PROFESSIONAL SUMMARY
As a Diploma Mechanical Engineer Obtained, Over 21 Years of Experience in the Areas of fabrication and erection of Steel Structures, Having Experience in Fabrication and Erection of Steel Structures and Piping in Refineries, Oil and Gas, , Power plants, Civil Construction, Industrial projects, Metro Water Pipe Line , AirPort Projects, and Metro Rail Projects. Fabrication and erection of Main pipe rack, Sub-pipe rack, Compressor shelter, Pipe Bridge, Technical structure, Roof structure, Platforms, Grating, Handrail, and other steel fabrication and erection works. pipeline, laying (1200 to 1300mm), an inspection of pipe fit-up and welding works, Refineries projects (SRU and PFCCU), and Shutdown Maintenance, and Supervising the pipe Truss, Walkway Bridge, Atrium, and Hollow Section Truss. Monorail, Gantry grider fabrication and erection work.
I have 8+ years of experience in Oil, Gas and Petrochemical Plant projects as Civil /Structural Design Engineer.
I have experience of working in Middle East – Kuwait and Oman.
I have worked for basic design, FEED, detailed engineering and construction support phases of the projects which has given me an experience in executing the project from its very beginning.
Involved in the execution of large green field projects and brown field jobs.
I have performed design for most of the oil and gas structures like pipe racks, equipment structures, technological structures, platforms, pipe supports, vessel supporting structures using STAAD.Pro and various Civil foundations using Mat 3D.
Proficient in Civil Engineering application software’s like STAAD.Pro, Mat 3D, AutoCAD and General Engineering Software.
Experience in international codes for structural design. (BS, AISC,API and IS)
I have 8+ years of experience in Oil, Gas and Petrochemical Plant projects as Civil /Structural Design Engineer.
I have experience of working in Middle East – Kuwait and Oman.
I have worked for basic design, FEED, detailed engineering and construction support phases of the projects which has given me an experience in executing the project from its very beginning.
Involved in the execution of large green field projects and brown field jobs.
I have performed design for most of the oil and gas structures like pipe racks, equipment structures, technological structures, platforms, pipe supports, vessel supporting structures using STAAD.Pro and various Civil foundations using Mat 3D.
Proficient in Civil Engineering application software’s like STAAD.Pro, Mat 3D, AutoCAD and General Engineering Software.
Experience in international codes for structural design. (BS, AISC,API and IS)
Dear Sir/Madam,
I am Anas M. H, a Mechanical Engineer by qualification working in Cochin Shipyard Limited INDIA as Piping Engineer. I have more than 6 years of experience in Ship Building & Ship Repair.I had 3 months work Experience in DRYDOCKS WORLD DUBAI.Due to some health problems,I resigned from there..
I am looking forward to the next challenge that draws on my professional experience. Attached herewith is my resume for your kind reference. If my qualification and experience suits for any vacancy in your reputed organization, kindly arrange for a face to face or phone in interview.
Looking forward to hear from you soon in this regard.
Thanks & Best regards,
Anas M. H
Skype ID: anasmanganattu1@skype.com
INDIA:+919747265577,+919037066990
I am a highly motivated Mechanical Engineer with a Bachelor of technology B-tech (Mechanical Major) and Eight years of practical on-site experience. I am very interested in joining the engineering team.
In my current position as a Mechanical QA/QC Engineer at Pipelink Construction Pvt Ltd. I have developed key project management skills and the ability to improve communication with the broader project team. As I am required to ensure risk assessments are correctly implemented and current legislative and environmental guidelines are followed, successful communication is critical to my role.
I am very confident in planning inspection and executing projects using AutoCAD and Primavera. I enjoy the hands-on work, including checking the technical aspects of drawings and equipment designs and the maintenance of existing infrastructure.
I have a thorough knowledge of mechanical construction activities and I am experienced in directing and managing the on-site team, including contractors. I possess excellent interpersonal and communication skills and my multitasking abilities are advanced.
I working hard to keep projects running on time and within budget. I am keen to employ my skills and enthusiasm as an integral part of your team and I look forward to being able to discuss this position with you further.
Water billing management system project report.pdfKamal Acharya
Our project entitled “Water Billing Management System” aims is to generate Water bill with all the charges and penalty. Manual system that is employed is extremely laborious and quite inadequate. It only makes the process more difficult and hard.
The aim of our project is to develop a system that is meant to partially computerize the work performed in the Water Board like generating monthly Water bill, record of consuming unit of water, store record of the customer and previous unpaid record.
We used HTML/PHP as front end and MYSQL as back end for developing our project. HTML is primarily a visual design environment. We can create a android application by designing the form and that make up the user interface. Adding android application code to the form and the objects such as buttons and text boxes on them and adding any required support code in additional modular.
MySQL is free open source database that facilitates the effective management of the databases by connecting them to the software. It is a stable ,reliable and the powerful solution with the advanced features and advantages which are as follows: Data Security.MySQL is free open source database that facilitates the effective management of the databases by connecting them to the software.
Dear Sir/Madam,
I am Anas M. H, a Mechanical Engineer by qualification working in Cochin Shipyard Limited INDIA as Piping Engineer. I have more than 6 years of experience in Ship Building & Ship Repair.I had 3 months work Experience in DRYDOCKS WORLD DUBAI.Due to some health problems,I resigned from there..
I am looking forward to the next challenge that draws on my professional experience. Attached herewith is my resume for your kind reference. If my qualification and experience suits for any vacancy in your reputed organization, kindly arrange for a face to face or phone in interview.
Looking forward to hear from you soon in this regard.
Thanks & Best regards,
Anas M. H
Skype ID: anasmanganattu1@skype.com
INDIA:+919747265577,+919037066990
I am a highly motivated Mechanical Engineer with a Bachelor of technology B-tech (Mechanical Major) and Eight years of practical on-site experience. I am very interested in joining the engineering team.
In my current position as a Mechanical QA/QC Engineer at Pipelink Construction Pvt Ltd. I have developed key project management skills and the ability to improve communication with the broader project team. As I am required to ensure risk assessments are correctly implemented and current legislative and environmental guidelines are followed, successful communication is critical to my role.
I am very confident in planning inspection and executing projects using AutoCAD and Primavera. I enjoy the hands-on work, including checking the technical aspects of drawings and equipment designs and the maintenance of existing infrastructure.
I have a thorough knowledge of mechanical construction activities and I am experienced in directing and managing the on-site team, including contractors. I possess excellent interpersonal and communication skills and my multitasking abilities are advanced.
I working hard to keep projects running on time and within budget. I am keen to employ my skills and enthusiasm as an integral part of your team and I look forward to being able to discuss this position with you further.
Water billing management system project report.pdfKamal Acharya
Our project entitled “Water Billing Management System” aims is to generate Water bill with all the charges and penalty. Manual system that is employed is extremely laborious and quite inadequate. It only makes the process more difficult and hard.
The aim of our project is to develop a system that is meant to partially computerize the work performed in the Water Board like generating monthly Water bill, record of consuming unit of water, store record of the customer and previous unpaid record.
We used HTML/PHP as front end and MYSQL as back end for developing our project. HTML is primarily a visual design environment. We can create a android application by designing the form and that make up the user interface. Adding android application code to the form and the objects such as buttons and text boxes on them and adding any required support code in additional modular.
MySQL is free open source database that facilitates the effective management of the databases by connecting them to the software. It is a stable ,reliable and the powerful solution with the advanced features and advantages which are as follows: Data Security.MySQL is free open source database that facilitates the effective management of the databases by connecting them to the software.
ACEP Magazine edition 4th launched on 05.06.2024Rahul
This document provides information about the third edition of the magazine "Sthapatya" published by the Association of Civil Engineers (Practicing) Aurangabad. It includes messages from current and past presidents of ACEP, memories and photos from past ACEP events, information on life time achievement awards given by ACEP, and a technical article on concrete maintenance, repairs and strengthening. The document highlights activities of ACEP and provides a technical educational article for members.
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...ssuser7dcef0
Power plants release a large amount of water vapor into the
atmosphere through the stack. The flue gas can be a potential
source for obtaining much needed cooling water for a power
plant. If a power plant could recover and reuse a portion of this
moisture, it could reduce its total cooling water intake
requirement. One of the most practical way to recover water
from flue gas is to use a condensing heat exchanger. The power
plant could also recover latent heat due to condensation as well
as sensible heat due to lowering the flue gas exit temperature.
Additionally, harmful acids released from the stack can be
reduced in a condensing heat exchanger by acid condensation. reduced in a condensing heat exchanger by acid condensation.
Condensation of vapors in flue gas is a complicated
phenomenon since heat and mass transfer of water vapor and
various acids simultaneously occur in the presence of noncondensable
gases such as nitrogen and oxygen. Design of a
condenser depends on the knowledge and understanding of the
heat and mass transfer processes. A computer program for
numerical simulations of water (H2O) and sulfuric acid (H2SO4)
condensation in a flue gas condensing heat exchanger was
developed using MATLAB. Governing equations based on
mass and energy balances for the system were derived to
predict variables such as flue gas exit temperature, cooling
water outlet temperature, mole fraction and condensation rates
of water and sulfuric acid vapors. The equations were solved
using an iterative solution technique with calculations of heat
and mass transfer coefficients and physical properties.
HEAP SORT ILLUSTRATED WITH HEAPIFY, BUILD HEAP FOR DYNAMIC ARRAYS.
Heap sort is a comparison-based sorting technique based on Binary Heap data structure. It is similar to the selection sort where we first find the minimum element and place the minimum element at the beginning. Repeat the same process for the remaining elements.
Understanding Inductive Bias in Machine LearningSUTEJAS
This presentation explores the concept of inductive bias in machine learning. It explains how algorithms come with built-in assumptions and preferences that guide the learning process. You'll learn about the different types of inductive bias and how they can impact the performance and generalizability of machine learning models.
The presentation also covers the positive and negative aspects of inductive bias, along with strategies for mitigating potential drawbacks. We'll explore examples of how bias manifests in algorithms like neural networks and decision trees.
By understanding inductive bias, you can gain valuable insights into how machine learning models work and make informed decisions when building and deploying them.
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
MANOGARN RESUMEN (3).pdf
1. CURRICULUM VITAE
S.MANOGARAN, No: 9, Govindabodi Street, Vettuvanam post, via- Pallikonda, Vellore dist, Pin- 635809
Tamilnadu, India. Mobile number: +91 8660403095, E-Mail: manogaran1976@gmail.com
FABRICATION AND ERECTION OF HEAVY S T R U C T U R E S
ACDEMIC AND TECHNICAL QUALIFICATION
Diploma Mechanical Engineering–1995-75%
Thandhaiperiyar E.V.R Govt Polytechnic-Tamilnadu, India.
12th Class –XII: Govt High School Year of Passing--1993-79%
Basic Computer Knowledge (MS WORD, MS EXEL)
Software: Diploma in AutoCAD
PROFESSIONAL SUMMARY
As a Diploma Mechanical Engineer Obtained, Over 21 Years of Experience in the Areas of fabrication and
erection of Steel Structures, Having Experience in Fabrication and Erection of Steel Structures and Piping in
Refineries, Oil and Gas, , Power plants, Civil Construction, Industrial projects, Metro Water Pipe Line , AirPort
Projects, and Metro Rail Projects. Fabrication and erection of Main pipe rack, Sub-pipe rack, Compressor
shelter, Pipe Bridge, Technical structure, Roof structure, Platforms, Grating, Handrail, and other steel fabrication
and erection works. pipeline, laying (1200 to 1300mm), an inspection of pipe fit-up and welding works,
Refineries projects (SRU and PFCCU), and Shutdown Maintenance, and Supervising the pipe Truss, Walkway
Bridge, Atrium, and Hollow Section Truss. Monorail, Gantry grider fabrication and erection work.
ROLE AND RESPONSIBILITY
Inspection of pad plate elevation for structural columns before erection.
Ensure proper cleaning and paint touch-up before erection.
Checking of verticality and alignment of structural columns.
Bolt tightening inspection of steel members.
Ensure the structure is installed as per the approved drawings
Visual Inspection of welded joints of steel members according to code AWS D 1.1
Raise RFIs and prepare reports for the inspection performed and submit them to contractor Q.C.
Witness and monitor suppliers/contractors' work activities, inspection, and test in accordance with the
approved Quality, Plan, ITP, Quality Procedures and etc.
Issue and follow-up of Non-conformity Report (NCR).
Handling the isometric drawing, structural layout, and Erection drawing.
Monitor the progress through the cladding and grouting works.
Constantly monitor existing processing and continually drive improvement projects.
Following general assembly drawing and detail drawing for the project planning and discussion.
KEY TASKS HANDLED ACROSS THE TENURE
Generating fabrication & erection Plan, which comprises BOQ preparing according to the Drawing,
Material planning, Manpower, and Machinery planning to finish the product at the right time.
2. BOQ PREPARATION
According to the approved drawing schedule, BOQ as well as cutting plan preparation.
Raw Material requirement detail sent to procurement dept.
Raw Material arrival schedule from drawing and Execution of fabrication schedule preparation.
Co-Ordination with purchase dept from revision drawings from time to time informing the changes in the
revision drawings rival Manpower elevation before from time.
FABRICATION EXECUTION
The vendor approval from the concerned authority for fabrication and supplementary activities.
Vendor manpower and machinery mobilization schedule chart according to the overall master schedule.
Get monitor the production target achievement on a day-to-day, weekly and monthly schedules.
Weekly meetings with subordinates as well as vendors to evaluate positives & negatives.
Preparing Client Bills for every month and coordinating with clients to get approval.
ERECTION EXECUTION
Total Safety Task Instruction (TSTI) AND Tool Box Talk (TBT).
Checking civil foundation elevation before steel Column Erection.
Ground assembly for main columns with beams to compose frames can be lifted and erection.
Get monitoring of the production target achievement on day-to-day, weekly and monthly schedules.
Prepare daily progress reports and forward planning department.
Alignment and bolt tightening for main members and axis before offering for inspection.
Supervising erection of steel handrail, and grating. I have to check the bolt tightening to torque.
RECONCILIATION
Reconcile the raw materials from time to time to avoid inconvenience in inventory planning.
Maximum effort was taken for avoiding the rework and minimizing wastage.
PROJECTS HANDLED ACROSS THER TENUR
PROJECT SITES:
6. ORGANIZATION NAME: GANESH ENGINEERING WORKS.
CLIENT: BHARAT HEAVY ELECTRICALS LIMITED.,
DESIGNATION: Steel Structural Engineer.
PERIOD: 18.07.2021 TO TILLDATE
NATURE OF WORK: Fabrication and Erection of steel Structural Works.
5. ORGANIZATION NAME: HDGSK-JV- Sk Engineering-3 YEARS
CLIENT: Scoop Iraq Karbala Refinery
DESIGNATION: Steel Structural Engineer.
PERIOD: 23.03.2016 TO 04.05.2016
19.11.2017 TO 06.03.2020
NATURE OF WORK: Prepare daily progress reports and forward them to the planning department, Total
Safety Task Instruction (TSTI), and Tool Box Talk (TBT), Conduct Weekly Mass Housekeeping and Reviewing
Steel Structural Erection Drawings. Checking civil foundation elevation before steel Column Erection,
Supervising ground assembly for main columns with beams to compose frames that can be lifted and erection
3. works, supervising alignment and bolt tightening for main members and axis before offering for inspection,
Supervising erection of steel handrail, grating. I have to check the bolt tightening to torque.
4. ORGANIZATION NAME: CONSOLIDATED CONSTRUCTION CONSORTIUM LTD.-9.5 YEARS.
CLIENT: 1. Infosys technologies limited Chandigarh 2. Eveready Industries India Limited Haridwar, 3. Ashok
Leyland- Rajasthan.4.Construction of 60 TPD Powder Plant for M/s Hat sun Agro Products., 5.Airport Authority of
India 6. Engineer India Ltd 7. General Motors India Pvt. Ltd., 8. Rvnl 9. Chennai metro rail.
DESIGNATION: Steel Structural Engineer-Fabrication and Erection.
PERIOD: 21.03.2005 TO 10.06.2014
NATURE OF WORK
1. Tubular Truss (50meters span), Purlin supervising the fabrication works, Based on site requirement
mobilizing and Organizing sub-contractor for fabrication and erection works
2. Hollow section Truss, purlin, and Mono rail supervising the Structural fabrication works,
3. North light truss, lattice girder, boom truss, and purlin supervising the Structural fabrication and
erection works.
4. Portable Truss, Monorails, and purlin supervising the Structural Fabrication and erection works.
5. Build up the column, portable Truss, purlin, and side cladding supervising the Structural fabrication and
erection works,
6. Refineries Project- Build up the column, main pipe rack, branch pipe rack, technical structure
portable truss supervising the Structural fabrication and erection works,
7. Build up the column, Gantry girder, truss, and purlin supervising the fabrication works.
8. Railway station ramp works supervising the Structural fabrication and erection works,
9. Tubular Truss, purlin, vault supervising the fabrication works, Material Calculation (BOQ) According
to the approved shop drawing, as well as cutting plan preparation, Project execution, and fabrication
of steel structure. Checking of dimensions at the time of fabrication and welded joint inspection.
3. ORGANIZATION NAME: H.S.STEEL ENGINEERING LLC.,-2 . 5 YEARS.
CLIENT: SABIC – SAUDI
PROJECT: STEEL STRUCTURAL FABRICATION AND ERECTION WORKS.
DESIGNATION: SUPERVISOR – STEEL STRUCTURE ERECTION.
PERIOD: 18.06.2002 TO 15.10.2004
NATUREOFWORK: Reviewing for main members and axis before offering for inspection,
Supervising erection of steel handrail, and grating. I have to check the bolt tightening to Steel
Structural Erection Drawing. Checking civil foundation elevation before steel Column Erection,
Supervising ground assembly for main columns with beams to compose frames that can be lifted
and erection works, Supervising alignment and bolt tightening torque.
4. 2. ORGANIZATION NAME: BHEL-1 YEAR EXPERIENCE.
CLIENT: Bharat Heavy Electricals Limited.,
PROJECT: Fabrication of Structure.
DESIGNATION: Technical Apprentice- Supervisor Trainee.
PERIOD: 07.06.1996 TO 06.06.1997
NATURE OF WORK Fabrication of connection plate assemblies for air pre-heater,
AV-Design box pressure boxed for Economizer Evaporator, and condenses pre-water
for Recovery boilers.
1. ORGANIZATION NAME: L&T E.C.C.GROUP., - 4 YEARS EXPERIENCE.
PROJECT: 1 TO 5
CLIENT: 1. Chennai Metro Water Sewerage Supply Board (CMWSSB), 2.HyundaiMotors India
Limited. 3. Madras RefineriesLimited-Chennai.4.MadrasRefineriesLimitedI-Chennai. 5. CMWSSB-
Government of Tamilnadu
DESIGNATION: SUPERVISOR
PERIOD: 12.11.1995 TO 23.12.2002
NATURE OF WORK
PROJECT: 1. supervising MS pipelines laying and Inspection of pipe fit-up and welding works.
PERIOD: 12.10.1995 TO 05.06.1996
PROJECT: 2. Pipe laying fit-ups, welding and structural works.
PERIOD: 11.09.1997 TO 05.03.1998
PROJECT: 3. Maintained structural works and valve maintenance works.
PERIOD: 12.03.1998 TO 23.04.1998
PROJECT: 4. supervising the Structural fabrication & Erection works.
PERIOD: 01.12.1998 to 05 .08.1999
PROJECT: 5. planning of works daily basis and supervising the pipe laying M.S. and D.I. pipes.
PERIOD: 03.10.2000 TO 15.01.2002
PASS PORT AND SALARY DETAILS: Salary drew: 2500USD, Salary Expected: 3000USD, Join: 30 Days,
Passport No: M7909804, Valid Up TO: 06/04/2025, Place of ISSUE: Chennai, Notice PERIOD: 1 Month
PERSONAL PROFILE: Date of Birth: 27.05.1975. Parent Name: Subramani Sex: Male, Marital
Status: Married
DECLARATION: I hereby declare that all information given above is true to the best of my
knowledge.
PLACE: Vellore,
DATE: 01/01/2023 (S.MANOGARAN)