Mohammed Mustafa Abo El Qasim Abd El Baset
Address: Suez - Egypt
Mobile: +201001645727
Tel: 062/3327560
Email: Mohammed_754@yahoo.com
Date of Birth: 20 April 1989.
Seeking a job in field of Electrical Engineering at a reputable company where my
back ground and Experience can be well utilized knowledge , personal skills
Education
Pre-Master :Very Good From Port Said University
I study Master in Port Said University in field reduce
energy consumption in Glass Melting Furnaces
University : Higher Technological Institute 10
th
Ramadan City, Egypt
College : Faculty of Engineer
Department : Electrical Engineer
Grade : Excellent With Honors
G P A : 3.66
Graduation Year : 2011
Project Name : Secure 4G Comparison Wi-max Technology
Project Grade : Excellent
Technical Skills
 TOEFL ( Degree 510 )
 Local TOEFL Preparation Class
 Windows( XP – Windows 7 )
 Microsoft Office(Word, Excel, PowerPoint, Access )
 PC Maintenance
 PLC (Basics)
 C language –VHDL-Assembly
 AutoCAD
JJoobb OObbjjeeccttiivvee
Spoken Languages
Arabic-Degree : Mother Tongue
English-Degree :Very Good (Written & Spoken )
Nationality Egyptian
Marital Status Single
Military Status Exempted
Driving license Available
Smoking No
 Maintenance and Network Engineer at Canon Company from
24/10/2011 to 2/2/2012.
 Electrical Maintenance and Control Engineer at Arab Pharmaceutical
Glass Company ACDIMA Group from 5/2/2012 to 12/7/ 2015.
 Electrical Senior Shift Supervisor Engineer in United sugar Company
Egyptian SAVOLA Group from 12/7/ 2015 to Now.
 Certificate of excellence in the field of scientific ingenuity year
2007/2008.
 Certificate of excellence in the field of scientific ingenuity year
2009/2010.
 Certificate of thanks and appreciation from the Arab Pharmaceutical
Glass Company because of the sincere effort and outstanding
performance year 2015.
 Certificate of Appreciation from the United Sugar Company of Egypt
because of the sincere effort and outstanding performance in the field
of safety and occupational health factory year 2016.
 Interactive and fast enough to learn new technologies and sciences.
 Able to work in group, under pressure, manage stress, teaching others, helpful,
creative and calm.
 High Communications Skills.
 Self-Motivated.
 Ability to meet deadlines successfully maintaining the quality of work.
 Strong interpersonal skills, verbal and written communication skills.
 Able to maintain a consistent high level of performance.
 Effective problem solving and fault identification skills.
Personal Information
Experience
Certificates
Soft Skills
Description my work:
1. Follow up the electrical executive team and ensure that the electrical systems
were erected according to the design drawings. Supervision works.
2. Supervise the preparation of preventive maintenance programs and ensure the
implementation of the preventive maintenance program and coordinate
preventive maintenance programs with production and routine maintenance,
according to the manufacturer's recommendations, insure that the works are
completed according to the quality and safety requirements and routine
maintenance, according to the manufacturer's recommendations, insure that the
works are completed according to the quality and safety requirements.
3. Good Ability to record problems and/or issues on the defect tracking tools.
4. Prepare daily progress report consisting of works completed, works pending,
personnel issues, and safety issues and should recommend corrective measures.
5. Organize the workshop in order to be highly efficient, Make or improve
products such as electric motors, parts, equipment and appliances and the
ability to read and work from schematic diagrams.
6. Prepare and interpret specifications, drawings and regulations for the use of
electric power equipment and Preparation of time estimates, materials, tooling,
and manpower requirements for electrical maintenance and repair activities.
7. Create the maintenance procedures and operational spare parts and create what
is additional needed. Check spare part delivery quality and issue the material
receiving report. Verification of the min-maxi levels of the re-orders of spare
parts.
8. Follow up the maintenance works performed by outside contractors.
9. Control of corrective and preventative maintenance activities to the correct,
safe, and timely standard to maximize plant utilization and optimize costs
10. Ability to build up maintenance systems database to ascertain that accurate
performance trends can be identified and maintenance jobs are handled in a
timely and cost effective manner.
11. Work on the training and development of individuals and provide the necessary
support to them and work to arrange and coordinate individual’s holidays.
12. Reception of all the proposals that improve the efficiency of the equipment and
supervise the implementation of the approved ones of the Director of
Administration.
13. Attend a meeting of all (follow up) to resolve the problems existing lines per
week.
 Experience in Fields : -
Electrical Stations
1. Electrical Maintenance For Medium Voltage Switch Gear type:
a. ABB: HD 4 & VD 4
b. AGE OIL CIRCUIT BREAKER
2. Low Voltage A.C.B & M.C.C.B type :
a. Schneider: Merlin Grein & Telemecanique
b. ABB : SAGE E3&, E2& Tmax
3. Maintenance Transformer Stations (Oil and Dry Cast Resin), Power Factor,
Batteries and Generators (Caterpillar – Perkins – Mitsubishi).
4. Knowledge Learn How work Variable Speed Drive :
a. ABB: ACS 800 & 350)
b. Telemecanique: Altivar 28 & 31 & 312 & 61
c. Linza: SMD & SMV
d. Siemens: Micro Master 420 & 430 & 440
e. Hitachi: HJ 1000
f. Toshiba: VS-CF 11
5. Knowledge Learn how work Soft Starter:
a. ABB: PST&PSTB 30, 85&1050
b. Schneider: Altistart 22
Electrical Workshop
1. Workshop Winding Motors, Lighting
2. Electrical Maintenance For Equipment’s Moving
3. Electrical Maintenance For Equipment’s Engineering And Production
Workshops
4. Maintenance For Equipment’s Chemical
Electrical Maintenance for Engineering Sector
1. Electrical Maintenance For All Compressors Air
2. Electrical Maintenance For All Pumps Factory
3. Electrical Maintenance For Cells Operation Stations
4. L P G Station And Fuel Oil Station
5. Electrical Maintenance For All Equipment’s Clean Area Unit( HVAC )
6. Electrical Maintenance For Packing Machines
7. Electrical Maintenance For Fans Forming Machines
8. Electrical Maintenance For Fire Alarm And Fire Fighting
9. Maintenance For Water Treatment ( RO )
Electrical Maintenance for Production Sector
1. Electrical Maintenance For Equipment Raw Materials (Sand, Dolomite,
Limestone, Soda Ashe) And Crusher Internal/External Cullet Glass
2. Electrical Maintenance For Double Girder Cranes And Lifteres
3. Electrical Maintenance For Batch House (Mixing )
4. Electrical Maintenance For Melting Furnaces Glass
5. Electrical Maintenance For Glass Heat Treatment ( Lehar )
 TARGET Engineer Company For Fire Alarm And Fire Fighting
 ICDL
 Schlumberger
 Western Geco
 Arab Pharmaceutical Glass company ( APG )
 Transformer stations
 Generators and batteries
 Engine maintenance and the kinds of motors
 Winding motors
 Instrumentation and control
 Protective equipment
 Training to read graphics
 Training on the control circuits in glass melting and furnaces
 Training on the control circuits in the treatment furnaces glass
 Training on the control circuits in the machines run glass
 Suez Power Station
 Become familiar with the basic components of the station
 Identify the components of the generator and existing protections
 Types of transformers and types of protections available
 Identify the components of the public network
 Recognition on measurement devices and their role in the station
 Identify with the operating system D.C.S
 The petroleum Project and Technical consultation company ( PETROJET )
 Cathode protection
 Instruments
 Public address
 Fire alarm system
 General Authority Redsea ports
 Wireless communications devices and Mobile telecommunications
 The Preparation Program For Fresh Graduate Engineer In Egyptian
Syndicate Of Engineers
 The program features a variety of specialized engineering courses,
workshops & site visits suitable for Civil & Architecture to obtain Hands-
On Experience
 Mobile Package Technology
 GPRS, EDGE, UMTS 3G and HSPA Technology
 LTE 4G Technology
 Telecom Egypt
 Central equipment
 Types of faults
 The auto room
 DLU, LTG, SN, MB and CP units
 The Frame room
 Protection devices
 Types of the cables link
 Chamber of the cable
 Cabinet distribution
REFERENCES ARE FURNISHED UPON REQUEST
Training Courses

Mohammad Mustafa ( 01001645727) (Autosaved)

  • 1.
    Mohammed Mustafa AboEl Qasim Abd El Baset Address: Suez - Egypt Mobile: +201001645727 Tel: 062/3327560 Email: Mohammed_754@yahoo.com Date of Birth: 20 April 1989. Seeking a job in field of Electrical Engineering at a reputable company where my back ground and Experience can be well utilized knowledge , personal skills Education Pre-Master :Very Good From Port Said University I study Master in Port Said University in field reduce energy consumption in Glass Melting Furnaces University : Higher Technological Institute 10 th Ramadan City, Egypt College : Faculty of Engineer Department : Electrical Engineer Grade : Excellent With Honors G P A : 3.66 Graduation Year : 2011 Project Name : Secure 4G Comparison Wi-max Technology Project Grade : Excellent Technical Skills  TOEFL ( Degree 510 )  Local TOEFL Preparation Class  Windows( XP – Windows 7 )  Microsoft Office(Word, Excel, PowerPoint, Access )  PC Maintenance  PLC (Basics)  C language –VHDL-Assembly  AutoCAD JJoobb OObbjjeeccttiivvee Spoken Languages Arabic-Degree : Mother Tongue English-Degree :Very Good (Written & Spoken )
  • 2.
    Nationality Egyptian Marital StatusSingle Military Status Exempted Driving license Available Smoking No  Maintenance and Network Engineer at Canon Company from 24/10/2011 to 2/2/2012.  Electrical Maintenance and Control Engineer at Arab Pharmaceutical Glass Company ACDIMA Group from 5/2/2012 to 12/7/ 2015.  Electrical Senior Shift Supervisor Engineer in United sugar Company Egyptian SAVOLA Group from 12/7/ 2015 to Now.  Certificate of excellence in the field of scientific ingenuity year 2007/2008.  Certificate of excellence in the field of scientific ingenuity year 2009/2010.  Certificate of thanks and appreciation from the Arab Pharmaceutical Glass Company because of the sincere effort and outstanding performance year 2015.  Certificate of Appreciation from the United Sugar Company of Egypt because of the sincere effort and outstanding performance in the field of safety and occupational health factory year 2016.  Interactive and fast enough to learn new technologies and sciences.  Able to work in group, under pressure, manage stress, teaching others, helpful, creative and calm.  High Communications Skills.  Self-Motivated.  Ability to meet deadlines successfully maintaining the quality of work.  Strong interpersonal skills, verbal and written communication skills.  Able to maintain a consistent high level of performance.  Effective problem solving and fault identification skills. Personal Information Experience Certificates Soft Skills
  • 3.
    Description my work: 1.Follow up the electrical executive team and ensure that the electrical systems were erected according to the design drawings. Supervision works. 2. Supervise the preparation of preventive maintenance programs and ensure the implementation of the preventive maintenance program and coordinate preventive maintenance programs with production and routine maintenance, according to the manufacturer's recommendations, insure that the works are completed according to the quality and safety requirements and routine maintenance, according to the manufacturer's recommendations, insure that the works are completed according to the quality and safety requirements. 3. Good Ability to record problems and/or issues on the defect tracking tools. 4. Prepare daily progress report consisting of works completed, works pending, personnel issues, and safety issues and should recommend corrective measures. 5. Organize the workshop in order to be highly efficient, Make or improve products such as electric motors, parts, equipment and appliances and the ability to read and work from schematic diagrams. 6. Prepare and interpret specifications, drawings and regulations for the use of electric power equipment and Preparation of time estimates, materials, tooling, and manpower requirements for electrical maintenance and repair activities. 7. Create the maintenance procedures and operational spare parts and create what is additional needed. Check spare part delivery quality and issue the material receiving report. Verification of the min-maxi levels of the re-orders of spare parts. 8. Follow up the maintenance works performed by outside contractors. 9. Control of corrective and preventative maintenance activities to the correct, safe, and timely standard to maximize plant utilization and optimize costs 10. Ability to build up maintenance systems database to ascertain that accurate performance trends can be identified and maintenance jobs are handled in a timely and cost effective manner. 11. Work on the training and development of individuals and provide the necessary support to them and work to arrange and coordinate individual’s holidays. 12. Reception of all the proposals that improve the efficiency of the equipment and supervise the implementation of the approved ones of the Director of Administration. 13. Attend a meeting of all (follow up) to resolve the problems existing lines per week.
  • 4.
     Experience inFields : - Electrical Stations 1. Electrical Maintenance For Medium Voltage Switch Gear type: a. ABB: HD 4 & VD 4 b. AGE OIL CIRCUIT BREAKER 2. Low Voltage A.C.B & M.C.C.B type : a. Schneider: Merlin Grein & Telemecanique b. ABB : SAGE E3&, E2& Tmax 3. Maintenance Transformer Stations (Oil and Dry Cast Resin), Power Factor, Batteries and Generators (Caterpillar – Perkins – Mitsubishi). 4. Knowledge Learn How work Variable Speed Drive : a. ABB: ACS 800 & 350) b. Telemecanique: Altivar 28 & 31 & 312 & 61 c. Linza: SMD & SMV d. Siemens: Micro Master 420 & 430 & 440 e. Hitachi: HJ 1000 f. Toshiba: VS-CF 11 5. Knowledge Learn how work Soft Starter: a. ABB: PST&PSTB 30, 85&1050 b. Schneider: Altistart 22 Electrical Workshop 1. Workshop Winding Motors, Lighting 2. Electrical Maintenance For Equipment’s Moving 3. Electrical Maintenance For Equipment’s Engineering And Production Workshops 4. Maintenance For Equipment’s Chemical Electrical Maintenance for Engineering Sector 1. Electrical Maintenance For All Compressors Air 2. Electrical Maintenance For All Pumps Factory 3. Electrical Maintenance For Cells Operation Stations 4. L P G Station And Fuel Oil Station 5. Electrical Maintenance For All Equipment’s Clean Area Unit( HVAC ) 6. Electrical Maintenance For Packing Machines 7. Electrical Maintenance For Fans Forming Machines 8. Electrical Maintenance For Fire Alarm And Fire Fighting 9. Maintenance For Water Treatment ( RO ) Electrical Maintenance for Production Sector 1. Electrical Maintenance For Equipment Raw Materials (Sand, Dolomite, Limestone, Soda Ashe) And Crusher Internal/External Cullet Glass 2. Electrical Maintenance For Double Girder Cranes And Lifteres 3. Electrical Maintenance For Batch House (Mixing ) 4. Electrical Maintenance For Melting Furnaces Glass 5. Electrical Maintenance For Glass Heat Treatment ( Lehar )
  • 5.
     TARGET EngineerCompany For Fire Alarm And Fire Fighting  ICDL  Schlumberger  Western Geco  Arab Pharmaceutical Glass company ( APG )  Transformer stations  Generators and batteries  Engine maintenance and the kinds of motors  Winding motors  Instrumentation and control  Protective equipment  Training to read graphics  Training on the control circuits in glass melting and furnaces  Training on the control circuits in the treatment furnaces glass  Training on the control circuits in the machines run glass  Suez Power Station  Become familiar with the basic components of the station  Identify the components of the generator and existing protections  Types of transformers and types of protections available  Identify the components of the public network  Recognition on measurement devices and their role in the station  Identify with the operating system D.C.S  The petroleum Project and Technical consultation company ( PETROJET )  Cathode protection  Instruments  Public address  Fire alarm system  General Authority Redsea ports  Wireless communications devices and Mobile telecommunications  The Preparation Program For Fresh Graduate Engineer In Egyptian Syndicate Of Engineers  The program features a variety of specialized engineering courses, workshops & site visits suitable for Civil & Architecture to obtain Hands- On Experience  Mobile Package Technology  GPRS, EDGE, UMTS 3G and HSPA Technology  LTE 4G Technology  Telecom Egypt  Central equipment  Types of faults  The auto room  DLU, LTG, SN, MB and CP units  The Frame room  Protection devices  Types of the cables link  Chamber of the cable  Cabinet distribution REFERENCES ARE FURNISHED UPON REQUEST Training Courses