This document presents a proposal for a mini sports and recreational area (MSRA) to be built on a 1216 sqm plot of land in Bandar Sungai Long, Kajang, Selangor. The proposed MSRA would include a 420 sqm basketball court, two 105 sqm badminton courts, a bicycle stop, exercise area, mini garden, and gazebo. The facilities are intended to promote health and foster relationships among residents of the nearby Ascara Residence. The proposal provides details on the site context, concept, facilities, maintenance plan, and costing for the MSRA.
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
ICI Proposal
1. 1
ICI Final Project
FNBE AUG 2014 INTAKE
Lecturer : Ms Ann See Peng
Pe Zhi Yong (0319765)
Seet Tiong Hong (0320438)
Introduction To Construction Industry Final Project
2. No Description Page
1 Site Introduction 3
2 Zoning 4
3 Site Analysis & Observation 5-11
4 Proposal 12
5 Concept 13
6 Sketch Plan 14
7 Image of Idea 15-21
8 Rationale & Benefits 22
9 Maintenance 23
10 Costing 24-25
11 Reference 26
2
Content
Introduction To Construction Industry Final Project
3. Malaysia. The Universiti Tunku Abdul Rahman (UTAR) operates a
campus in Bandar Sungai Long.It is currently under the
administration of local council Majlis Perbandaran Kajang (MPKj).
• The Sungai Long Golf & Country Club is situated in this township.
Bandar Sungai Long was designed for a population of 10,000
residents. It was built around the "leisure" living theme with
residential homes surrounding an 18-hole golf course. High end
detached houses were built around the golf course with semi-detached
condominiums, commercial properties and low cost low rise
apartments on the outer edges of the development. The majority
population in this township are Chinese.
3
Site Introduction
• Bandar Sungai Long is a main township in Kajang, Selangor,
and terraced residential dwellings alongside
Introduction To Construction Industry Final Project
4. 4
Zoning
Residential Area
Commercial Area
Education Area
Picture above showed that the Sungai Long Gold & Country club is
surrounded by residential areas. There is 3 Educational Area, which is
primary school (under construction), secondary school (SMKBBSL),
and university (UTAR).
Introduction To Construction Industry Final Project
5. Site Analysis
&Observation
Site Plan
The site is surrounded by all residential area and each
residential area has its own recreational park. The site is
located at SL14 residential area which is being called as
“ASCARA RESIDENCY”. Ascara Residence is a freehold
gated and guarded semi-detached homes nestled in Bandar
Sungai Long. The residential development is developed by
SHL Consolidated under Sin Heap Lee Development
Group, and it was completed in 2005.
5
Introduction To Construction Industry Final Project
6. 6
ASCARA DEVELOPMENT COMPRISES:
• 66 semi-detached houses
• Built within parcel of 3.761 hectares (9 acres)
• Building blocks are arranged to avoid facing west
• Playground
• Concealed drains with walk paths
• Concealed telephone & streetlight cabling system
Introduction To Construction Industry Final Project
7. 7
The Site
The site is located at Jalan SL 14, Bandar Sungai Long, Kajang,
Selangor. Which GPS Coordinated (3.038357, 101.799740). It is
surrounded by one of the main road in residential area and
houses. The Area of the site is amount 1216 m2.The amount of
traffic around is high and busy every morning and evening
Introduction To Construction Industry Final Project
9. • The site is surrounded by all residential area and each
9
Site Plan
residential area has its own recreational park
Introduction To Construction Industry Final Project
10. 10
Recreational Park
Around The Site
• Located at SL 14
• Consists of playground ,bench and sidewalks
• Located at Taming Indah 1
• Consist of Playground, Gazebo, Football Field
Introduction To Construction Industry Final Project
11. In a nutshell, most of the recreational parks do not have common
exercising area such as the basketball and badminton courts.
However, there's is a country club with comprehensive facilities,
which include Olympic sized swimming pool, tennis courts, squash
& badminton courts, bowling alley, gym, snooker and pool room,
coffee house and a beautiful 18-hole Jack Nicklaus-designed golf
course. Sadly, it is a private club which only welcomes its
members. Only club members are allow to enjoy those facilities in
the club.
11
• Located at SL 4
• Provided : playground, football field , garden
walk
Conclusion:
Introduction To Construction Industry Final Project
12. In this 1216 m2 land, we have decided to develop a mini sports
and recreational area (MSRA) that would benefits the residence of
Ascara Residence, Kajang, Selangor in terms of health and
relationship between the residence. This MRSA consists of a 420
m2 basketball court, two 105 m2 badminton courts, bicycle stop
and an exercise area.
Moreover, there will be one mini garden that the residence could
to prevent the ball from getting out of the court for safety purposes.
There will be two entrances in the park. The first one would be the
entrance near the mini garden and the other one would be near the
basketball courts.
12
Proposal – Recreational Area
Considering that most of the user would be the children and
teenagers, the bicycle stop is being introduced. The bicycle stop
also encourages the residences to be more active in exercising
which promotes good health.
Besides, bleachers are provided to watch competitions that are
especially being organized by the authorities of the Ascara
Residence. 2 benches are also being provided in between 2
badminton courts as most of the players tend to be very tired after
the intensive game and they could keep their eye open on their
belongings that are being placed on the benches.
exercise and also relax at as the gazebo is being provided. The
senior residences could spend most of their time to keep their
minds alert.
Next, the sporting net will be built around the proposed MRSA
Introduction To Construction Industry Final Project
13. 40 m X 30 m site in Kajang, Ascara Residence. The proposed
MRSP will be built using mainly green or sustainable materials
such as the green concrete. The production of normal concrete
produces large amount of carbon dioxide. The badminton and
basketball courts will be built mainly using green concrete. By
using this material, I could cut the overall construction cost and it’s
more sustainable. Besides, the gazebo is being included in the park
so that the senior residence is able to keep their minds alert by
communicating with each other.
13
Concept – Green Materials
The Mini Sport and Recreational Park will be designed on a
Introduction To Construction Industry Final Project
14. 14
Sketch Plan
2
3 5
1
Badminton Court
Introduction To Construction Industry Final Project
4
1
6
4
4
4
2
3
4
5
6
4
4
4
Gazebo
Basketball Court
Bicycle Stop
Bench Bleacher
Spotlight Bin Yellow Flame Tree
Legend
15. 15
Image Of Idea
Bleacher
Bench
Introduction To Construction Industry Final Project
Purpose: To encourage residence to take
part in any activities at the park (support
or take part).
Other Uses: Place where spectators will
cheer for their teams whenever there is a
competition.
Purpose: To let the residence put their
belongings (bag, towel) to take a rest and
also to wait for their turns in the
activities.
Other Uses: Place to have conversation.
16. 16
Sporting Net
Gazebo
Introduction To Construction Industry Final Project
Purpose: To prevent the ball from
getting out of the court.
Other Uses: To prevent the players from
falling onto the ground.
Purpose: To gather the residence
especially the senior one.
Other Uses: As a place where residence
meeting is being held at.
17. 17
Stainless Bin
LED Spotlight
Introduction To Construction Industry Final Project
Purpose: Keep the park clean.
Other Uses: Witstand adverse weather
conditions. Easy to maintain.
Purpose: To keep the park in visible at
night.
Other Uses: To prevent someone from
hiding in the park.
18. A 420 m2 basketball court is being included in the
plan. The basketball court will be constructed using
green concrete. This is court is being built is because
we have found out that the surrounding
neighborhoods do not have any basketball court. So,
by building it, it helps basketball players and those
who are interested to improve their health and also
skills as well as unite them.
18
Facilities
Basketball
Introduction To Construction Industry Final Project
19. After doing few researches around the neighborhoods,
we have also found out that those neighborhoods are
lacked of badminton courts. We have planned to
construct two badminton courts at the site to
encourage healthy lifestyle and clearer minds.
19
Badminton Court
Introduction To Construction Industry Final Project
20. We have also proposed bicycle stop in the recreation
park at Ascara Residence. The reason we proposed
bicycle stop is that we estimate that most of the user
would be the teenagers and children of the Ascara
residence. Therefore, most of them would use bicycle
to travel to the park. Moreover, adults are also
encouraged to cycle to improve their health.
20
Bicycle Stop
Introduction To Construction Industry Final Project
21. Distribution: Australasia, Sri Lanka, Thailand,
Vietnam, Indonesia, Malaysia, Papua New Guinea and Philippines.
21
Softscape
Name: Peltophorum Pterocarpum (Yellow Flame Tree)
Height: 15-16m
Spacing: 12m
Colour: Yellow
Begins To Flower: 4 years
Propagation Method: Seeds, Direct Planting
Uses: Ornament Tree
1) Wood – Cabinet-making
2) Foliage - Fodder
Introduction To Construction Industry Final Project
22. We found that the surrounding area of Ascara Residence do not
have enough sport facilities. In order to take part in sport activities
(basketball), one has to travel out from the neighborhood. By doing
so, it not only will affect the safety of the residence but also their
health. (Intake of CO2 from vehicles)
The courts are being included in the construction plan is mainly
to empower and motivate the youth. Sports will not only keep their
minds at the top form but also neutralize youth with higher energy.
The park also
By taking part in those activities that could be done in the park will
improve the bond between the residence which leads to a safer
residential area. Everyone will take care and cooperate with each
other.
22
Rationale & Benefit
The site is an abandoned space. As a result, the site is currently
purposeless. Therefore, in order to fully utilize the space in the
residential area, a park is being built for win-win situation.
This Mini Sport and Recreational Park is being built for several
reasons and benefits. First and foremost, it is to promote healthy
lifestyle to the Ascara Residence.
Besides, the park is being built to unite the Ascara residence.
Introduction To Construction Industry Final Project
23. Labour cost RM/Mth
Fertiliser; once a month 100
Replacement of dead plants. 100
Total 1060
Add profit & overhead 20% 332
23
Maintenance
Maintenance Cost
1 labourer @ RM 50/day X
4 times a month. 200
1 supervisor @ RM 65/day X
4 times a month. 260
Transportation – lorry @ RM 100/day X
4 times a month 400
Material cost
Introduction To Construction Industry Final Project
RM 1,392/Month
24. Hardscape Cost RM
RM 150 X 630 m2 94,500
RM 0.36 X 1216 m2 437.76
RM 1,000 X 2 2,000
RM 32 X 2 Nos 64
RM 98 X 11 Nos 1,078
RM 1000 X 1 Set 1,000
RM 100 X 2 Nos 200
RM 5000 X 1 No 5,000
RM 80 X 2 Nos 160
RM 400 X 2 Nos 800
Total 105,239.76
24
Costing
• Green concrete paver @
• Sporting net @
• Basketball goal @
• Badminton net @
• LED Spotlight @
• Bleacher @
• Bench @
• Gazebo @
• Stainless Steel Bin @
• Steel Gate @
Introduction To Construction Industry Final Project
25. Softscape Costing RM
RM800 X 5 4,000
• Shrubs @ RM 50 X 50 2,500
• Taiwan grass @
RM 30 X 600 m2 18,000
Total RM 24,500
25
• Yellow Flame Tree @
Summary
Introduction To Construction Industry Final Project
RM
• Hardscape Costs 105,239.76
• Softscape Costs 24,500.00
• Maintenance 1,392.00
Total Amount 131,131.76