Profile- ABOUT ME
To draw a prospective line of distinction between limited resource and unlimited
innovative ideasin the face of volatile times, hence to enhance and expand upon
my education and experiences(mechanical engineer/supervisor.), having more
than 20+ years’ experience in Fabrication & Erection, Rigging & Erection
planning of Steel Structure in Oil & Gas, Power Plant, cement plant, sponge iron
plant & steel plant.
Professional Experience
Steel structure erection stage
• Reviewing Steel Erection drawings.
• Checking civil foundationselevation before steel (columns / frames
Erection).
• Supervising ground assembly for main columns with beams to compose
framescan be lifted and erected one time.
• Supervising erection of main steel girders and bracings between frames
(with consideration of erection sequence).
• Supervising alignment and bolt tightening for main members of the
structure on the main Aligns and Axis before offering for inspection.
• Supervising erection of Dressing (erection of small beams, bracings,
angles, C-Channelsand other medium & light steel items).
• Supervising balance bolttightening and offering for final inspection.
• Supervising Erection steel handrailsand gratings.
• Through all previous steel erection steps, solution for many technical
problems in erection due to material defects or wrong design to be set by my or
client proposals through RFIs (Request for Information).
EDUCATION QUALIFICATIONS
 Diploma in Mechanical Engineering passed in July 1996 from Biju
Patnaik University of Technology, Orissa India.
 12TH Passed from Patna intermediate council in 1992.
 10TH Passed from Bihar Board in 1990.
TECHNICAL QUALIFICATION
 Rigging & Slinging Supervisor Course from Emirates Risk Management
Consultancy (Abu Dhabi) UAE.2012
CERTIFICATE OF SEFETY APPRECIATION
Certificate of Appreciation for outstanding services, Safety and team work
during the period of 2012 to 2013 from FLOOR SHAH GAS DEVELOPMENT
PROJECT (Package 2 & 3) Client: -AL HOSN GAS ENI SAIPEM.
COMPUTER SKILLS
 MS WORD, EXCEL, ENTERNET, ENTRANET.
AREA OF INTEREST
 All kinds of works related to any production unit or mechanical
maintenance or construction unit with all type of heavy lift. Challenging
job, Structural Fabrication Erection and Equipment works.
SAFETY CONSCIOUSNESS 
 Handsome Safety Awareness against personal as well as plant Safety. Safe
working Procedures (PTW Permit applicant & Job performer according to work
permit procedure).
 Having fire fighting training, special trainings on safety topics like
housekeeping, use of personal Protective Equipments. (PPE’s) Acid Handling,
Confined Space, Emergency Handling, Noise Pollution and First Aid.
EXPERIENCE
June’2016 to till date -as a Erection Supervisor in SAIPEM SAUDI JIGCC PROJECT. My
job Involved in monitering of Erection, Rigging & Commissioning of pipe racks
Steel Structural equipment erection along with supporting Civil & E&I works.
SAIPEM major subcontractors are NSH & CCC.
Mar’2014 to till date -as a Erection Supervisor in M/S JSW SEVERFIELD LIMITED
(JINDAL STEEL) BELARI KARNATAKA My job Involved in Erection, Rigging &
Commissioning of Growth Shop project Steel Structural. Erection along with
supporting Civil & E&I works with safety & quality. Total scope 5600 m t
completed in 5 month. Currently I work in JSW DOLVI Mumbai Sinter plant
project.

Fab’2012 to date Fab’2014-as a Associate Engineer in M/S DESCON ENGINEERING ABU
DHABI. SHAH GAS DEVELOPMENT PROJECT (Package 2 & 3) Client: -AL HOSN GAS
ENI SAIPEM. Shah process plant & sulfur recovery unit. My job Involved in
Erection, Rigging & Commissioning of unit 740 & 742 pipe racks Steel
Structural. Scope includes construction of four areas(15.4 million man hours)
with fabrication & erection of about 500,000dia inches of Piping, 13000 tons
of steel structure, 6500 ton of equipment erection along with supporting Civil
& E&I works.
July’2011 to Fab’2012–as a Assistant Engineer Structural in M/s. SIMPLEX
INFRA STRUCTURE LIMITED. BHEL (DPL) my job involved in Fabrication &
Erection of structural for DPS Expansion project at Durgapur (WB). In this
project my main role is Fabrication & Erection of Power plant structure. Out of
all this I am looking after the day to day schedule of work maintaining the
monthly progress and other day to day site activities.
Mar’2010 to July’2011 –as a Senior Field Assistant in M/s. NAGARJUNA
CONSTRUCTION COMPANY LIMITED. My job involved in Erection of structural
for ISP (SAIL) Expansion project at Barnum, Asansol (WB). In this project my
main role is Erection of 48A2 BOF structure. In this package we did the India
record of 2011 M.T Erection in one day (24 hr). This is the biggest
achievement for both NCC Limited & SAIL. Out of all this I am looking after the
day to day schedule of work maintaining the monthly progress and other day
to day site activities.
Aug’2008 to Mar’2010–as a Mechanical Supervisor in M/s. GANNON
DUNKERLEY & COMPANY LIMITED, DELHI. My job involved in Fabrication &
Erection and alignmentof all Steel structures and other heavy erections for
JINDAL STAINLESS LIMITED Expansion project at JAJPUR (ORISSA). My
Functional activities includes handling entire Steel Melting Shop project
Structural Erection& schedule monitoring, day to day program fixing, making
skim for all heavy lift and giving progress as per schedules of the project
works.
Oct’2007 to Aug’2008–as a Mechanical Supervisor in M/s. DURHA COMPONENT
PRIVATE LIMITED, DELHI. My job involved in Equipment Erection and
alignment of all structures & Equipment in cement plant. Other heavy
erections for project. My Functional activities include handling entire
LAFFARGE CEMENT project at MAGIYA BAN KURA (W.B.) Equipment
Erection & schedule monitoring, day to day program fixing, making skim for
all heavy lift and giving progress as per schedules of the project works.
Aug’2006 to Oct’2007–as a Mechanical Supervisor in M/s .HAZY A. P. BAVA &
COMPANY, A.P. My job involved in Equipment Erection and alignment of all
structures & Equipment. Other heavy erections for ESP project. My Functional
activities include handling entire SRI CEMENT project at BEAWER
(RAJASTHAN) ESP Equipment Erection & schedule monitoring.
Fab’2004 to Aug’2006–as a Mechanical Supervisor in M/s. VISHAL
ENTERPRISES, TATA GROWTH SHOP TISCO (TATA IRON & STEEL)
(JAMSHEDPUR) (JHARKHAND). My job involved in structures Steel
Fabrication. My Functional activities include handling as a supervisor
monitoring.
Sept’1996 to Fab’2004–as a Mechanical Supervisor in M/s. SHARTHI
ENGINEERING & SERVICES, JAMSHEDPUR. My job involved in my job
involved in Fabrication & Erection and alignmentof all Steel structures and
Equipment Erection and alignmentof all structures & Equipment. Other heavy
erections for project. My Functional activities include handling entire project at
SPONGE IRON PLANT in Jharkhand, W.B, ORISSA, and CHHATTISGARH.
Equipment Erection & schedule monitoring, day to day program fixing,
making skim for all heavy lift and giving progress as per schedules of the
project works.
RESPONSIBILITY SUMMARY
 Responsible and accountable for the coordinated managementof multiple
related projects.
 Planned, directed, and managed designated projects.
 Analyzed results of fabricationserection to discover more efficient ways
and utilize resources.
 Delegated responsibilities and designed time schedules.
 Reviewed project status reports during each stage of fabrication.
 Prepared weekly project status reports for managementand clients.
 Managing commissioning / construction teams, able to direct (civil,
mechanical & electrical).
 Multinational teams.
 Maintaining effective relationships with the Client, Vendors, EPC and Sub-
contractors.
 Primarily responsible for ensuring all aspects of Quality on the nominated
project.
 Capable to cover multidisciplinary (civil, mechanical & electrical)
engineering project.
PERSONAL INFORMATION
Date of birth : 29th NOV 1974
Gender : Male
Marital status : Married
Nationality : Indian
Passport number & expire date : H5769713 & 2015
Driving License : UAE 742829
Languagesknown : English, Hindi, Oriya, Bengali.
Father’s name : Shri. BARHMANAD TIWARY
Permanent Address : Plot No 39, Vivek Bihar Pebco
Aditaypur, Jamshedpur
Dist.-Sarikela-Kharsawa
Jharkhand, India. 832109
Current Salary : 6500 SR @ Month
Expected Salary : As per company structure
DECLARATION:
I hereby declare that all statements written above are true and correct to the best
of my knowledge & belief.
Thanking you and looking forward for an opportunity to work in your
organization.
DATE: ……………………… Ramesh Kumar Tiwary
Place: ………………………. (Signature)

More Related Content

What's hot

CV---MECHANICAL ENGINEER / EPC-PROPOSALS MANAGER
CV---MECHANICAL ENGINEER / EPC-PROPOSALS MANAGERCV---MECHANICAL ENGINEER / EPC-PROPOSALS MANAGER
CV---MECHANICAL ENGINEER / EPC-PROPOSALS MANAGER
AZHAR QAZI
 
CV - Mechanical Engineer with 4 years and 9 Months Exp NEW ATC
CV - Mechanical Engineer with 4 years and 9 Months Exp NEW ATCCV - Mechanical Engineer with 4 years and 9 Months Exp NEW ATC
CV - Mechanical Engineer with 4 years and 9 Months Exp NEW ATCMidhun Raj
 
TAHRER C.V on 30-07-2015 -link
TAHRER C.V  on 30-07-2015 -linkTAHRER C.V  on 30-07-2015 -link
TAHRER C.V on 30-07-2015 -linkTahrer Abu Yousef
 
New CV Faisal Rauf
New CV Faisal RaufNew CV Faisal Rauf
New CV Faisal Raufawrish94
 
Sajid CV BE Civil 2007
Sajid CV BE Civil 2007Sajid CV BE Civil 2007
Sajid CV BE Civil 2007
sajid hasan
 
CV_of_A_K_Choudhary_with_Photo
CV_of_A_K_Choudhary_with_PhotoCV_of_A_K_Choudhary_with_Photo
CV_of_A_K_Choudhary_with_PhotoAshok Choudhary
 
Syed mohammed project manager civil
Syed mohammed project manager civilSyed mohammed project manager civil
Syed mohammed project manager civil
syedmohd77
 

What's hot (19)

CV---MECHANICAL ENGINEER / EPC-PROPOSALS MANAGER
CV---MECHANICAL ENGINEER / EPC-PROPOSALS MANAGERCV---MECHANICAL ENGINEER / EPC-PROPOSALS MANAGER
CV---MECHANICAL ENGINEER / EPC-PROPOSALS MANAGER
 
CV - Mechanical Engineer with 4 years and 9 Months Exp NEW ATC
CV - Mechanical Engineer with 4 years and 9 Months Exp NEW ATCCV - Mechanical Engineer with 4 years and 9 Months Exp NEW ATC
CV - Mechanical Engineer with 4 years and 9 Months Exp NEW ATC
 
Engr,imran cv.cement.
Engr,imran cv.cement.Engr,imran cv.cement.
Engr,imran cv.cement.
 
Murali-Resume
Murali-ResumeMurali-Resume
Murali-Resume
 
Ali
AliAli
Ali
 
Cv mm
Cv mmCv mm
Cv mm
 
TAHRER C.V on 30-07-2015 -link
TAHRER C.V  on 30-07-2015 -linkTAHRER C.V  on 30-07-2015 -link
TAHRER C.V on 30-07-2015 -link
 
New CV Faisal Rauf
New CV Faisal RaufNew CV Faisal Rauf
New CV Faisal Rauf
 
Sajid CV BE Civil 2007
Sajid CV BE Civil 2007Sajid CV BE Civil 2007
Sajid CV BE Civil 2007
 
jsw resume
jsw resumejsw resume
jsw resume
 
CV_of_A_K_Choudhary_with_Photo
CV_of_A_K_Choudhary_with_PhotoCV_of_A_K_Choudhary_with_Photo
CV_of_A_K_Choudhary_with_Photo
 
resume (1)
resume (1)resume (1)
resume (1)
 
FAISAL_REHMAN_CV
FAISAL_REHMAN_CVFAISAL_REHMAN_CV
FAISAL_REHMAN_CV
 
Resume for Mechanical Engineer (1)
Resume for Mechanical Engineer (1)Resume for Mechanical Engineer (1)
Resume for Mechanical Engineer (1)
 
Civil engineer
Civil engineerCivil engineer
Civil engineer
 
Vijayendra CV
Vijayendra CVVijayendra CV
Vijayendra CV
 
updated CV
updated CVupdated CV
updated CV
 
Syed mohammed project manager civil
Syed mohammed project manager civilSyed mohammed project manager civil
Syed mohammed project manager civil
 
MohammadShafique (1)
MohammadShafique (1)MohammadShafique (1)
MohammadShafique (1)
 

Viewers also liked

independentevents
independenteventsindependentevents
independentevents
Dinesh Kumar
 
Svjetske sile VI b
Svjetske sile VI bSvjetske sile VI b
Svjetske sile VI b
estera hadasa
 
Double the Performance of Oracle SOA Suite 11g? Absolutely! (whitepaper)
Double the Performance of Oracle SOA Suite 11g? Absolutely! (whitepaper)Double the Performance of Oracle SOA Suite 11g? Absolutely! (whitepaper)
Double the Performance of Oracle SOA Suite 11g? Absolutely! (whitepaper)
Revelation Technologies
 
Aquib kapil vasim
Aquib kapil vasimAquib kapil vasim
Aquib kapil vasim
jabi khan
 
Values, attitudes & job satisfaction
Values, attitudes & job satisfactionValues, attitudes & job satisfaction
Values, attitudes & job satisfaction
A. K. M. Anwar Hossain
 
வெற்றியைத் தடுக்கும் 12 மனநிலைகள்!
வெற்றியைத் தடுக்கும்  12 மனநிலைகள்!வெற்றியைத் தடுக்கும்  12 மனநிலைகள்!
வெற்றியைத் தடுக்கும் 12 மனநிலைகள்!
N Ganeshan
 
Java Performance and Using Java Flight Recorder
Java Performance and Using Java Flight RecorderJava Performance and Using Java Flight Recorder
Java Performance and Using Java Flight Recorder
Isuru Perera
 
Estadísticas de capacitación en seguridad y salvamento minero - 2015. Hasta d...
Estadísticas de capacitación en seguridad y salvamento minero - 2015. Hasta d...Estadísticas de capacitación en seguridad y salvamento minero - 2015. Hasta d...
Estadísticas de capacitación en seguridad y salvamento minero - 2015. Hasta d...
Agencia Nacional de Minería
 
Topic11 sortingandsearching
Topic11 sortingandsearchingTopic11 sortingandsearching
Topic11 sortingandsearching
Gopi Saiteja
 
Rational decision making model
Rational decision making modelRational decision making model
Rational decision making model
A. K. M. Anwar Hossain
 
Company brochure BeglinWoods Architects
Company brochure BeglinWoods ArchitectsCompany brochure BeglinWoods Architects
Company brochure BeglinWoods Architects
Simon Woods
 

Viewers also liked (11)

independentevents
independenteventsindependentevents
independentevents
 
Svjetske sile VI b
Svjetske sile VI bSvjetske sile VI b
Svjetske sile VI b
 
Double the Performance of Oracle SOA Suite 11g? Absolutely! (whitepaper)
Double the Performance of Oracle SOA Suite 11g? Absolutely! (whitepaper)Double the Performance of Oracle SOA Suite 11g? Absolutely! (whitepaper)
Double the Performance of Oracle SOA Suite 11g? Absolutely! (whitepaper)
 
Aquib kapil vasim
Aquib kapil vasimAquib kapil vasim
Aquib kapil vasim
 
Values, attitudes & job satisfaction
Values, attitudes & job satisfactionValues, attitudes & job satisfaction
Values, attitudes & job satisfaction
 
வெற்றியைத் தடுக்கும் 12 மனநிலைகள்!
வெற்றியைத் தடுக்கும்  12 மனநிலைகள்!வெற்றியைத் தடுக்கும்  12 மனநிலைகள்!
வெற்றியைத் தடுக்கும் 12 மனநிலைகள்!
 
Java Performance and Using Java Flight Recorder
Java Performance and Using Java Flight RecorderJava Performance and Using Java Flight Recorder
Java Performance and Using Java Flight Recorder
 
Estadísticas de capacitación en seguridad y salvamento minero - 2015. Hasta d...
Estadísticas de capacitación en seguridad y salvamento minero - 2015. Hasta d...Estadísticas de capacitación en seguridad y salvamento minero - 2015. Hasta d...
Estadísticas de capacitación en seguridad y salvamento minero - 2015. Hasta d...
 
Topic11 sortingandsearching
Topic11 sortingandsearchingTopic11 sortingandsearching
Topic11 sortingandsearching
 
Rational decision making model
Rational decision making modelRational decision making model
Rational decision making model
 
Company brochure BeglinWoods Architects
Company brochure BeglinWoods ArchitectsCompany brochure BeglinWoods Architects
Company brochure BeglinWoods Architects
 

Similar to RAMESH KUMAR TIWARI CV jssl 1

RESUME_of_manish-New
RESUME_of_manish-NewRESUME_of_manish-New
RESUME_of_manish-NewManish Sabane
 
ARUNKUMAR.R_ CV
ARUNKUMAR.R_ CVARUNKUMAR.R_ CV
ARUNKUMAR.R_ CVArun Kumar
 
Suvajit_Resume
Suvajit_ResumeSuvajit_Resume
Suvajit_ResumeJit Roy
 
CV AMINUL 19-05-2015
CV AMINUL 19-05-2015CV AMINUL 19-05-2015
CV AMINUL 19-05-2015Aminul Haque
 
Belal Khalid Alrwadieh-25 Oct 2016
Belal Khalid Alrwadieh-25 Oct 2016Belal Khalid Alrwadieh-25 Oct 2016
Belal Khalid Alrwadieh-25 Oct 2016belal alrwadieh
 
AMIT KUMAR (3)
AMIT KUMAR (3)AMIT KUMAR (3)
AMIT KUMAR (3)Amit Singh
 
AMIT KUMAR (3)
AMIT KUMAR (3)AMIT KUMAR (3)
AMIT KUMAR (3)Amit Singh
 
M.s. resume 150316
M.s. resume 150316M.s. resume 150316
M.s. resume 150316
Mohamad Safarudin
 
M.s. resume 290817
M.s. resume 290817M.s. resume 290817
M.s. resume 290817
Mohamad Safarudin
 
Shabd saran sahu
Shabd saran sahuShabd saran sahu
Shabd saran sahu
Shabd Saran Sahu
 

Similar to RAMESH KUMAR TIWARI CV jssl 1 (20)

cv@sanjaychaubey REV
cv@sanjaychaubey REVcv@sanjaychaubey REV
cv@sanjaychaubey REV
 
cv@sanjaychaubey REV
cv@sanjaychaubey REVcv@sanjaychaubey REV
cv@sanjaychaubey REV
 
Ranjith_Kumar R - CV
Ranjith_Kumar R - CVRanjith_Kumar R - CV
Ranjith_Kumar R - CV
 
aravind ..
aravind ..aravind ..
aravind ..
 
RESUME_of_manish-New
RESUME_of_manish-NewRESUME_of_manish-New
RESUME_of_manish-New
 
Connelly Darren (CV1)
Connelly Darren (CV1)Connelly Darren (CV1)
Connelly Darren (CV1)
 
ARUNKUMAR.R_ CV
ARUNKUMAR.R_ CVARUNKUMAR.R_ CV
ARUNKUMAR.R_ CV
 
latest resume
latest resumelatest resume
latest resume
 
Suvajit_Resume
Suvajit_ResumeSuvajit_Resume
Suvajit_Resume
 
---Ajinkya-- Resume
---Ajinkya-- Resume---Ajinkya-- Resume
---Ajinkya-- Resume
 
Abdul Hameed Civil supervisor
Abdul Hameed Civil supervisorAbdul Hameed Civil supervisor
Abdul Hameed Civil supervisor
 
Sanjay's C.V
Sanjay's C.VSanjay's C.V
Sanjay's C.V
 
Resume
ResumeResume
Resume
 
CV AMINUL 19-05-2015
CV AMINUL 19-05-2015CV AMINUL 19-05-2015
CV AMINUL 19-05-2015
 
Belal Khalid Alrwadieh-25 Oct 2016
Belal Khalid Alrwadieh-25 Oct 2016Belal Khalid Alrwadieh-25 Oct 2016
Belal Khalid Alrwadieh-25 Oct 2016
 
AMIT KUMAR (3)
AMIT KUMAR (3)AMIT KUMAR (3)
AMIT KUMAR (3)
 
AMIT KUMAR (3)
AMIT KUMAR (3)AMIT KUMAR (3)
AMIT KUMAR (3)
 
M.s. resume 150316
M.s. resume 150316M.s. resume 150316
M.s. resume 150316
 
M.s. resume 290817
M.s. resume 290817M.s. resume 290817
M.s. resume 290817
 
Shabd saran sahu
Shabd saran sahuShabd saran sahu
Shabd saran sahu
 

RAMESH KUMAR TIWARI CV jssl 1

  • 1. CURRICULUM VITAE RAMESHKUMAR TIWARY (MECHANICALENGINEER – ERECTION) Phone: +977-572595938 Email: rameshtiwari74@gmail.com Profile- ABOUT ME To draw a prospective line of distinction between limited resource and unlimited innovative ideasin the face of volatile times, hence to enhance and expand upon my education and experiences(mechanical engineer/supervisor.), having more than 20+ years’ experience in Fabrication & Erection, Rigging & Erection planning of Steel Structure in Oil & Gas, Power Plant, cement plant, sponge iron plant & steel plant. Professional Experience Steel structure erection stage • Reviewing Steel Erection drawings. • Checking civil foundationselevation before steel (columns / frames Erection). • Supervising ground assembly for main columns with beams to compose framescan be lifted and erected one time. • Supervising erection of main steel girders and bracings between frames (with consideration of erection sequence). • Supervising alignment and bolt tightening for main members of the structure on the main Aligns and Axis before offering for inspection. • Supervising erection of Dressing (erection of small beams, bracings, angles, C-Channelsand other medium & light steel items). • Supervising balance bolttightening and offering for final inspection. • Supervising Erection steel handrailsand gratings. • Through all previous steel erection steps, solution for many technical problems in erection due to material defects or wrong design to be set by my or client proposals through RFIs (Request for Information). EDUCATION QUALIFICATIONS  Diploma in Mechanical Engineering passed in July 1996 from Biju Patnaik University of Technology, Orissa India.  12TH Passed from Patna intermediate council in 1992.  10TH Passed from Bihar Board in 1990.
  • 2. TECHNICAL QUALIFICATION  Rigging & Slinging Supervisor Course from Emirates Risk Management Consultancy (Abu Dhabi) UAE.2012 CERTIFICATE OF SEFETY APPRECIATION Certificate of Appreciation for outstanding services, Safety and team work during the period of 2012 to 2013 from FLOOR SHAH GAS DEVELOPMENT PROJECT (Package 2 & 3) Client: -AL HOSN GAS ENI SAIPEM. COMPUTER SKILLS  MS WORD, EXCEL, ENTERNET, ENTRANET. AREA OF INTEREST  All kinds of works related to any production unit or mechanical maintenance or construction unit with all type of heavy lift. Challenging job, Structural Fabrication Erection and Equipment works. SAFETY CONSCIOUSNESS   Handsome Safety Awareness against personal as well as plant Safety. Safe working Procedures (PTW Permit applicant & Job performer according to work permit procedure).  Having fire fighting training, special trainings on safety topics like housekeeping, use of personal Protective Equipments. (PPE’s) Acid Handling, Confined Space, Emergency Handling, Noise Pollution and First Aid. EXPERIENCE June’2016 to till date -as a Erection Supervisor in SAIPEM SAUDI JIGCC PROJECT. My job Involved in monitering of Erection, Rigging & Commissioning of pipe racks Steel Structural equipment erection along with supporting Civil & E&I works. SAIPEM major subcontractors are NSH & CCC. Mar’2014 to till date -as a Erection Supervisor in M/S JSW SEVERFIELD LIMITED (JINDAL STEEL) BELARI KARNATAKA My job Involved in Erection, Rigging & Commissioning of Growth Shop project Steel Structural. Erection along with supporting Civil & E&I works with safety & quality. Total scope 5600 m t completed in 5 month. Currently I work in JSW DOLVI Mumbai Sinter plant project.  Fab’2012 to date Fab’2014-as a Associate Engineer in M/S DESCON ENGINEERING ABU DHABI. SHAH GAS DEVELOPMENT PROJECT (Package 2 & 3) Client: -AL HOSN GAS ENI SAIPEM. Shah process plant & sulfur recovery unit. My job Involved in
  • 3. Erection, Rigging & Commissioning of unit 740 & 742 pipe racks Steel Structural. Scope includes construction of four areas(15.4 million man hours) with fabrication & erection of about 500,000dia inches of Piping, 13000 tons of steel structure, 6500 ton of equipment erection along with supporting Civil & E&I works. July’2011 to Fab’2012–as a Assistant Engineer Structural in M/s. SIMPLEX INFRA STRUCTURE LIMITED. BHEL (DPL) my job involved in Fabrication & Erection of structural for DPS Expansion project at Durgapur (WB). In this project my main role is Fabrication & Erection of Power plant structure. Out of all this I am looking after the day to day schedule of work maintaining the monthly progress and other day to day site activities. Mar’2010 to July’2011 –as a Senior Field Assistant in M/s. NAGARJUNA CONSTRUCTION COMPANY LIMITED. My job involved in Erection of structural for ISP (SAIL) Expansion project at Barnum, Asansol (WB). In this project my main role is Erection of 48A2 BOF structure. In this package we did the India record of 2011 M.T Erection in one day (24 hr). This is the biggest achievement for both NCC Limited & SAIL. Out of all this I am looking after the day to day schedule of work maintaining the monthly progress and other day to day site activities. Aug’2008 to Mar’2010–as a Mechanical Supervisor in M/s. GANNON DUNKERLEY & COMPANY LIMITED, DELHI. My job involved in Fabrication & Erection and alignmentof all Steel structures and other heavy erections for JINDAL STAINLESS LIMITED Expansion project at JAJPUR (ORISSA). My Functional activities includes handling entire Steel Melting Shop project Structural Erection& schedule monitoring, day to day program fixing, making skim for all heavy lift and giving progress as per schedules of the project works. Oct’2007 to Aug’2008–as a Mechanical Supervisor in M/s. DURHA COMPONENT PRIVATE LIMITED, DELHI. My job involved in Equipment Erection and alignment of all structures & Equipment in cement plant. Other heavy erections for project. My Functional activities include handling entire LAFFARGE CEMENT project at MAGIYA BAN KURA (W.B.) Equipment Erection & schedule monitoring, day to day program fixing, making skim for all heavy lift and giving progress as per schedules of the project works. Aug’2006 to Oct’2007–as a Mechanical Supervisor in M/s .HAZY A. P. BAVA & COMPANY, A.P. My job involved in Equipment Erection and alignment of all structures & Equipment. Other heavy erections for ESP project. My Functional activities include handling entire SRI CEMENT project at BEAWER (RAJASTHAN) ESP Equipment Erection & schedule monitoring. Fab’2004 to Aug’2006–as a Mechanical Supervisor in M/s. VISHAL ENTERPRISES, TATA GROWTH SHOP TISCO (TATA IRON & STEEL) (JAMSHEDPUR) (JHARKHAND). My job involved in structures Steel Fabrication. My Functional activities include handling as a supervisor monitoring.
  • 4. Sept’1996 to Fab’2004–as a Mechanical Supervisor in M/s. SHARTHI ENGINEERING & SERVICES, JAMSHEDPUR. My job involved in my job involved in Fabrication & Erection and alignmentof all Steel structures and Equipment Erection and alignmentof all structures & Equipment. Other heavy erections for project. My Functional activities include handling entire project at SPONGE IRON PLANT in Jharkhand, W.B, ORISSA, and CHHATTISGARH. Equipment Erection & schedule monitoring, day to day program fixing, making skim for all heavy lift and giving progress as per schedules of the project works. RESPONSIBILITY SUMMARY  Responsible and accountable for the coordinated managementof multiple related projects.  Planned, directed, and managed designated projects.  Analyzed results of fabricationserection to discover more efficient ways and utilize resources.  Delegated responsibilities and designed time schedules.  Reviewed project status reports during each stage of fabrication.  Prepared weekly project status reports for managementand clients.  Managing commissioning / construction teams, able to direct (civil, mechanical & electrical).  Multinational teams.  Maintaining effective relationships with the Client, Vendors, EPC and Sub- contractors.  Primarily responsible for ensuring all aspects of Quality on the nominated project.  Capable to cover multidisciplinary (civil, mechanical & electrical) engineering project. PERSONAL INFORMATION Date of birth : 29th NOV 1974 Gender : Male Marital status : Married Nationality : Indian Passport number & expire date : H5769713 & 2015 Driving License : UAE 742829
  • 5. Languagesknown : English, Hindi, Oriya, Bengali. Father’s name : Shri. BARHMANAD TIWARY Permanent Address : Plot No 39, Vivek Bihar Pebco Aditaypur, Jamshedpur Dist.-Sarikela-Kharsawa Jharkhand, India. 832109 Current Salary : 6500 SR @ Month Expected Salary : As per company structure DECLARATION: I hereby declare that all statements written above are true and correct to the best of my knowledge & belief. Thanking you and looking forward for an opportunity to work in your organization. DATE: ……………………… Ramesh Kumar Tiwary Place: ………………………. (Signature)