This document provides a professional profile and resume for Kevin R. Henson. It summarizes his 26 years of experience in commercial construction management, including roles as superintendent for various construction companies. It lists his key competencies and details several major projects he has completed totaling over $268 million, such as retail remodels, medical office buildings, and military construction projects. Contact information is provided at the top.
1. 1 | P a g e
Kevin R. Henson
17092 Adelmann St SE#200
Prior Lake, MN 55372
559-281-1827 Cell
krhenson58@msn.com
PROFESSIONAL PROFILE
An efficient, organized achiever excels at multi-tasking in a fast-paced environment. Kevin
Henson has a proven track record of accomplishing all project objectives within all time and
budgetary constraints. This is the caliber of candidate your organization is in need of, an
experienced, flexible, detail-oriented performer who is highly capable of providing superior
leadership and project management with proven skills.
Key Competencies Gained through Experience
26 years of
Commercial
Construction
Management
experience
Commercial/Retail/Corporate
/Military/Remodel
Experience
Client Relation
& Budget
expediting
experience
OSHA 30
Certificate
Building Pad
Construction
Structural/Decorative
Concrete
Structural Steel Wood Framing
Panelized Roof
Structure
CMU
Construction
Turn-Key Tenant
Improvements
Remodels Refrigeration
Hydronic
Heating/Cooling
Systems
Underground
Wet/Dry
Utilities
1 Subcontractor
Employee Accident in
30 years
Underground Wet/Dry
Utilities
Military
Construction
Experience
DOD, GSA and
FBI Security
Clearance
Excavation, Site
Grading and
Paving, Curb
and Gutter
Experience
LaMacchia Group 2015-2016
Superintendent - Salinas, CA
(414) 223-4400
RMC Construction 2014 - 2015
Superintendent - Fresno, CA
(559) 432-9070
Johnston Contracting-2011-2014
Superintendent - Fresno, CA
(559) 432-9070
Garcia Construction, Inc. – 2008-2010
Superintendent - Fresno, CA
(559) 276-7726
Michael. R Tolladay Corporation 1996-
2008
Superintendent - Fresno, CA
(559) 431-4111
Target Constructors Inc. – 1984-1996
Superintendent - Fresno, CA
Major Projects Completed – 1996-present
2. 2 | P a g e
Career Highlight Projects totaling over $268 Million in commercial construction
management From 1996 to Current
Various Save Mart’s - #19 Fresno, CA - #54
Complete Remodel Fresno, CA - #52 Complete
Remodel Fresno, CA - #92 New Construction – Shops
1, 2, 3 Ripon, CA – Total Job Values of $11.4 M
Tolladay Corp.
Existing 30 & 50-year-old grocery store in an existing
shopping center. Completely removed the front
of the store, extended it out 15 feet, remodeled the entire
interior (every department) and all
site utilities. Departments remodeled include: Frozen
Foods, Full Service Deli/Bakery, Meat,
Dairy, Produce and General Merchandise. Not one day
of business was missed.
New ground up 65,000 sq. ft. grocery store. Included
were General Merchandise, Deli/Bakery,
Meat, Produce and Dairy departments. As with all Save
Mart’s, the new stores are opened in
5 months, 4 weeks, and 3 days. Complete site
development. Constructed 1 grocery store and 3 shop
buildings. All new wet/dry utilities, site work, site
concrete, grading and paving.
Medical Office Building, Valley Children’s Hospital,
Madera, CA. $2M
Tolladay Corp.
New construction on semi-developed site, 2-story
building and turnkey tenant improvement, including
Dr’s offices, Pharmacy, Elevator Labs, on/off site
utilities.
Drainage Basin, Valley Children’s Hospital, Madera,
CA. $1M
Tolladay Corp.
Constructed a 5-acre Drainage Basin with associated
underground to facilitate new development.
Building G - New Construction-Office Building,
Fresno, CA. $1.3M
Tolladay Corp.
Shell office building in an existing site with 2 turnkey
tenant improvements. Brought in both wet and dry
utilities from off sit.
Building A - New Construction – Retail Space,
Fresno, CA. $1M
Tolladay Corp.
Constructed new shell building and turnkey retail space.
(Blockbuster Video). Brought in all wet and dry utilities
from off site. $900,000
Allstate Insurance, Complete Remodel and
Relocation, Fresno, CA, $1.2M
Tolladay Corp.
Complete remodel and relocation of existing and
occupied (100 plus employees) office space. All new
offices, finishes communication, data and facilities.
California Bank and Trust, Complete Remodel,
Fresno, CA, $1.8M
Tolladay Corp.
Complete demo and turnkey remodel of existing
building in an existing center. Involved were security,
alarms, data, exterior remodel, and structural corrections.
83 E. Shaw Ave., Complete Remodel, Fresno, CA,
$1.4M
Tolladay Corp.
Complete demo and remodel of 2 occupied office
buildings. Included were adding 2 elevators,
reconfiguration of all structural elements, all new
interior finishes, all new exterior finishes, all new
HVAC systems, upgrade all electrical systems, add a
parking lot, update of wet utilities and constructed 2
radio stations.
3. 3 | P a g e
Shell Building, New Construction, Fresno, CA, $1M
Tolladay Corp.
Shell building with turnkey tenant improvement
(Blockbuster Video). Installed on/off site utilities.
$890,000
Eastgate Shopping Center, Complete Remodel and
Rebuild of Entire Site, Fresno, CA, $2.9M
Tolladay Corp.
Complete demolition of 30 acre site. Remove all existing
buildings, services and facilities. Construction included
7 new building pad sites, anchor strip, all new utilities,
all new site concrete, 7 new shop buildings, off-site
improvements per Caltrans requirements and 5 turnkey
tenant improvements.
Save Mart #52, Complete Remodel, Fresno, CA,
$2.2M
Tolladay Corp.
Complete remodel of existing and open grocery store.
The front of the building was removed, extended out and
rebuilt. Every department was remodeled and relocated.
All new refrigeration/freezer systems were installed. All
new finishes throughout, in addition, a complete
demolition and remodel of the fronts of an additional 2
building onsite were performed at the same time, which
included providing access, structural remodeling, public
access, and site improvements. Departments remodeled
include: Frozen foods, Full service Deli/Bakery, Meat,
Dairy, Produce and General Merchandise. Not one day
of business was missed.
Food4Less, Site and New Building Construction,
Atwater, CA, $3.4
Tolladay Corp.
Developed an 18-acre site. Brought in all new utilities,
constructed 175,000 sq. ft. grocery store. 4 shop
building, constructed a 1-acre ponding basin and storm
water lift station.
Hayward Plaza, New Construction Retail Shops,
Hayward, CA, $3M
Tolladay Corp.
Constructed 3 new shop buildings in an existing
Albertson’s shopping center. This was an extremely tight
situation. Albertson’s didn’t have enough room for its
own customers, much less 3 additional buildings. I
managed the construction of the buildings, all new
utilities and City required improvements on the corner of
the 2 busiest streets in crossroads the Hayward. Project
located across the street from Hayward City’s Building
Department. $2.9 Million
John’s Incredible Pizza, Complete Remodel,
Modesto, CA, 2.9M
Tolladay Corp.
A themed restaurant inside an 85,000 sq. ft. Home Depot
shell. Complete demolition of all floors, utilities, docks
and finishes. Constructed a full service commercial
kitchen, 12 themed dining rooms and an arcade
including a full size carnival ride.
Westlan Shopping Center, Complete Remodel,
Fresno, CA, 3.2M
Tolladay Corp.
Complete demolition of site utilities and all buildings.
Constructed 3 new shop buildings. 1 grocery store,
Installed all new on/off site utilities. Completely re-
contoured site drainage, all new curb/gutter and repaved
entire site
Crossroads Shopping Center - Entire Site
Development – Pad A, E, L, P, Petco, Staples, Save
Mart #105, Shop I, Junior Anchor, Riverbank, CA,
$37M
Tolladay Corp.
Originally property was an 85 acre farm. Complete
demolition of site. Installed all new on/off site utilities
for 28 buildings, 2 new City streets, 1 complete
widening and reconstruction of 1 City street,1 bridge
with canal siphon system, 6 shop buildings, 3 power
strip buildings. Management of relocation of all off site
utilities, worked closely with City Public Works,
Building Department, and local utility companies. This
is an ongoing project. Administered entire project. Ripon
Shopping Center, Entire Site.
4. 4 | P a g e
Flight line Medical Center-Ops Side, Remodel,
Lemoore Navy Air Station, Lemoore, CA, $5M
Garcia Const.
Convert a WWII mechanical repair facility to a modern
pre-flight medical clinic for flight crews and facility
members. The 15,000 sq. ft. was just across the street
from the bases actual flight line in a highly secure area,
which presented a whole new level of logistics.
Child Development Center, New Construction,
Military Housing, Marine Warfare Training
Center, Coleville, CA, $5M
Ground up facility using LEED Gold standards. This
project was in a very remote area and faced many
timing/budget challenges.
Federal Bureau of Investigation – Field Office,
Fresno, CA, $1.5M
Tutalian Corp.
4-month Tenant Improvement. Advanced security
requirements, Completed forty days early. $1.5 million
Nisbett Lucas Videography Worldwide – Fresno, CA,
$180,000
Tutalian Corp.
30 day Tenant Improvement. Complete turn-key tenant
improvement. $180,000.00 and a O item punch list.
Family Dollar-Delano CA, $1.1M
Johnston Cont.
I was hired specifically to be a Superintendent of
construction for these stores.
Lions/Magnus-Fresno CA, $3. 3M
Johnston Corp.
A complete remodel of an occupied and existing food
factory. I spent the entire project dealing with a facility
that has been under production for more than 30 years.
This project consisted of several changes during the
construction process that included very high end finishes
and a complete server room, that was not originally
considered.