PRIVATE AND HYBRID CLOUD
STRATEGIES



                    Sponsored by :
2
Red = 2010
    Expectations       Private   Cloud                   Green = 2011
                       Clouds    Computing

                                      Cloud
    High



                                      Computing
                   Private
                   Clouds
    Expectations




                                      SaaS        SaaS
    Low




                                                                Time



4
•Service Catalog

    •Charge-back or Show-back

    •Access Control

    •Hybrid

    •Scalable



5
6
7
8
Server                                     Cloud
    Virtualization++                                          •
                                                              •
                                                                  10x more scaleable
                                                                  2-5x lower cost
                                                              •   100% more open




Built for traditional enterprise         Designed around big data, massive
apps & client-server compute             scale & next-gen apps
•    Enterprise arch for 100s of hosts   • Cloud architecture for 1000s of
•    Scale-up (server clusters)            hosts
•    Apps assume reliability             • Scale-out (multi-site server farms)
•    IT Mgmt-centric [1:Dozens]          • Apps assume failure
•    Proprietary vendor stack            • Autonomic [1:1,000‟s]
                                         • Open, value-added stack
         Enterprises should, and               …but adoption of new cloud
    will, make SV more cloud-like…              architecture is the future
SP
Owner | Operator




                        Server                                      „Data-as-a-           Citrix-powered
                                                                      Service‟            Clouds
                    Virtualization                  „WaaS‟ clouds
                                                                      clouds              [example
                                                     XenDesktop
                         ++              Dev/Test                                         customers]
                                                       XenApp
                                          clouds
IT

                   Horizontal                                                  Vertical
                                     Cloud Design
                   General Purpose                                    Special Purpose
NetScaler                                                CloudBridge



            ESX   Hyper-V   XenServer        KVM   OVM
                            VIRTUALIZATION




   Compute                   Network                     Storage
NetScaler               CloudStack                       CloudBridge



            ESX   Hyper-V   XenServer        KVM   OVM
                            VIRTUALIZATION




   Compute                   Network                     Storage
WINDOWS     DEV     DISASTER BRIDGE &   BYO     INFRA-   YOUR
ON-DEMAND   & TEST   RECOVERY GATEWAY PLATFORM STRUCTURE SERVICE




  NetScaler                CloudStack                       CloudBridge



              ESX    Hyper-V   XenServer        KVM   OVM
                               VIRTUALIZATION




      Compute                   Network                     Storage
• Secure, multi-tenant platform
  –   Hypervisor agnostic
  –   Massively scalable, secure and open
  –   Self service portal
  –   Amazon and CloudStack API support
  –   CloudStack is 100% Open Source

• Implemented today to run clouds
  over 20,000 servers
• CloudStack momentum
  – Over 100,000 downloads of CloudStack
    through 2011
  – Over 10,000 community members in
    CloudStack.org
Create Custom Virtual Machines via Service Offerings
                                         Select Operating System
                                          • Windows, Linux



                                         Select Compute Offering
                                              • CPU & RAM


                                         Select Data Disk Offering
                                              • Volume Size


                                          Select Network Offering
                                           • Network & Services



                                                Create VM
Dashboard Provides Overview of Consumed Resources




• Running, Stopped & Total VMs

• Public IPs

• Private networks

• Latest Events
Case Study: Zynga
 Web-scale/hybrid cloud example

• Originally 100% on Amazon EC2, Zynga recently
  built zCloud - their own private cloud
  – Manages both zCloud and AWS workloads
    through a single pane of glass
  – zCloud runs predictable workloads; mature
    games or prototypes
  – zCloud has multiple availability zones with data
    centers on the east and west coasts of the US
• zCloud went from concept to product in <6 months by using CloudStack +
  RightScale
• Already in deployment with 10’s of thousands of physical nodes, it takes 22
  minutes to provision and add 100 hosts to their cloud
Public Clouds




                                           Zone 3
   Zone 1                               Private Cloud
Private Cloud
                   Zone 2
                Private Cloud
How will a Private Cloud affect my current IT Services model and
IT’s relationship with the business?

  – Cloud capabilities allow IT to adopt a greater degree of “service provider”
    model and relationship with the business

  – Flexible, measureable, on-demand, low-friction way to provide computing
    resources and services for customers
If it’s “All about the App” – how does your Private Cloud enable a
stronger relationship with line-of-business applications?
Workforce Leverage


                           Self Service         Remove IT as a delivery critical path

                           Management
                                                Reduce IT operational costs
                           Automation

                             Workload
                                                Consistent application and service deployment
                          Standardization


                          Usage Metering        Visibility into user and line of business usage
Capital Leverage




                           Centralized          Manage complete infrastructure, regardless of
                           Management           scale

                       Smarter Virtualization   Drive reduced capital requirements
What are the 3 most common pitfalls that get in the way of Private
Cloud adoption and how can they be addressed?

  – Limited knowledge of cloud, solutions, and practices

  – Unclear understanding of customers’ needs and the desired user
    experience

  – Lack of strategy, implementation/migration plan
Building Private and Hybrid Cloud Solutions
 Powered by VMware
 Paul Jacobsen
 April 25th, 2012




Customer Presentation
The Business has Strict Demands of IT
“As the CIO, I provide                                 Cloud services enable       “As the CEO, it’s my
   business with the     Through Cloud I am              new and improved         responsibility to create
       services Supplier to cost effectively
                it      able                         business models so that   Consumer whilst being
                                                                               sustainable value
needs, when it needs provision IT services to        I can maximize windows      responsive to a dynamic
it, within my resource my business customers –            of opportunity –           market, changing
      constraints.”     others will if I don’t!         before others do!        workforce, and business
                                                                                       environment.”




                 Efficiency                                                       Agility
       Govern costs, get best from resources   IT as a Service         Anticipate and respond to change


            Competitive Advantage                                         Competitive Advantage
      Right Service at Right Price                                Right Capability at Right Time
 29
Cloud is Changing the New IT Landscape…



                            Re-think End-User Computing
                                The Challenge for IT:

                        Modernize Application Development
                           Weave all this together
     Existing Apps                      New Enterprise Apps                       SaaS Apps
                                into a cohesive,
                             secure, compliant whole
                                Evolve the Infrastructure


                 Existing Datacenters                     Public Cloud Services
30
Evolve Your Existing Datacenter to a Private Cloud
 Leverage virtualization to transform physical silos into elastic, virtual capacity
 Increase automation thru built-in policy-driven management
 Move from static, physical security to dynamic, embedded security




                                                                         Compute


                                                                           Storage

                                                                          Network

31
Evolve Your Existing Datacenter to a Private Cloud
 Leverage virtualization to transform physical silos into elastic, virtual capacity
 Increase automation thru built-in policy-driven management
 Move from static, physical security to dynamic, embedded security
 Enable secure, self-service to pre-defined IT services, with pay-for-use
                        Organization: Marketing                                 Organization: Finance
     Users & Policies    Organization VDCs        Catalogs   Users & Policies      Organization VDCs    Catalogs




                                                                                           Compute


                                                                                             Storage
                                                                                                                   USE



                                                                                             Network         $75
32
Evolve Your Existing Datacenter to a Private Cloud




                        Organization: Marketing                                      Organization: Finance
     Users & Policies    Organization VDCs        Catalogs        Users & Policies      Organization VDCs    Catalogs




                                              Private Cloud
                                                      Cloud Infrastructure                      Compute
                                                  Automation         Management
                                                                                           Integrated
                                   Compute             Storage     Networking                    Storage
                                                                                            Security                    USE



                                                                                                  Network         $75
33
Only VMware Offers the Best of Both Worlds with Hybrid Cloud


           Apps                Apps


                                                            Common platform
                                                            Common management
                                                            Common security

                                                               vCloud
               Private Cloud            VMware             Service Provider
                                 Enterprise Hybrid Cloud
                                          Security
     Cloud Infrastructure                                       Cloud Infrastructure
                                        Management

                           Cloud Computing Moves from a
                    Technology Discussion to a Business Decision
34
VMware vCloud Initiative
     VMware Delivers This Today with vCloud




35
user

******


         Connecting…
Monte Carlo vApp
VM created in seconds with a
  friendly user experience
VMware is the Leader in Enterprise Hybrid Cloud Infrastructures
              VMware is the leader                                  VMware offers the products and
              in the cloud platform                                 services to build a hybrid cloud
     “Virtualization is a                                                                      Private Cloud                                                                                                                                                Public Cloud

                                                                                                                                                                                                                                           Co-Branded vCloud Services

       modernization                                                                        Cloud Consumption
                                                                                                  vCloud
                                                                                                                                                                                                                                                                 vCloud Datacenter
                                                                                                                                                                                                                                                                Security & performance

        catalyst and                                                   Operations and Management
                                                                                                  vCenter
                                                                                                                                                                                              Portability                                                           for enterprises




       unlocks cloud                                                                                                                                                Cross-Cloud Standards
                                                                                                                                                                                    vCloud API
                                                                                                                                                                             Open Virtualization Format
                                                                                                                                                                                                                                                                   vCloud Express
                                                                                                                                                                                                                                                                Rapid credit-card payment
                                                                                                                                                                                                                                                                     for developers


        computing.”
                                                                               Security and Compliance
                                                                                                  vShield
                                                                                                                                                               Cross-Cloud Management
                                                                                                                                                                                         vCloud Connector                                                   vCloud Powered
                                                                                                                                                                                                                                                              Broad array of
                                                                                              Virtualization                                                                                                                                            VMware-compatible clouds
                                                                                                  vSphere                                                                                                                                                 for any business need


      Gartner, May 2011


         VMware powers the industry‟s                                                         VMware has the expertise
           largest cloud ecosystem                                                           and services to build clouds

                                                                                                                                                            vCenter Chargeback

                                        vCloud API

                                                                              vClo
                                                                              ud                                       vCD
                                                                              API                                      Port
                                                                                                                       al
                                                                                                                                                                                                         vCenter Chargeback Web
                                                                                                   End                                                                                                   Interface




                                                                                                                                                                                                                                                    VMware vCloud
                                                                                                   User
                                                                                                    s

                                                                                                                                        v                                                                                 vCe
                                                                                                                                        C                                                                                 nter
                                                                                                                                        D                                                                                 Char
                                                                                                                                                                                                                          geba



                                                                                                                                                                                                                                                    Director Security
                                        VMware vCloud Director                                                                         D                                                                                  ck
                                                                                                                VMware vCloud Director a                                                                                  Data
                                                                                                                                       t                                                                                  base
                                                                                                                                       a
                                                                                                                                       b
                                                                                                                                       a
                                                                                                                                       s
                                                                                                                                                                                 vCenter Chargeback Server

                                                                                                                                                                                                                                               VMware vCloud
                                                                                                                                                                                                                                                    Hardening Guide
                                                                                                                                       e

                                                                                                                                                                                                                                                    WHITEPAPER
                                                                                                                                                                                                                                               Director Security
                                                                                                                                                      LDA
                                                                                                                                                      P


                                                                                                                                               vCe
                                                                                                                                               nter




                                                                                                                                                                                                                                     VMware vCloud Guide
                                                                                                                                                                                                                                        Hardening
                                                                                                                                               Data

                                                                                                                              vCenter Server
                                                                                                                                               base
                                                                                                                                                                                                                                        WHITEPAPER
                                        vShield Manager w/ Edge



                                                                                                                                                                                                                     Net
                                                                                                                                                                                                                     work
                                                                                 vShield                                                                                                                             s
                                                                           Manager and                                                                                                                       vCenter
                                                                           vShield Edge                                                                                                                      Chargeback Collectors
                                                                                  Virtual
                                                                             Appliances
                                                                                                                                                                                                             (vCenter, vCD, vSE)




                                                                                                                                                                                                                ESX/ESXi Hosts
                                                                                                                                                                                                                                     Architecture
                                        VMware vSphere 4 Enterprise Plus                                                                                                                         Data
                                                                                                                                                                                                 store
                                                                                                                                                                                                 s
                                                                                                                                                                                                                                     Tool
                                                                                                                                                                                                                                     Kit




41
Why Choose VMware?
1.    How will a Private Cloud effect my current IT Services model and IT‟s relationship
      with the business?
VMware: A Private cloud will deliver business agility so IT can respond and deliver!
2.    If it‟s “All about the App” – how does your Private Cloud enable a stronger
      relationship with the line-of-business applications?
VMware: You break down the application silos with virtual data centers enabling
   applications to be deployed from a self-service catalog.
3.    What are the cost implications of a Private Cloud? Where will I see efficiences?
VMware: IT simplification = less hardware (CAPEX savings), more strategic
   investments (business growth), and staff focused on value add projects
4.    What are the 3 most common pitfalls that get in the way of Private Cloud adopting
      and how can they be addressed?
VMware: Resistance to Change, Executive Sponsorship, Security Concerns
 42
•   495 million active users worldwide
                                      •   Integrated Social Media
•   >3 billion searches/month         •   Worldwide Voice/Video/Chat
•   30% market share <24 months
•   Dynamic decision engine




                                  •   45 million users worldwide
                                  •   Dynamic content delivery
                                  •   ID management
All About   Cross-Platform   Foundation for    Cloud On
the App        From the        the Future     Your Terms
              Metal Up
Uncoordinated, ma                Fully automated
  nual infrastructure            management, dynami
                                      c resource
                                  usage, business-
                                     linked SLAs


Datacenter services

Client services

Identity and security services

IT process and compliance
Configure
             App Controller                         Orchestrator
                                                                              Deploy



                                                                         Virtual Machine Manager

                               Service             Service               Operations Manager
                               Model             Delivery &
           Self Service                          Automation              Configuration Manager

                                                                         Data Protection Manager
 App                                                                                                       DC
Owner                                                                                                     Admin
             Service Manager                       Service Manager
                                                                               Monitor
                                                                               Operate




        Application Management           Service Delivery & Automation        Infrastructure Management
• How will a Private Cloud effect your Current IT Services model and IT’s
  relationship with the business?

• If its ‘All about the App’ – how does Microsoft Private Cloud enable a
  stronger relationship with line-of-business applications?

• What are the cost implications of a Private Cloud? Where will you see
  efficiencies?

• What are the 3 most common pitfalls that get in the way of Private Cloud
  adoption and how can they be addressed?
52
53

Mhta.private.cloud.final.16.9

  • 1.
    PRIVATE AND HYBRIDCLOUD STRATEGIES Sponsored by :
  • 2.
  • 4.
    Red = 2010 Expectations Private Cloud Green = 2011 Clouds Computing Cloud High Computing Private Clouds Expectations SaaS SaaS Low Time 4
  • 5.
    •Service Catalog •Charge-back or Show-back •Access Control •Hybrid •Scalable 5
  • 6.
  • 7.
  • 8.
  • 11.
    Server Cloud Virtualization++ • • 10x more scaleable 2-5x lower cost • 100% more open Built for traditional enterprise Designed around big data, massive apps & client-server compute scale & next-gen apps • Enterprise arch for 100s of hosts • Cloud architecture for 1000s of • Scale-up (server clusters) hosts • Apps assume reliability • Scale-out (multi-site server farms) • IT Mgmt-centric [1:Dozens] • Apps assume failure • Proprietary vendor stack • Autonomic [1:1,000‟s] • Open, value-added stack Enterprises should, and …but adoption of new cloud will, make SV more cloud-like… architecture is the future
  • 12.
    SP Owner | Operator Server „Data-as-a- Citrix-powered Service‟ Clouds Virtualization „WaaS‟ clouds clouds [example XenDesktop ++ Dev/Test customers] XenApp clouds IT Horizontal Vertical Cloud Design General Purpose Special Purpose
  • 13.
    NetScaler CloudBridge ESX Hyper-V XenServer KVM OVM VIRTUALIZATION Compute Network Storage
  • 14.
    NetScaler CloudStack CloudBridge ESX Hyper-V XenServer KVM OVM VIRTUALIZATION Compute Network Storage
  • 15.
    WINDOWS DEV DISASTER BRIDGE & BYO INFRA- YOUR ON-DEMAND & TEST RECOVERY GATEWAY PLATFORM STRUCTURE SERVICE NetScaler CloudStack CloudBridge ESX Hyper-V XenServer KVM OVM VIRTUALIZATION Compute Network Storage
  • 16.
    • Secure, multi-tenantplatform – Hypervisor agnostic – Massively scalable, secure and open – Self service portal – Amazon and CloudStack API support – CloudStack is 100% Open Source • Implemented today to run clouds over 20,000 servers • CloudStack momentum – Over 100,000 downloads of CloudStack through 2011 – Over 10,000 community members in CloudStack.org
  • 17.
    Create Custom VirtualMachines via Service Offerings Select Operating System • Windows, Linux Select Compute Offering • CPU & RAM Select Data Disk Offering • Volume Size Select Network Offering • Network & Services Create VM
  • 18.
    Dashboard Provides Overviewof Consumed Resources • Running, Stopped & Total VMs • Public IPs • Private networks • Latest Events
  • 19.
    Case Study: Zynga Web-scale/hybrid cloud example • Originally 100% on Amazon EC2, Zynga recently built zCloud - their own private cloud – Manages both zCloud and AWS workloads through a single pane of glass – zCloud runs predictable workloads; mature games or prototypes – zCloud has multiple availability zones with data centers on the east and west coasts of the US • zCloud went from concept to product in <6 months by using CloudStack + RightScale • Already in deployment with 10’s of thousands of physical nodes, it takes 22 minutes to provision and add 100 hosts to their cloud
  • 20.
    Public Clouds Zone 3 Zone 1 Private Cloud Private Cloud Zone 2 Private Cloud
  • 21.
    How will aPrivate Cloud affect my current IT Services model and IT’s relationship with the business? – Cloud capabilities allow IT to adopt a greater degree of “service provider” model and relationship with the business – Flexible, measureable, on-demand, low-friction way to provide computing resources and services for customers
  • 23.
    If it’s “Allabout the App” – how does your Private Cloud enable a stronger relationship with line-of-business applications?
  • 25.
    Workforce Leverage Self Service Remove IT as a delivery critical path Management Reduce IT operational costs Automation Workload Consistent application and service deployment Standardization Usage Metering Visibility into user and line of business usage Capital Leverage Centralized Manage complete infrastructure, regardless of Management scale Smarter Virtualization Drive reduced capital requirements
  • 26.
    What are the3 most common pitfalls that get in the way of Private Cloud adoption and how can they be addressed? – Limited knowledge of cloud, solutions, and practices – Unclear understanding of customers’ needs and the desired user experience – Lack of strategy, implementation/migration plan
  • 28.
    Building Private andHybrid Cloud Solutions Powered by VMware Paul Jacobsen April 25th, 2012 Customer Presentation
  • 29.
    The Business hasStrict Demands of IT “As the CIO, I provide Cloud services enable “As the CEO, it’s my business with the Through Cloud I am new and improved responsibility to create services Supplier to cost effectively it able business models so that Consumer whilst being sustainable value needs, when it needs provision IT services to I can maximize windows responsive to a dynamic it, within my resource my business customers – of opportunity – market, changing constraints.” others will if I don’t! before others do! workforce, and business environment.” Efficiency Agility Govern costs, get best from resources IT as a Service Anticipate and respond to change Competitive Advantage Competitive Advantage Right Service at Right Price Right Capability at Right Time 29
  • 30.
    Cloud is Changingthe New IT Landscape… Re-think End-User Computing The Challenge for IT: Modernize Application Development Weave all this together Existing Apps New Enterprise Apps SaaS Apps into a cohesive, secure, compliant whole Evolve the Infrastructure Existing Datacenters Public Cloud Services 30
  • 31.
    Evolve Your ExistingDatacenter to a Private Cloud  Leverage virtualization to transform physical silos into elastic, virtual capacity  Increase automation thru built-in policy-driven management  Move from static, physical security to dynamic, embedded security Compute Storage Network 31
  • 32.
    Evolve Your ExistingDatacenter to a Private Cloud  Leverage virtualization to transform physical silos into elastic, virtual capacity  Increase automation thru built-in policy-driven management  Move from static, physical security to dynamic, embedded security  Enable secure, self-service to pre-defined IT services, with pay-for-use Organization: Marketing Organization: Finance Users & Policies Organization VDCs Catalogs Users & Policies Organization VDCs Catalogs Compute Storage USE Network $75 32
  • 33.
    Evolve Your ExistingDatacenter to a Private Cloud Organization: Marketing Organization: Finance Users & Policies Organization VDCs Catalogs Users & Policies Organization VDCs Catalogs Private Cloud Cloud Infrastructure Compute Automation Management Integrated Compute Storage Networking Storage Security USE Network $75 33
  • 34.
    Only VMware Offersthe Best of Both Worlds with Hybrid Cloud Apps Apps  Common platform  Common management  Common security vCloud Private Cloud VMware Service Provider Enterprise Hybrid Cloud Security Cloud Infrastructure Cloud Infrastructure Management Cloud Computing Moves from a Technology Discussion to a Business Decision 34
  • 35.
    VMware vCloud Initiative VMware Delivers This Today with vCloud 35
  • 36.
    user ****** Connecting…
  • 38.
  • 40.
    VM created inseconds with a friendly user experience
  • 41.
    VMware is theLeader in Enterprise Hybrid Cloud Infrastructures VMware is the leader VMware offers the products and in the cloud platform services to build a hybrid cloud “Virtualization is a Private Cloud Public Cloud Co-Branded vCloud Services modernization Cloud Consumption vCloud vCloud Datacenter Security & performance catalyst and Operations and Management vCenter Portability for enterprises unlocks cloud Cross-Cloud Standards vCloud API Open Virtualization Format vCloud Express Rapid credit-card payment for developers computing.” Security and Compliance vShield Cross-Cloud Management vCloud Connector vCloud Powered Broad array of Virtualization VMware-compatible clouds vSphere for any business need Gartner, May 2011 VMware powers the industry‟s VMware has the expertise largest cloud ecosystem and services to build clouds vCenter Chargeback vCloud API vClo ud vCD API Port al vCenter Chargeback Web End Interface VMware vCloud User s v vCe C nter D Char geba Director Security VMware vCloud Director D ck VMware vCloud Director a Data t base a b a s vCenter Chargeback Server VMware vCloud Hardening Guide e WHITEPAPER Director Security LDA P vCe nter VMware vCloud Guide Hardening Data vCenter Server base WHITEPAPER vShield Manager w/ Edge Net work vShield s Manager and vCenter vShield Edge Chargeback Collectors Virtual Appliances (vCenter, vCD, vSE) ESX/ESXi Hosts Architecture VMware vSphere 4 Enterprise Plus Data store s Tool Kit 41
  • 42.
    Why Choose VMware? 1. How will a Private Cloud effect my current IT Services model and IT‟s relationship with the business? VMware: A Private cloud will deliver business agility so IT can respond and deliver! 2. If it‟s “All about the App” – how does your Private Cloud enable a stronger relationship with the line-of-business applications? VMware: You break down the application silos with virtual data centers enabling applications to be deployed from a self-service catalog. 3. What are the cost implications of a Private Cloud? Where will I see efficiences? VMware: IT simplification = less hardware (CAPEX savings), more strategic investments (business growth), and staff focused on value add projects 4. What are the 3 most common pitfalls that get in the way of Private Cloud adopting and how can they be addressed? VMware: Resistance to Change, Executive Sponsorship, Security Concerns 42
  • 45.
    495 million active users worldwide • Integrated Social Media • >3 billion searches/month • Worldwide Voice/Video/Chat • 30% market share <24 months • Dynamic decision engine • 45 million users worldwide • Dynamic content delivery • ID management
  • 46.
    All About Cross-Platform Foundation for Cloud On the App From the the Future Your Terms Metal Up
  • 47.
    Uncoordinated, ma Fully automated nual infrastructure management, dynami c resource usage, business- linked SLAs Datacenter services Client services Identity and security services IT process and compliance
  • 49.
    Configure App Controller Orchestrator Deploy Virtual Machine Manager Service Service Operations Manager Model Delivery & Self Service Automation Configuration Manager Data Protection Manager App DC Owner Admin Service Manager Service Manager Monitor Operate Application Management Service Delivery & Automation Infrastructure Management
  • 50.
    • How willa Private Cloud effect your Current IT Services model and IT’s relationship with the business? • If its ‘All about the App’ – how does Microsoft Private Cloud enable a stronger relationship with line-of-business applications? • What are the cost implications of a Private Cloud? Where will you see efficiencies? • What are the 3 most common pitfalls that get in the way of Private Cloud adoption and how can they be addressed?
  • 52.
  • 53.

Editor's Notes

  • #19 User at a glance can see all the resources s/he is currently consuming, their current status and also get alerted on critical events related to his resources.
  • #25 Cloud is the foundation to providing the applications, services
  • #26 Also build a lean stack (server, storage, hypervisor, orchestrator)
  • #30 The purpose of each is simple to defineIT …..Business ….So for IT is comes down to two disciplines Provisioning (supply of IT services) and the economics of doing soAnd for business finding and sustaining value====================ProvisioningDev &amp; test, Apps &amp; Ops, Delivering on-time, to need, within budget, meeting user expectations and changing IT landscape, providing a consistent experience …EconomyGetting the most out of finite resources, optimize costs by reducing and avoiding spending, make costs transparent, govern investments, help make right investment decisions, increase utilization,improve performance and returns …Value/InnovationHow is Cloud creating something new, or improved an existing business situationFinancial performance (shareholder value) is driven by the company’s “value proposition” of its products and services. IT is part of that proposition, it’s part of the customer experience. Cloud offers new sources of revenue, Value today can be lost tomorrow … hence need to be agileAgilityTo adapt and change, quickly, effectively, sense and respond, sustain value, continuity, no disruption ….
  • #31 The link between IT and end-users is applications. Existing applications, new applications that will be developed to support new business value, and the increasing emergence of SaaS apps in the business.&lt;click&gt;And these applications will be sourced from existing datacenters, as well as from external cloud services.&lt;click&gt;And of course end users will access these applications from a growing variety of devices. This creates the new IT landscape that must be addressed in the new world of cloud computing. An approach based on cloud computing promises new benefits to the business:&lt;click&gt; A more flexible, and efficient infrastructure upon which the journey to IT agility will begin. &lt;click&gt;A new generation of enterprise applications, that will represent the convergence of the type of end-user experience we see in the consumer world, with the requirements of the enterprise.&lt;click&gt;And finally, a more empowered mobile workforce, that doesn’t compromise the security of corporate assets and data.
  • #32 Every one of our customers has existing applications, running in existing datacenters, that represents significant investments and ongoing value. The first thing we are doing with these customers, is helping them stand-up a Private Cloud, to get the most efficiency and agility out of their existing assets. And this can be done in a pragmatic, evolutionary way. We have over 250,000 customers worldwide that are already on this path, because they are leveraging vSphere to virtualize the entire fabric of the datacenter, including CPU &amp; memory, storage, and networking. And because they are using vSphere, they get built-in high-availability, and automated, dynamic resource scheduling to give them the cloud attributes of elastic, pooled capacity. &lt;click&gt;With virtualization in place, the independent silos are broken down, enabling us to automate many of the mundane, repetitive administration tasks with our vCenter management suite, further decreasing opex in the datacenter.
  • #33 Another attractive benefit of cloud computing is the notion of on-demand, self-service, which contributes to increased customer satisfaction and business agility. This notion is just as important in the Private Cloud, but needs to be done in a way that conforms to IT security policies.&lt;click&gt;Businesses are made-up of multiple organizations, such as our example here with both Marketing and Finance. Each organization has members, or users, with respective security policies, as defined in corporate identity management systems. &lt;click&gt;With vCloud Director, IT organizations can define catalogs of pre-defined IT services, that can be accessed through a self-service portal, and deployed to pre-configured logical datacenters, or Virtual Datacenters as we refer to them, that represent committed SLA’s to the organization. And with our Chargeback module, IT can set-up pay-for-use models for each organization, dependent on their virtual datacenter and actual usage parameters.
  • #34 These steps are what transform existing datacenters, into cost-effective, flexible Private Cloud environments. That is the focus of VMware’s Cloud Infrastructure solutions, covering all aspects of infrastructure, including security and management.
  • #35 The real value in cloud computing is when all boundaries are flexible, to enable cross-cloud federation and coordination. This is what gives customers maximum choice and flexibility in how to streamline costs and improve agility. Our belief is that cloud computing implies a ubiquitous model for interoperability between multiple clouds, both within and outside the enterprise. We refer to this as Open Cloud Computing, which we are fully committed to.&lt;click&gt;This is why VMware is working with so many public cloud service providers, as part of our vCloud program, to create compatible cloud environments for application mobility.&lt;click&gt;In particular, we are working with a handful of service providers to create a secure, enterprise-class cloud service, that uses a common service-level management model based on vCloud Director, and a common security model based on vShield, to extend the trust boundary of the enterprise into these public cloud services, and enable the safe, secure mobility of application workloads between the environments. &lt;click&gt;This class of service is referred to as the VMware vCloud Datacenter Service, and ensures a common platform, management model, and security model, to create the ultimate secure hybrid cloud environment. With vCloud, open cloud computing moves from being a technology discussion, to a business decision!
  • #37 Login screen; looks the same for both admins and users, but has a different URL and login name/passwordCool animations 
  • #38 0. This is the home landing pageClick add to add a vApp from the catalogueSelect the template (in this case we do #2, montecarlo)Click next to select properties. Note that we have cut out a few of the property options
  • #39 Select the properties of the vm:The nameVM configuration detailsNetworkingClick finish
  • #40 vApp will spin up. Click on OPEN when it is done loaded and says “Stopped”
  • #41 This is a view of all the VMs
  • #42 If cloud is about reducing complexity in the datacenter, cutting costs, and increasing agility, no other vendor has ever successfully delivered on all three of these in such a profound way as VMware.” No other vendor has delivered as much impact as VMware. VMware has already delivered reduced complexity, cost, and agilitySo who do you really believe can deliver this with cloud? The big 4? What have they given you? Have you automated your way to a cloud over the past 10 years? What’s new?