Technical Qualification:-
 B.Tech (Bachelor of Technology) Civil Engineering from Preston Institute of Management
Science and Technology, Pakistan ( Attested Documents From HEC , IBCC , UAE Embassy )
 Diploma of Associate Engineer from Punjab Board of Technical Education, Lahore,
Work Experience: -
(Building Construction, Renovation, Road work, Maintenance)
1. Working as Site Civil Engineer Proposed G+1 Residential Complex Project.
Dubai Industrial City (DIP)
Cost of Project is 100Millon.
 Execution and Supervision of the Site-Work.
 Handle the project independently.
 Setting out, leveling and surveying the site.
 Monitoring of the work of subcontractors to ensure Quality Standards.
 Supervising cutting of roads by contractors for installation of new ducts.
 Correspondence with the project parties on regular basis.
 Checking plans, drawings
 Responsible for workers’ productivity and efficiency.
 Preparation of Daily reports, work allocation and submission to project Engineer.
 Supervision and inspection for Formwork, Steel, Concrete & Finishing Work.
2. Working as Site Civil Engineer / Project Coordinator. (B+G+POD+4FL+ROOF+HC)
Jumeirah village circle Dubai.
Cost of Project 80millon AED.
 Site Construction management.
 Managing parts of construction projects
 Documentation and IR , NCR and RFI
 Inspect earth work (fill, porous fill, etc.), footings for foundations, masonry work
 Verify contractor compliance with codes, regulations, site materials, specifications
 Closing the punch list.
 Initial inspection.
 Establish and maintain all files, submittals, daily reports, and contractor daily reports.
 Work as par trakhees requirement
 Undertaking surveys
 Setting out sites and organizing facilities
 Supervising contracted staff
 Coordinates with consultant and authority
 Ensuring projects meet agreed specifications, budgets or timescales
 Liaising with clients, subcontractors and other professional staff
 Checking and preparing site reports, designs and drawings
 Providing technical advice
 Problem solving
 Ordering and negotiating the price of materials
 Ensuring site safety
1. Working as Site Civil Engineer in SINOPEC International Petroleum Service Corporation Sharjah-
from January 2014 to Feb 2016.
 Execution and Supervision of the Site-Work.
 Setting out, leveling and surveying the site.
 Monitoring of the work of subcontractors to ensure Quality Standards.
 Supervising cutting of roads by contractors for installation of new ducts.
 Correspondence with the project parties on regular basis.
 Checking plans, drawings
 Responsible for workers’ productivity and efficiency.
 Preparation of Daily reports, work allocation and submission to project Engineer.
 Supervision and inspection for Formwork, Steel, Concrete & Finishing Work.
 Supervise backfilling, road, and asphalt.
 Obtain NO Objection Certificates (NOCs) for Pipeline and Road work.
 Arranging NOC for road cutting, and excavation work.
 Ordering and negotiating the price of materials.
 Ensuring that all materials used and work performed are as per specifications.
 Collection of quotations for various subcontracted items for the bidding of the new tenders.
 PTW & NOC Coordinator of Civil works
2. Working as Site Engineer in Al-Rehman, Pakistan from June 2012 to Dec 2013.
 Site Management
 Construction Management
 Materials Planning and procurement
 Monitoring and verification of the progress report of the contractor work
 Deliver project on schedule, within budget, quality and technical standards
 Preparation of work schedule and working drawing
 Preparation of bar bending and cutting drawing
 Correspondence with Client, Consultant and Architect.
 Labor Management
 Every day feedback to the project manager.
 Ensure the works are done as per specifications / relevant standards.
 Check out material Quality at the site
 Allocating work to subcontractors;
 Making estimations for timescales and costs

3. Working as Assistant Engineer in WAF, Bahawalpur, and Pakistan from June 2010 to March 2012.
 Allocating work to subcontractors;
 Providing advice on contractual claims
 Preparation of BOQ by Take-OFF Quantities from relevant drawing.
Project:-
I. University of Engineering & Technology Lahore Boys Hostel
Software Skills:-
 Auto CAD
 MS Office
 Ms Project
 Primavera (P6)
 Plan Swift
Certification & Workshops
 Certified DIT , Pakistan
 Two Days workshop (Primavera P6) (PAKISTAN)
 Two Days Health & Safety Training.(ADNOC)
 One Days Excavation , and Fire work Safety Training ( ADNOC)
 One Days First Aid Training ( GMC Hospital Spencer by ADNOC)

Personal Resumes:-
Name of Candidate : Imran Barkat
Date of Birth : September. 15th, 1991 (24 years)
Language Known : English Hindi Urdu Punjabi
Nationality : Pakistani
Passport Number : AL3961981
Expiry : 23-March-2019
Driving License : Dubai.
Declaration:-
I hereby declare that the details furnished above are true and correct to the best of my
knowledge.

CV Engr Imran Brkat

  • 1.
    Imran Barkat. Cell Phone:- 00971-55-4586082 Email: - imran.tatari@gmail.com Present Address: - Room No.102 Al Saqooq Building Deira Dubai Driving License No. 3562351/ Dubai License Expiry 04/08/2025 Post applied for Site Engineer / Civil Inspector -------------------------------------------------------------------------------------------------------------------------- Objective:- To work with reputed organization, that provides challenges & opportunity to utilize my skills & provide me a platform so that I can excel myself in the field of latest technology & Construction. Technical Qualification:-  B.Tech (Bachelor of Technology) Civil Engineering from Preston Institute of Management Science and Technology, Pakistan ( Attested Documents From HEC , IBCC , UAE Embassy )  Diploma of Associate Engineer from Punjab Board of Technical Education, Lahore, Work Experience: - (Building Construction, Renovation, Road work, Maintenance) 1. Working as Site Civil Engineer Proposed G+1 Residential Complex Project. Dubai Industrial City (DIP) Cost of Project is 100Millon.  Execution and Supervision of the Site-Work.  Handle the project independently.  Setting out, leveling and surveying the site.  Monitoring of the work of subcontractors to ensure Quality Standards.  Supervising cutting of roads by contractors for installation of new ducts.  Correspondence with the project parties on regular basis.  Checking plans, drawings  Responsible for workers’ productivity and efficiency.  Preparation of Daily reports, work allocation and submission to project Engineer.  Supervision and inspection for Formwork, Steel, Concrete & Finishing Work. 2. Working as Site Civil Engineer / Project Coordinator. (B+G+POD+4FL+ROOF+HC) Jumeirah village circle Dubai. Cost of Project 80millon AED.  Site Construction management.  Managing parts of construction projects  Documentation and IR , NCR and RFI  Inspect earth work (fill, porous fill, etc.), footings for foundations, masonry work  Verify contractor compliance with codes, regulations, site materials, specifications  Closing the punch list.
  • 2.
     Initial inspection. Establish and maintain all files, submittals, daily reports, and contractor daily reports.  Work as par trakhees requirement  Undertaking surveys  Setting out sites and organizing facilities  Supervising contracted staff  Coordinates with consultant and authority  Ensuring projects meet agreed specifications, budgets or timescales  Liaising with clients, subcontractors and other professional staff  Checking and preparing site reports, designs and drawings  Providing technical advice  Problem solving  Ordering and negotiating the price of materials  Ensuring site safety 1. Working as Site Civil Engineer in SINOPEC International Petroleum Service Corporation Sharjah- from January 2014 to Feb 2016.  Execution and Supervision of the Site-Work.  Setting out, leveling and surveying the site.  Monitoring of the work of subcontractors to ensure Quality Standards.  Supervising cutting of roads by contractors for installation of new ducts.  Correspondence with the project parties on regular basis.  Checking plans, drawings  Responsible for workers’ productivity and efficiency.  Preparation of Daily reports, work allocation and submission to project Engineer.  Supervision and inspection for Formwork, Steel, Concrete & Finishing Work.  Supervise backfilling, road, and asphalt.  Obtain NO Objection Certificates (NOCs) for Pipeline and Road work.  Arranging NOC for road cutting, and excavation work.  Ordering and negotiating the price of materials.  Ensuring that all materials used and work performed are as per specifications.  Collection of quotations for various subcontracted items for the bidding of the new tenders.  PTW & NOC Coordinator of Civil works 2. Working as Site Engineer in Al-Rehman, Pakistan from June 2012 to Dec 2013.  Site Management  Construction Management  Materials Planning and procurement  Monitoring and verification of the progress report of the contractor work  Deliver project on schedule, within budget, quality and technical standards  Preparation of work schedule and working drawing  Preparation of bar bending and cutting drawing  Correspondence with Client, Consultant and Architect.  Labor Management  Every day feedback to the project manager.  Ensure the works are done as per specifications / relevant standards.
  • 3.
     Check outmaterial Quality at the site  Allocating work to subcontractors;  Making estimations for timescales and costs  3. Working as Assistant Engineer in WAF, Bahawalpur, and Pakistan from June 2010 to March 2012.  Allocating work to subcontractors;  Providing advice on contractual claims  Preparation of BOQ by Take-OFF Quantities from relevant drawing. Project:- I. University of Engineering & Technology Lahore Boys Hostel Software Skills:-  Auto CAD  MS Office  Ms Project  Primavera (P6)  Plan Swift Certification & Workshops  Certified DIT , Pakistan  Two Days workshop (Primavera P6) (PAKISTAN)  Two Days Health & Safety Training.(ADNOC)  One Days Excavation , and Fire work Safety Training ( ADNOC)  One Days First Aid Training ( GMC Hospital Spencer by ADNOC)  Personal Resumes:- Name of Candidate : Imran Barkat Date of Birth : September. 15th, 1991 (24 years) Language Known : English Hindi Urdu Punjabi Nationality : Pakistani Passport Number : AL3961981 Expiry : 23-March-2019 Driving License : Dubai. Declaration:- I hereby declare that the details furnished above are true and correct to the best of my knowledge.