 𝐹𝑖𝑠ℎ𝑒𝑠 𝑓𝑜𝑟 𝑙𝑎𝑘𝑒 500 - 2 1,000 Total 2,348,650 References 1. http://en.wikipedia.org/wiki/List_of_coffee_beverages 2. http://www.facebook.com/l.php?u=http%3A%2F%2Fwww.powerhousemuseum.c om%2Fpdf%2Feducation%2Fscamper_design_activity.pdf&h=JAQFpUsKF 3. http://www.facebook.com/l.php?u=http%3A%2F%2Fdesignjournalsos.blogspot.c om%2F2013%2F01%2Fwhat-is-scamper.html&h=oAQEaBSon 4. http://www.facebook.com/l.php?u=http%3A%2F%2Fraskisimani.files.wordpress. com%2F2013%2F01%2Fsamanea-
  • 27. ICI | FINAL PROJECT | THE PROJECT BRIEF LIM JEY SHEN 0319796 | LIM YANG KANG 0320538 | MS IFFA | TAYLOR’S UNIVERSITY 27 raintree.pdfhttp%3A%2F%2Fraskisimani.files.wordpress.com%2F2013%2F01% 2Fsamanea- raintree.pdfhttp%3A%2F%2Fraskisimani.files.wordpress.com%2F2013%2F01% 2Fsamanea-raintree.pdf&h=QAQFuJ0np 5. http://www.euro-inox.org/pdf/map/Tables_TechnicalProperties_EN.pdf 6. http://www.continentalcement.com/web/technical/uploads/Cement_Properties_an d_Characteristics.pdf 7. http://www.mps.sabah.gov.my/borangkepuasanpelanggan.cfm 8. http://en.wikipedia.org/wiki/Recreation_area 9. http://www.allmodern.com/Tables-C438831.html 10. http://www.modernhouse.co/ 11. http://www.houseplans.com/collection/modern-house-plans 12. http://www.bhg.com/gardening/plant-dictionary/tree/ 13. http://www.landscapingnetwork.com/trees/