PURUSHOTHAMAN K
CIVIL ENGINEER
Mobile- 00971509540280
Email- vishnu_purus@yahoo.com
Personal Data:
Date of Birth : 25-05-1984
Sex : Male
Religion : Hindu
Nationality : Indian
Marital Status : Married
Languages : English, Hindi,
Tamil,
Malayalam.
Visa Status : 90days
Service Visa
Passport Details
Number : N 1813054
Issued at : Trichy, India
Issue Date : 04-08-2015
Expiry Date : 03-08-2025
Driving license: Qatar
Professional Synopsis
Experienced, results-driven Civil engineer 10-years hands-on
experience on large building projects like Hotel construction,
Commercial & Residential. An independent worker with ability to
work in a pressurized work environment, capable to handle
multiple projects within set scope, time & cost and effectively
prioritize job responsibilities. Well experienced with managing the
projects as a client, contractor representative.
Educational Qualification
 Bachelor in Civil Engineering from MEPCO SCHLENK
Engineering College -Sivakasi, Anna University, India.(May
2006)
Professional Skills
 Technical Coordination
 Problem solving
 Organizing
 Communication skills
 Interpersonal skills
 Time Management
Professional Experience Summary
Project Engineer April 2016 – Present
Modern Executive System Contracting
Dubai- U.A.E
Senior Engineer Feb 2012 – Oct 2015
Bouygues Batiment International
Doha, Qatar
Site Engineer May 2007 – Jan 2012
Eversendai Construction LLC.
Dubai- U.A.E
Junior Site Engineer May 2006 – Apr 2007
Government Public Work Department.
India.
CURRICULUM VITAE
PROJECT DETAILS
G+ 12 Residential building , UAE Feb 2016 – Present
 Noor Talia Mohammad Tower with 12 story’s in Dubai. United Arab Emirates.
 G + 12 Apartment with 8 flats per floor and basement car park.
 Consultant is Design Centre.
Qatar Petroleum District, Doha, Qatar (Feb 2012- Oct2015)
 Qatar Petroleum District project features an outer ring of 6 office towers ascending in a clockwise
direction from 20 to 35 storeys in height, and an inner ring of 3 office towers and a hotel tower ascending
in a counter-clockwise direction from 31 to 50 storeys in height.
 This commercial development of 696,000sqm is among the first certified sustainably designed
developments in the Middle East.
 The Project upon its completion will serve as the Head Quarters for Qatar-Petroleum and its subsidiaries.
 Consultant is KEO international and Façade subcontractor is Jangho Curtain Wall co.
Dubai Pearl , UAE (Mar2009 - Jan 2012)
 Dubai Pearl is 4 Towers with 73 storeys each, 300 m (984 ft), tall residential skyscraper along AlSufouh
Road in Dubai. United Arab Emirates.
 It consists of four mixed-use towers connected together at the base and by a sky bridge at the top.
 Consultant is Meinhardt and main contractor is Al Habtoor Leighton group.
Emirates Park Tower Hotel Dubai,UAE (May 2007-Mar 2009)
 The project involves construction of 355 meter high twin towers (South Tower and North Tower) hotel
in which each tower comprises 2 basement levels, a ground floor, 6 podium parking levels and 70
additional floors offering 1.
 614 rooms and apartments cantilevered suspended room balconies, 31 restaurants, rooftop bars, a spa, an
outdoor swimming pool, conference facilities, 900 guest rooms and 300 serviced apartments.
 Consultant is Arch Group International and main contractor is Brookfield Multiplex.
Experience in Detail
Senior Engineer Feb 2012 – Oct 2015
Qatar Petroleum District, Doha, Qatar
 Senior site Engineer for site production in Civil and Façade Services.
 After successfully completing structural works for Tower-9 &worked as Façade Engineer for UCW system,
External Screens and Terracotta tiles.
Responsibilities being handled during this project
 Ensuring that work is carried out as per the approved Method Statement and approved Shop Drawings.
 Preparing Method Statements.
 Assisting Resident engineer to verify all the variation done with respect to updated drawings and to
contractual tender drawings. Regular meeting with consultants and other concerned subcontractors to
resolve the technical as well as contractual issues.
 Imposing a systematic approach and process for smooth execution of the projects through guidance,
monitoring and controlling. Coordination with Technical Department to sort out any technical and drawing
issues. Coordination with Methods Department for any Temporary works related issues.
 Arranging and conducting Task Launch Meeting for each specific work. Ensuring effective and efficient
production within set timescales.
 Manage and coordinate work of subordinates and Sub-contractors within area of responsibility. Seriously
complying with Safety regulations and requirements at site.
 Direct or indirect involvement in all inspections with the Structural and Architectural Consultant, Inspection
of Temporary works and issuing Permits to Load and Unload,MEP coordination
 Motivate and organize site personnel to achieve high performance of project objectives, keeping the
project on track with respect to budget and schedule.
Site Engineer May 2007 – Jan 2012
Emirates Park Tower Hotel & Dubai Pearl Tower
 Site Engineer for construction of Raft, Structural, Cantilever Core wall System, Aluma Table System, Doka
Formwork System
Responsibilities handled by me during this project
 Direct construction, operations and maintenance activities at site.
 Perform site inspection, man-material management on site, completing job as per drawings, ensure project
progress as per set time and budgets maintaining quality.
 Inspect sites to monitor progress and ensure conformance to design specifications and standards.
 Participate in surveying to lay out installations and establish reference points, grades, and elevations to
guide construction.
 Provide technical advice regarding design, construction, or program modifications and structural repairs
to industrial and managerial personnel according to the site or as-built conditions.
 Allocation of resources to the particular activities and monitoring the productivity of labors to achieve the
planned schedule.
 Inspect formwork, steel reinforcement, and concrete placement, checking the bar bending schedule and
inspecting the structural steel reinforcement and shuttering works as per the approved drawings
 Attend different kinds of meeting (Progress, Safety) on a daily, weekly or biweekly basis, daily tool box
talk prior to any works, MEP co-ordination.
 Execution of site activities and reporting to the project manager regular basis and update the programme.
 On - Site Alterations as per local authorities.
Jr Site Engineer Jun 2006- May 2007
Public Works Department Madurai, Tamilnadu, India
 Worked as a part time Jr Site Engineer during my Academics for this Food Storage Building located at
Madurai, Tamilnadu, India.
Responsibilities handled by me during this project :-
 Responsible for construction supervision, quality control, review of shop drawing, method statements, joint
measurements, preparation of progress reports, certification of measurements.
Computer Proficiency
 Operating Systems MS DOS, Windows 95 / 98 / ME / XP, Windows Vista .7.
 Software Auto CAD , MS Office,
Online Document, management and maintenance system- ACONEX

CV updated 28.07.2016

  • 1.
    PURUSHOTHAMAN K CIVIL ENGINEER Mobile-00971509540280 Email- vishnu_purus@yahoo.com Personal Data: Date of Birth : 25-05-1984 Sex : Male Religion : Hindu Nationality : Indian Marital Status : Married Languages : English, Hindi, Tamil, Malayalam. Visa Status : 90days Service Visa Passport Details Number : N 1813054 Issued at : Trichy, India Issue Date : 04-08-2015 Expiry Date : 03-08-2025 Driving license: Qatar Professional Synopsis Experienced, results-driven Civil engineer 10-years hands-on experience on large building projects like Hotel construction, Commercial & Residential. An independent worker with ability to work in a pressurized work environment, capable to handle multiple projects within set scope, time & cost and effectively prioritize job responsibilities. Well experienced with managing the projects as a client, contractor representative. Educational Qualification  Bachelor in Civil Engineering from MEPCO SCHLENK Engineering College -Sivakasi, Anna University, India.(May 2006) Professional Skills  Technical Coordination  Problem solving  Organizing  Communication skills  Interpersonal skills  Time Management Professional Experience Summary Project Engineer April 2016 – Present Modern Executive System Contracting Dubai- U.A.E Senior Engineer Feb 2012 – Oct 2015 Bouygues Batiment International Doha, Qatar Site Engineer May 2007 – Jan 2012 Eversendai Construction LLC. Dubai- U.A.E Junior Site Engineer May 2006 – Apr 2007 Government Public Work Department. India. CURRICULUM VITAE
  • 2.
    PROJECT DETAILS G+ 12Residential building , UAE Feb 2016 – Present  Noor Talia Mohammad Tower with 12 story’s in Dubai. United Arab Emirates.  G + 12 Apartment with 8 flats per floor and basement car park.  Consultant is Design Centre. Qatar Petroleum District, Doha, Qatar (Feb 2012- Oct2015)  Qatar Petroleum District project features an outer ring of 6 office towers ascending in a clockwise direction from 20 to 35 storeys in height, and an inner ring of 3 office towers and a hotel tower ascending in a counter-clockwise direction from 31 to 50 storeys in height.  This commercial development of 696,000sqm is among the first certified sustainably designed developments in the Middle East.  The Project upon its completion will serve as the Head Quarters for Qatar-Petroleum and its subsidiaries.  Consultant is KEO international and Façade subcontractor is Jangho Curtain Wall co. Dubai Pearl , UAE (Mar2009 - Jan 2012)  Dubai Pearl is 4 Towers with 73 storeys each, 300 m (984 ft), tall residential skyscraper along AlSufouh Road in Dubai. United Arab Emirates.  It consists of four mixed-use towers connected together at the base and by a sky bridge at the top.  Consultant is Meinhardt and main contractor is Al Habtoor Leighton group. Emirates Park Tower Hotel Dubai,UAE (May 2007-Mar 2009)  The project involves construction of 355 meter high twin towers (South Tower and North Tower) hotel in which each tower comprises 2 basement levels, a ground floor, 6 podium parking levels and 70 additional floors offering 1.  614 rooms and apartments cantilevered suspended room balconies, 31 restaurants, rooftop bars, a spa, an outdoor swimming pool, conference facilities, 900 guest rooms and 300 serviced apartments.  Consultant is Arch Group International and main contractor is Brookfield Multiplex.
  • 3.
    Experience in Detail SeniorEngineer Feb 2012 – Oct 2015 Qatar Petroleum District, Doha, Qatar  Senior site Engineer for site production in Civil and Façade Services.  After successfully completing structural works for Tower-9 &worked as Façade Engineer for UCW system, External Screens and Terracotta tiles. Responsibilities being handled during this project  Ensuring that work is carried out as per the approved Method Statement and approved Shop Drawings.  Preparing Method Statements.  Assisting Resident engineer to verify all the variation done with respect to updated drawings and to contractual tender drawings. Regular meeting with consultants and other concerned subcontractors to resolve the technical as well as contractual issues.  Imposing a systematic approach and process for smooth execution of the projects through guidance, monitoring and controlling. Coordination with Technical Department to sort out any technical and drawing issues. Coordination with Methods Department for any Temporary works related issues.  Arranging and conducting Task Launch Meeting for each specific work. Ensuring effective and efficient production within set timescales.  Manage and coordinate work of subordinates and Sub-contractors within area of responsibility. Seriously complying with Safety regulations and requirements at site.  Direct or indirect involvement in all inspections with the Structural and Architectural Consultant, Inspection of Temporary works and issuing Permits to Load and Unload,MEP coordination  Motivate and organize site personnel to achieve high performance of project objectives, keeping the project on track with respect to budget and schedule.
  • 4.
    Site Engineer May2007 – Jan 2012 Emirates Park Tower Hotel & Dubai Pearl Tower  Site Engineer for construction of Raft, Structural, Cantilever Core wall System, Aluma Table System, Doka Formwork System Responsibilities handled by me during this project  Direct construction, operations and maintenance activities at site.  Perform site inspection, man-material management on site, completing job as per drawings, ensure project progress as per set time and budgets maintaining quality.  Inspect sites to monitor progress and ensure conformance to design specifications and standards.  Participate in surveying to lay out installations and establish reference points, grades, and elevations to guide construction.  Provide technical advice regarding design, construction, or program modifications and structural repairs to industrial and managerial personnel according to the site or as-built conditions.  Allocation of resources to the particular activities and monitoring the productivity of labors to achieve the planned schedule.  Inspect formwork, steel reinforcement, and concrete placement, checking the bar bending schedule and inspecting the structural steel reinforcement and shuttering works as per the approved drawings  Attend different kinds of meeting (Progress, Safety) on a daily, weekly or biweekly basis, daily tool box talk prior to any works, MEP co-ordination.  Execution of site activities and reporting to the project manager regular basis and update the programme.  On - Site Alterations as per local authorities. Jr Site Engineer Jun 2006- May 2007 Public Works Department Madurai, Tamilnadu, India  Worked as a part time Jr Site Engineer during my Academics for this Food Storage Building located at Madurai, Tamilnadu, India. Responsibilities handled by me during this project :-  Responsible for construction supervision, quality control, review of shop drawing, method statements, joint measurements, preparation of progress reports, certification of measurements. Computer Proficiency  Operating Systems MS DOS, Windows 95 / 98 / ME / XP, Windows Vista .7.  Software Auto CAD , MS Office, Online Document, management and maintenance system- ACONEX