Kevin R. Henson
17092 Adelmann St SE#200
Prior Lake, MN 55372
559-281-1827 Cell
krhenson58@msn.com
PROFESSIONAL PROFILE
An efficient, organized achiever excels at multi-tasking in a fast-paced environment. Kevin
Henson has a proven track record of accomplishing all project objectives within all time and
budgetary constraints. This is the caliber of candidate your organization is in need of, an
experienced, flexible, detail-oriented performer who is highly capable of providing superior
leadership and project management with proven skills.
Key Competencies Gained through Experience
26 years of
Commercial
Construction
Management
experience
Commercial/Retail/Corporate
/Military/Remodel
Experience
Client Relation
& Budget
expediting
experience
OSHA 30
Certificate
Building Pad
Construction
Structural/Decorative
Concrete
Structural Steel Wood Framing
Panelized Roof
Structure
CMU
Construction
Turn-Key Tenant
Improvements
Remodels Refrigeration
Hydronic
Heating/Cooling
Systems
Underground
Wet/Dry
Utilities
1 Subcontractor
Employee Accident in
30 years
Underground Wet/Dry
Utilities
Military
Construction
Experience
DOD, GSA and
FBI Security
Clearance
Excavation, Site
Grading and
Paving, Curb
and Gutter
Experience
 LaMacchia Group 2015-2016
Superintendent - Salinas, CA
(414) 223-4400
 RMC Construction 2014 - 2015
Superintendent - Fresno, CA
(559) 432-9070
 Johnston Contracting-2011-2014
Superintendent - Fresno, CA
(559) 432-9070
 Garcia Construction, Inc. – 2008-2010
Superintendent - Fresno, CA
(559) 276-7726
 Michael. R Tolladay Corporation 1996-
2008
Superintendent - Fresno, CA
(559) 431-4111
 Target Constructors Inc. – 1984-1996
Superintendent - Fresno, CA
Major Projects Completed – 1996-present
2 | P a g e
Career Highlight Projects totaling over $268 Million in commercial construction
management From 1996 to Current
Various Save Mart’s - #19 Fresno, CA - #54
Complete Remodel Fresno, CA - #52 Complete
Remodel Fresno, CA - #92 New Construction – Shops
1, 2, 3 Ripon, CA – Total Job Values of $11.4 M
Tolladay Corp.
Existing 30 & 50-year-old grocery store in an existing
shopping center. Completely removed the front
of the store, extended it out 15 feet, remodeled the entire
interior (every department) and all
site utilities. Departments remodeled include: Frozen
Foods, Full Service Deli/Bakery, Meat,
Dairy, Produce and General Merchandise. Not one day
of business was missed.
New ground up 65,000 sq. ft. grocery store. Included
were General Merchandise, Deli/Bakery,
Meat, Produce and Dairy departments. As with all Save
Mart’s, the new stores are opened in
5 months, 4 weeks, and 3 days. Complete site
development. Constructed 1 grocery store and 3 shop
buildings. All new wet/dry utilities, site work, site
concrete, grading and paving.
Medical Office Building, Valley Children’s Hospital,
Madera, CA. $2M
Tolladay Corp.
New construction on semi-developed site, 2-story
building and turnkey tenant improvement, including
Dr’s offices, Pharmacy, Elevator Labs, on/off site
utilities.
Drainage Basin, Valley Children’s Hospital, Madera,
CA. $1M
Tolladay Corp.
Constructed a 5-acre Drainage Basin with associated
underground to facilitate new development.
Building G - New Construction-Office Building,
Fresno, CA. $1.3M
Tolladay Corp.
Shell office building in an existing site with 2 turnkey
tenant improvements. Brought in both wet and dry
utilities from off sit.
Building A - New Construction – Retail Space,
Fresno, CA. $1M
Tolladay Corp.
Constructed new shell building and turnkey retail space.
(Blockbuster Video). Brought in all wet and dry utilities
from off site. $900,000
Allstate Insurance, Complete Remodel and
Relocation, Fresno, CA, $1.2M
Tolladay Corp.
Complete remodel and relocation of existing and
occupied (100 plus employees) office space. All new
offices, finishes communication, data and facilities.
California Bank and Trust, Complete Remodel,
Fresno, CA, $1.8M
Tolladay Corp.
Complete demo and turnkey remodel of existing
building in an existing center. Involved were security,
alarms, data, exterior remodel, and structural corrections.
83 E. Shaw Ave., Complete Remodel, Fresno, CA,
$1.4M
Tolladay Corp.
Complete demo and remodel of 2 occupied office
buildings. Included were adding 2 elevators,
reconfiguration of all structural elements, all new
interior finishes, all new exterior finishes, all new
HVAC systems, upgrade all electrical systems, add a
parking lot, update of wet utilities and constructed 2
radio stations.
3 | P a g e
Shell Building, New Construction, Fresno, CA, $1M
Tolladay Corp.
Shell building with turnkey tenant improvement
(Blockbuster Video). Installed on/off site utilities.
$890,000
Eastgate Shopping Center, Complete Remodel and
Rebuild of Entire Site, Fresno, CA, $2.9M
Tolladay Corp.
Complete demolition of 30 acre site. Remove all existing
buildings, services and facilities. Construction included
7 new building pad sites, anchor strip, all new utilities,
all new site concrete, 7 new shop buildings, off-site
improvements per Caltrans requirements and 5 turnkey
tenant improvements.
Save Mart #52, Complete Remodel, Fresno, CA,
$2.2M
Tolladay Corp.
Complete remodel of existing and open grocery store.
The front of the building was removed, extended out and
rebuilt. Every department was remodeled and relocated.
All new refrigeration/freezer systems were installed. All
new finishes throughout, in addition, a complete
demolition and remodel of the fronts of an additional 2
building onsite were performed at the same time, which
included providing access, structural remodeling, public
access, and site improvements. Departments remodeled
include: Frozen foods, Full service Deli/Bakery, Meat,
Dairy, Produce and General Merchandise. Not one day
of business was missed.
Food4Less, Site and New Building Construction,
Atwater, CA, $3.4
Tolladay Corp.
Developed an 18-acre site. Brought in all new utilities,
constructed 175,000 sq. ft. grocery store. 4 shop
building, constructed a 1-acre ponding basin and storm
water lift station.
Hayward Plaza, New Construction Retail Shops,
Hayward, CA, $3M
Tolladay Corp.
Constructed 3 new shop buildings in an existing
Albertson’s shopping center. This was an extremely tight
situation. Albertson’s didn’t have enough room for its
own customers, much less 3 additional buildings. I
managed the construction of the buildings, all new
utilities and City required improvements on the corner of
the 2 busiest streets in crossroads the Hayward. Project
located across the street from Hayward City’s Building
Department. $2.9 Million
John’s Incredible Pizza, Complete Remodel,
Modesto, CA, 2.9M
Tolladay Corp.
A themed restaurant inside an 85,000 sq. ft. Home Depot
shell. Complete demolition of all floors, utilities, docks
and finishes. Constructed a full service commercial
kitchen, 12 themed dining rooms and an arcade
including a full size carnival ride.
Westlan Shopping Center, Complete Remodel,
Fresno, CA, 3.2M
Tolladay Corp.
Complete demolition of site utilities and all buildings.
Constructed 3 new shop buildings. 1 grocery store,
Installed all new on/off site utilities. Completely re-
contoured site drainage, all new curb/gutter and repaved
entire site
Crossroads Shopping Center - Entire Site
Development – Pad A, E, L, P, Petco, Staples, Save
Mart #105, Shop I, Junior Anchor, Riverbank, CA,
$37M
Tolladay Corp.
Originally property was an 85 acre farm. Complete
demolition of site. Installed all new on/off site utilities
for 28 buildings, 2 new City streets, 1 complete
widening and reconstruction of 1 City street,1 bridge
with canal siphon system, 6 shop buildings, 3 power
strip buildings. Management of relocation of all off site
utilities, worked closely with City Public Works,
Building Department, and local utility companies. This
is an ongoing project. Administered entire project. Ripon
Shopping Center, Entire Site.
4 | P a g e
Flight line Medical Center-Ops Side, Remodel,
Lemoore Navy Air Station, Lemoore, CA, $5M
Garcia Const.
Convert a WWII mechanical repair facility to a modern
pre-flight medical clinic for flight crews and facility
members. The 15,000 sq. ft. was just across the street
from the bases actual flight line in a highly secure area,
which presented a whole new level of logistics.
Child Development Center, New Construction,
Military Housing, Marine Warfare Training
Center, Coleville, CA, $5M
Ground up facility using LEED Gold standards. This
project was in a very remote area and faced many
timing/budget challenges.
Federal Bureau of Investigation – Field Office,
Fresno, CA, $1.5M
Tutalian Corp.
4-month Tenant Improvement. Advanced security
requirements, Completed forty days early. $1.5 million
Nisbett Lucas Videography Worldwide – Fresno, CA,
$180,000
Tutalian Corp.
30 day Tenant Improvement. Complete turn-key tenant
improvement. $180,000.00 and a O item punch list.
Family Dollar-Delano CA, $1.1M
Johnston Cont.
I was hired specifically to be a Superintendent of
construction for these stores.
Lions/Magnus-Fresno CA, $3. 3M
Johnston Corp.
A complete remodel of an occupied and existing food
factory. I spent the entire project dealing with a facility
that has been under production for more than 30 years.
This project consisted of several changes during the
construction process that included very high end finishes
and a complete server room, that was not originally
considered.

More Related Content

What's hot

What's hot (15)

Paverpresentation
PaverpresentationPaverpresentation
Paverpresentation
 
Braithwaite Case Study Fit Out
Braithwaite Case Study Fit OutBraithwaite Case Study Fit Out
Braithwaite Case Study Fit Out
 
Lynn's Resume 1
Lynn's Resume 1Lynn's Resume 1
Lynn's Resume 1
 
AllenCon Capability
AllenCon CapabilityAllenCon Capability
AllenCon Capability
 
Jim's Portfolio
Jim's PortfolioJim's Portfolio
Jim's Portfolio
 
Buildings & Projects
Buildings & ProjectsBuildings & Projects
Buildings & Projects
 
AC SOQ
AC SOQAC SOQ
AC SOQ
 
2015
20152015
2015
 
CV GM 050116
CV GM 050116CV GM 050116
CV GM 050116
 
2017 Fairfax County Walkway Rehab Projects
2017 Fairfax County Walkway Rehab Projects2017 Fairfax County Walkway Rehab Projects
2017 Fairfax County Walkway Rehab Projects
 
ChronoResume1
ChronoResume1ChronoResume1
ChronoResume1
 
Markfel S. Lamban CV
Markfel S. Lamban CVMarkfel S. Lamban CV
Markfel S. Lamban CV
 
4348 Tompkins Avenue Transformation
4348 Tompkins Avenue Transformation4348 Tompkins Avenue Transformation
4348 Tompkins Avenue Transformation
 
ESV CV-764 (new)
ESV CV-764 (new)ESV CV-764 (new)
ESV CV-764 (new)
 
Restoring a landmark
Restoring a landmarkRestoring a landmark
Restoring a landmark
 

Viewers also liked

Emilio Hoyos RESUME 2 2015
Emilio Hoyos RESUME 2 2015Emilio Hoyos RESUME 2 2015
Emilio Hoyos RESUME 2 2015Emilio Hoyos
 
2014-11-28b BAT_TAFOYA_Bruce_Updated_Resume
2014-11-28b BAT_TAFOYA_Bruce_Updated_Resume2014-11-28b BAT_TAFOYA_Bruce_Updated_Resume
2014-11-28b BAT_TAFOYA_Bruce_Updated_ResumeBruce Tafoya
 
DrewsNEWresume2016
DrewsNEWresume2016DrewsNEWresume2016
DrewsNEWresume2016Drew Marr
 
Carl doucette res 2015
Carl doucette res 2015Carl doucette res 2015
Carl doucette res 2015carl doucette
 
Projects and Work Experience
Projects and Work ExperienceProjects and Work Experience
Projects and Work Experiencejvezirian
 
James Daisa PE (transportation planning traffic engineering).rev 5.14
James Daisa PE (transportation planning traffic engineering).rev 5.14James Daisa PE (transportation planning traffic engineering).rev 5.14
James Daisa PE (transportation planning traffic engineering).rev 5.14jdaisa
 

Viewers also liked (11)

Brandon L Drouillard Resume 2
Brandon L Drouillard Resume 2Brandon L Drouillard Resume 2
Brandon L Drouillard Resume 2
 
Emilio Hoyos RESUME 2 2015
Emilio Hoyos RESUME 2 2015Emilio Hoyos RESUME 2 2015
Emilio Hoyos RESUME 2 2015
 
2014-11-28b BAT_TAFOYA_Bruce_Updated_Resume
2014-11-28b BAT_TAFOYA_Bruce_Updated_Resume2014-11-28b BAT_TAFOYA_Bruce_Updated_Resume
2014-11-28b BAT_TAFOYA_Bruce_Updated_Resume
 
DrewsNEWresume2016
DrewsNEWresume2016DrewsNEWresume2016
DrewsNEWresume2016
 
Dobbins resume - new
Dobbins resume - newDobbins resume - new
Dobbins resume - new
 
Carl doucette res 2015
Carl doucette res 2015Carl doucette res 2015
Carl doucette res 2015
 
Projects and Work Experience
Projects and Work ExperienceProjects and Work Experience
Projects and Work Experience
 
James Daisa PE (transportation planning traffic engineering).rev 5.14
James Daisa PE (transportation planning traffic engineering).rev 5.14James Daisa PE (transportation planning traffic engineering).rev 5.14
James Daisa PE (transportation planning traffic engineering).rev 5.14
 
Richard Roush Bio
Richard Roush Bio Richard Roush Bio
Richard Roush Bio
 
CURRICULUM VITAE 2015
CURRICULUM VITAE 2015CURRICULUM VITAE 2015
CURRICULUM VITAE 2015
 
My new resume
My new resumeMy new resume
My new resume
 

Similar to ###RESUME###

Optimum CM presentation
Optimum CM presentationOptimum CM presentation
Optimum CM presentationTomKummer
 
Project Portfolio Powerpoint
Project Portfolio PowerpointProject Portfolio Powerpoint
Project Portfolio Powerpointwdemshar
 
Mike Resume January 2015
Mike Resume January 2015Mike Resume January 2015
Mike Resume January 2015Mike Berry
 
Evan McCoy-Resume
Evan McCoy-ResumeEvan McCoy-Resume
Evan McCoy-ResumeEvan McCoy
 
RRozek Project List 9 20 15
RRozek Project List 9 20 15RRozek Project List 9 20 15
RRozek Project List 9 20 15Roman Rozek
 
Projects presentation1
Projects presentation1Projects presentation1
Projects presentation1Eamon Hannaway
 
RussRudolph Resume_Project List
RussRudolph Resume_Project ListRussRudolph Resume_Project List
RussRudolph Resume_Project ListRuss Rudolph
 
Helmes Presentation
Helmes PresentationHelmes Presentation
Helmes Presentationhelmessteve
 
Resume17july19
Resume17july19Resume17july19
Resume17july19John Woods
 
Rodney Hibbard CV_Construction Manager
Rodney Hibbard CV_Construction ManagerRodney Hibbard CV_Construction Manager
Rodney Hibbard CV_Construction ManagerRodney Hibbard
 
Carlos Yibirin - CAY Group International 2014
Carlos Yibirin - CAY Group International 2014Carlos Yibirin - CAY Group International 2014
Carlos Yibirin - CAY Group International 2014Carlos Yibirin
 
Brbc video bpt mktg cmpgn ec dev june 2010
Brbc video bpt mktg cmpgn ec dev june 2010Brbc video bpt mktg cmpgn ec dev june 2010
Brbc video bpt mktg cmpgn ec dev june 2010GMSolis
 

Similar to ###RESUME### (20)

ES-2015 Canyon Resume
ES-2015 Canyon ResumeES-2015 Canyon Resume
ES-2015 Canyon Resume
 
John Richard Berry Sr Resume
John Richard Berry Sr ResumeJohn Richard Berry Sr Resume
John Richard Berry Sr Resume
 
Biron Resume 3
Biron Resume 3Biron Resume 3
Biron Resume 3
 
Optimum CM presentation
Optimum CM presentationOptimum CM presentation
Optimum CM presentation
 
Project Portfolio Powerpoint
Project Portfolio PowerpointProject Portfolio Powerpoint
Project Portfolio Powerpoint
 
Dudley 2-7-2017
Dudley 2-7-2017Dudley 2-7-2017
Dudley 2-7-2017
 
Mike Resume January 2015
Mike Resume January 2015Mike Resume January 2015
Mike Resume January 2015
 
Evan McCoy-Resume
Evan McCoy-ResumeEvan McCoy-Resume
Evan McCoy-Resume
 
Martin L Reetz Resume 092215
Martin L Reetz Resume 092215Martin L Reetz Resume 092215
Martin L Reetz Resume 092215
 
ISbrochure
ISbrochureISbrochure
ISbrochure
 
RRozek Project List 9 20 15
RRozek Project List 9 20 15RRozek Project List 9 20 15
RRozek Project List 9 20 15
 
Projects presentation1
Projects presentation1Projects presentation1
Projects presentation1
 
RussRudolph Resume_Project List
RussRudolph Resume_Project ListRussRudolph Resume_Project List
RussRudolph Resume_Project List
 
Francisco Quintana Resume
Francisco Quintana Resume Francisco Quintana Resume
Francisco Quintana Resume
 
Helmes Presentation
Helmes PresentationHelmes Presentation
Helmes Presentation
 
Resume17july19
Resume17july19Resume17july19
Resume17july19
 
Rodney Hibbard CV_Construction Manager
Rodney Hibbard CV_Construction ManagerRodney Hibbard CV_Construction Manager
Rodney Hibbard CV_Construction Manager
 
Carlos Yibirin - CAY Group International 2014
Carlos Yibirin - CAY Group International 2014Carlos Yibirin - CAY Group International 2014
Carlos Yibirin - CAY Group International 2014
 
Brbc video bpt mktg cmpgn ec dev june 2010
Brbc video bpt mktg cmpgn ec dev june 2010Brbc video bpt mktg cmpgn ec dev june 2010
Brbc video bpt mktg cmpgn ec dev june 2010
 
Green leed projects
Green leed projectsGreen leed projects
Green leed projects
 

###RESUME###

  • 1. 1 | P a g e Kevin R. Henson 17092 Adelmann St SE#200 Prior Lake, MN 55372 559-281-1827 Cell krhenson58@msn.com PROFESSIONAL PROFILE An efficient, organized achiever excels at multi-tasking in a fast-paced environment. Kevin Henson has a proven track record of accomplishing all project objectives within all time and budgetary constraints. This is the caliber of candidate your organization is in need of, an experienced, flexible, detail-oriented performer who is highly capable of providing superior leadership and project management with proven skills. Key Competencies Gained through Experience 26 years of Commercial Construction Management experience Commercial/Retail/Corporate /Military/Remodel Experience Client Relation & Budget expediting experience OSHA 30 Certificate Building Pad Construction Structural/Decorative Concrete Structural Steel Wood Framing Panelized Roof Structure CMU Construction Turn-Key Tenant Improvements Remodels Refrigeration Hydronic Heating/Cooling Systems Underground Wet/Dry Utilities 1 Subcontractor Employee Accident in 30 years Underground Wet/Dry Utilities Military Construction Experience DOD, GSA and FBI Security Clearance Excavation, Site Grading and Paving, Curb and Gutter Experience  LaMacchia Group 2015-2016 Superintendent - Salinas, CA (414) 223-4400  RMC Construction 2014 - 2015 Superintendent - Fresno, CA (559) 432-9070  Johnston Contracting-2011-2014 Superintendent - Fresno, CA (559) 432-9070  Garcia Construction, Inc. – 2008-2010 Superintendent - Fresno, CA (559) 276-7726  Michael. R Tolladay Corporation 1996- 2008 Superintendent - Fresno, CA (559) 431-4111  Target Constructors Inc. – 1984-1996 Superintendent - Fresno, CA Major Projects Completed – 1996-present
  • 2. 2 | P a g e Career Highlight Projects totaling over $268 Million in commercial construction management From 1996 to Current Various Save Mart’s - #19 Fresno, CA - #54 Complete Remodel Fresno, CA - #52 Complete Remodel Fresno, CA - #92 New Construction – Shops 1, 2, 3 Ripon, CA – Total Job Values of $11.4 M Tolladay Corp. Existing 30 & 50-year-old grocery store in an existing shopping center. Completely removed the front of the store, extended it out 15 feet, remodeled the entire interior (every department) and all site utilities. Departments remodeled include: Frozen Foods, Full Service Deli/Bakery, Meat, Dairy, Produce and General Merchandise. Not one day of business was missed. New ground up 65,000 sq. ft. grocery store. Included were General Merchandise, Deli/Bakery, Meat, Produce and Dairy departments. As with all Save Mart’s, the new stores are opened in 5 months, 4 weeks, and 3 days. Complete site development. Constructed 1 grocery store and 3 shop buildings. All new wet/dry utilities, site work, site concrete, grading and paving. Medical Office Building, Valley Children’s Hospital, Madera, CA. $2M Tolladay Corp. New construction on semi-developed site, 2-story building and turnkey tenant improvement, including Dr’s offices, Pharmacy, Elevator Labs, on/off site utilities. Drainage Basin, Valley Children’s Hospital, Madera, CA. $1M Tolladay Corp. Constructed a 5-acre Drainage Basin with associated underground to facilitate new development. Building G - New Construction-Office Building, Fresno, CA. $1.3M Tolladay Corp. Shell office building in an existing site with 2 turnkey tenant improvements. Brought in both wet and dry utilities from off sit. Building A - New Construction – Retail Space, Fresno, CA. $1M Tolladay Corp. Constructed new shell building and turnkey retail space. (Blockbuster Video). Brought in all wet and dry utilities from off site. $900,000 Allstate Insurance, Complete Remodel and Relocation, Fresno, CA, $1.2M Tolladay Corp. Complete remodel and relocation of existing and occupied (100 plus employees) office space. All new offices, finishes communication, data and facilities. California Bank and Trust, Complete Remodel, Fresno, CA, $1.8M Tolladay Corp. Complete demo and turnkey remodel of existing building in an existing center. Involved were security, alarms, data, exterior remodel, and structural corrections. 83 E. Shaw Ave., Complete Remodel, Fresno, CA, $1.4M Tolladay Corp. Complete demo and remodel of 2 occupied office buildings. Included were adding 2 elevators, reconfiguration of all structural elements, all new interior finishes, all new exterior finishes, all new HVAC systems, upgrade all electrical systems, add a parking lot, update of wet utilities and constructed 2 radio stations.
  • 3. 3 | P a g e Shell Building, New Construction, Fresno, CA, $1M Tolladay Corp. Shell building with turnkey tenant improvement (Blockbuster Video). Installed on/off site utilities. $890,000 Eastgate Shopping Center, Complete Remodel and Rebuild of Entire Site, Fresno, CA, $2.9M Tolladay Corp. Complete demolition of 30 acre site. Remove all existing buildings, services and facilities. Construction included 7 new building pad sites, anchor strip, all new utilities, all new site concrete, 7 new shop buildings, off-site improvements per Caltrans requirements and 5 turnkey tenant improvements. Save Mart #52, Complete Remodel, Fresno, CA, $2.2M Tolladay Corp. Complete remodel of existing and open grocery store. The front of the building was removed, extended out and rebuilt. Every department was remodeled and relocated. All new refrigeration/freezer systems were installed. All new finishes throughout, in addition, a complete demolition and remodel of the fronts of an additional 2 building onsite were performed at the same time, which included providing access, structural remodeling, public access, and site improvements. Departments remodeled include: Frozen foods, Full service Deli/Bakery, Meat, Dairy, Produce and General Merchandise. Not one day of business was missed. Food4Less, Site and New Building Construction, Atwater, CA, $3.4 Tolladay Corp. Developed an 18-acre site. Brought in all new utilities, constructed 175,000 sq. ft. grocery store. 4 shop building, constructed a 1-acre ponding basin and storm water lift station. Hayward Plaza, New Construction Retail Shops, Hayward, CA, $3M Tolladay Corp. Constructed 3 new shop buildings in an existing Albertson’s shopping center. This was an extremely tight situation. Albertson’s didn’t have enough room for its own customers, much less 3 additional buildings. I managed the construction of the buildings, all new utilities and City required improvements on the corner of the 2 busiest streets in crossroads the Hayward. Project located across the street from Hayward City’s Building Department. $2.9 Million John’s Incredible Pizza, Complete Remodel, Modesto, CA, 2.9M Tolladay Corp. A themed restaurant inside an 85,000 sq. ft. Home Depot shell. Complete demolition of all floors, utilities, docks and finishes. Constructed a full service commercial kitchen, 12 themed dining rooms and an arcade including a full size carnival ride. Westlan Shopping Center, Complete Remodel, Fresno, CA, 3.2M Tolladay Corp. Complete demolition of site utilities and all buildings. Constructed 3 new shop buildings. 1 grocery store, Installed all new on/off site utilities. Completely re- contoured site drainage, all new curb/gutter and repaved entire site Crossroads Shopping Center - Entire Site Development – Pad A, E, L, P, Petco, Staples, Save Mart #105, Shop I, Junior Anchor, Riverbank, CA, $37M Tolladay Corp. Originally property was an 85 acre farm. Complete demolition of site. Installed all new on/off site utilities for 28 buildings, 2 new City streets, 1 complete widening and reconstruction of 1 City street,1 bridge with canal siphon system, 6 shop buildings, 3 power strip buildings. Management of relocation of all off site utilities, worked closely with City Public Works, Building Department, and local utility companies. This is an ongoing project. Administered entire project. Ripon Shopping Center, Entire Site.
  • 4. 4 | P a g e Flight line Medical Center-Ops Side, Remodel, Lemoore Navy Air Station, Lemoore, CA, $5M Garcia Const. Convert a WWII mechanical repair facility to a modern pre-flight medical clinic for flight crews and facility members. The 15,000 sq. ft. was just across the street from the bases actual flight line in a highly secure area, which presented a whole new level of logistics. Child Development Center, New Construction, Military Housing, Marine Warfare Training Center, Coleville, CA, $5M Ground up facility using LEED Gold standards. This project was in a very remote area and faced many timing/budget challenges. Federal Bureau of Investigation – Field Office, Fresno, CA, $1.5M Tutalian Corp. 4-month Tenant Improvement. Advanced security requirements, Completed forty days early. $1.5 million Nisbett Lucas Videography Worldwide – Fresno, CA, $180,000 Tutalian Corp. 30 day Tenant Improvement. Complete turn-key tenant improvement. $180,000.00 and a O item punch list. Family Dollar-Delano CA, $1.1M Johnston Cont. I was hired specifically to be a Superintendent of construction for these stores. Lions/Magnus-Fresno CA, $3. 3M Johnston Corp. A complete remodel of an occupied and existing food factory. I spent the entire project dealing with a facility that has been under production for more than 30 years. This project consisted of several changes during the construction process that included very high end finishes and a complete server room, that was not originally considered.