Ramesh Kumar Tiwary is a mechanical engineer and erection supervisor with over 20 years of experience in fabrication and erection of steel structures for oil, gas, power and industrial plants. He holds a diploma in mechanical engineering and safety certifications. His experience includes planning and supervising erection of steel structures, solving technical problems, and managing teams for projects in India, UAE and Saudi Arabia. He is seeking a new position that allows him to utilize his skills in construction, maintenance, and heavy lifting.
Experienced to work with Large Refineries, Petrochemical Plants, Power Plants, and Cement Plant, at different positions in order to excel my carrier apply Engineering tools for the advancement of Process plants.
Experienced to work with Large Refineries, Petrochemical Plants, Power Plants, and Cement Plant, at different positions in order to excel my carrier apply Engineering tools for the advancement of Process plants.
Java Performance and Using Java Flight RecorderIsuru Perera
Slides used for an internal training. Explains why throughput and latency are important when measuring performance. How Java Flight Recording can be used to analyze performance issues.
1. CURRICULUM VITAE
RAMESHKUMAR TIWARY
(MECHANICALENGINEER – ERECTION)
Phone: +977-572595938
Email: rameshtiwari74@gmail.com
Profile- ABOUT ME
To draw a prospective line of distinction between limited resource and unlimited
innovative ideasin the face of volatile times, hence to enhance and expand upon
my education and experiences(mechanical engineer/supervisor.), having more
than 20+ years’ experience in Fabrication & Erection, Rigging & Erection
planning of Steel Structure in Oil & Gas, Power Plant, cement plant, sponge iron
plant & steel plant.
Professional Experience
Steel structure erection stage
• Reviewing Steel Erection drawings.
• Checking civil foundationselevation before steel (columns / frames
Erection).
• Supervising ground assembly for main columns with beams to compose
framescan be lifted and erected one time.
• Supervising erection of main steel girders and bracings between frames
(with consideration of erection sequence).
• Supervising alignment and bolt tightening for main members of the
structure on the main Aligns and Axis before offering for inspection.
• Supervising erection of Dressing (erection of small beams, bracings,
angles, C-Channelsand other medium & light steel items).
• Supervising balance bolttightening and offering for final inspection.
• Supervising Erection steel handrailsand gratings.
• Through all previous steel erection steps, solution for many technical
problems in erection due to material defects or wrong design to be set by my or
client proposals through RFIs (Request for Information).
EDUCATION QUALIFICATIONS
Diploma in Mechanical Engineering passed in July 1996 from Biju
Patnaik University of Technology, Orissa India.
12TH Passed from Patna intermediate council in 1992.
10TH Passed from Bihar Board in 1990.
2. TECHNICAL QUALIFICATION
Rigging & Slinging Supervisor Course from Emirates Risk Management
Consultancy (Abu Dhabi) UAE.2012
CERTIFICATE OF SEFETY APPRECIATION
Certificate of Appreciation for outstanding services, Safety and team work
during the period of 2012 to 2013 from FLOOR SHAH GAS DEVELOPMENT
PROJECT (Package 2 & 3) Client: -AL HOSN GAS ENI SAIPEM.
COMPUTER SKILLS
MS WORD, EXCEL, ENTERNET, ENTRANET.
AREA OF INTEREST
All kinds of works related to any production unit or mechanical
maintenance or construction unit with all type of heavy lift. Challenging
job, Structural Fabrication Erection and Equipment works.
SAFETY CONSCIOUSNESS
Handsome Safety Awareness against personal as well as plant Safety. Safe
working Procedures (PTW Permit applicant & Job performer according to work
permit procedure).
Having fire fighting training, special trainings on safety topics like
housekeeping, use of personal Protective Equipments. (PPE’s) Acid Handling,
Confined Space, Emergency Handling, Noise Pollution and First Aid.
EXPERIENCE
June’2016 to till date -as a Erection Supervisor in SAIPEM SAUDI JIGCC PROJECT. My
job Involved in monitering of Erection, Rigging & Commissioning of pipe racks
Steel Structural equipment erection along with supporting Civil & E&I works.
SAIPEM major subcontractors are NSH & CCC.
Mar’2014 to till date -as a Erection Supervisor in M/S JSW SEVERFIELD LIMITED
(JINDAL STEEL) BELARI KARNATAKA My job Involved in Erection, Rigging &
Commissioning of Growth Shop project Steel Structural. Erection along with
supporting Civil & E&I works with safety & quality. Total scope 5600 m t
completed in 5 month. Currently I work in JSW DOLVI Mumbai Sinter plant
project.
Fab’2012 to date Fab’2014-as a Associate Engineer in M/S DESCON ENGINEERING ABU
DHABI. SHAH GAS DEVELOPMENT PROJECT (Package 2 & 3) Client: -AL HOSN GAS
ENI SAIPEM. Shah process plant & sulfur recovery unit. My job Involved in
3. Erection, Rigging & Commissioning of unit 740 & 742 pipe racks Steel
Structural. Scope includes construction of four areas(15.4 million man hours)
with fabrication & erection of about 500,000dia inches of Piping, 13000 tons
of steel structure, 6500 ton of equipment erection along with supporting Civil
& E&I works.
July’2011 to Fab’2012–as a Assistant Engineer Structural in M/s. SIMPLEX
INFRA STRUCTURE LIMITED. BHEL (DPL) my job involved in Fabrication &
Erection of structural for DPS Expansion project at Durgapur (WB). In this
project my main role is Fabrication & Erection of Power plant structure. Out of
all this I am looking after the day to day schedule of work maintaining the
monthly progress and other day to day site activities.
Mar’2010 to July’2011 –as a Senior Field Assistant in M/s. NAGARJUNA
CONSTRUCTION COMPANY LIMITED. My job involved in Erection of structural
for ISP (SAIL) Expansion project at Barnum, Asansol (WB). In this project my
main role is Erection of 48A2 BOF structure. In this package we did the India
record of 2011 M.T Erection in one day (24 hr). This is the biggest
achievement for both NCC Limited & SAIL. Out of all this I am looking after the
day to day schedule of work maintaining the monthly progress and other day
to day site activities.
Aug’2008 to Mar’2010–as a Mechanical Supervisor in M/s. GANNON
DUNKERLEY & COMPANY LIMITED, DELHI. My job involved in Fabrication &
Erection and alignmentof all Steel structures and other heavy erections for
JINDAL STAINLESS LIMITED Expansion project at JAJPUR (ORISSA). My
Functional activities includes handling entire Steel Melting Shop project
Structural Erection& schedule monitoring, day to day program fixing, making
skim for all heavy lift and giving progress as per schedules of the project
works.
Oct’2007 to Aug’2008–as a Mechanical Supervisor in M/s. DURHA COMPONENT
PRIVATE LIMITED, DELHI. My job involved in Equipment Erection and
alignment of all structures & Equipment in cement plant. Other heavy
erections for project. My Functional activities include handling entire
LAFFARGE CEMENT project at MAGIYA BAN KURA (W.B.) Equipment
Erection & schedule monitoring, day to day program fixing, making skim for
all heavy lift and giving progress as per schedules of the project works.
Aug’2006 to Oct’2007–as a Mechanical Supervisor in M/s .HAZY A. P. BAVA &
COMPANY, A.P. My job involved in Equipment Erection and alignment of all
structures & Equipment. Other heavy erections for ESP project. My Functional
activities include handling entire SRI CEMENT project at BEAWER
(RAJASTHAN) ESP Equipment Erection & schedule monitoring.
Fab’2004 to Aug’2006–as a Mechanical Supervisor in M/s. VISHAL
ENTERPRISES, TATA GROWTH SHOP TISCO (TATA IRON & STEEL)
(JAMSHEDPUR) (JHARKHAND). My job involved in structures Steel
Fabrication. My Functional activities include handling as a supervisor
monitoring.
4. Sept’1996 to Fab’2004–as a Mechanical Supervisor in M/s. SHARTHI
ENGINEERING & SERVICES, JAMSHEDPUR. My job involved in my job
involved in Fabrication & Erection and alignmentof all Steel structures and
Equipment Erection and alignmentof all structures & Equipment. Other heavy
erections for project. My Functional activities include handling entire project at
SPONGE IRON PLANT in Jharkhand, W.B, ORISSA, and CHHATTISGARH.
Equipment Erection & schedule monitoring, day to day program fixing,
making skim for all heavy lift and giving progress as per schedules of the
project works.
RESPONSIBILITY SUMMARY
Responsible and accountable for the coordinated managementof multiple
related projects.
Planned, directed, and managed designated projects.
Analyzed results of fabricationserection to discover more efficient ways
and utilize resources.
Delegated responsibilities and designed time schedules.
Reviewed project status reports during each stage of fabrication.
Prepared weekly project status reports for managementand clients.
Managing commissioning / construction teams, able to direct (civil,
mechanical & electrical).
Multinational teams.
Maintaining effective relationships with the Client, Vendors, EPC and Sub-
contractors.
Primarily responsible for ensuring all aspects of Quality on the nominated
project.
Capable to cover multidisciplinary (civil, mechanical & electrical)
engineering project.
PERSONAL INFORMATION
Date of birth : 29th NOV 1974
Gender : Male
Marital status : Married
Nationality : Indian
Passport number & expire date : H5769713 & 2015
Driving License : UAE 742829
5. Languagesknown : English, Hindi, Oriya, Bengali.
Father’s name : Shri. BARHMANAD TIWARY
Permanent Address : Plot No 39, Vivek Bihar Pebco
Aditaypur, Jamshedpur
Dist.-Sarikela-Kharsawa
Jharkhand, India. 832109
Current Salary : 6500 SR @ Month
Expected Salary : As per company structure
DECLARATION:
I hereby declare that all statements written above are true and correct to the best
of my knowledge & belief.
Thanking you and looking forward for an opportunity to work in your
organization.
DATE: ……………………… Ramesh Kumar Tiwary
Place: ………………………. (Signature)