SlideShare a Scribd company logo
MUHAMMAD AMIN
muhammadamin461@gmail.com
Cell#+92-342-7115047(Pak)
+964-751-1823831(Iraq)
EDUCATION
 PIMSAT Institute of Higher Education Lahore, Pakistan in 2009
Bachelors of Technology in ELECTRICAL Technology with 3.1GPA.
 Punjab Board of Technical Education Lahore, Pakistan in 2005
3 Years Diploma of Associate Engineer in ELECTRICAL Technology 72% marks.
 Board of Intermediate and secondary Education Lahore, Pakistan in 2002
Matriculation With Science with 72% marks.
OBJECTIVE
Desire a challenging position as Electrical Supervisor with great deal of experience in
many aspects of research & design, Construction, installation, commissioning and
Maintenance Oil and Gas Projects Electrical and Instrumentation Department.
 10 Years’ experience in Oil & Field Projects and Conventional Plants.
CAREER CONTOUR
LISTOFPROJECTS
Project Client Responsibility
Oryx Petroleum Oil & Gas Ph-1 (EPF)
Erbil Iraq
Oryx E&I Technologist/Supervisor
Oryx Petroleum Oil & Gas Ph-0 (TPF)
Erbil Iraq
Oryx E&I Technologist
Gharraf FCP Oil &Gas(Basra Iraq) Petronas E&I Technologist
Bina Bawi Oil & Gas Erbil Iraq OMV E&I Technologist
Nestle Khanewal Plant Pakistan Nestle Electrical Technologist
Al-Mukalla Iron and Steel MillsYemen Siemens Electrical Supervisor
Dost Steel Mills Pakistan Siemens Electrical Technician
CURRENT PROFILE
Recently working as E&I Supervisor in Operation and Maintenance Team at Oryx
Petroleum EPF having 45000 b/d production project in Kurdistan, Iraq.
DRAKKEN PVT LTD PAK & CANADA (from 2012 to till date)
Construction, Commissioning and Start-up activities as E&I Technologist /Supervisor
on various Oil and Gas Projects in IRAQ.
BINA BAWI OIL & GAS ERBIL IRAQ:
1st FCP oil and gas project in Erbil (Kurdistan) of 5000 b/d capacity project. Having 2
Wellhead and 3 Wellheads in construction stages to increase capacity up to 10,000 b/d crude
oil for Kurdistan region.
Job Responsibility:
Construction and Commissioning supervision job are as following in from Nov 20012 to
April 2013:
 Cable ladder installation on three site Truck loading station, Early Production facility
and Wellhead.
 Cable pulling and termination job on same sites including Earth system with proper
earth testing.
 Three 600 KVA Genset termination, synchronization and start-up activities.
 Installation and Testing of different types of Instrument like FIT, LIT, PCV, TIT and
LCV etc.
 Also have work experience on H2S and IR3 Technology Flame detector instruments
with DATACON control technology.
 10 Km Optical-fiber cable pulling job done with complete safety precaution through
trench.
GARRAF FCP OIL & GAS (BASRA IRAQ):
1st FCP oil and gas project in Nasiriya (Iraq) of 200,000 b/d capacity project.
Construction work still running to increase production at different Wellheads and
processing units. A great combination in Oil and Gas field between South Oil Gas
Company and PETRONAS Malaysian Company.
Job Responsibility:
Construction and Commissioning Senior E&I Technologist job areas following from July
2013 to May 2014:
 Cable, Motor and Transformer testing, Meggering and report preparation.
 Control, Power and MV Cables termination job in CP, and Distribution panels.
 Installation and testing of different types Instrument of Honeywell and Rosemount like FIT,
LIT, PCV, TIT and LCV etc.
 Also have work experience on H2S and IR3 Technology Flame detector instruments with
Honey-Well DCS control system technology.
 Progress reporting to client PETRONAS and Weatherford on daily basis.
ORYX PETROLEUM PHASE (0) EXPRO OPERATOR:
TPF (Temporary Production Facility) by Oryx Petroleum oil and gas project in Erbil
(Kurdistan) of 5000 b/d capacity project. Having 1 Wellhead in process and 4 Wellhead in
construction stages in Kurdistan region supported by N.O.C Iraq. Work for Oryx
Petroleum on EXPRO operator Equipments.
Job Responsibility:
Construction and Commissioning Supervisor job as following in June 2014:
 Construction job of TPF site from 0 levels to 1
st
start up of this project.
 Instruct to technical team about E&I construction jobs on daily basis.
 Inspection and testing of E&I construction and Commissioning jobs and report to Expro
and Oryx Petroleum.
 Works on Installation of Control panel and field construction.
 Testing and Meggering of AC Motors, Alternator and Distribution panels.
 Commissioning and testing job on Rosemount LIT, PIT instruments and also on IR3 flame
detector and H2S gas detectors and Siemens process control system.
 Same E&I job on TLS site.
ORYX PETROLEUM PHASE (1) EXTENSION EXPRO OPERATOR:
EPF (Early Production Facility) by Oryx Petroleum oil and gas project in Erbil
(Kurdistan) of 5000 b/d capacity running project. Having 10 Wellhead in process with
45,000 b/d crude oil for Kurdistan region supported by N.O.C Iraq. Work for Oryx
Petroleum.
Job Responsibility:
Complete Construction and Commissioning jobs from Nov 2014 to till date.
Now Working in Operation and Maintenance Oryx Team Jobs are as under after
completion of construction jobs to till date.
 Construction jobs of E&I Installation with team work and reporting Team lead .
 Supervision on Installation of Control Panels, MCC and Field DCS sub panels.
 Testing and Meggering of AC Motors, Alternator and Distribution panels.
 Commissioning and testing job on Rosemount LIT, PIT instruments and also on IR3
flame detector, LEL and H2S gas detectors by Crowcon Technology.
 Work on DataCon DCS process control system.
 QA/QC of E&I Installation and ITR submission to document control lead.
 Working on E&I trouble shouting and maintenance jobs with OM team.
 Safety Induction to all teams on daily basis.

AL-MUKALLA IRON AND STEEL MILLS YEMEN (From 2010 to 2011 )
Al-Mukalla Iron and steel mills a biggest Re-rolling project in Al-Mukalla (Hadhar-mout) in
Yemen. Planned on latest and fast Siemens/VIA DCS control system Technology having
10,000 Tons/day production.
Job Responsibility:
Work as Electrical Supervisor in Construction of Re-rolling Iron and Steel mills
Yemen.
 Installation of DC Drive, AC Drive, HT, PLC and Remote I/O unites panels.
 HT,LT, Control, Optical fiber, Profi-bus and Optic-Glass cables pulling and termination.
 Installation and testing job regarding Earthing system on the project.
 Installation of AC motors of 500 KW by assisting of Russian & Italian Engineers.
 Installation of E&I Equipments and Instruments like Metal Detector, Loop-Scanners, Level
and Pressure transmitters.
 Instrumentation job on 2700 0
C of electric-furnace.
 Work on installation of100 Ton overhead cranes controlled by AC Drive units.
 Hot and Cold commissioning of site with Russian and Italian Engineers controlled by
Siemens S7 Semantic control system also commissioning job on HMI units.
DOST STEEL MILLS LTD PAKISTAN ( From 2005 to 2010)
5 year Construction, Commissioning and Maintenance job as an Electrical Technician.
Dost Steel Mills an Iron rolling project in Bhai-Phero, Kasur Pakistan. Planned on latest
and fast Siemens/ENI control system Technology having 1000 Tons/day production.
Job Responsibility:
 Installation of DC Drive, HT, PLC and Remote I/O unites panels.
 HT, LT, Control, Optical fiber, Profi-bus cables pulling and termination.
 Installation and testing job regarding Earthing system on the project.
 Installation of DC motors of 500 KW by assisting of Italian Engineers.
 Installation of E&I Equipments and Instruments like Metal Detector, Loop-Scanners, Level
and Pressure transmitters.
 Work on installation of 100 Ton overhead cranes controlled by AC Drive units.
 Hot and Cold commissioning of site with Italian Engineers controlled by Siemens S4
Semantic control system also commissioning job on HMI units.
 Start-up activities and field technician job of maintenance of E&I Equipments.
 Troubleshooting of E&I Equipments during operation with proper LOTO & PTW
procedure.
TRAININGS
 Onsite one day Training for MV panels Protections, VCB Breakers & Transformer
Safeties.
 On-site two week training PLC Siemens Somatic S7 300/S7 400.
 Very well familiar with permit to work system (cold and hot) process plant hazards and
control jobs safety analysis. These includes Emergency response plan, Mechanical and
Electrical isolation according to PTW. Handling and storage Hazard substances
environmental awareness. Good knowledge about hazards Area classifications.
 3 days H2S Gas safety training at Bina Bawi Oil Gas Field Erbil Iraq from OMV client
safety Instructors and Managers.
 2 days H2S Safety training at Garraf FCP Oil and Gas project near Nasiriya Iraq arranged
by PETRONAS Management on site
 2 days H2S, PTW and Construction Hazards training arranged by Oryx Petroleum at
Oryx TPF Oil and Gas Filed Erbil Iraq.
o from Sterling training office in Iraq, Erbil.
 English Interaction training from Institute of Modern Language Lahore, Pakistan
PROCESS CONTROL SYSTEMS
I have worked on different Process Control System while working in different projects,
like…
 Siemens/ENI Technology Process Control system in Dost Steel Mills Pakistan.
 Siemens/VIA Technology Process Control System in Al-Mukalla Iron and Steel Mills
Yemen
 DATACON DCS Control System in Bina Bawi Oil and Gas Project Kurdistan, Iraq.
 Honey Well DCS Control System in Garraf Oil and Gas Project Nasseriya, Basra region,
Iraq.
 Siemens Technology Process Control System in Oryx Petroleum Phase Zero, Kurdistan,
Iraq.
 DATACON Technology Process and Control System in Oryx Petroleum Early
Production Facility Kurdistan, Iraq.
COMPUTER AND COMMUNICATION SKILLS
 Proficient in MSOffice (MSWord, MS Excel, MS Power Point)
 Computer Hardware & Soft Ware, Windows 98/Window
XP
 experience in Auto Cad
 English Interactions course from Lahore Pakistan
 Good communication skills in English, Urdu and Arabic.
PERSONAL DETAILS
Father’s Name Muhammad Younis
Passport no. BR1203463
Date of Birth 08-05-1987
Nationality Pakistani
Marital Status married

More Related Content

What's hot

Marlon Maisog CV GE 1
Marlon Maisog CV GE 1Marlon Maisog CV GE 1
Marlon Maisog CV GE 1
Marlon Maisog
 
Chris Irvine Resume 27.09.2013
Chris Irvine Resume 27.09.2013Chris Irvine Resume 27.09.2013
Chris Irvine Resume 27.09.2013
Chris Irvine
 
Ward, George Resume
Ward, George ResumeWard, George Resume
Ward, George Resume
George Ward
 
cv-ramez-2016 new
cv-ramez-2016 newcv-ramez-2016 new
cv-ramez-2016 new
Ramez Nasr
 
Harish_QA_QC_Engineer_resume
Harish_QA_QC_Engineer_resumeHarish_QA_QC_Engineer_resume
Harish_QA_QC_Engineer_resume
Harish G
 

What's hot (20)

M Imran
M ImranM Imran
M Imran
 
Sreekumar_bms
Sreekumar_bmsSreekumar_bms
Sreekumar_bms
 
Muthukumaran cv
Muthukumaran cvMuthukumaran cv
Muthukumaran cv
 
CV 2016 new
CV 2016 newCV 2016 new
CV 2016 new
 
Resume_new
Resume_newResume_new
Resume_new
 
ELECTRICAL AND INSTRUMENT SUPERVISOR
ELECTRICAL AND INSTRUMENT SUPERVISORELECTRICAL AND INSTRUMENT SUPERVISOR
ELECTRICAL AND INSTRUMENT SUPERVISOR
 
Marlon Maisog CV GE 1
Marlon Maisog CV GE 1Marlon Maisog CV GE 1
Marlon Maisog CV GE 1
 
cv Instrument Commissioning Engineer
cv Instrument Commissioning Engineercv Instrument Commissioning Engineer
cv Instrument Commissioning Engineer
 
CV_Sandeep Anugade
CV_Sandeep AnugadeCV_Sandeep Anugade
CV_Sandeep Anugade
 
CV
CV CV
CV
 
noel cv
noel cvnoel cv
noel cv
 
LATEST UPDATED CV OF MR SAJEEV R
LATEST UPDATED CV OF MR SAJEEV RLATEST UPDATED CV OF MR SAJEEV R
LATEST UPDATED CV OF MR SAJEEV R
 
cv
cvcv
cv
 
CV 2015
CV 2015CV 2015
CV 2015
 
Chris Irvine Resume 27.09.2013
Chris Irvine Resume 27.09.2013Chris Irvine Resume 27.09.2013
Chris Irvine Resume 27.09.2013
 
Ward, George Resume
Ward, George ResumeWard, George Resume
Ward, George Resume
 
cv-ramez-2016 new
cv-ramez-2016 newcv-ramez-2016 new
cv-ramez-2016 new
 
Harish_QA_QC_Engineer_resume
Harish_QA_QC_Engineer_resumeHarish_QA_QC_Engineer_resume
Harish_QA_QC_Engineer_resume
 
Mohamed HENDI CV
Mohamed HENDI CVMohamed HENDI CV
Mohamed HENDI CV
 
AHMED KHAMIS new
AHMED KHAMIS newAHMED KHAMIS new
AHMED KHAMIS new
 

Viewers also liked (13)

Cv
CvCv
Cv
 
saqib cv chiller
saqib cv chillersaqib cv chiller
saqib cv chiller
 
cv new pakistan
cv new pakistancv new pakistan
cv new pakistan
 
Syed Mazhar CV
Syed Mazhar CVSyed Mazhar CV
Syed Mazhar CV
 
my CV 19Dec2016
my CV 19Dec2016my CV 19Dec2016
my CV 19Dec2016
 
Ahsan Bhai CV
Ahsan Bhai CVAhsan Bhai CV
Ahsan Bhai CV
 
CV of Safait didar
CV of Safait didarCV of Safait didar
CV of Safait didar
 
CV YAHYA April2015 R2
CV YAHYA April2015 R2CV YAHYA April2015 R2
CV YAHYA April2015 R2
 
Mechanical Engineer Anjum
Mechanical Engineer AnjumMechanical Engineer Anjum
Mechanical Engineer Anjum
 
CV umair farooq
CV umair farooqCV umair farooq
CV umair farooq
 
New & Complete CV Of Mr. Zeeshan
New & Complete CV Of Mr. ZeeshanNew & Complete CV Of Mr. Zeeshan
New & Complete CV Of Mr. Zeeshan
 
RJ
RJRJ
RJ
 
Azim uddin CV
Azim uddin CVAzim uddin CV
Azim uddin CV
 

Similar to MUHAMMAD AMIN CV

CV_Abdul Razzaq.doc
CV_Abdul Razzaq.docCV_Abdul Razzaq.doc
CV_Abdul Razzaq.doc
Abdul Razzaq
 
Mohamed Mady C
Mohamed Mady CMohamed Mady C
Mohamed Mady C
ENGADAM
 
Rana Maqsood Alam Resume (E&I)
Rana Maqsood Alam  Resume (E&I)Rana Maqsood Alam  Resume (E&I)
Rana Maqsood Alam Resume (E&I)
rana maqsood
 
ELECTRICAL ENGINEER CV M
ELECTRICAL ENGINEER CV MELECTRICAL ENGINEER CV M
ELECTRICAL ENGINEER CV M
usama gamal
 
CV of Ronnel T. Domingo - Electrical Engineer
CV of Ronnel T. Domingo - Electrical EngineerCV of Ronnel T. Domingo - Electrical Engineer
CV of Ronnel T. Domingo - Electrical Engineer
RONNEL DOMINGO
 
Engr.SaherCV (1)
Engr.SaherCV (1)Engr.SaherCV (1)
Engr.SaherCV (1)
Saher Jehad
 
Resume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripitionResume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripition
vineeth ravi
 
JAMES MICHAEL STULTS_RESUME
JAMES MICHAEL STULTS_RESUMEJAMES MICHAEL STULTS_RESUME
JAMES MICHAEL STULTS_RESUME
James Stults
 
ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAE
sekar palani
 

Similar to MUHAMMAD AMIN CV (20)

Resume iif 2020
Resume iif 2020Resume iif 2020
Resume iif 2020
 
Haider Ali_CV
Haider Ali_CVHaider Ali_CV
Haider Ali_CV
 
CV_Abdul Razzaq.doc
CV_Abdul Razzaq.docCV_Abdul Razzaq.doc
CV_Abdul Razzaq.doc
 
Mohamed Mady C
Mohamed Mady CMohamed Mady C
Mohamed Mady C
 
Ww cv 2016
Ww cv 2016Ww cv 2016
Ww cv 2016
 
Rana Maqsood Alam Resume (E&I)
Rana Maqsood Alam  Resume (E&I)Rana Maqsood Alam  Resume (E&I)
Rana Maqsood Alam Resume (E&I)
 
Rana maqsood alam resume (e&i) and construction
Rana maqsood alam  resume (e&i) and constructionRana maqsood alam  resume (e&i) and construction
Rana maqsood alam resume (e&i) and construction
 
Khaled elhag cv
Khaled elhag cvKhaled elhag cv
Khaled elhag cv
 
Ww CV 2016
Ww CV 2016Ww CV 2016
Ww CV 2016
 
Ivan new_cv_updated
Ivan new_cv_updatedIvan new_cv_updated
Ivan new_cv_updated
 
ELECTRICAL ENGINEER CV M
ELECTRICAL ENGINEER CV MELECTRICAL ENGINEER CV M
ELECTRICAL ENGINEER CV M
 
CV of Ronnel T. Domingo - Electrical Engineer
CV of Ronnel T. Domingo - Electrical EngineerCV of Ronnel T. Domingo - Electrical Engineer
CV of Ronnel T. Domingo - Electrical Engineer
 
ARUNKUMAR CV
ARUNKUMAR CVARUNKUMAR CV
ARUNKUMAR CV
 
Abraham CV 03.06.2015
Abraham CV 03.06.2015Abraham CV 03.06.2015
Abraham CV 03.06.2015
 
Engr.SaherCV (1)
Engr.SaherCV (1)Engr.SaherCV (1)
Engr.SaherCV (1)
 
Muayad New
Muayad NewMuayad New
Muayad New
 
CV
CVCV
CV
 
Resume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripitionResume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripition
 
JAMES MICHAEL STULTS_RESUME
JAMES MICHAEL STULTS_RESUMEJAMES MICHAEL STULTS_RESUME
JAMES MICHAEL STULTS_RESUME
 
ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAE
 

MUHAMMAD AMIN CV

  • 1. MUHAMMAD AMIN muhammadamin461@gmail.com Cell#+92-342-7115047(Pak) +964-751-1823831(Iraq) EDUCATION  PIMSAT Institute of Higher Education Lahore, Pakistan in 2009 Bachelors of Technology in ELECTRICAL Technology with 3.1GPA.  Punjab Board of Technical Education Lahore, Pakistan in 2005 3 Years Diploma of Associate Engineer in ELECTRICAL Technology 72% marks.  Board of Intermediate and secondary Education Lahore, Pakistan in 2002 Matriculation With Science with 72% marks. OBJECTIVE Desire a challenging position as Electrical Supervisor with great deal of experience in many aspects of research & design, Construction, installation, commissioning and Maintenance Oil and Gas Projects Electrical and Instrumentation Department.  10 Years’ experience in Oil & Field Projects and Conventional Plants. CAREER CONTOUR LISTOFPROJECTS Project Client Responsibility Oryx Petroleum Oil & Gas Ph-1 (EPF) Erbil Iraq Oryx E&I Technologist/Supervisor Oryx Petroleum Oil & Gas Ph-0 (TPF) Erbil Iraq Oryx E&I Technologist Gharraf FCP Oil &Gas(Basra Iraq) Petronas E&I Technologist Bina Bawi Oil & Gas Erbil Iraq OMV E&I Technologist Nestle Khanewal Plant Pakistan Nestle Electrical Technologist Al-Mukalla Iron and Steel MillsYemen Siemens Electrical Supervisor Dost Steel Mills Pakistan Siemens Electrical Technician CURRENT PROFILE Recently working as E&I Supervisor in Operation and Maintenance Team at Oryx Petroleum EPF having 45000 b/d production project in Kurdistan, Iraq. DRAKKEN PVT LTD PAK & CANADA (from 2012 to till date) Construction, Commissioning and Start-up activities as E&I Technologist /Supervisor on various Oil and Gas Projects in IRAQ. BINA BAWI OIL & GAS ERBIL IRAQ: 1st FCP oil and gas project in Erbil (Kurdistan) of 5000 b/d capacity project. Having 2 Wellhead and 3 Wellheads in construction stages to increase capacity up to 10,000 b/d crude oil for Kurdistan region.
  • 2. Job Responsibility: Construction and Commissioning supervision job are as following in from Nov 20012 to April 2013:  Cable ladder installation on three site Truck loading station, Early Production facility and Wellhead.  Cable pulling and termination job on same sites including Earth system with proper earth testing.  Three 600 KVA Genset termination, synchronization and start-up activities.  Installation and Testing of different types of Instrument like FIT, LIT, PCV, TIT and LCV etc.  Also have work experience on H2S and IR3 Technology Flame detector instruments with DATACON control technology.  10 Km Optical-fiber cable pulling job done with complete safety precaution through trench. GARRAF FCP OIL & GAS (BASRA IRAQ): 1st FCP oil and gas project in Nasiriya (Iraq) of 200,000 b/d capacity project. Construction work still running to increase production at different Wellheads and processing units. A great combination in Oil and Gas field between South Oil Gas Company and PETRONAS Malaysian Company. Job Responsibility: Construction and Commissioning Senior E&I Technologist job areas following from July 2013 to May 2014:  Cable, Motor and Transformer testing, Meggering and report preparation.  Control, Power and MV Cables termination job in CP, and Distribution panels.  Installation and testing of different types Instrument of Honeywell and Rosemount like FIT, LIT, PCV, TIT and LCV etc.  Also have work experience on H2S and IR3 Technology Flame detector instruments with Honey-Well DCS control system technology.  Progress reporting to client PETRONAS and Weatherford on daily basis. ORYX PETROLEUM PHASE (0) EXPRO OPERATOR: TPF (Temporary Production Facility) by Oryx Petroleum oil and gas project in Erbil (Kurdistan) of 5000 b/d capacity project. Having 1 Wellhead in process and 4 Wellhead in construction stages in Kurdistan region supported by N.O.C Iraq. Work for Oryx Petroleum on EXPRO operator Equipments. Job Responsibility: Construction and Commissioning Supervisor job as following in June 2014:  Construction job of TPF site from 0 levels to 1 st start up of this project.  Instruct to technical team about E&I construction jobs on daily basis.  Inspection and testing of E&I construction and Commissioning jobs and report to Expro and Oryx Petroleum.  Works on Installation of Control panel and field construction.  Testing and Meggering of AC Motors, Alternator and Distribution panels.  Commissioning and testing job on Rosemount LIT, PIT instruments and also on IR3 flame detector and H2S gas detectors and Siemens process control system.  Same E&I job on TLS site.
  • 3. ORYX PETROLEUM PHASE (1) EXTENSION EXPRO OPERATOR: EPF (Early Production Facility) by Oryx Petroleum oil and gas project in Erbil (Kurdistan) of 5000 b/d capacity running project. Having 10 Wellhead in process with 45,000 b/d crude oil for Kurdistan region supported by N.O.C Iraq. Work for Oryx Petroleum. Job Responsibility: Complete Construction and Commissioning jobs from Nov 2014 to till date. Now Working in Operation and Maintenance Oryx Team Jobs are as under after completion of construction jobs to till date.  Construction jobs of E&I Installation with team work and reporting Team lead .  Supervision on Installation of Control Panels, MCC and Field DCS sub panels.  Testing and Meggering of AC Motors, Alternator and Distribution panels.  Commissioning and testing job on Rosemount LIT, PIT instruments and also on IR3 flame detector, LEL and H2S gas detectors by Crowcon Technology.  Work on DataCon DCS process control system.  QA/QC of E&I Installation and ITR submission to document control lead.  Working on E&I trouble shouting and maintenance jobs with OM team.  Safety Induction to all teams on daily basis.  AL-MUKALLA IRON AND STEEL MILLS YEMEN (From 2010 to 2011 ) Al-Mukalla Iron and steel mills a biggest Re-rolling project in Al-Mukalla (Hadhar-mout) in Yemen. Planned on latest and fast Siemens/VIA DCS control system Technology having 10,000 Tons/day production. Job Responsibility: Work as Electrical Supervisor in Construction of Re-rolling Iron and Steel mills Yemen.  Installation of DC Drive, AC Drive, HT, PLC and Remote I/O unites panels.  HT,LT, Control, Optical fiber, Profi-bus and Optic-Glass cables pulling and termination.  Installation and testing job regarding Earthing system on the project.  Installation of AC motors of 500 KW by assisting of Russian & Italian Engineers.  Installation of E&I Equipments and Instruments like Metal Detector, Loop-Scanners, Level and Pressure transmitters.  Instrumentation job on 2700 0 C of electric-furnace.  Work on installation of100 Ton overhead cranes controlled by AC Drive units.  Hot and Cold commissioning of site with Russian and Italian Engineers controlled by Siemens S7 Semantic control system also commissioning job on HMI units. DOST STEEL MILLS LTD PAKISTAN ( From 2005 to 2010) 5 year Construction, Commissioning and Maintenance job as an Electrical Technician. Dost Steel Mills an Iron rolling project in Bhai-Phero, Kasur Pakistan. Planned on latest and fast Siemens/ENI control system Technology having 1000 Tons/day production. Job Responsibility:  Installation of DC Drive, HT, PLC and Remote I/O unites panels.  HT, LT, Control, Optical fiber, Profi-bus cables pulling and termination.  Installation and testing job regarding Earthing system on the project.  Installation of DC motors of 500 KW by assisting of Italian Engineers.  Installation of E&I Equipments and Instruments like Metal Detector, Loop-Scanners, Level and Pressure transmitters.
  • 4.  Work on installation of 100 Ton overhead cranes controlled by AC Drive units.  Hot and Cold commissioning of site with Italian Engineers controlled by Siemens S4 Semantic control system also commissioning job on HMI units.  Start-up activities and field technician job of maintenance of E&I Equipments.  Troubleshooting of E&I Equipments during operation with proper LOTO & PTW procedure. TRAININGS  Onsite one day Training for MV panels Protections, VCB Breakers & Transformer Safeties.  On-site two week training PLC Siemens Somatic S7 300/S7 400.  Very well familiar with permit to work system (cold and hot) process plant hazards and control jobs safety analysis. These includes Emergency response plan, Mechanical and Electrical isolation according to PTW. Handling and storage Hazard substances environmental awareness. Good knowledge about hazards Area classifications.  3 days H2S Gas safety training at Bina Bawi Oil Gas Field Erbil Iraq from OMV client safety Instructors and Managers.  2 days H2S Safety training at Garraf FCP Oil and Gas project near Nasiriya Iraq arranged by PETRONAS Management on site  2 days H2S, PTW and Construction Hazards training arranged by Oryx Petroleum at Oryx TPF Oil and Gas Filed Erbil Iraq. o from Sterling training office in Iraq, Erbil.  English Interaction training from Institute of Modern Language Lahore, Pakistan PROCESS CONTROL SYSTEMS I have worked on different Process Control System while working in different projects, like…  Siemens/ENI Technology Process Control system in Dost Steel Mills Pakistan.  Siemens/VIA Technology Process Control System in Al-Mukalla Iron and Steel Mills Yemen  DATACON DCS Control System in Bina Bawi Oil and Gas Project Kurdistan, Iraq.  Honey Well DCS Control System in Garraf Oil and Gas Project Nasseriya, Basra region, Iraq.  Siemens Technology Process Control System in Oryx Petroleum Phase Zero, Kurdistan, Iraq.  DATACON Technology Process and Control System in Oryx Petroleum Early Production Facility Kurdistan, Iraq. COMPUTER AND COMMUNICATION SKILLS  Proficient in MSOffice (MSWord, MS Excel, MS Power Point)  Computer Hardware & Soft Ware, Windows 98/Window XP  experience in Auto Cad  English Interactions course from Lahore Pakistan  Good communication skills in English, Urdu and Arabic. PERSONAL DETAILS Father’s Name Muhammad Younis Passport no. BR1203463 Date of Birth 08-05-1987 Nationality Pakistani