SlideShare a Scribd company logo
Mouneer ALJebn Resume
Instrument &control Supervisor
Name: Mouneer ALJebn
Date of Birth: 8/5/1980.
Nationality: Sudanese
Marital Status: Married
Education: Bachelor degree in electronic and electrical engineering.
Home address:United Arab Emirates (UAE) – Abu Dhabi.
Contact. Mobile No. : +992289209922
E-mail: mouneer180@hotmail.com
Career objective
Proudly have experience more than 10 years, I am looking for a good position in
the field of instruments and control in a prestigious company where previous
skills and capabilities can be put to efficient use. I possess effective organizational
skills and the ability to supervise a team and develop the final output .
 Career History
 Period : Oct ‘2010 Till 6102
Abu Dhabi Gas Industries Ltd – GASCO
PositionSenior instrument and control Technician
Responsible for
 Commissioning, pre commissioning and plant start up procedures
 Permit to work originator and Personin charge of work site(PICWS)
 Perfume Preventive maintenance PM, Break down, shutdown maintenance
 Calibrate, configure and installment all type of electronic transmitters
ROSEMOUNT, HONYWELL FOXBORO
 Calibrate, assemble and disassemble control valves with its accessories
positionrs Masoneileian SVI1,SVI2, Flowserve, FISHER….
 Experience in shutdown and ON/OFF valves with their accessories (solenoid
valve, limit switch) troubleshooting and PST (partial stork test).
 Conversant with BENTLY NEVADA 3000, 3500 troubleshooting and
RACK configuration.
 Experience to check all types of switches (pressure, level, temperature, flow)
micro and proximity switches.
 Maintenance & calibration of turbine governor controlsystem
 Maintenance and calibration of different analyzers : Conductivity, Chlorine,
PH, SDI, Redox, Turbidity, TDS ( Endress and Hauser(
 Conversant with controlsystem PLC(Siemens, Allen Bradley…)
YOKWGAWA Centime 3000 DCS, SCADA, BMS,F&G,TCS
 familiar with Field bus, SMART instrumentation, SIS systems, Telemetry
(SCADA), HIPPS and Intelligent well completions Spares balance
investigation and inventory control for all instruments’ spare parts
 conversant with steam boilers MACHI operation and maintenance
 conversant with instrument Air compressors operation and maintenance
 conversant with instrument Air dryers operation and maintenance
 conversant with GE gas turbine maintenance overhauling, hot path
inspection, GCV,SRVand controlsystem,N2 Generator, Fire Water pumps.
 Manpower planning and estimation, and preparation of failure analysis
reports and recommendations to avoid recurrence,
 preparation of various progress reports, PM task reports and purchase
requisition for spares.
 Able to carry out technical evaluations of vendor offers, checking of vendor
drawings.
 Ability to use instrument calibration and Test equipments like, HART
communicator, FLUKE pressure calibrator ,Vibration test TK3, Multimeter,
frequency simulation Oscillator ………ets
 Ability to read drawings like P&ID, PFD, Logic Drawings, cause and affect
affect, installation hook ups, junction boxes, loop schemes & cable schedules
Electrical diagrams
 Ensure Spares balance and inventory and rise purchase requisite by using
MAXIMO 6.2
Period : Jan ‘2005 Till 2010
CONOCO PHILIPS Tabia gas plant.
Position: Instrument & Control Engineer
Responsible for:
 Follow up delay maintenance activates, preventive maintenance, break down,
shutdown maintenance as per the procedures and safety plan
 Conform the complement the maintenance and work environment with ISO
ISO 9001 – 2008,IEC and maintenance policy
 specifications for controlvalve, System Network , Control Panel,
Cabinet and Rack , Panel Specification , HSSD Specification
,Telecom cable Specification Instrumentation MCS, PSD, & ESD
System , Pressure Safety and Relief Valves…..ete
 Instrument Philosophies like Automation System Philosophy, Reset &
Override ,Fire and Gas Instrument Earthling Philosophy, Shutdown
Philosophy
 Documents Related To Automation System like Fire & Gas Cause / ESD
and Effect Chart MCS, PSD/ESD Instrument Cable Block Diagram MCS,
PSD/ESD, TCS. SIL ,instrument I/O .List of Test Equipments
 instrument Data sheet like control valve data sheet, ESD valves,
transmitters, T/K, RTD …..ete
 coordinate with other sections for major plant shutdown, follow up
shutdown critical path and annual shutdown planning.
 responsible for control systems DCS YOKOGAWACentum3000,
PLC ALLEN BRADELY , SCADA,TCS,F&G
 Personal Skills:
 Self-starter, motivated, communication skills, professional ,Good Problems-
solver, ,Adapting rapidly to changes in environment places and people
 Excellent team player with active network of other
 Self-confident in successfully handling the assigned tasks &responsibilities,
Plenty of drive, enthusiasm and motivation
 UAE driving license
Specific Tasks & Assignments involvement:
PMO:Preventive Maintenance Optimization. Development of revised
maintenance strategy with a focus on Pdm & CBM as future substitute of some
PM wherever applicable without compromising integrity and reliability of the
asset.
HSECES:HSE Critical Equipment & Systems. MAT incorporated in the JP as
per standards
.
PRM:Plant Resource Manager is a software toolthat works with production
control systems like CENTUM, CS-3000, Prosafe-RS and intelligent field
devices. PRM software linked with Maximo for continuous monitoring.
PST:Partial Stroke Test project implementation, and test with a running plant.
Safetycourses:
 Permit to work (PTW).
 Working safely and hazards elimination by IOSH.
 I worked Two years as HSE representative.
 Emergency response plan.
 Safe handling of chemical (SHOCH).
 Firefighting and Breathing apparatus
 Contribute in developing emergency response plan(ERP) for GASCO LTD
 Supervising safely by IOSH
 Conversant with operation Hazards study HAZOP
Technicalcourses:
 Bentley Nevada 3500 operation and maintenance by GENERAL
ELECTRIC GE
 DCS for maintenance.
 Electrical Equipment In Hazardous Areas & Classification
 GE Mark 6 (Turbine ControlSystem)
 HMI& controlpanel Maintenance PLC.
 Controller and control theory.
 Control valve and accessories.
 Fire, smoke and gas detection system.
 Certificate of attendance training courseof Training of Trainers by redar
uk.
 Critical instrument and control equipments competency by GASCO LTD
 Quality management System ISO 9001-2008
 Leadership Courses:
 Planning & Goal-Setting
 Leadership &personality at work
 Managing Professional Relationships
 CAS (Competency Assessorsystem) Training Course for local developees.
 Communication, Interpersonal & Team Building Skills.
 Project management and skills
 Self training for Skills of dealing with difficult people.
 Self training for strategic planning with critical success factories and future
scenarios
Languages skills
 Arabic as mother language and English fluently
Computer Experience:
 M.S Windows, ME and 2000, XP, Installation and setup programs.
 Familiar with M.S Office, including Word, Excel, Outlook, Access,
PowerPoint, Visio and Photoshop.
 IMMPOWER / MAXIMO: Central Maintenance Management System
(CMMS)
 C,C++ and visual basic programming
References
Abdelkader Attallah – GASCO – Maintenance Department head – Mobile No:
+971501457113
Abdel Qader Alshatri – GASCO – Section head – Mobile No: 00971504417297

More Related Content

What's hot

Elv project engineer
Elv project engineerElv project engineer
Elv project engineer
Fahim Mohamed
 
Amerison tom-resume
Amerison tom-resumeAmerison tom-resume
Amerison tom-resume
AmerisonTom
 
Omar Diaa CV
Omar Diaa CVOmar Diaa CV
Omar Diaa CVOmar Diaa
 
Zubair CV OK
Zubair CV OKZubair CV OK
Zubair CV OKZubair .
 
Resume2015
Resume2015Resume2015
Resume2015
Landon Williams
 

What's hot (18)

sajid cv.
sajid cv.sajid cv.
sajid cv.
 
FT WTT Brochure New
FT WTT Brochure NewFT WTT Brochure New
FT WTT Brochure New
 
BMS Engineer
BMS EngineerBMS Engineer
BMS Engineer
 
Elv project engineer
Elv project engineerElv project engineer
Elv project engineer
 
Amerison tom-resume
Amerison tom-resumeAmerison tom-resume
Amerison tom-resume
 
sameh c.v
sameh c.vsameh c.v
sameh c.v
 
Abdelmouizz Mahfouz
Abdelmouizz MahfouzAbdelmouizz Mahfouz
Abdelmouizz Mahfouz
 
sulaiman cv new
sulaiman cv newsulaiman cv new
sulaiman cv new
 
ELV ENGINEER RESUME
ELV ENGINEER RESUMEELV ENGINEER RESUME
ELV ENGINEER RESUME
 
CV - ELV ENGINEER
CV - ELV ENGINEERCV - ELV ENGINEER
CV - ELV ENGINEER
 
c&i24.12.1014
c&i24.12.1014c&i24.12.1014
c&i24.12.1014
 
resume latest
resume latestresume latest
resume latest
 
SENIOR AEROSPACE
SENIOR AEROSPACESENIOR AEROSPACE
SENIOR AEROSPACE
 
ARRONRESUME[1]
ARRONRESUME[1]ARRONRESUME[1]
ARRONRESUME[1]
 
Omar Diaa CV
Omar Diaa CVOmar Diaa CV
Omar Diaa CV
 
Zubair CV OK
Zubair CV OKZubair CV OK
Zubair CV OK
 
Resume2015
Resume2015Resume2015
Resume2015
 
Resume - kalees
Resume - kaleesResume - kalees
Resume - kalees
 

Viewers also liked

Adb procurement guidelines icb-b1
Adb procurement guidelines   icb-b1Adb procurement guidelines   icb-b1
Adb procurement guidelines icb-b1Joy Irman
 
Ankur Sood-Instrument engineer
Ankur Sood-Instrument engineerAnkur Sood-Instrument engineer
Ankur Sood-Instrument engineerankur sood
 
Procurment Management
Procurment ManagementProcurment Management
Procurment Managementwellanet
 
Construction phases
Construction phasesConstruction phases
Construction phases
Meesum Zaidi
 
Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)Nitinkumar Patel
 
Project Procurment Management
Project Procurment ManagementProject Procurment Management
Project Procurment Management
Saad Al Jabri
 
Class 42 control valves - valve positioners, cavitation and flashing
Class 42   control valves - valve positioners, cavitation and flashingClass 42   control valves - valve positioners, cavitation and flashing
Class 42 control valves - valve positioners, cavitation and flashing
Manipal Institute of Technology
 
Class 37 inferential control, gain scheduling
Class 37   inferential control, gain schedulingClass 37   inferential control, gain scheduling
Class 37 inferential control, gain scheduling
Manipal Institute of Technology
 
Types of contracts
Types of contractsTypes of contracts
Types of contracts
Tulsi Pokhrel
 
80 instrumentation interview questions with answers
80 instrumentation interview questions with answers80 instrumentation interview questions with answers
80 instrumentation interview questions with answers
kirstymoore071
 
3 Things Every Sales Team Needs to Be Thinking About in 2017
3 Things Every Sales Team Needs to Be Thinking About in 20173 Things Every Sales Team Needs to Be Thinking About in 2017
3 Things Every Sales Team Needs to Be Thinking About in 2017
Drift
 

Viewers also liked (14)

Adb procurement guidelines icb-b1
Adb procurement guidelines   icb-b1Adb procurement guidelines   icb-b1
Adb procurement guidelines icb-b1
 
Ankur Sood-Instrument engineer
Ankur Sood-Instrument engineerAnkur Sood-Instrument engineer
Ankur Sood-Instrument engineer
 
CV of Viswanathan KK
CV of Viswanathan KKCV of Viswanathan KK
CV of Viswanathan KK
 
Procurment Management
Procurment ManagementProcurment Management
Procurment Management
 
Epc presentation robert foxpresentation
Epc presentation robert foxpresentationEpc presentation robert foxpresentation
Epc presentation robert foxpresentation
 
Construction phases
Construction phasesConstruction phases
Construction phases
 
Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)
 
Project Procurment Management
Project Procurment ManagementProject Procurment Management
Project Procurment Management
 
Instrument Supervisor CV
Instrument Supervisor CVInstrument Supervisor CV
Instrument Supervisor CV
 
Class 42 control valves - valve positioners, cavitation and flashing
Class 42   control valves - valve positioners, cavitation and flashingClass 42   control valves - valve positioners, cavitation and flashing
Class 42 control valves - valve positioners, cavitation and flashing
 
Class 37 inferential control, gain scheduling
Class 37   inferential control, gain schedulingClass 37   inferential control, gain scheduling
Class 37 inferential control, gain scheduling
 
Types of contracts
Types of contractsTypes of contracts
Types of contracts
 
80 instrumentation interview questions with answers
80 instrumentation interview questions with answers80 instrumentation interview questions with answers
80 instrumentation interview questions with answers
 
3 Things Every Sales Team Needs to Be Thinking About in 2017
3 Things Every Sales Team Needs to Be Thinking About in 20173 Things Every Sales Team Needs to Be Thinking About in 2017
3 Things Every Sales Team Needs to Be Thinking About in 2017
 

Similar to Mouneer ALjebn CV

jameen new senior instrument cv
jameen new senior instrument cvjameen new senior instrument cv
jameen new senior instrument cvjameen rahman
 
Mahfuzur Fire & Gas Tech CV -2017
Mahfuzur Fire & Gas Tech CV -2017Mahfuzur Fire & Gas Tech CV -2017
Mahfuzur Fire & Gas Tech CV -2017Mahfuzur Rahman
 
Mahfuzur Fire & Gas Tech CV -2017
Mahfuzur Fire & Gas Tech CV -2017Mahfuzur Fire & Gas Tech CV -2017
Mahfuzur Fire & Gas Tech CV -2017Mahfuzur Rahman
 
PRABHA CURRICULAM VITAE
PRABHA CURRICULAM VITAEPRABHA CURRICULAM VITAE
PRABHA CURRICULAM VITAEPrabhakaran K
 
Mohammad Mustafa ( 01001645727) (Autosaved)
Mohammad Mustafa ( 01001645727) (Autosaved)Mohammad Mustafa ( 01001645727) (Autosaved)
Mohammad Mustafa ( 01001645727) (Autosaved)mohammed mostafa
 
Mohammad Mustafa ( 01001645727) (Autosaved)
Mohammad Mustafa ( 01001645727) (Autosaved)Mohammad Mustafa ( 01001645727) (Autosaved)
Mohammad Mustafa ( 01001645727) (Autosaved)mohammed mostafa
 
Distributed Control System (DCS) Applications, Selection & Troubleshooting
Distributed Control System (DCS) Applications, Selection & TroubleshootingDistributed Control System (DCS) Applications, Selection & Troubleshooting
Distributed Control System (DCS) Applications, Selection & Troubleshooting
petroEDGE
 
Marinelle resume with salary
Marinelle resume with salaryMarinelle resume with salary
Marinelle resume with salaryMarinelle Beredo
 
Curriculum Vitae (2015)
Curriculum Vitae (2015)Curriculum Vitae (2015)
Curriculum Vitae (2015)Jay Arances
 
Jamal_Ashraf -1 oil@gas
Jamal_Ashraf -1 oil@gasJamal_Ashraf -1 oil@gas
Jamal_Ashraf -1 oil@gasJAMAL ASHRAF
 
Palanikumar Resume
Palanikumar ResumePalanikumar Resume
Palanikumar Resumepalani kumar
 

Similar to Mouneer ALjebn CV (20)

jameen new senior instrument cv
jameen new senior instrument cvjameen new senior instrument cv
jameen new senior instrument cv
 
Mahfuzur Fire & Gas Tech CV -2017
Mahfuzur Fire & Gas Tech CV -2017Mahfuzur Fire & Gas Tech CV -2017
Mahfuzur Fire & Gas Tech CV -2017
 
Mahfuzur Fire & Gas Tech CV -2017
Mahfuzur Fire & Gas Tech CV -2017Mahfuzur Fire & Gas Tech CV -2017
Mahfuzur Fire & Gas Tech CV -2017
 
PRABHA CURRICULAM VITAE
PRABHA CURRICULAM VITAEPRABHA CURRICULAM VITAE
PRABHA CURRICULAM VITAE
 
DINESH parmar resume
DINESH parmar resumeDINESH parmar resume
DINESH parmar resume
 
Mohammad Mustafa ( 01001645727) (Autosaved)
Mohammad Mustafa ( 01001645727) (Autosaved)Mohammad Mustafa ( 01001645727) (Autosaved)
Mohammad Mustafa ( 01001645727) (Autosaved)
 
Mohammad Mustafa ( 01001645727) (Autosaved)
Mohammad Mustafa ( 01001645727) (Autosaved)Mohammad Mustafa ( 01001645727) (Autosaved)
Mohammad Mustafa ( 01001645727) (Autosaved)
 
Distributed Control System (DCS) Applications, Selection & Troubleshooting
Distributed Control System (DCS) Applications, Selection & TroubleshootingDistributed Control System (DCS) Applications, Selection & Troubleshooting
Distributed Control System (DCS) Applications, Selection & Troubleshooting
 
ROHIT JOSHI JI
ROHIT JOSHI JIROHIT JOSHI JI
ROHIT JOSHI JI
 
2 (1)
2 (1)2 (1)
2 (1)
 
Lijo_cv updated 27.04.2015
Lijo_cv updated 27.04.2015Lijo_cv updated 27.04.2015
Lijo_cv updated 27.04.2015
 
Winston Resume new
Winston Resume newWinston Resume new
Winston Resume new
 
Marinelle resume with salary
Marinelle resume with salaryMarinelle resume with salary
Marinelle resume with salary
 
Curriculum Vitae (2015)
Curriculum Vitae (2015)Curriculum Vitae (2015)
Curriculum Vitae (2015)
 
Resume
ResumeResume
Resume
 
Resume
Resume Resume
Resume
 
Jamal_Ashraf -1 oil@gas
Jamal_Ashraf -1 oil@gasJamal_Ashraf -1 oil@gas
Jamal_Ashraf -1 oil@gas
 
AlaaEddinCV
AlaaEddinCVAlaaEddinCV
AlaaEddinCV
 
Palanikumar Resume
Palanikumar ResumePalanikumar Resume
Palanikumar Resume
 
RESUME
RESUMERESUME
RESUME
 

Recently uploaded

DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
Kamal Acharya
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
Kamal Acharya
 

Recently uploaded (20)

DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 

Mouneer ALjebn CV

  • 1. Mouneer ALJebn Resume Instrument &control Supervisor Name: Mouneer ALJebn Date of Birth: 8/5/1980. Nationality: Sudanese Marital Status: Married Education: Bachelor degree in electronic and electrical engineering. Home address:United Arab Emirates (UAE) – Abu Dhabi. Contact. Mobile No. : +992289209922 E-mail: mouneer180@hotmail.com Career objective Proudly have experience more than 10 years, I am looking for a good position in the field of instruments and control in a prestigious company where previous skills and capabilities can be put to efficient use. I possess effective organizational skills and the ability to supervise a team and develop the final output .  Career History  Period : Oct ‘2010 Till 6102 Abu Dhabi Gas Industries Ltd – GASCO PositionSenior instrument and control Technician Responsible for  Commissioning, pre commissioning and plant start up procedures  Permit to work originator and Personin charge of work site(PICWS)  Perfume Preventive maintenance PM, Break down, shutdown maintenance  Calibrate, configure and installment all type of electronic transmitters ROSEMOUNT, HONYWELL FOXBORO  Calibrate, assemble and disassemble control valves with its accessories positionrs Masoneileian SVI1,SVI2, Flowserve, FISHER….  Experience in shutdown and ON/OFF valves with their accessories (solenoid valve, limit switch) troubleshooting and PST (partial stork test).  Conversant with BENTLY NEVADA 3000, 3500 troubleshooting and RACK configuration.  Experience to check all types of switches (pressure, level, temperature, flow) micro and proximity switches.  Maintenance & calibration of turbine governor controlsystem
  • 2.  Maintenance and calibration of different analyzers : Conductivity, Chlorine, PH, SDI, Redox, Turbidity, TDS ( Endress and Hauser(  Conversant with controlsystem PLC(Siemens, Allen Bradley…) YOKWGAWA Centime 3000 DCS, SCADA, BMS,F&G,TCS  familiar with Field bus, SMART instrumentation, SIS systems, Telemetry (SCADA), HIPPS and Intelligent well completions Spares balance investigation and inventory control for all instruments’ spare parts  conversant with steam boilers MACHI operation and maintenance  conversant with instrument Air compressors operation and maintenance  conversant with instrument Air dryers operation and maintenance  conversant with GE gas turbine maintenance overhauling, hot path inspection, GCV,SRVand controlsystem,N2 Generator, Fire Water pumps.  Manpower planning and estimation, and preparation of failure analysis reports and recommendations to avoid recurrence,  preparation of various progress reports, PM task reports and purchase requisition for spares.  Able to carry out technical evaluations of vendor offers, checking of vendor drawings.  Ability to use instrument calibration and Test equipments like, HART communicator, FLUKE pressure calibrator ,Vibration test TK3, Multimeter, frequency simulation Oscillator ………ets  Ability to read drawings like P&ID, PFD, Logic Drawings, cause and affect affect, installation hook ups, junction boxes, loop schemes & cable schedules Electrical diagrams  Ensure Spares balance and inventory and rise purchase requisite by using MAXIMO 6.2 Period : Jan ‘2005 Till 2010 CONOCO PHILIPS Tabia gas plant. Position: Instrument & Control Engineer Responsible for:  Follow up delay maintenance activates, preventive maintenance, break down, shutdown maintenance as per the procedures and safety plan  Conform the complement the maintenance and work environment with ISO ISO 9001 – 2008,IEC and maintenance policy
  • 3.  specifications for controlvalve, System Network , Control Panel, Cabinet and Rack , Panel Specification , HSSD Specification ,Telecom cable Specification Instrumentation MCS, PSD, & ESD System , Pressure Safety and Relief Valves…..ete  Instrument Philosophies like Automation System Philosophy, Reset & Override ,Fire and Gas Instrument Earthling Philosophy, Shutdown Philosophy  Documents Related To Automation System like Fire & Gas Cause / ESD and Effect Chart MCS, PSD/ESD Instrument Cable Block Diagram MCS, PSD/ESD, TCS. SIL ,instrument I/O .List of Test Equipments  instrument Data sheet like control valve data sheet, ESD valves, transmitters, T/K, RTD …..ete  coordinate with other sections for major plant shutdown, follow up shutdown critical path and annual shutdown planning.  responsible for control systems DCS YOKOGAWACentum3000, PLC ALLEN BRADELY , SCADA,TCS,F&G  Personal Skills:  Self-starter, motivated, communication skills, professional ,Good Problems- solver, ,Adapting rapidly to changes in environment places and people  Excellent team player with active network of other  Self-confident in successfully handling the assigned tasks &responsibilities, Plenty of drive, enthusiasm and motivation  UAE driving license Specific Tasks & Assignments involvement: PMO:Preventive Maintenance Optimization. Development of revised maintenance strategy with a focus on Pdm & CBM as future substitute of some PM wherever applicable without compromising integrity and reliability of the asset. HSECES:HSE Critical Equipment & Systems. MAT incorporated in the JP as per standards . PRM:Plant Resource Manager is a software toolthat works with production control systems like CENTUM, CS-3000, Prosafe-RS and intelligent field devices. PRM software linked with Maximo for continuous monitoring. PST:Partial Stroke Test project implementation, and test with a running plant.
  • 4. Safetycourses:  Permit to work (PTW).  Working safely and hazards elimination by IOSH.  I worked Two years as HSE representative.  Emergency response plan.  Safe handling of chemical (SHOCH).  Firefighting and Breathing apparatus  Contribute in developing emergency response plan(ERP) for GASCO LTD  Supervising safely by IOSH  Conversant with operation Hazards study HAZOP Technicalcourses:  Bentley Nevada 3500 operation and maintenance by GENERAL ELECTRIC GE  DCS for maintenance.  Electrical Equipment In Hazardous Areas & Classification  GE Mark 6 (Turbine ControlSystem)  HMI& controlpanel Maintenance PLC.  Controller and control theory.  Control valve and accessories.  Fire, smoke and gas detection system.  Certificate of attendance training courseof Training of Trainers by redar uk.  Critical instrument and control equipments competency by GASCO LTD  Quality management System ISO 9001-2008  Leadership Courses:  Planning & Goal-Setting  Leadership &personality at work  Managing Professional Relationships  CAS (Competency Assessorsystem) Training Course for local developees.  Communication, Interpersonal & Team Building Skills.  Project management and skills  Self training for Skills of dealing with difficult people.  Self training for strategic planning with critical success factories and future scenarios
  • 5. Languages skills  Arabic as mother language and English fluently Computer Experience:  M.S Windows, ME and 2000, XP, Installation and setup programs.  Familiar with M.S Office, including Word, Excel, Outlook, Access, PowerPoint, Visio and Photoshop.  IMMPOWER / MAXIMO: Central Maintenance Management System (CMMS)  C,C++ and visual basic programming References Abdelkader Attallah – GASCO – Maintenance Department head – Mobile No: +971501457113 Abdel Qader Alshatri – GASCO – Section head – Mobile No: 00971504417297