1. The document provides abbreviations and acronyms commonly used on mechanical drawings. It includes over 70 abbreviations ranging from general terms like GPM, GAL, FT to equipment terms like C.I., CFM, HP.
2. It also lists 13 general mechanical notes covering topics like pipe supports, equipment dimensions, field verification of dimensions, flexible connectors for expansion, and fireproof sealed wall penetrations.
3. The notes indicate that drawings and specifications use specific manufacturers as design basis, and contractors must verify exact placement and dimensions in field conditions.
This document contains diagrams and technical specifications for a building site plan, fire sprinkler system, and floor plans. It includes details like pipe sizes and locations, sprinkler head types and quantities, mechanical equipment, plumbing fixtures, and room names and numbers for approximately 35,000 square foot facility with residential and administrative areas. Fire protection and building systems are mapped out along with relevant codes and standards.
This document contains framing plans, sections, and details for an antenna tower. It includes drawings showing the layout and connections of steel beams, columns, and braces on multiple levels of the tower, labeled as Levels B, C, D, and E. It also contains details for items like ladder installations, guardrails, and bracket connections. Dimensions and material callouts are provided for all structural elements.
This document contains drawings and a bill of materials for structural steel components. It includes details for 6 columns, 5 beams, and templates. The columns are made of HSS, pipe, and plate. Beams include W12, W14, and W16 shapes. Connections use headed studs, threaded rods, and anchor bolts. Dimensions and quantities of materials are specified.
- This document contains framing plans and details for a platform and roof structure.
- It includes a platform framing plan showing structural members, connections, and decking. Elevations of members are provided.
- A roof framing plan shows framing for the roof structure including beams, channels, and purlins. Details show connections between members.
- Additional details provide specifications for structural members, connections, guardrails, and access ladders for the platform.
This document contains architectural drawings of a mechanical room showing floor plans, elevations, and sections with labels of equipment and piping. Key details include dimensions of existing structures like the auditorium roof and floors. Plan views show the layout of equipment like air handlers, panels, and piping throughout different areas of the mechanical room along with labels and notes.
This document contains drawings and details for a 14' NALP custom shelter with a standing seam roof. It includes a front view, side elevation, isometric view, floor plan, and 13 detailed drawings showing roof construction details, connections, framing, paneling and dimensions. Notes specify materials and welding standards. Dimensions show an overall shelter size of 14'11-3/4" x 12'-3-1/2" with a roof perimeter of 6" x 2" aluminum tube and internal framing of aluminum tubes and plates.
The document contains plans for an operating room, including horizontal and vertical sections, door and cabinet elevations, and material specifications. Key details include dimensions for the operating room space, location of equipment such as gimbal glass and wild walls, and finishes of light blue and dark blue laminate with sage accents.
This document contains architectural drawings for a residential unit including:
- Floor plans showing the layout and dimensions of the ground floor and second floor.
- Furniture plans identifying the location and names of furniture and fixtures on each floor.
- Finishes plans indicating the types of finishes (e.g. flooring, paint, tiles) used in different areas.
The drawings were created by Manpreet Kaur and checked by Dr. Maha Salman for a project in December 2016.
This document contains diagrams and technical specifications for a building site plan, fire sprinkler system, and floor plans. It includes details like pipe sizes and locations, sprinkler head types and quantities, mechanical equipment, plumbing fixtures, and room names and numbers for approximately 35,000 square foot facility with residential and administrative areas. Fire protection and building systems are mapped out along with relevant codes and standards.
This document contains framing plans, sections, and details for an antenna tower. It includes drawings showing the layout and connections of steel beams, columns, and braces on multiple levels of the tower, labeled as Levels B, C, D, and E. It also contains details for items like ladder installations, guardrails, and bracket connections. Dimensions and material callouts are provided for all structural elements.
This document contains drawings and a bill of materials for structural steel components. It includes details for 6 columns, 5 beams, and templates. The columns are made of HSS, pipe, and plate. Beams include W12, W14, and W16 shapes. Connections use headed studs, threaded rods, and anchor bolts. Dimensions and quantities of materials are specified.
- This document contains framing plans and details for a platform and roof structure.
- It includes a platform framing plan showing structural members, connections, and decking. Elevations of members are provided.
- A roof framing plan shows framing for the roof structure including beams, channels, and purlins. Details show connections between members.
- Additional details provide specifications for structural members, connections, guardrails, and access ladders for the platform.
This document contains architectural drawings of a mechanical room showing floor plans, elevations, and sections with labels of equipment and piping. Key details include dimensions of existing structures like the auditorium roof and floors. Plan views show the layout of equipment like air handlers, panels, and piping throughout different areas of the mechanical room along with labels and notes.
This document contains drawings and details for a 14' NALP custom shelter with a standing seam roof. It includes a front view, side elevation, isometric view, floor plan, and 13 detailed drawings showing roof construction details, connections, framing, paneling and dimensions. Notes specify materials and welding standards. Dimensions show an overall shelter size of 14'11-3/4" x 12'-3-1/2" with a roof perimeter of 6" x 2" aluminum tube and internal framing of aluminum tubes and plates.
The document contains plans for an operating room, including horizontal and vertical sections, door and cabinet elevations, and material specifications. Key details include dimensions for the operating room space, location of equipment such as gimbal glass and wild walls, and finishes of light blue and dark blue laminate with sage accents.
This document contains architectural drawings for a residential unit including:
- Floor plans showing the layout and dimensions of the ground floor and second floor.
- Furniture plans identifying the location and names of furniture and fixtures on each floor.
- Finishes plans indicating the types of finishes (e.g. flooring, paint, tiles) used in different areas.
The drawings were created by Manpreet Kaur and checked by Dr. Maha Salman for a project in December 2016.
Jual,Harga,Distributor Water Heater Pemanas Air Ariston Toko Jakarta,Bekasi,Tangerang Electrik Harga Murah Ekonomis Bergaransi Cv Fikri Mandiri Jaya 082113812149 @Copyrigh - Budi JR - 2016
Farmers Grand Rapids MI Print Distribution CenterRichard Clark
The document provides details for 12 different wall types including dimensions and materials. It specifies the wall types for different areas including steel studs spaced at 16 inches, varying thicknesses of sound attenuation blankets and gypsum boards, fire ratings, and STC sound ratings between 45-57. It also provides a legend for the wall types and sections for each.
This document contains plans and specifications for a tenant improvement project for Farmers Insurance Company in an existing building in Agoura Hills, California. It includes a cover page with project information, a sheet index, general notes, contact information, and permit details. The plans include demolition plans, floor plans, reflected ceiling plans, interior elevations, sections, details, schedules, and specifications. It provides documentation for the interior renovation of existing office space into a Chairman's Suite for Farmers Insurance, including new partitions, ceilings, lighting, mechanical, electrical and low voltage systems.
TechTown vision for the first-floor redesign is to create a more open, collaborative environment for entrepreneurs, along with a best-in-class conference center to serve the expanding need for sophisticated and flexible meeting space in this building.
My duties on this project include:
- Field measurements & existing condition verification.
- Project document setup.
- Construction documentation & detailing utilizing Revit.
(1) Tree branches contact the roof and structure, balcony railing is missing caps, areas of stucco need repair, patio mist system is inoperable.
(2) Areas of roof tile are broken, kitchen outlets lack GFCI, water heater has corrosion, garage door is damaged, cracks in casita walls/ceilings, windows show water intrusion.
(3) Master bedroom shows water intrusion in ceiling and attic, fans are noisy or inoperable, several plumbing fixtures leak, shower grout is cracked/deteriorated.
This document provides details for insulating pipe systems. It specifies using mineral fiber insulation conforming to ASTM C 547 Class 1, with a factory applied FSK/kraft paper laminate jacket. The insulation will be used on cold water, hot water, and chilled water pipes as described. Half wood sections will be inserted into the insulation and taped with FSK tape to maintain the vapor barrier. 360 degree type 40 pipe protection shields 12 inches long will be used, along with U-bolt or hanger supports conforming to MSS SP 58-69 Type 24 standards.
This document contains construction drawings for a project at Marine Corps Base Hawaii. The drawings include a title sheet with an index of drawings, sheets showing foundation details and layouts, elevations, framing details, and notes. The drawings were prepared by the 84th Engineer Battalion for a project to construct a training structure at Schofield Barracks in Hawaii.
NO DIMENSION 1945 BELAIR KITCHEN RENOVATION PROPOSALKensonSunBernade
The document is a set of floor plans and elevations for a kitchen renovation project. It includes labels for an upper corner cabinet, concealed hood range, tall cabinet, and marble countertop and ceramic backsplash. Scale and date information is provided, along with labels for the proposed main floor plan, and elevations A, D, and C. The drawings were created by Kensonsun Bernade for a renovation at address OP#21945 Belair.
This document provides insulation details for tee elbows and valves at a scale of 1:5. It includes 3D and scaled side views of the insulation systems. Notes specify that insulation sections should be cut uniformly with sharp tools to minimize air gaps when joined. Low VOC adhesive should be applied to pipes and fittings, and joints fully covered with FSK tape as a vapor barrier.
This document provides information about thermocouples and RTDs from W. H. Cooke & Co., including:
1. An overview of different thermocouple styles such as bayonet, adjustable compression fitting, not-in-melt, surface, stick-on, and extension cable assemblies.
2. Details on how to order each thermocouple style with specifications like length, calibration type, and termination style.
3. A selection table for determining "A" dimensions of fixed length bayonet thermocouples.
4. Information on related accessories like plugs and jacks, fittings, and mineral insulated thermocouples.
5. Contact information
This document is a plumbing plan showing the layout of pipes in the basement including waste and vent piping. It depicts the locations of various fixtures such as sinks, toilets, and floor drains along with the sizes and routing of drainage pipes connecting them. It also shows the locations of mechanical, electrical, and pool equipment rooms as well as notes specifying pipe materials and references other related drawings.
This document contains plans and diagrams for a residential building project including:
- Floor plans for the first and second floors showing room layouts and dimensions.
- Building sections and wall sections detailing construction materials and methods.
- Reflected ceiling plans indicating lighting fixtures for the first floor.
- Plumbing fixtures schedule and notes.
- Project information like the address, scales, dates, and designers.
This document provides part number information for forklift pumps from various manufacturers including Toyota, TCM, and Hyster. It lists pump part numbers, descriptions, specifications and applications for different forklift truck models, engine types, and capacities ranging from 1 to 7 tons. The pumps listed are for petrol/gas and diesel powered forklifts, as well as electric forklifts, and include information on shaft type, ports, rotation, mounting, and OEM part numbers.
This document appears to be a kitchen design plan. It includes a scale drawing showing the layout of the kitchen with measurements and descriptions of cabinetry, appliances, and other fixtures. There are labels for a pantry, trash can, refrigerator, range, microwave, drawers, and panels. The drawing is signed by the owner acknowledging any changes will result in additional charges.
This document contains a parts list for a gas tank assembly with 27 items. It lists each part number, description, and quantity. It includes parts for the gas tank structure like strakes and ends, as well as pipes of various sizes, valves, flanges, and other fittings to connect the tank to pipes. The total weight of all parts is listed as 14673147.44.
Service ariston kelapa gading 0813-8024-0365komporariston
Service center ariston kelapa gading swh Sebuah pemanas air tenaga matahari (Water Heater) dapat menjadi solusi yang tepat untuk rumah anda. Jika anda frustrasi dengan biaya listrik rumah anda, mungkin sudah saatnya untuk menjangkau solusi energi yang lebih efisien. Anda bisa mendapatkan pemanas air lain yang jauh lebih efisien daripada yang anda miliki. Tenaga matahari tersedia melimpah tak terbatas untuk anda, ini solusi yang memberi manfaat untuk Anda
Cara Pasang Ariston Water Heater electric 082122541663 atau pemanas air listrik merupakan alat pemanas air yang menggunakan energi listrik sebagai sumber energinya untuk dapat memenuhi kebutuhan mandi air panas keluarga Anda secara praktis. Sebenarnya, untuk pemasangan alat ini bisa dilakukan sendiri tanpa harus memakai jasa tukang. Dengan begitu kita dapat lebih menghemat biaya pengeluaran untuk membayar jasa tukang untuk memasang water heater listrik.
Berikut ini hal yang perlu diperhatikan untuk memasang water heater atau pemanas air listrik :
· Sebelum memasang pemanas air, Anda perlu menyiapkan instalasi pipa untuk jalur air panas dan jalur air dingin yang masuk ke dalam water heater. Pipa yang digunakan untuk saluran air panas pada pemanas air tentunya harus pipa khusus yang tahan terhadap panas tinggi seperti pipa dengan material polypropylene, serta material non-korosif yang tahan terhadap berbagai cairan kimia dan bebas dari sedimentasi (pengikisan).
· Kran mixing atau yang biasa kita kenal dengan kran panas dingin yang memiliki 2 saluran yaitu saluran air panas dan saluran air dingin yang nantinya akan digunakan untuk menyalurkan air dari water heater.
· Alat water heater listrik lebih baik dipasang minimal 1.5m dari lantai agar memudahkan Anda dalam pemasangan dan pengaturan pada water heater serta agar terhindar dari cipratan air mandi.
http://ekinsurance.com/financial/how-to-maximize-your-social-security-benefits/
You may have a simple question like, “What can I do now to get the biggest Social Security check?” The answer is not much but you do have some possibilities if married.
Mia Edwards has over 15 years of experience in accounting roles. Her experience includes positions as a senior staff accountant, client accountant, property accountant, staff accountant, and cost accountant. She prepared financial statements and reports, performed account reconciliations, ensured compliance with GAAP, and maintained general and subsidiary ledgers. Mia holds a Bachelor's degree in Accounting from Southern Methodist University.
Este documento presenta un estudio bíblico sobre la importancia de la oración. Enfatiza que la oración es un privilegio y una disciplina espiritual clave. Explica que a través de la oración, los creyentes pueden acercarse a Dios y recibir fuerza, consuelo y guía. También analiza pasajes bíblicos que destacan la oración de los primeros cristianos y la necesidad de orar unos por otros. El objetivo final es motivar a las lectoras a dedicar tiempo diario a la oración.
A Robust Object Recognition using LBP, LTP and RLBPEditor IJMTER
The document proposes two new feature sets called Discriminative Robust Local Binary Pattern (DRLBP) and Discriminative Robust Local Ternary Pattern (DRLTP) for object recognition. It summarizes the drawbacks of existing features like Local Binary Pattern (LBP), Local Ternary Pattern (LTP), and Robust LBP (RLBP) that do not differentiate between weak and strong contrast patterns or brightness reversal. The proposed DRLBP and DRLTP combine edge and texture information into a single representation to better analyze objects and address the issues with prior features. They are designed to improve object recognition performance.
Jual,Harga,Distributor Water Heater Pemanas Air Ariston Toko Jakarta,Bekasi,Tangerang Electrik Harga Murah Ekonomis Bergaransi Cv Fikri Mandiri Jaya 082113812149 @Copyrigh - Budi JR - 2016
Farmers Grand Rapids MI Print Distribution CenterRichard Clark
The document provides details for 12 different wall types including dimensions and materials. It specifies the wall types for different areas including steel studs spaced at 16 inches, varying thicknesses of sound attenuation blankets and gypsum boards, fire ratings, and STC sound ratings between 45-57. It also provides a legend for the wall types and sections for each.
This document contains plans and specifications for a tenant improvement project for Farmers Insurance Company in an existing building in Agoura Hills, California. It includes a cover page with project information, a sheet index, general notes, contact information, and permit details. The plans include demolition plans, floor plans, reflected ceiling plans, interior elevations, sections, details, schedules, and specifications. It provides documentation for the interior renovation of existing office space into a Chairman's Suite for Farmers Insurance, including new partitions, ceilings, lighting, mechanical, electrical and low voltage systems.
TechTown vision for the first-floor redesign is to create a more open, collaborative environment for entrepreneurs, along with a best-in-class conference center to serve the expanding need for sophisticated and flexible meeting space in this building.
My duties on this project include:
- Field measurements & existing condition verification.
- Project document setup.
- Construction documentation & detailing utilizing Revit.
(1) Tree branches contact the roof and structure, balcony railing is missing caps, areas of stucco need repair, patio mist system is inoperable.
(2) Areas of roof tile are broken, kitchen outlets lack GFCI, water heater has corrosion, garage door is damaged, cracks in casita walls/ceilings, windows show water intrusion.
(3) Master bedroom shows water intrusion in ceiling and attic, fans are noisy or inoperable, several plumbing fixtures leak, shower grout is cracked/deteriorated.
This document provides details for insulating pipe systems. It specifies using mineral fiber insulation conforming to ASTM C 547 Class 1, with a factory applied FSK/kraft paper laminate jacket. The insulation will be used on cold water, hot water, and chilled water pipes as described. Half wood sections will be inserted into the insulation and taped with FSK tape to maintain the vapor barrier. 360 degree type 40 pipe protection shields 12 inches long will be used, along with U-bolt or hanger supports conforming to MSS SP 58-69 Type 24 standards.
This document contains construction drawings for a project at Marine Corps Base Hawaii. The drawings include a title sheet with an index of drawings, sheets showing foundation details and layouts, elevations, framing details, and notes. The drawings were prepared by the 84th Engineer Battalion for a project to construct a training structure at Schofield Barracks in Hawaii.
NO DIMENSION 1945 BELAIR KITCHEN RENOVATION PROPOSALKensonSunBernade
The document is a set of floor plans and elevations for a kitchen renovation project. It includes labels for an upper corner cabinet, concealed hood range, tall cabinet, and marble countertop and ceramic backsplash. Scale and date information is provided, along with labels for the proposed main floor plan, and elevations A, D, and C. The drawings were created by Kensonsun Bernade for a renovation at address OP#21945 Belair.
This document provides insulation details for tee elbows and valves at a scale of 1:5. It includes 3D and scaled side views of the insulation systems. Notes specify that insulation sections should be cut uniformly with sharp tools to minimize air gaps when joined. Low VOC adhesive should be applied to pipes and fittings, and joints fully covered with FSK tape as a vapor barrier.
This document provides information about thermocouples and RTDs from W. H. Cooke & Co., including:
1. An overview of different thermocouple styles such as bayonet, adjustable compression fitting, not-in-melt, surface, stick-on, and extension cable assemblies.
2. Details on how to order each thermocouple style with specifications like length, calibration type, and termination style.
3. A selection table for determining "A" dimensions of fixed length bayonet thermocouples.
4. Information on related accessories like plugs and jacks, fittings, and mineral insulated thermocouples.
5. Contact information
This document is a plumbing plan showing the layout of pipes in the basement including waste and vent piping. It depicts the locations of various fixtures such as sinks, toilets, and floor drains along with the sizes and routing of drainage pipes connecting them. It also shows the locations of mechanical, electrical, and pool equipment rooms as well as notes specifying pipe materials and references other related drawings.
This document contains plans and diagrams for a residential building project including:
- Floor plans for the first and second floors showing room layouts and dimensions.
- Building sections and wall sections detailing construction materials and methods.
- Reflected ceiling plans indicating lighting fixtures for the first floor.
- Plumbing fixtures schedule and notes.
- Project information like the address, scales, dates, and designers.
This document provides part number information for forklift pumps from various manufacturers including Toyota, TCM, and Hyster. It lists pump part numbers, descriptions, specifications and applications for different forklift truck models, engine types, and capacities ranging from 1 to 7 tons. The pumps listed are for petrol/gas and diesel powered forklifts, as well as electric forklifts, and include information on shaft type, ports, rotation, mounting, and OEM part numbers.
This document appears to be a kitchen design plan. It includes a scale drawing showing the layout of the kitchen with measurements and descriptions of cabinetry, appliances, and other fixtures. There are labels for a pantry, trash can, refrigerator, range, microwave, drawers, and panels. The drawing is signed by the owner acknowledging any changes will result in additional charges.
This document contains a parts list for a gas tank assembly with 27 items. It lists each part number, description, and quantity. It includes parts for the gas tank structure like strakes and ends, as well as pipes of various sizes, valves, flanges, and other fittings to connect the tank to pipes. The total weight of all parts is listed as 14673147.44.
Service ariston kelapa gading 0813-8024-0365komporariston
Service center ariston kelapa gading swh Sebuah pemanas air tenaga matahari (Water Heater) dapat menjadi solusi yang tepat untuk rumah anda. Jika anda frustrasi dengan biaya listrik rumah anda, mungkin sudah saatnya untuk menjangkau solusi energi yang lebih efisien. Anda bisa mendapatkan pemanas air lain yang jauh lebih efisien daripada yang anda miliki. Tenaga matahari tersedia melimpah tak terbatas untuk anda, ini solusi yang memberi manfaat untuk Anda
Cara Pasang Ariston Water Heater electric 082122541663 atau pemanas air listrik merupakan alat pemanas air yang menggunakan energi listrik sebagai sumber energinya untuk dapat memenuhi kebutuhan mandi air panas keluarga Anda secara praktis. Sebenarnya, untuk pemasangan alat ini bisa dilakukan sendiri tanpa harus memakai jasa tukang. Dengan begitu kita dapat lebih menghemat biaya pengeluaran untuk membayar jasa tukang untuk memasang water heater listrik.
Berikut ini hal yang perlu diperhatikan untuk memasang water heater atau pemanas air listrik :
· Sebelum memasang pemanas air, Anda perlu menyiapkan instalasi pipa untuk jalur air panas dan jalur air dingin yang masuk ke dalam water heater. Pipa yang digunakan untuk saluran air panas pada pemanas air tentunya harus pipa khusus yang tahan terhadap panas tinggi seperti pipa dengan material polypropylene, serta material non-korosif yang tahan terhadap berbagai cairan kimia dan bebas dari sedimentasi (pengikisan).
· Kran mixing atau yang biasa kita kenal dengan kran panas dingin yang memiliki 2 saluran yaitu saluran air panas dan saluran air dingin yang nantinya akan digunakan untuk menyalurkan air dari water heater.
· Alat water heater listrik lebih baik dipasang minimal 1.5m dari lantai agar memudahkan Anda dalam pemasangan dan pengaturan pada water heater serta agar terhindar dari cipratan air mandi.
http://ekinsurance.com/financial/how-to-maximize-your-social-security-benefits/
You may have a simple question like, “What can I do now to get the biggest Social Security check?” The answer is not much but you do have some possibilities if married.
Mia Edwards has over 15 years of experience in accounting roles. Her experience includes positions as a senior staff accountant, client accountant, property accountant, staff accountant, and cost accountant. She prepared financial statements and reports, performed account reconciliations, ensured compliance with GAAP, and maintained general and subsidiary ledgers. Mia holds a Bachelor's degree in Accounting from Southern Methodist University.
Este documento presenta un estudio bíblico sobre la importancia de la oración. Enfatiza que la oración es un privilegio y una disciplina espiritual clave. Explica que a través de la oración, los creyentes pueden acercarse a Dios y recibir fuerza, consuelo y guía. También analiza pasajes bíblicos que destacan la oración de los primeros cristianos y la necesidad de orar unos por otros. El objetivo final es motivar a las lectoras a dedicar tiempo diario a la oración.
A Robust Object Recognition using LBP, LTP and RLBPEditor IJMTER
The document proposes two new feature sets called Discriminative Robust Local Binary Pattern (DRLBP) and Discriminative Robust Local Ternary Pattern (DRLTP) for object recognition. It summarizes the drawbacks of existing features like Local Binary Pattern (LBP), Local Ternary Pattern (LTP), and Robust LBP (RLBP) that do not differentiate between weak and strong contrast patterns or brightness reversal. The proposed DRLBP and DRLTP combine edge and texture information into a single representation to better analyze objects and address the issues with prior features. They are designed to improve object recognition performance.
The expansion and adoption of new business technologies has brought enterprise networking to a tipping point. The network edge is becoming more distributed than ever before, and application requirements are becoming more complicated.
This document contains feedback from teachers on various meetings. The feedback asks teachers about how meetings aligned with their expectations, what strong points they saw, any weak points, and if anything was missing. For strong points, teachers noted a visit to a lab and creative work in international groups. Weak points included little space, organization and communication issues, and concerns about food and directives for students. Most teachers said nothing was missing from the meetings.
Rajasthan is the biggest state of India where vibrancy is found at every corner of the state. Not only dance forms, living style but also, the dishes here have apparent taste of this enriched culture. The names of Ghewar, Mawa Kachaori, Gatte Ki Sabzi, Daal Bati Churma and Laal Maas etc. are enough to trigger taste buds.
The document provides an overview of the key components and processes involved in a petroleum system:
1) Source rocks contain organic matter that generates oil and gas during burial and heating over geological time. 2) Reservoir rocks provide porous space for oil and gas to accumulate. 3) Seal rocks trap hydrocarbons by capping reservoirs and preventing migration. 4) Traps such as folds, faults, or stratigraphic variations create structures that allow hydrocarbons to accumulate. 5) The petroleum system requires all these elements to be present and work together over time for an active system that can lead to commercial oil and gas deposits.
1) The document discusses a final year project on face recognition using local features such as Gabor and LBP. 2) It reviews literature on biometrics and common face recognition algorithms like PCA, LDA, and LBP. 3) The methodology section explains how LBP works by comparing pixel values to label images and extracting histograms to represent facial features.
This document contains notes and details related to utility work for a proposed development project. It includes notes on sanitary sewer lines and manholes, water lines of various sizes, gas and electrical utilities, and callouts for specific items needed like water meters and backflow preventers. Plan views show the proposed utility layout with manholes, lines, and connections labeled. Profile views graphically depict elevations and slopes of sanitary sewer lines. The contractor is responsible for verifying existing utilities, complying with all specifications, and coordinating work with the relevant utility authorities and companies.
The document contains schedules and symbols for various mechanical, plumbing, and fire suppression systems. It includes schedules for air handling units, VAV terminal units, water heaters, grease interceptors, and plumbing fixtures. It also contains legends listing the symbols used on drawings to represent different types of pipes, ducts, valves, dampers, and other mechanical equipment.
Recycled water project draft plans and specificationskristinemassey
FINAL TOWN REVIEW NFC
100% SUBMITTAL
No
1/7/14
5/24/13
Revision
Plot Date:
Note: * indicates signatures on original issue of drawing or last revision of drawing
22 November 2013 - 2:41 PM
Plotted by: Ben Langston
Drawn
Job
Project
Manager Director
Cad File No:
Date
N:\US\Santa Rosa\Projects\12027 - The Town of Yountville\12027-11-001 Recycled Water Expansion Project\06-CAD\Sheets\1202711001 G-001.dw
BEHRMANN_BROOKE MEDICAL OFFICES ID 312 FALL 2016Brooke Leigh
This document contains a cover sheet, general notes, and door schedule for a construction project. It lists various door hardware combinations and notes for the project, including that all doors and frames are to meet building standards unless noted otherwise. Door types include single glass, double glass, and single panel doors. The general notes provide requirements for items like silencers on door frames, undercutting doors, fire rated walls, and coordinating with other contractors.
This document contains architectural plans and schedules for an interior renovation project. It includes 26 sheets that provide floor plans, reflected ceiling plans, elevations, and schedules for areas like the leasing office, clubroom, exercise studio, fitness center, and more. Electrical, lighting, and finish legends are also included to define symbols and materials used. The project is for a residential building called La Floresta in Brea, California by developer Morgan Group.
This document provides a floor plan and notes for a proposed restaurant fit-out. The floor plan shows the layout and dimensions of the space along with symbols indicating fixtures like fire doors, smoke detectors, and emergency equipment. The notes provide guidance on fire protection requirements, ventilation, lighting, drainage, and the general scope of the fit-out work which includes new signage, shopfront finishes, kitchen equipment, flooring, lighting alterations, and tie-ins to existing mechanical and safety systems. Compliance with all relevant regulations and approval from local authorities is required.
72 roberto o. pellizzari - 6779513 - fuel injector for an internal combusio...Mello_Patent_Registry
Roberto O. Pellizzari, John Baron, Jan Roger Linna, Peter Loftus, Peter Palmer, John Paul Mello, Stuart Bennett Sprague - Fuel Injector for an Internal Combustion Engine
This document contains technical drawings and specifications for a process plant. It includes symbols and abbreviations for piping, valves, materials, and other components. Project area codes and their descriptions are provided. Engineering details such as scales, revisions, and approvals are listed.
This document provides piping, instrumentation, and equipment symbols and numbering codes for a coke dry quenching plant. It includes symbols for various pumps, valves, heat exchangers, filters, blowers, instruments, and other components. The document also outlines equipment, instrument, motor/actuator, and nozzle numbering codes that include plant section numbers, tags, and progressive numbers for identification.
Binder 161004 - 6500 san pablo ave, oakland (1)E'ville Eye
This document provides project details for a new five-story mixed-use building with 10 residential units and 1 commercial space located at 6500 San Pablo Avenue in Oakland, California. It includes information such as the project address, scope of work, applicable codes, zoning details, building data including height and floor area, a drawing index, general notes, and requirements for water conservation and building insulation. The project team includes an applicant, designer, engineer, and reviewer.
The document provides a code analysis summary for a proposed tenant improvement project at an existing one-story building. The building has a footprint of 159,515sf and total area of 174,568sf. The occupancies include office, production, and warehouse. The analysis finds the building meets egress requirements based on an increased occupant load of 788. Accessibility and parking requirements are identified.
This document contains architectural drawings and notes for a building project located at 289 Tappan Street in Brookline, MA. It includes floor plans, elevations, and sections of the building showing wall types and materials. Notes provide information on construction requirements, dimensions, building codes, and specifications.
This hydro-test report summarizes the pressure testing of a 4" diameter and 158m long gas pipeline. Key details include:
- Water will be used to fill, flush, and pressure test the pipeline at 147 bar, which is 150% of the design pressure of 98 bar.
- Calculations are provided to determine the volume of water needed, expected back pressures, and pump requirements. Factors like elevation changes, pipe dimensions, and friction losses are accounted for.
- Test equipment will be calibrated and certified. Instruments will monitor and record pressure and temperature during the test.
- The pipeline will be isolated and prepared, then filled and pressure tested. Any leaks will be repaired before re-
This document contains a process flow diagram and piping and instrumentation diagram for a natural gas production facility. The facility receives untreated natural gas from a production header at 700 psig and separates the liquids from the gas stream using a high pressure separator and low pressure separator. The dried natural gas is compressed before being exported via pipeline. Liquids are recovered from the separators and exported by pump. Key equipment includes a gas compressor, separators, export pump, and various valves, instruments and piping.
This document provides installation details for a pressure gage system used to monitor water, reagents, and air pressure. It was issued for construction on October 4, 2011. The document includes a parts list and specifications for piping components made of 316 stainless steel, including fittings, valves, tubing, and other accessories rated for 2000 Psi-g at 300°C.
This document provides building code and construction information for a proposed remodel of a 2,377 square foot KFC restaurant located in Surprise, Arizona. The scope of work includes renovations to the dining area including new seating, flooring, wall finishes and lighting. Restroom remodels are planned to provide accessibility compliance upgrades. Exterior alterations consist of a new facade, finishes and lighting. Site improvements will modify sidewalks and parking areas to comply with accessibility standards. Construction will conform to the 2006 International Building Code and other applicable local codes.
The document appears to be engineering drawings and specifications for piping and instrumentation for a gas metering and safety controls system. It includes multiple pages with detailed drawings of pipe spools, lists of items and part numbers, general notes and requirements. Revisions are noted for changes to pipe routing and component locations.
This chapter discusses the engineering mechanics of bins, silos, and stacks. Key points include:
- Proper bin design requires understanding why solids do not always flow easily and can develop rat holes, transient arches, or dead storage zones.
- The relationship between shear and normal stresses is important, defined by the kinematic angle of friction. Typical friction angles are provided for common solids and materials.
- Two types of solid flow can occur - mass flow along walls or funnel flow through the center. Proper design depends on predicting the flow pattern.
- Stack design is similar to tower design but simpler since stacks have fewer attachments. Vortex shedding can be controlled using helical vortex
2. GENERAL NOTES
L.R. ELL.
L.P.
LG.
LB.
KGV
INV.
INSUL.
IN.
I.D.
HVAC
HST
HPT
HP
H.P.
HO
HGL
GPM
GALV.
GAL.
FT.
FS
FPM
F.O.T.
F.O.S.
F.O.B.
FL.
FLEX.
FIT
FIN. GR.
FIN. FL.
FE
EXIST
EW
ENCL.
EL.
ELEC.
EGL
EFF. %
EFF.
ECC. RED.
DWG'S
DN
DIA.
D.I.
DET.
DEG. F.
CS
CPVC
CORP.
CONT.
CONN.
CONC.
C.O.
CMU
~
C.I.
CFM
BCR. BOD
ARCH.
APPROX.
AFF
ACFM
XPROOF
WS
WC
WxH
W/
VAC
V
TYP.
T.O.D.
T.O.C.
THK.
TEMP.
SW
STR.
STD.
S.S.
SR
SQ.
SPECS.
SPD
SL
SH.
SG
SCR
SCH.
RPM
REQ'D.
REINF.
REF.
RED. FLG.
RED.
R
PVC
PSIG
PSIA
PSI
PSH
PS
PLUMB.
`
P
OPER.
O.D.
O.C.
NTS
NPT
NOM.
No.
N.O.
N.C.
MIN.
MH
MGD
MECH.
MATL.
MAX.
LxW
LSP
LSH
L.R. RED. ELL.
L.R. RED. BASE ELL.
GENERAL MECHANICAL ABBREVIATIONS
GENERAL MECHANICAL NOTES
3.
2.
1.
NOTES:
2
GN
NTS
SHEET MAY NOT APPEAR ON THIS SET OF DRAWINGS.
ALL SYMBOLS AND ABBREVIATIONS SHOWN ON THIS
REQUIRED ON MECHANICAL DRAWINGS.
FLANGED JOINTS. OTHER JOINTS ARE SHOWN AS
VALVES AND PIPE FITTINGS ARE SHOWN WITH
SPECIFICATIONS FOR ITEMS REQUIRED.
USE OF THE PLANS. REFER TO THE PLANS AND
THIS IS A GENERAL LEGEND PROVIDED TO FACILITATE
EXPLOSION PROOF
WATER SURFACE
WATER COLUMN
WIDTH x HEIGHT
WITH
VACUUM
VENT
TYPICAL
TOP OF DUCT
TOP OF CONCRETE
THICK
TEMPERATURE
SEAL WATER
STRUCTURAL
STANDARD
STAINLESS STEEL
RAW SEWAGE
SQUARE
SPECIFICATIONS
SUMP PUMP DISCHARGE
STOP LOG
SHEET
SLIDE GATE
SCREEN
SCHEDULE
REVOLUTIONS PER MINUTE
REQUIRED
REINFORCED
REFERENCE
REDUCING FLANGE
REDUCER
RADIUS
POLYVINYL CHLORIDE
POUNDS PER SQUARE INCH GAGE
POUNDS PER SQUARE INCH ABSOLUTE
POUNDS PER SQUARE INCH
PRESSURE SWITCH HIGH
PRESSURE SWITCH
PLUMBING
PLATE
PRESSURE GAUGE
OPERATING
OUTSIDE DIAMETER
ON CENTER
NOT TO SCALE
NATIONAL PIPE THREAD
NOMINAL
NUMBER
NORMALLY OPEN
NORMALLY CLOSED
MINIMUM
MANHOLE
MILLION GALLONS PER DAY
MECHANICAL
MATERIAL
MAXIMUM
LENGTH X WIDTH
LIQUID SAMPLE PORT
PRESSURE SWITCH LOW
LONG RADIUS REDUCING ELBOW
LONG RADIUS REDUCING BASE ELBOW
LONG RADIUS ELBOW
LOW POINT
LONG
POUND
KNIFE GATE VALVE
INVERT
INSULATION
INCHES
INSIDE DIAMETER
HEATING VENTILATION
HOIST
HOSE PIPE THREAD
HORSE POWER
HIGH POINT
HYDRAULIC OIL
HYDRAULIC GRADE LINE
GALLONS PER MINUTE
GALVANIZED
GALLONS
FEET
FLOW SWITCH
FEET PER MINUTE
FLAT ON TOP
FLAT ON SIDE
FLAT ON BOTTOM
FLANGE
FLEXIBLE
FLOW INDICATING TRANSMITTER
FINISHED GRADE
FINISHED FLOOR
FLOWMETER
EXISTING
EFFLUENT WATER
ENCLOSURE
ELEVATION
ELECTRICAL
ENERGY GRADE LINE
% EFFICIENCY
EFFLUENT
ECCENTRIC REDUCER
DRAWINGS
DOWN
DIAMETER
DUCTILE IRON
DETAIL
DEGREES FEHRENHEIT
CHLORINATED POLYVINYL CHLORIDE
CORPORATION
CONTINUATION
CONNECTION
CONCRETE
CLEANOUT
CONCRETE MASONRY UNIT
CENTERLINE
CAST IRON
CUBIC FEET PER MINUTE
BOTTOM OF DUCT
BRIDGE CRANE
ARCHITECTURAL
APPROXIMATE
ABOVE FINISHED FLOOR
ACTUAL CUBIC FEET PER MINUTE
12.
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
NATIONAL ELECTRIC CODE (NEC) FOR THE APPROPRIATE ENVIRONMENT.
ALL MECHANICAL AND ELECTRICAL ITEMS INSTALLED IN THE WORK AREAS SHALL BE SUITABLE FOR THE ENVIRONMENT FOR WHICH THEY WILL EXIST AND CLASSIFIED BY THE
SUPPORT SYSTEMS WITH SUITABLE SPACING AS REQUIRED BY THE PROJECT SPECIAL PROVISIONS.
PIPE SUPPORTS FOR PIPES LESS THAN 8-INCHES IN DIAMETER ARE NOT SHOWN ON THESE PLANS FOR CLARITY. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY PIPE
EQUIPMENT AT NO ADDITIONAL COST TO THE OWNER.
FITS INTO THE ALLOCATED SPACES WITH SUITABLE CLEARANCE FOR ACCESS. THE CONTRACTOR SHALL PROVIDE ALL ALTERATIONS REQUIRED TO ACCOMODATE SUCH
DRAWINGS. MINOR DEVIATIONS IN DIMENSIONS WILL BE PERMITTED AT THE ENGINEER'S DISCRETION, PROVIDED THAT THE EQUIPMENT MEETS THE SPECIFIED RATINGS AND
BE RESPONSIBLE FOR CHECKING ALL OF THE EQUIPMENT DIMENSIONS TO ENSURE THAT ALL COMPONENTS WILL FIT INTO THE DESIGNATED SPACES INDICATED ON THE
THE DRAWINGS, SCHEDULES, AND SPECIFICATIONS, HAVE BEEN PREPARED USING SPECIFIC MANUFACTURERS FOR THE BASIS OF DIMENSIONAL DESIGN. THE CONTRACTOR SHALL
CONDITIONS AND APPROVED SHOP DRAWINGS.
DROP, OFFSET, FITTING, OR STRUCTURAL ELEMENT THAT MAY BE REQUIRED. THE CONTRACTOR SHALL VERIFY EXACT PLACEMENT OF ALL DEVICES AND EQUIPMENT WITH FIELD
THE PLANS ARE GENERALLY DIAGRAMMATIC IN NATURE. ROUTING OF PIPING, DUCTWORK, CONDUITS, ETC., AS SHOWN ON THE DRAWINGS, DOES NOT INTEND TO SHOW EVERY RISE,
THE CONTRACTOR SHALL MAKE ALL REQUIRED FIELD MEASUREMENTS TO VERIFY EXISTING AND CONTRACT INTERFACE DIMENSIONS, LOCATIONS, AND OTHER CONDITIONS.
ALL FLEXIBLE CONNECTORS, EXPANSION JOINTS, AND SLEEVE COUPLINGS SUBJECT TO PRESSURE SHALL BE RESTRAINED AS REQUIRED FOR EXPANSION AND FLEXIBILITY.
EQUIPMENT REMOVAL.
FOR FLANGED SYSTEMS, PROVIDE FLEXIBLE CONNECTORS WHERE NECESSARY, AND AS APPROVED BY THE ENGINEER, TO FACILITATE PIPING INSTALLATION AND VALVE AND
SLEEVE COUPLINGS MAY BE USED WHERE NECESSARY, AND AS APPROVED BY THE ENGINEER, TO FACILITATE PIPING INSTALLATION.
ALL PIPE PENETRATIONS THROUGH INTERIOR AND EXTERIOR WALLS AND FLOORS SHALL BE SEALED WATERTIGHT AND FIREPROOF RATED.
ALL DIMENSIONS LOCATING EQUIPMENT ARE FROM FINISHED WALL SURFACES OR CENTERLINES, AS INDICATED.
CONTRACTOR TO PROVIDE A LAYOUT DRAWING SHOWING ALL PIPING, SUPPORTS, AND APPURTENANCES.
PUBLIC HEALTH (IDPH) REGULATIONS.
ALL WORK TO BE IN ACCORDANCE WITH THE CITY OF CHICAGO BUILDING CODES, COOK COUNTY DEPARTMENT OF PUBLIC HEALTH AND ILLINOIS DEPARTMENT OF
CLIENT:
DRAWING NO.
SHEET OF
TITLE:
NO. DATE NATURE OF REVISION
FILE NAME N:chicago150084MechNOT_150084_02.sht
CHKD.
JPCDSGN.
JPCCHKD.
SCALE:
DWN.
7/6/2016PLOT DATE:
jkennedyCAD USER:
PROJ. NO.
MODEL: Default
DATE:
ELP
15-0084
JTK
GAH
CHICAGO, IL 60608
1501 SOUTH CALIFORNIA AVENUE
MT. SINAI HOSPITAL
7
HW HEATER REPLACEMENT PROJ.
7//5/16
MT. SINAI HOSPITAL - DOMESTIC
3. OVERALL PLAN VIEW PLN
3
SYSTEM AND PIPING
EXISTING WATER HEATING
NTS
OF BOILER ROOM
EXISTING WEST WALL
COLUMN
EXISTING BUILDING
ABANDONED IN PLACE
TO BE SEALED AND
EXISTING CATCH BASIN
WATER HEATERS
TYPE SEMI-INSTANTANEOUS
PROPOSED TRIPLEX, SKID
CONTROL PANELS
CONFIGURED
PROPOSED TRIPLEX
PIPING
ACCEPT PROPOSED
BE RECONFIGURED TO
HOT WATER PIPING TO
EXISTING STEAM ANDINSTANTANEUOUS WATER HEATER
STEAM LINES TO PROPOSED SEMI-
TO BE REUSED. CONNECT EXISTING
EXISTING STEAM SUPPLY HEADER
AND CEILINGS
ROUTING THRU EXISTING WALLS
CONTRACTOR TO COORDINATE
DIAGRAMATIC CONDUIT ROUTING,
EXISTING HALLWAY
FRANKEL BUILDING
LOCATED IN BASEMENT OF
EXISTING BOILER ROOM L41
EXISTING MECHANICAL ROOM L42
(TO REMAIN)
SUMP PUMP
CONDENSATE
STEAM LINE
CONDUIT
INTERMEDIATE METAL
GROUND THWN IN 1"
NEUTRAL AND 3/C #12
3-1/C #12, 1/C #12
APPROX. 2' HIGH x 3' WIDE
METRO MIX MIXING VALVE HEADER
PROPOSED LOCATION OF
INSTANTANEOUS WATER HEATER SKID
CONTROL PANELS ON SEMI-
FOR POWER TO THE 3 PROPOSED
CIRCUIT BREAKERS IN PANELBOARD
PROVIDE 3 NEW, 2O AMP, 1-POLE
EXISTING LIGHTING PANEL RP-1.
OPERATIONAL
IN PLACE AND
HEATING SYSTEM IS
AFTER NEW WATER
ANCILLARY PIPING
REMOVED, WITH ALL
WATER HEATER TO BE
EXISTING 1500 GALLON
HOT WATER2" STEAM
1 8/10/16 IDPH COMMENTS GAH
BELOW FOR ROOM LOCATIONS
BUILDING LAYOUT PLAN
SEE EXISTING BASEMENT
(ROOMS L41 & L42)
LOCATION OF WORK AREA
EXISTING BASEMENT BUILDING LAYOUT PLAN
CLIENT:
DRAWING NO.
SHEET OF
TITLE:
NO. DATE NATURE OF REVISION
FILE NAME N:chicago150084MechPLN_150084_03.sht
CHKD.
JPCDSGN.
JPCCHKD.
SCALE:
DWN.
8/10/2016PLOT DATE:
jkennedyCAD USER:
PROJ. NO.
MODEL: Default
DATE:
ELP
15-0084
JTK
GAH
CHICAGO, IL 60608
1501 SOUTH CALIFORNIA AVENUE
MT. SINAI HOSPITAL
7
HW HEATER REPLACEMENT PROJ.
7//5/16
MT. SINAI HOSPITAL - DOMESTIC
1
1
4. STEAM AND HEAT EXCHANGER
1'
6.
5.
4.
3.
2.
1.
NOTES:
NO.
ITEM
1
THRUSH STEAM TO WATER HEAT EXCHANGER
STRUCTURAL STEEL FRAME
PART NUMBER
4" X 2" FABRICATED ELBOW
2" GATE VALVE
2" FABRICATED SPOOL
2" STEAM CONTROL VALVE
2" STRAINER
2" FABRICATED TEE
2" GLOBE VALVE
2" FABRICATED ELBOW
2" FABRICATED HEADER
2" CONDENSATE HEADER
3" WAFER SILENT CHECK VALVE
3" HOT WATER HEADER
3" X 2" FABRICATED ELBOW
2" BUTTERFLY VALVE - 3H
3" COLD WATER HEADER
2" GATE VALVE
2" BALL VALVE
STEAM TRAP
2" CHECK VALVE
2" STRAINER
SUCTION PRESSURE GAUGE
CONTROLS ENCLOSURE24
23
22
21
20
19
18
17
16
15
14
13
12
10
11
9
7
6
8
5
4
3
2
3
3
6
1
3
3
1
3
1
1
3
3
6
3
3
3
6
3
1
3
3
3
3
DESCRIPTION
DSH8324
ANSI CLASS 150 FLANGES, SCHED. 40 BLK. PIPE
FLANGED
ANSI CLASS 150 FLANGES, SCHED. 40 BLK. PIPE
ELECTRONIC CONTROLLED
FLANGED CONNECTION
ANSI CLASS 150 FLANGES, SCHED. 40 BLK. PIPE
FLANGED
ANSI CLASS 150 FLANGES, SCHED. 40 BLK. PIPE
ANSI CLASS 150 FLANGES, SCHED. 40 BLK. PIPE
SOCKET WELD X P.E. SCHED. 80 BLK. PIPE
SILENT CHECK VALVE, WAFER STYLE, ANSI CLASS 125/250
ANSI CLASS 150 FLANGES, STAINLESS STEEL PIPE
ANSI CLASS 150 FLANGES, STAINLESS STEEL PIPE
ANSI CLASS 150 FLANGES, STAINLESS STEEL PIPE
SOCKET WELD
CARBON STEEL BALL VALVE
FT-S8-15
STAINLESS STEEL NPT CHECK VALVE
KECKLEY STYLE B
SUCTION PRESSURE - 100 PSI
WITH ALARM OPTION
3
QTY.
SCALE 1:8
TYP. AT 3 PLACES
DETAIL A
SPLIT
SKID
SPLIT
SKID
281/4"233/4"29"
10 3/4"
91/4"
493/4"
801/2"
CLEARANCE
REQD.NEC
42"
0"
2"
8"
20"
32"
48"
60"
76"
81"
0"
1"
86"
14"
36 1/4"
48 1/4"
53 1/2"
58 1/4"
74 1/4"
76 1/4"
4 1/2"
14"
9 1/2"
36 1/4"
53 1/2"
76 1/4"
TOP VIEW
REAR VIEW
FRONT VIEW
SIDE VIEW
ALL STEAM SUPPLY PIPING TO BE SCH. 40 BLK. STL.
ALL CONDENSATE PIPING TO SCH. 80 BLK. STL.
ESTIMATED SYSTEM WEIGHT: 5000 LBS
DISCHARGE CONNECTION ORIENTATION.
CONTRACTOR/ENGINEER TO VERIFY SUCTION &
SOME ITEMS NOT SHOWN FOR CLARITY.
SUBMITTALS.
WILL BE FORWARDED UPON RECEIPT OF APPROVED
FOR CONSTRUCTION. CONSTRUCTION DRAWINGS
THIS DRAWING IS PRELIMINARY LAYOUT ONLY. NOT
ANSI CLASS 125/150 BUTTERFLY VALVE - 250 PSI MAX
MDT1
4
PLANS AND SECTIONS
PROPOSED SEMI INSTANTANEOUS HOT WATER HEATER
HOT WATER2" STEAM
19 18 15 22 2016 21 18
24 24 24
2
13
14
A
14
17
12
1
11 5 8 49 10 13
3 23 4228 6 72
CLIENT:
DRAWING NO.
SHEET OF
TITLE:
NO. DATE NATURE OF REVISION
FILE NAME N:chicago150084MechMDT1_150084_04.dgn
CHKD.
JPCDSGN.
JPCCHKD.
SCALE:
DWN.
7/6/2016PLOT DATE:
jkennedyCAD USER:
PROJ. NO.
MODEL: Default
DATE:
ELP
15-0084
JTK
GAH
CHICAGO, IL 60608
1501 SOUTH CALIFORNIA AVENUE
MT. SINAI HOSPITAL
7
HW HEATER REPLACEMENT PROJ.
7//5/16
MT. SINAI HOSPITAL - DOMESTIC
5. CONDENSATE PUMP
TO EXISTING
EXPANSION TANK
RETURN
HOT WATER
COLD WATER
HOT WATER
DWH #1
DWH #2
DWH #3
15 PSI STEAM
INLET
HOT WATER
INLET
COLD WATER
RETURN
BUILDING
OUTLET
MIXED WATER
SENSOR
METRO MIX
GENERATION SOURCE
RETURN TO HOT WATER
PIPING DIAGRAMS
LEGEND
P
GLOBE VALVE
CHECK VALVE
STRAINER
TEMPERATURE GAUGE
PRESSURE GAUGE
UNION
RECIRCULATION PUMP
CONTROL VALVE
TRAP
HOSE BIB
T
MDT2
5NTS
PROPOSED METRO MIX MIXING VALVE ONE LINE DIAGRAM
PROPOSED STEAM AND HEAT EXCHANGER ONE LINE DIAGRAM
PROPOSED EQUIPMENT SCHEDULE
CLIENT:
DRAWING NO.
SHEET OF
TITLE:
NO. DATE NATURE OF REVISION
FILE NAME N:chicago150084MechMDT2_150084_05.sht
CHKD.
JPCDSGN.
JPCCHKD.
SCALE:
DWN.
7/6/2016PLOT DATE:
jkennedyCAD USER:
PROJ. NO.
MODEL: Default
DATE:
ELP
15-0084
JTK
GAH
CHICAGO, IL 60608
1501 SOUTH CALIFORNIA AVENUE
MT. SINAI HOSPITAL
7
HW HEATER REPLACEMENT PROJ.
7//5/16
MT. SINAI HOSPITAL - DOMESTIC
TT
T
T
P
P
P
P
6. 6
MDT3
N.T.S.
NTS
METRO MIX MIXING VALVE DETAIL
STAINLESS STEEL PIPE
1 1/2" THREADED
STEEL PIPE
1" THREADED STAINLESS
?
?
? ?
?
? ?
?
?
?
?
GAUGE
PRESSURE
GAUGE
PRESSURE
GAUGE
TEMP.
GAUGE
TEMP.
GAUGE
TEMP.
GAUGE
TEMP.
GAUGE
PRESSURE
MOUNTING PLATE
FABRICATED
GAUGE
PRESSURE
MIXING VALVE
1 8/10/16 IDPH COMMENTS GAH
CLIENT:
DRAWING NO.
SHEET OF
TITLE:
NO. DATE NATURE OF REVISION
FILE NAME N:chicago150084MechMDT3_150084_06.sht
CHKD.
JPCDSGN.
JPCCHKD.
SCALE:
DWN.
8/10/2016PLOT DATE:
jkennedyCAD USER:
PROJ. NO.
MODEL: Default
DATE:
ELP
15-0084
JTK
GAH
CHICAGO, IL 60608
1501 SOUTH CALIFORNIA AVENUE
MT. SINAI HOSPITAL
7
HW HEATER REPLACEMENT PROJ.
7//5/16
MT. SINAI HOSPITAL - DOMESTIC
1
1
PROPOSED METRO MIX MIXING VALVE HEADER
EXISTING CONDITION PICTURES
WATER HEATER TO BE LOCATED IN THIS AREA
EXISTING SOUTH WALL OF L41 SEMI INSTANTANEOUS
WATER HEATER TO BE LOCATED IN THIS AREA
EXISTING SOUTH WALL OF L41 SEMI INSTANTANEOUS
AND PRESSURE GAUGE TO BE REMOVED
EXISTING HOT WATER TANK SUPPLY LINES
FOR PROPOSED CONTROL PANELS
PROVIDE 3 1-POLE 20 AMP CIRCUIT BREAKERS
EXISTING LIGHTING PANEL IN MECH RM L41 TO
PIPING TO BE REMOVED
EXISTING WATER TANK AND RELATED
PUMP STATION
WALL SOUTH OF CONDENSATE
EXISTING WEST BOILER ROOM
NEW WATER HEATER
ACCOMODATE
TO BE REWORKED TO
EXISTING STEAM PIPING
BE ABANDONED AND SEALED
EXISTING CATCH BASIN TORECIRCULATIONRETURN
RETURN TO HEATER
MIXEDWATEROUTLET
HOTWATERINLET
COLDWATERINLET
7. SPECIFICATIONS
7
SPC
NTS
CLIENT:
DRAWING NO.
SHEET OF
TITLE:
NO. DATE NATURE OF REVISION
FILE NAME N:chicago150084MechSPC_150084_07.sht
CHKD.
JPCDSGN.
JPCCHKD.
SCALE:
DWN.
7/6/2016PLOT DATE:
jkennedyCAD USER:
PROJ. NO.
MODEL: Default
DATE:
ELP
15-0084
JTK
GAH
CHICAGO, IL 60608
1501 SOUTH CALIFORNIA AVENUE
MT. SINAI HOSPITAL
7
HW HEATER REPLACEMENT PROJ.
7//5/16
MT. SINAI HOSPITAL - DOMESTIC