SlideShare a Scribd company logo
RAMON ESCANILLA AVELLANA
ADDRESS:
Block 20 Lot 3 Phase I Cerritos Heights, Daang Hari
Molino IV, Bacoor, Cavite, Philippines 4102
Mobile No. +639184950164 – roaming
Mobile No. +97430661327 - Qatar
E-mail Address : ramon_ramana@yahoo.com
POSITION : Mechanical Engineer
Senior Supervisor
- Structural/Tanks/Mechanical/Piping
General Almost twenty eight years of relevant experience in the field of engineering and
Background construction for oil & gas, petrochemicals, refineries, mining and power holding positions in
workshops and site works.
Education 1982 – 1987 Technological Institute of the Philippines
Bachelor of Science in Mechanical Engineering
Registered – Professional Regulation Commission #40199
Personal Date of Birth : August 10, 1965 Place of Birth : Daet, Camarines Norte
Religion : Roman-Catholic Wife’s Name : Lutgarda Z. Avellana
Civil Status : Married with Three (3) children Weight : 67 kg Height : 168 cm.
Mothers Name : Flora E. Avellana Father’s Name : Angel I. Avellana Jr.
Passport No. EC0694322 Date of Expiry : March 27, 2019
Computer Literate – MS Word/Excel/Outlook Holder of Philippine Driving License
Work April 5, 2015 to March 31, 2016 Piping Supervisor
Experience Qatar Solar Technologies(PMO – Project Management Organization)
(Member of Qatar Foundation) Ras Laffan, Qatar
1. Responsible for supervision of construction works executed by contractors are in accordance
with the approved scope of work, engineering design, ensuring full compliance with safety
and quality standards and verify that works are correctly carried out in accordance with
project documentation and in the planned time frame.
2. Review and provide comments on construction method statements, material submittals
during construction works until completion and handover to endusers.
3. Support the contractors ensuring the feasibility(availability of drawings and materials) of the
works.
1
4. Responsible as performing authority for permit to work by contractors.
December 3, 2013 to April 2, 2015 Steel Structural Supervisor
Samsung Engineering Co. Ltd. Takreer Carbon Black & Delayed
Coker Project – Ruwais, Abu Dhabi – UAE
1. Supervision and monitoring the construction activities carried out by subcontractor including
but not limited to erection and installation of pipe racks, equipment platforms and shelters.
2. Assist in carrying out inspection and testing (fit-up, alignment, bolt tightening, punch list and
final inrks aspection) during construction.
3. Coordination with other discipline at area of assignment.
4. Day-to-day interface with sub-contractors with emphasis on safety and quality
5. Ensure that procedures and processes are understood and followed by sub-contractors.
6. Monitor and ensure compliance with specification, procedures, and plans. Provide on-site
knowledge of project specific requirements
7. Implement project HSE initiatives and ensure compliance with HSE plans and procedures
8. Interface with QA/QC personnel to address quality issues/progress. Provide oversight of sub-
contractor's materials management/verification systems. Monitor workforce progress as
relative to schedule. Monitor arrival of materials. Implement field surveillance plans. Assist
with change process on structures
9. Ensure sub-contractor's on site planning activities are appropriate to meet objectives
10. Provide safety monitoring/leadership/coaching as well as participate in safety meetings
11. Participate, coach and assist sub-contractor personnel in effective pre-task planning
measures in JSA's, and toolbox meetings
12. Participate in on site Risk Assessments and JSA development.
13. Record data for inclusion in the preparation of close-out report
October 23, 2011 to December 2,2013 Steel Structural Supervisor
Samsung Engineering Co. Ltd. Shah Gas Development Project
Hameem, Abu Dhabi – UAE
• At Workshop – Fabrication/Modification (Workshop Supervisor)
1. Supervision of all steel structure fabrication/modification works at workshop according to
approved fabrication and repair procedures.
2. Fabrication of pipe spools and supports for pre-commissioning group requirements such as
steam blowing pipelines among others.
3. Control man-hours allowed for fabrication/modification, ensure all budget are met or
improved.
• At Site – Construction(Site Supervisor)
1. Supervision of subcontractor in the construction of temporary facilities such as
blasting/painting shelter and fabrication workshop.
2. Supervision and monitoring the construction activities carried out by subcontractors
including but not limited to erection and installation of pipe racks and shelters at utilities and
offsite area. Prepare daily progress report of structural steel erected.
3. Ensure that subcontractors will adhere to high standards of safety and quality.
4. Ensure that site works conform to method of statements, procedures and test plans, and met
target completion dates.
5. Ensure that subcontractors adhere to the latest IFC drawings, specifications, procedures and
site instructions.
6. Report all deviations from the original scope of work in writing to the Structural Manager.
7. Assist in carrying out inspection and testing (fit-up, alignment, bolt tightening, punch list and
final inspection) during construction. Prepare weekly progress report of all inspection and
testing activities.
8. Coordination with other discipline at area of assignment.
Februar
y 19, 2011 to August 15, 2011 Sr. Mechanical Engineer - Tanks
New Horizons Company - Ledwood Saudi Aramco Project - KSA
2
1. Project-in-charge for the repair and maintenance of miscellaneous oil and gas storage tanks
including spheroids up to 750,000 BBL capacity at their tank farm – Yanbu Refinery
2. Site Engineer for the replacement of two (2) units Arab Heavy Crude Oil(AHCO) booster
pumps including modification of suction and discharge piping and pump shelter as well as
construction of new pump foundations – Jeddah Refinery.
November 18, 2009 to October 30, 2010 Steel Structure/Mechanical SV
Keangnam Enterprises, Ltd. Ambatovy Nickel/Cobalt Project
Toamasina, Madagascar
1. Review work packages for constructability
2. Supervision and monitoring the construction activities carried out by subcontractors such as
erection and installation of steel structures (e.g. piperacks, vessel platforms, equipment
buildings, shelters) and mechanical equipment ( e.g.
agitators, bins, chutes, conveyors, filters, fans, hoists, hydraulic units, heat exchangers,
mixers, pumps, storage/process/settler tanks, thickeners, vessels ) at utilities/ancillaries and
refinery area. Prepare daily report of equipment installed and tons of steel erected.
3. Ensure that construction activities are carried out to the highest HSE standards
4. Assist in carrying out inspection and testing of subcontractors during construction and
installation. Prepare weekly progess report of fit-up, alignment and bolt tightening.
5. Ensure that construction and installation conform with project standards and will meet
target completion dates
6. Attend safety toolbox talk and progress meeting
7. Coordinate in the preparation of test packages and handover documents
8. Actively participate on programs to develop the capabilities of local construction workers
with particular emphasis on HSE and quality
January 2, 2009 to July 31, 2009 Tank Supervisor
CB&I Lummus – Toyo Engineering Joint Venture Shell Houdini ECC Project
Pulau Ular, Singapore
1. Supervision of construction of steel storage tanks for plant utilities and offsite.
2. Coordination with other discipline at area of assignment.
3. Ensure that job implementation contractor(IC) adheres to the latest AFC drawings,
specifications, procedures and site instructions.
4. Ensure that IC works is according to method of statement and will met target completion
dates.
5. Daily surveillance check and records ensuring that IC will provide safe working conditions
and with necessary permits, PPE, enough supervisors & manpower and reliable well-
maintained construction equipment.
6. Ensure proper change control by issuing field instructions, review technical queries and make
sure that responses are correct and appropriate.
7. Ensure that IC carry-out witness, inspection and surveillance check in accordance with
Quality Control Plan.
8. Ensure that assigned IC interface and well coordinated with other IC’s.
9. Attend safety toolbox talk and daily/weekly coordination meeting, if necessary.
10. Assigned as Team Leader during weekly safety assessment on area of assignment.
11. Ensure that IC complies with HSE plan at site.
December 12, 2007 to September 30, 2008 Steel Structure Supervisor
TECHNIP Consortium Dung Quat Refinery Project
(Technip-JGC-Tecnicas Reunidas) Central Vietnam
• At Workshop – Fabrication
1. Full time supervision at appointed subcontractor workshop during fabrication of steel
structures for off-site and utilities.
2. Observe fabrication condition and call for changes, if necessary.
3. Expedite all priority items to ensure early completion.
3
4. Prepare daily report on all levels of fabrication to the Construction Manager.
5. Act as a channel of communication between site and sub-contractor on all matters relevant to
satisfactory delivery of structures.
6. Ensure that Field Quality Control Plan (FQCP) is implemented and drawings are updated at
workshop to avoid rework on site.
• At Site – Construction
1. Supervision of erection/modifications of steel structures by sub-contractors at area of
assignment.
2. Overall coordinator with other discipline at off-site area.
3. Follow-up RFI’s on area of assignment.
4. Coordination with workshop on remaining and additional items for fabrication.
5. Assume the duties and responsibilities of Steel Structure Superintendent while on home leave
or during his absence such as conducting weekly meeting with sub-contractors.
6. Prepare internal construction punch list for clearing by sub-contractors before final
inspection of PMC/client.
7. Ensure that sub-contractors will comply with HSE requirements at site.
January 24, 2002 to November 24, 2007 Project Engineer
AL ZAMIL METAL/AZTRACON Jeddah, Saudi Arabia
• Mechanical Contractor – Design, fabrication, erec5tion and alteration of above ground steel
storage tanks as per API 650/653 and pressure vessels as per ASME standards other steel structures.
Completed the following :
1. Erection of thirty seven (37) units process/storage steel tanks, thickeners and ore silo at Al
Amar Gold Mine (Ma’aden) - Saudi Arabia.
2. Erection of ore conveyors for GEO Robson at Al Amar Gold Mine (Ma’aden) – Saudi Arabia
3. Erection by jacking system of 36-m dia. X 16.5-m high process water tank at National
Titanium Dioxide Co., Ltd. (Cristal) – Yanbu Al-Sinaiyah, K.S.A.
4. Repair of miscellaneous steel storage tanks during November 2006 Turnaround at
Sabic/Yanpet – Yanbu, K.S.A.
5. Replacement of bottom plates by jacking system of various steel storage tanks at Saudi
Aramco(Luberef) – Yanbu.
Replacement of three upper shell course including rafters and girders of a 48-m x 16—m steel
storage tank at Saudi Aramco (Luberef) – Yanbu.
6. Erection/Installation of pre-engineered and conventional buildings including pipe racks and
pipe bridges at Saudi Soya Bean and Derivatives Plant.
Responsibilities :
1. Review of project related drawings, scope of work, inspection and testing plan (ITP).
2. Modify project execution plan to adapt on the existing situation.
3. Planning and scheduling.
4. General supervision of project activities to ensure productivity and safety of all areas
concerned.
5. Coordination with client and other trade contractors.
6. Prepare project status report and submit to client and head office.
7. Ensure to comply with HSE plan at site.
November 6, 2000 – December 31, 2001 Steel Structure Supervisor
PRIMO OLEOCHEMICALS INC.(PRIMECHEM)
1. Planning, supervision and monitoring of daily construction activities for storage tanks and
steel structures as per implementation of quality policy satisfying project requirement and
satisfaction.
2. Coordination with other disciplines that involve any interfacing in the project.
3. Prepares progress reports to monitor project accomplishment.
4. Ensure all safety, health and environment requirement are effectively and fully implemented.
5. Monitoring overall fabrications, including shop drawings, material purchases, coatings,
logistic and shipment control.
4
August 9, 1994 – October 20,2000 Project Engineer
LAWIN TECHNOLOGIES/DADSON MECHANICAL SERVICES
• Mechanical and Electrical Contractor
1. Project implementation and ensure timely completion
2. Ensure that working group will comply with HSE plan at site
3. Coordinate and liaise with clients on conceptual plans as well as project requirements,
standards and operations
4. Prepare project execution plan and drawing up detailed project schedules and costing
October 12, 1992 – February 18, 1994 Project Engineer
Aguilar Consolidated Construction and Industrial Corp. - ACCICOR
• General Contractor Specializing in Fire Protection System and Plumbing Works
Complete installation and commissioning of Fire Protection System of Cebu Holdings Center
(18-storey building) – Cebu City, Philippines
November 27, 1989 – October 15, 1992 Junior Engineer
HAYAMA INDUSTRIAL CORPORATION
• Mechanical and Electrical Contractor
Assigned in refurbishing works of various industrial plant equipment and machinery, conveyor
manufacturing and installation, machinery installation and other related works
July 17, 1987 – Mar. 2, 1988 Millwright/Junior Engineer
BENGUET CORPORATION
• Mining Company
Complete installation and commissioning of mill equipment and machinery for Paracale Gold
Mine introducing Cyanidation Process and perform the duties of Jr. Engineer during operation.
Industrial Pneumatics Design – SMC Pneumatics
Trainings Industrial Hydraulics – HIC Engineers
Steam Engineering – Spirax Zarco
Cylinder Controller Programming – SMC Pneumatics
Turnover Management System – Shell ECC Project
Safety Permit Receiver Course – National Titanium Dioxide Co. – CRISTAL(KSA)
Trainings Permit Receiver Course – Saudi Aramco (Luberef II) – Yanbu
Permit to Work System Training Course – Technip HSSE Dep’ t –Vietnam
Hot and Cold Commissioning Training Course – Shell ECC Project
Hazardous Chemicals And Nitrogen Awareness – Shell ECC Project
Lock Out & Tag Out System – Shell ECC Project
Safety Orientation Course (Manhole) – CB&I – Toyo JV HSE Dep’t (Ministry of Manpower
Accredited Training Provider) – Singapore
Oil & Petrochemical Safety Orientation Course – Shell Bukom Refinery - Singapore
Recognition Top STA (Safety Task Analysis) Evaluator for April 2009 – Shell Houdini ECC Project
Best Employee – Samsung Engineering Co. Ltd. – Takreer Carbon Black and Delayed
Coker Project – Given 12th
of July 2014
Philippine Mechanical Engineering Licensure Examination, 1989 – 79% Passed
Government Career Service Professional, 1989 – 85.95% Passed
Examination
5
August 9, 1994 – October 20,2000 Project Engineer
LAWIN TECHNOLOGIES/DADSON MECHANICAL SERVICES
• Mechanical and Electrical Contractor
1. Project implementation and ensure timely completion
2. Ensure that working group will comply with HSE plan at site
3. Coordinate and liaise with clients on conceptual plans as well as project requirements,
standards and operations
4. Prepare project execution plan and drawing up detailed project schedules and costing
October 12, 1992 – February 18, 1994 Project Engineer
Aguilar Consolidated Construction and Industrial Corp. - ACCICOR
• General Contractor Specializing in Fire Protection System and Plumbing Works
Complete installation and commissioning of Fire Protection System of Cebu Holdings Center
(18-storey building) – Cebu City, Philippines
November 27, 1989 – October 15, 1992 Junior Engineer
HAYAMA INDUSTRIAL CORPORATION
• Mechanical and Electrical Contractor
Assigned in refurbishing works of various industrial plant equipment and machinery, conveyor
manufacturing and installation, machinery installation and other related works
July 17, 1987 – Mar. 2, 1988 Millwright/Junior Engineer
BENGUET CORPORATION
• Mining Company
Complete installation and commissioning of mill equipment and machinery for Paracale Gold
Mine introducing Cyanidation Process and perform the duties of Jr. Engineer during operation.
Industrial Pneumatics Design – SMC Pneumatics
Trainings Industrial Hydraulics – HIC Engineers
Steam Engineering – Spirax Zarco
Cylinder Controller Programming – SMC Pneumatics
Turnover Management System – Shell ECC Project
Safety Permit Receiver Course – National Titanium Dioxide Co. – CRISTAL(KSA)
Trainings Permit Receiver Course – Saudi Aramco (Luberef II) – Yanbu
Permit to Work System Training Course – Technip HSSE Dep’ t –Vietnam
Hot and Cold Commissioning Training Course – Shell ECC Project
Hazardous Chemicals And Nitrogen Awareness – Shell ECC Project
Lock Out & Tag Out System – Shell ECC Project
Safety Orientation Course (Manhole) – CB&I – Toyo JV HSE Dep’t (Ministry of Manpower
Accredited Training Provider) – Singapore
Oil & Petrochemical Safety Orientation Course – Shell Bukom Refinery - Singapore
Recognition Top STA (Safety Task Analysis) Evaluator for April 2009 – Shell Houdini ECC Project
Best Employee – Samsung Engineering Co. Ltd. – Takreer Carbon Black and Delayed
Coker Project – Given 12th
of July 2014
Philippine Mechanical Engineering Licensure Examination, 1989 – 79% Passed
Government Career Service Professional, 1989 – 85.95% Passed
Examination
5

More Related Content

What's hot

Ernie Engr. Supervisor or Commissioning Engr. - Updated
Ernie Engr. Supervisor or Commissioning Engr. - UpdatedErnie Engr. Supervisor or Commissioning Engr. - Updated
Ernie Engr. Supervisor or Commissioning Engr. - Updated
Ernesto Costorio
 
2015 Resume Cary B. Dela Cruz.pdf
2015 Resume Cary B. Dela Cruz.pdf2015 Resume Cary B. Dela Cruz.pdf
2015 Resume Cary B. Dela Cruz.pdf
Cary Dela Cruz
 
MS-Abinash
MS-AbinashMS-Abinash
MS-Abinash
Abinash Routray
 
redacvEPT
redacvEPTredacvEPT
redacvEPT
Reda Fathallah
 
C.V
C.VC.V
Resume
Resume Resume
Marcel - 3 cv Rev 03
Marcel - 3 cv Rev 03Marcel - 3 cv Rev 03
Marcel - 3 cv Rev 03
Marcel Paul
 
JOEY_STEPHENSON_(R1136)
JOEY_STEPHENSON_(R1136)JOEY_STEPHENSON_(R1136)
JOEY_STEPHENSON_(R1136)
Joey Stephenson
 
Salman Resume 2016
Salman Resume  2016Salman Resume  2016
Salman Resume 2016
salman al-kadhem
 
CV
CVCV
SANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCVSANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCV
SANTHOSH KUMAR
 
Resume KV 2015
Resume KV 2015Resume KV 2015
Resume KV 2015
Keith Vary
 
Roy McCullough CV Feb 2015
Roy McCullough CV Feb 2015Roy McCullough CV Feb 2015
Roy McCullough CV Feb 2015
Roy McCullough
 
CV of KP Tomy
CV of KP TomyCV of KP Tomy
CV of KP Tomy
Tomy Pappu
 
Lory Francis Navor - CV
Lory Francis Navor - CVLory Francis Navor - CV
Lory Francis Navor - CV
lory francis navor
 
Mechanical Maintenance Supervisor CV
Mechanical  Maintenance  Supervisor CVMechanical  Maintenance  Supervisor CV
Mechanical Maintenance Supervisor CV
vaithiya nathan
 
Psm Cv Presentation Aug 16, 2012
Psm Cv Presentation Aug 16, 2012Psm Cv Presentation Aug 16, 2012
Psm Cv Presentation Aug 16, 2012
Patrick Soria Muga (psmuga9@gmail.com)
 
Resume Gopakumar Balakrishna Pillai
Resume Gopakumar Balakrishna PillaiResume Gopakumar Balakrishna Pillai
Resume Gopakumar Balakrishna Pillai
GOPAKUMAR BALAKRISHNA PILLAI
 
ERECTION METHOD STATEMENT
ERECTION METHOD STATEMENTERECTION METHOD STATEMENT
ERECTION METHOD STATEMENT
mustafa hussain
 

What's hot (19)

Ernie Engr. Supervisor or Commissioning Engr. - Updated
Ernie Engr. Supervisor or Commissioning Engr. - UpdatedErnie Engr. Supervisor or Commissioning Engr. - Updated
Ernie Engr. Supervisor or Commissioning Engr. - Updated
 
2015 Resume Cary B. Dela Cruz.pdf
2015 Resume Cary B. Dela Cruz.pdf2015 Resume Cary B. Dela Cruz.pdf
2015 Resume Cary B. Dela Cruz.pdf
 
MS-Abinash
MS-AbinashMS-Abinash
MS-Abinash
 
redacvEPT
redacvEPTredacvEPT
redacvEPT
 
C.V
C.VC.V
C.V
 
Resume
Resume Resume
Resume
 
Marcel - 3 cv Rev 03
Marcel - 3 cv Rev 03Marcel - 3 cv Rev 03
Marcel - 3 cv Rev 03
 
JOEY_STEPHENSON_(R1136)
JOEY_STEPHENSON_(R1136)JOEY_STEPHENSON_(R1136)
JOEY_STEPHENSON_(R1136)
 
Salman Resume 2016
Salman Resume  2016Salman Resume  2016
Salman Resume 2016
 
CV
CVCV
CV
 
SANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCVSANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCV
 
Resume KV 2015
Resume KV 2015Resume KV 2015
Resume KV 2015
 
Roy McCullough CV Feb 2015
Roy McCullough CV Feb 2015Roy McCullough CV Feb 2015
Roy McCullough CV Feb 2015
 
CV of KP Tomy
CV of KP TomyCV of KP Tomy
CV of KP Tomy
 
Lory Francis Navor - CV
Lory Francis Navor - CVLory Francis Navor - CV
Lory Francis Navor - CV
 
Mechanical Maintenance Supervisor CV
Mechanical  Maintenance  Supervisor CVMechanical  Maintenance  Supervisor CV
Mechanical Maintenance Supervisor CV
 
Psm Cv Presentation Aug 16, 2012
Psm Cv Presentation Aug 16, 2012Psm Cv Presentation Aug 16, 2012
Psm Cv Presentation Aug 16, 2012
 
Resume Gopakumar Balakrishna Pillai
Resume Gopakumar Balakrishna PillaiResume Gopakumar Balakrishna Pillai
Resume Gopakumar Balakrishna Pillai
 
ERECTION METHOD STATEMENT
ERECTION METHOD STATEMENTERECTION METHOD STATEMENT
ERECTION METHOD STATEMENT
 

Similar to MY CV-RAMON AVELLANA - QSTec1

Diosdado CV (updated)(1)
Diosdado CV (updated)(1)Diosdado CV (updated)(1)
Diosdado CV (updated)(1)
Diosdado Dolocanog
 
Nailesh Patel CV
Nailesh Patel CVNailesh Patel CV
Nailesh Patel CV
Nailesh Patel
 
hatata cv 2015
hatata cv 2015hatata cv 2015
hatata cv 2015
mohamed hatata
 
Kumlachew Mechanical QC Eng.
Kumlachew Mechanical QC Eng.Kumlachew Mechanical QC Eng.
Kumlachew Mechanical QC Eng.
kumlachew ketsela mengistu
 
CV-R.B.Guinir Jr.(01-15-17)
CV-R.B.Guinir Jr.(01-15-17)CV-R.B.Guinir Jr.(01-15-17)
CV-R.B.Guinir Jr.(01-15-17)
Rogelio Jr Guinir
 
A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)
Ahmed Youssef
 
PIPING SUPERVISOR Kz.docx
PIPING SUPERVISOR Kz.docxPIPING SUPERVISOR Kz.docx
PIPING SUPERVISOR Kz.docx
leonkidlat
 
Rudyard Ejercito - Resume
Rudyard Ejercito - ResumeRudyard Ejercito - Resume
Rudyard Ejercito - Resume
Rudyard Ejercito
 
Cris' Updated resume
Cris' Updated resumeCris' Updated resume
Cris' Updated resume
Cristopher Donayre
 
QA/QC Inspector or Engineer
QA/QC Inspector or EngineerQA/QC Inspector or Engineer
QA/QC Inspector or Engineer
Alfredo Tendero Alata Jr.
 
Engr ilyas cv new
Engr ilyas cv newEngr ilyas cv new
Engr ilyas cv new
Malik Ilyas KHATTAK
 
CV-Joedon Cunanan (latest)
CV-Joedon Cunanan (latest)CV-Joedon Cunanan (latest)
CV-Joedon Cunanan (latest)
Joedon Cunanan
 
CV 2016.doc
CV 2016.docCV 2016.doc
CV 2016.doc
Jack Milligan
 
Zeonn Koh 4 page CV
Zeonn Koh 4 page CVZeonn Koh 4 page CV
Zeonn Koh 4 page CV
Zeonn Koh
 
Hillary CV
Hillary CVHillary CV
Hillary CV
hillary were
 
OMIJIE ehinomen prince Reviewed cv
OMIJIE ehinomen prince Reviewed cvOMIJIE ehinomen prince Reviewed cv
OMIJIE ehinomen prince Reviewed cv
omijie ehinomen prince
 
jovy's RESUME
jovy's RESUMEjovy's RESUME
jovy's RESUME
Jovito Garcia
 
harveysarda-curriculum vitae
harveysarda-curriculum vitaeharveysarda-curriculum vitae
harveysarda-curriculum vitae
Harvey Sarda
 
Jayson Oraa QAQC CV
Jayson Oraa QAQC CVJayson Oraa QAQC CV
Jayson Oraa QAQC CV
Jayson Oraa
 
CV of Mohammed Uzair
CV of Mohammed UzairCV of Mohammed Uzair
CV of Mohammed Uzair
Mohammad Arif uzair
 

Similar to MY CV-RAMON AVELLANA - QSTec1 (20)

Diosdado CV (updated)(1)
Diosdado CV (updated)(1)Diosdado CV (updated)(1)
Diosdado CV (updated)(1)
 
Nailesh Patel CV
Nailesh Patel CVNailesh Patel CV
Nailesh Patel CV
 
hatata cv 2015
hatata cv 2015hatata cv 2015
hatata cv 2015
 
Kumlachew Mechanical QC Eng.
Kumlachew Mechanical QC Eng.Kumlachew Mechanical QC Eng.
Kumlachew Mechanical QC Eng.
 
CV-R.B.Guinir Jr.(01-15-17)
CV-R.B.Guinir Jr.(01-15-17)CV-R.B.Guinir Jr.(01-15-17)
CV-R.B.Guinir Jr.(01-15-17)
 
A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)
 
PIPING SUPERVISOR Kz.docx
PIPING SUPERVISOR Kz.docxPIPING SUPERVISOR Kz.docx
PIPING SUPERVISOR Kz.docx
 
Rudyard Ejercito - Resume
Rudyard Ejercito - ResumeRudyard Ejercito - Resume
Rudyard Ejercito - Resume
 
Cris' Updated resume
Cris' Updated resumeCris' Updated resume
Cris' Updated resume
 
QA/QC Inspector or Engineer
QA/QC Inspector or EngineerQA/QC Inspector or Engineer
QA/QC Inspector or Engineer
 
Engr ilyas cv new
Engr ilyas cv newEngr ilyas cv new
Engr ilyas cv new
 
CV-Joedon Cunanan (latest)
CV-Joedon Cunanan (latest)CV-Joedon Cunanan (latest)
CV-Joedon Cunanan (latest)
 
CV 2016.doc
CV 2016.docCV 2016.doc
CV 2016.doc
 
Zeonn Koh 4 page CV
Zeonn Koh 4 page CVZeonn Koh 4 page CV
Zeonn Koh 4 page CV
 
Hillary CV
Hillary CVHillary CV
Hillary CV
 
OMIJIE ehinomen prince Reviewed cv
OMIJIE ehinomen prince Reviewed cvOMIJIE ehinomen prince Reviewed cv
OMIJIE ehinomen prince Reviewed cv
 
jovy's RESUME
jovy's RESUMEjovy's RESUME
jovy's RESUME
 
harveysarda-curriculum vitae
harveysarda-curriculum vitaeharveysarda-curriculum vitae
harveysarda-curriculum vitae
 
Jayson Oraa QAQC CV
Jayson Oraa QAQC CVJayson Oraa QAQC CV
Jayson Oraa QAQC CV
 
CV of Mohammed Uzair
CV of Mohammed UzairCV of Mohammed Uzair
CV of Mohammed Uzair
 

MY CV-RAMON AVELLANA - QSTec1

  • 1. RAMON ESCANILLA AVELLANA ADDRESS: Block 20 Lot 3 Phase I Cerritos Heights, Daang Hari Molino IV, Bacoor, Cavite, Philippines 4102 Mobile No. +639184950164 – roaming Mobile No. +97430661327 - Qatar E-mail Address : ramon_ramana@yahoo.com POSITION : Mechanical Engineer Senior Supervisor - Structural/Tanks/Mechanical/Piping General Almost twenty eight years of relevant experience in the field of engineering and Background construction for oil & gas, petrochemicals, refineries, mining and power holding positions in workshops and site works. Education 1982 – 1987 Technological Institute of the Philippines Bachelor of Science in Mechanical Engineering Registered – Professional Regulation Commission #40199 Personal Date of Birth : August 10, 1965 Place of Birth : Daet, Camarines Norte Religion : Roman-Catholic Wife’s Name : Lutgarda Z. Avellana Civil Status : Married with Three (3) children Weight : 67 kg Height : 168 cm. Mothers Name : Flora E. Avellana Father’s Name : Angel I. Avellana Jr. Passport No. EC0694322 Date of Expiry : March 27, 2019 Computer Literate – MS Word/Excel/Outlook Holder of Philippine Driving License Work April 5, 2015 to March 31, 2016 Piping Supervisor Experience Qatar Solar Technologies(PMO – Project Management Organization) (Member of Qatar Foundation) Ras Laffan, Qatar 1. Responsible for supervision of construction works executed by contractors are in accordance with the approved scope of work, engineering design, ensuring full compliance with safety and quality standards and verify that works are correctly carried out in accordance with project documentation and in the planned time frame. 2. Review and provide comments on construction method statements, material submittals during construction works until completion and handover to endusers. 3. Support the contractors ensuring the feasibility(availability of drawings and materials) of the works. 1
  • 2. 4. Responsible as performing authority for permit to work by contractors. December 3, 2013 to April 2, 2015 Steel Structural Supervisor Samsung Engineering Co. Ltd. Takreer Carbon Black & Delayed Coker Project – Ruwais, Abu Dhabi – UAE 1. Supervision and monitoring the construction activities carried out by subcontractor including but not limited to erection and installation of pipe racks, equipment platforms and shelters. 2. Assist in carrying out inspection and testing (fit-up, alignment, bolt tightening, punch list and final inrks aspection) during construction. 3. Coordination with other discipline at area of assignment. 4. Day-to-day interface with sub-contractors with emphasis on safety and quality 5. Ensure that procedures and processes are understood and followed by sub-contractors. 6. Monitor and ensure compliance with specification, procedures, and plans. Provide on-site knowledge of project specific requirements 7. Implement project HSE initiatives and ensure compliance with HSE plans and procedures 8. Interface with QA/QC personnel to address quality issues/progress. Provide oversight of sub- contractor's materials management/verification systems. Monitor workforce progress as relative to schedule. Monitor arrival of materials. Implement field surveillance plans. Assist with change process on structures 9. Ensure sub-contractor's on site planning activities are appropriate to meet objectives 10. Provide safety monitoring/leadership/coaching as well as participate in safety meetings 11. Participate, coach and assist sub-contractor personnel in effective pre-task planning measures in JSA's, and toolbox meetings 12. Participate in on site Risk Assessments and JSA development. 13. Record data for inclusion in the preparation of close-out report October 23, 2011 to December 2,2013 Steel Structural Supervisor Samsung Engineering Co. Ltd. Shah Gas Development Project Hameem, Abu Dhabi – UAE • At Workshop – Fabrication/Modification (Workshop Supervisor) 1. Supervision of all steel structure fabrication/modification works at workshop according to approved fabrication and repair procedures. 2. Fabrication of pipe spools and supports for pre-commissioning group requirements such as steam blowing pipelines among others. 3. Control man-hours allowed for fabrication/modification, ensure all budget are met or improved. • At Site – Construction(Site Supervisor) 1. Supervision of subcontractor in the construction of temporary facilities such as blasting/painting shelter and fabrication workshop. 2. Supervision and monitoring the construction activities carried out by subcontractors including but not limited to erection and installation of pipe racks and shelters at utilities and offsite area. Prepare daily progress report of structural steel erected. 3. Ensure that subcontractors will adhere to high standards of safety and quality. 4. Ensure that site works conform to method of statements, procedures and test plans, and met target completion dates. 5. Ensure that subcontractors adhere to the latest IFC drawings, specifications, procedures and site instructions. 6. Report all deviations from the original scope of work in writing to the Structural Manager. 7. Assist in carrying out inspection and testing (fit-up, alignment, bolt tightening, punch list and final inspection) during construction. Prepare weekly progress report of all inspection and testing activities. 8. Coordination with other discipline at area of assignment. Februar y 19, 2011 to August 15, 2011 Sr. Mechanical Engineer - Tanks New Horizons Company - Ledwood Saudi Aramco Project - KSA 2
  • 3. 1. Project-in-charge for the repair and maintenance of miscellaneous oil and gas storage tanks including spheroids up to 750,000 BBL capacity at their tank farm – Yanbu Refinery 2. Site Engineer for the replacement of two (2) units Arab Heavy Crude Oil(AHCO) booster pumps including modification of suction and discharge piping and pump shelter as well as construction of new pump foundations – Jeddah Refinery. November 18, 2009 to October 30, 2010 Steel Structure/Mechanical SV Keangnam Enterprises, Ltd. Ambatovy Nickel/Cobalt Project Toamasina, Madagascar 1. Review work packages for constructability 2. Supervision and monitoring the construction activities carried out by subcontractors such as erection and installation of steel structures (e.g. piperacks, vessel platforms, equipment buildings, shelters) and mechanical equipment ( e.g. agitators, bins, chutes, conveyors, filters, fans, hoists, hydraulic units, heat exchangers, mixers, pumps, storage/process/settler tanks, thickeners, vessels ) at utilities/ancillaries and refinery area. Prepare daily report of equipment installed and tons of steel erected. 3. Ensure that construction activities are carried out to the highest HSE standards 4. Assist in carrying out inspection and testing of subcontractors during construction and installation. Prepare weekly progess report of fit-up, alignment and bolt tightening. 5. Ensure that construction and installation conform with project standards and will meet target completion dates 6. Attend safety toolbox talk and progress meeting 7. Coordinate in the preparation of test packages and handover documents 8. Actively participate on programs to develop the capabilities of local construction workers with particular emphasis on HSE and quality January 2, 2009 to July 31, 2009 Tank Supervisor CB&I Lummus – Toyo Engineering Joint Venture Shell Houdini ECC Project Pulau Ular, Singapore 1. Supervision of construction of steel storage tanks for plant utilities and offsite. 2. Coordination with other discipline at area of assignment. 3. Ensure that job implementation contractor(IC) adheres to the latest AFC drawings, specifications, procedures and site instructions. 4. Ensure that IC works is according to method of statement and will met target completion dates. 5. Daily surveillance check and records ensuring that IC will provide safe working conditions and with necessary permits, PPE, enough supervisors & manpower and reliable well- maintained construction equipment. 6. Ensure proper change control by issuing field instructions, review technical queries and make sure that responses are correct and appropriate. 7. Ensure that IC carry-out witness, inspection and surveillance check in accordance with Quality Control Plan. 8. Ensure that assigned IC interface and well coordinated with other IC’s. 9. Attend safety toolbox talk and daily/weekly coordination meeting, if necessary. 10. Assigned as Team Leader during weekly safety assessment on area of assignment. 11. Ensure that IC complies with HSE plan at site. December 12, 2007 to September 30, 2008 Steel Structure Supervisor TECHNIP Consortium Dung Quat Refinery Project (Technip-JGC-Tecnicas Reunidas) Central Vietnam • At Workshop – Fabrication 1. Full time supervision at appointed subcontractor workshop during fabrication of steel structures for off-site and utilities. 2. Observe fabrication condition and call for changes, if necessary. 3. Expedite all priority items to ensure early completion. 3
  • 4. 4. Prepare daily report on all levels of fabrication to the Construction Manager. 5. Act as a channel of communication between site and sub-contractor on all matters relevant to satisfactory delivery of structures. 6. Ensure that Field Quality Control Plan (FQCP) is implemented and drawings are updated at workshop to avoid rework on site. • At Site – Construction 1. Supervision of erection/modifications of steel structures by sub-contractors at area of assignment. 2. Overall coordinator with other discipline at off-site area. 3. Follow-up RFI’s on area of assignment. 4. Coordination with workshop on remaining and additional items for fabrication. 5. Assume the duties and responsibilities of Steel Structure Superintendent while on home leave or during his absence such as conducting weekly meeting with sub-contractors. 6. Prepare internal construction punch list for clearing by sub-contractors before final inspection of PMC/client. 7. Ensure that sub-contractors will comply with HSE requirements at site. January 24, 2002 to November 24, 2007 Project Engineer AL ZAMIL METAL/AZTRACON Jeddah, Saudi Arabia • Mechanical Contractor – Design, fabrication, erec5tion and alteration of above ground steel storage tanks as per API 650/653 and pressure vessels as per ASME standards other steel structures. Completed the following : 1. Erection of thirty seven (37) units process/storage steel tanks, thickeners and ore silo at Al Amar Gold Mine (Ma’aden) - Saudi Arabia. 2. Erection of ore conveyors for GEO Robson at Al Amar Gold Mine (Ma’aden) – Saudi Arabia 3. Erection by jacking system of 36-m dia. X 16.5-m high process water tank at National Titanium Dioxide Co., Ltd. (Cristal) – Yanbu Al-Sinaiyah, K.S.A. 4. Repair of miscellaneous steel storage tanks during November 2006 Turnaround at Sabic/Yanpet – Yanbu, K.S.A. 5. Replacement of bottom plates by jacking system of various steel storage tanks at Saudi Aramco(Luberef) – Yanbu. Replacement of three upper shell course including rafters and girders of a 48-m x 16—m steel storage tank at Saudi Aramco (Luberef) – Yanbu. 6. Erection/Installation of pre-engineered and conventional buildings including pipe racks and pipe bridges at Saudi Soya Bean and Derivatives Plant. Responsibilities : 1. Review of project related drawings, scope of work, inspection and testing plan (ITP). 2. Modify project execution plan to adapt on the existing situation. 3. Planning and scheduling. 4. General supervision of project activities to ensure productivity and safety of all areas concerned. 5. Coordination with client and other trade contractors. 6. Prepare project status report and submit to client and head office. 7. Ensure to comply with HSE plan at site. November 6, 2000 – December 31, 2001 Steel Structure Supervisor PRIMO OLEOCHEMICALS INC.(PRIMECHEM) 1. Planning, supervision and monitoring of daily construction activities for storage tanks and steel structures as per implementation of quality policy satisfying project requirement and satisfaction. 2. Coordination with other disciplines that involve any interfacing in the project. 3. Prepares progress reports to monitor project accomplishment. 4. Ensure all safety, health and environment requirement are effectively and fully implemented. 5. Monitoring overall fabrications, including shop drawings, material purchases, coatings, logistic and shipment control. 4
  • 5. August 9, 1994 – October 20,2000 Project Engineer LAWIN TECHNOLOGIES/DADSON MECHANICAL SERVICES • Mechanical and Electrical Contractor 1. Project implementation and ensure timely completion 2. Ensure that working group will comply with HSE plan at site 3. Coordinate and liaise with clients on conceptual plans as well as project requirements, standards and operations 4. Prepare project execution plan and drawing up detailed project schedules and costing October 12, 1992 – February 18, 1994 Project Engineer Aguilar Consolidated Construction and Industrial Corp. - ACCICOR • General Contractor Specializing in Fire Protection System and Plumbing Works Complete installation and commissioning of Fire Protection System of Cebu Holdings Center (18-storey building) – Cebu City, Philippines November 27, 1989 – October 15, 1992 Junior Engineer HAYAMA INDUSTRIAL CORPORATION • Mechanical and Electrical Contractor Assigned in refurbishing works of various industrial plant equipment and machinery, conveyor manufacturing and installation, machinery installation and other related works July 17, 1987 – Mar. 2, 1988 Millwright/Junior Engineer BENGUET CORPORATION • Mining Company Complete installation and commissioning of mill equipment and machinery for Paracale Gold Mine introducing Cyanidation Process and perform the duties of Jr. Engineer during operation. Industrial Pneumatics Design – SMC Pneumatics Trainings Industrial Hydraulics – HIC Engineers Steam Engineering – Spirax Zarco Cylinder Controller Programming – SMC Pneumatics Turnover Management System – Shell ECC Project Safety Permit Receiver Course – National Titanium Dioxide Co. – CRISTAL(KSA) Trainings Permit Receiver Course – Saudi Aramco (Luberef II) – Yanbu Permit to Work System Training Course – Technip HSSE Dep’ t –Vietnam Hot and Cold Commissioning Training Course – Shell ECC Project Hazardous Chemicals And Nitrogen Awareness – Shell ECC Project Lock Out & Tag Out System – Shell ECC Project Safety Orientation Course (Manhole) – CB&I – Toyo JV HSE Dep’t (Ministry of Manpower Accredited Training Provider) – Singapore Oil & Petrochemical Safety Orientation Course – Shell Bukom Refinery - Singapore Recognition Top STA (Safety Task Analysis) Evaluator for April 2009 – Shell Houdini ECC Project Best Employee – Samsung Engineering Co. Ltd. – Takreer Carbon Black and Delayed Coker Project – Given 12th of July 2014 Philippine Mechanical Engineering Licensure Examination, 1989 – 79% Passed Government Career Service Professional, 1989 – 85.95% Passed Examination 5
  • 6. August 9, 1994 – October 20,2000 Project Engineer LAWIN TECHNOLOGIES/DADSON MECHANICAL SERVICES • Mechanical and Electrical Contractor 1. Project implementation and ensure timely completion 2. Ensure that working group will comply with HSE plan at site 3. Coordinate and liaise with clients on conceptual plans as well as project requirements, standards and operations 4. Prepare project execution plan and drawing up detailed project schedules and costing October 12, 1992 – February 18, 1994 Project Engineer Aguilar Consolidated Construction and Industrial Corp. - ACCICOR • General Contractor Specializing in Fire Protection System and Plumbing Works Complete installation and commissioning of Fire Protection System of Cebu Holdings Center (18-storey building) – Cebu City, Philippines November 27, 1989 – October 15, 1992 Junior Engineer HAYAMA INDUSTRIAL CORPORATION • Mechanical and Electrical Contractor Assigned in refurbishing works of various industrial plant equipment and machinery, conveyor manufacturing and installation, machinery installation and other related works July 17, 1987 – Mar. 2, 1988 Millwright/Junior Engineer BENGUET CORPORATION • Mining Company Complete installation and commissioning of mill equipment and machinery for Paracale Gold Mine introducing Cyanidation Process and perform the duties of Jr. Engineer during operation. Industrial Pneumatics Design – SMC Pneumatics Trainings Industrial Hydraulics – HIC Engineers Steam Engineering – Spirax Zarco Cylinder Controller Programming – SMC Pneumatics Turnover Management System – Shell ECC Project Safety Permit Receiver Course – National Titanium Dioxide Co. – CRISTAL(KSA) Trainings Permit Receiver Course – Saudi Aramco (Luberef II) – Yanbu Permit to Work System Training Course – Technip HSSE Dep’ t –Vietnam Hot and Cold Commissioning Training Course – Shell ECC Project Hazardous Chemicals And Nitrogen Awareness – Shell ECC Project Lock Out & Tag Out System – Shell ECC Project Safety Orientation Course (Manhole) – CB&I – Toyo JV HSE Dep’t (Ministry of Manpower Accredited Training Provider) – Singapore Oil & Petrochemical Safety Orientation Course – Shell Bukom Refinery - Singapore Recognition Top STA (Safety Task Analysis) Evaluator for April 2009 – Shell Houdini ECC Project Best Employee – Samsung Engineering Co. Ltd. – Takreer Carbon Black and Delayed Coker Project – Given 12th of July 2014 Philippine Mechanical Engineering Licensure Examination, 1989 – 79% Passed Government Career Service Professional, 1989 – 85.95% Passed Examination 5