SlideShare a Scribd company logo
GET REVIEW MEET
ANSHUL KEWAT
(MEP:CRESECENT BAY, PAREL)
23/1/14
MEP
• MEP(i.e. Mechanical, Electrical & Plumbing) is
a agency or department that deals in
electromechanical services in construction
industry.
• Basically, MEP work move around co-
ordination with Civil structural team to
enhance their abilities to execute.
TASK
ANALYSIS
TESTING
CUM
VALIDATION
MEP EXECUTION
MAIN
EXECUTION
• Learning/Study of needful
documents like BOQ, GFC
Drawings etc.
1
• Prepare the Work front as per site
condition.2
• Gather required resource to
execute.3
TASK ANALYSIS
• Supervise related work with
motivational effort.1
• Maintain the quality of work with
specified standard.2
• Take the necessary measurement
to evaluate.3
MAIN EXECUTION
• Test out the work with proper
techniques.1
• Validate all documents with
concerned client team.2
• Handover your project within
stipulated time.3
TESTING CUM VALIDATION
Learning Involves
• Technical knowledge
• Inter-personal Skill
• Procedural approach
• Work ethics
THANKING YOU

More Related Content

What's hot

21.03.2018 ARDC session #3 measuring work Progress
21.03.2018 ARDC session #3  measuring work Progress21.03.2018 ARDC session #3  measuring work Progress
21.03.2018 ARDC session #3 measuring work Progress
Diaa Khalaf, PMP,PMI-RMP
 
Primavera EPPM case study - Oracle Primavera P6 Collaborate 14
Primavera EPPM case study - Oracle Primavera P6 Collaborate 14Primavera EPPM case study - Oracle Primavera P6 Collaborate 14
Primavera EPPM case study - Oracle Primavera P6 Collaborate 14
p6academy
 
160155061 project-monitoring-control
160155061 project-monitoring-control160155061 project-monitoring-control
160155061 project-monitoring-control
eidalin95
 
John Parcon Resume with reference
John Parcon Resume with reference John Parcon Resume with reference
John Parcon Resume with reference John Parcon
 
Fall 09 Residential Presentation
Fall 09 Residential PresentationFall 09 Residential Presentation
Fall 09 Residential Presentation
kneadae
 
Workflows of the Process
Workflows of the ProcessWorkflows of the Process
Workflows of the Process
Munazza-Mah-Jabeen
 
Senior Project-Manager
Senior Project-ManagerSenior Project-Manager
Senior Project-Manager
PT. IRAWAN PRIMA UTAMA
 
Algorithmic Software Cost Modeling
Algorithmic Software Cost ModelingAlgorithmic Software Cost Modeling
Algorithmic Software Cost Modeling
Kasun Ranga Wijeweera
 
Checkpoints of the Process
Checkpoints of the ProcessCheckpoints of the Process
Checkpoints of the Process
Munazza-Mah-Jabeen
 
Life Cycle Phases
Life Cycle PhasesLife Cycle Phases
Life Cycle Phases
Munazza-Mah-Jabeen
 
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
Shrikant Kate
 
Cost estimation techniques
Cost estimation techniquesCost estimation techniques
Cost estimation techniques
lokareminakshi
 
Software testing implementation
Software testing implementationSoftware testing implementation
Software testing implementationLuthfia Ulinnuha
 
Scale development -- reporting
Scale development -- reportingScale development -- reporting
Scale development -- reporting
Khalid Mahmood
 
Aftab resume
Aftab resumeAftab resume
Aftab resume
Aftab Ozair
 
MS Project 2010 schedule template for large NASA procurements $10-450 million
MS Project 2010 schedule template for large NASA procurements $10-450 millionMS Project 2010 schedule template for large NASA procurements $10-450 million
MS Project 2010 schedule template for large NASA procurements $10-450 million
Self employed
 
Ici and itd prensentation new
Ici and itd prensentation newIci and itd prensentation new
Ici and itd prensentation newWadeLim
 
Detailed project schedule
Detailed project scheduleDetailed project schedule
Detailed project schedulePeica Ionela
 

What's hot (19)

21.03.2018 ARDC session #3 measuring work Progress
21.03.2018 ARDC session #3  measuring work Progress21.03.2018 ARDC session #3  measuring work Progress
21.03.2018 ARDC session #3 measuring work Progress
 
Primavera EPPM case study - Oracle Primavera P6 Collaborate 14
Primavera EPPM case study - Oracle Primavera P6 Collaborate 14Primavera EPPM case study - Oracle Primavera P6 Collaborate 14
Primavera EPPM case study - Oracle Primavera P6 Collaborate 14
 
160155061 project-monitoring-control
160155061 project-monitoring-control160155061 project-monitoring-control
160155061 project-monitoring-control
 
John Parcon Resume with reference
John Parcon Resume with reference John Parcon Resume with reference
John Parcon Resume with reference
 
Fall 09 Residential Presentation
Fall 09 Residential PresentationFall 09 Residential Presentation
Fall 09 Residential Presentation
 
Job titl1
Job titl1Job titl1
Job titl1
 
Workflows of the Process
Workflows of the ProcessWorkflows of the Process
Workflows of the Process
 
Senior Project-Manager
Senior Project-ManagerSenior Project-Manager
Senior Project-Manager
 
Algorithmic Software Cost Modeling
Algorithmic Software Cost ModelingAlgorithmic Software Cost Modeling
Algorithmic Software Cost Modeling
 
Checkpoints of the Process
Checkpoints of the ProcessCheckpoints of the Process
Checkpoints of the Process
 
Life Cycle Phases
Life Cycle PhasesLife Cycle Phases
Life Cycle Phases
 
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
 
Cost estimation techniques
Cost estimation techniquesCost estimation techniques
Cost estimation techniques
 
Software testing implementation
Software testing implementationSoftware testing implementation
Software testing implementation
 
Scale development -- reporting
Scale development -- reportingScale development -- reporting
Scale development -- reporting
 
Aftab resume
Aftab resumeAftab resume
Aftab resume
 
MS Project 2010 schedule template for large NASA procurements $10-450 million
MS Project 2010 schedule template for large NASA procurements $10-450 millionMS Project 2010 schedule template for large NASA procurements $10-450 million
MS Project 2010 schedule template for large NASA procurements $10-450 million
 
Ici and itd prensentation new
Ici and itd prensentation newIci and itd prensentation new
Ici and itd prensentation new
 
Detailed project schedule
Detailed project scheduleDetailed project schedule
Detailed project schedule
 

Similar to MEP

Mohamed Mostafa Kamal Mohamed Elsahn 2016
Mohamed Mostafa Kamal Mohamed Elsahn 2016Mohamed Mostafa Kamal Mohamed Elsahn 2016
Mohamed Mostafa Kamal Mohamed Elsahn 2016Mohamed Elsahen
 
resume design engineer
resume design engineerresume design engineer
resume design engineerArun Kumar
 
Ayman curriculum vitae2
Ayman curriculum vitae2Ayman curriculum vitae2
Ayman curriculum vitae2
Ayman Hassan Refaie
 
Ayman curriculum vitae
Ayman curriculum vitaeAyman curriculum vitae
Ayman curriculum vitae
Ayman Hassan Refaie
 
Ayman curriculum vitae
Ayman curriculum vitaeAyman curriculum vitae
Ayman curriculum vitae
Ayman Hassan Refaie
 
CV of Tahir Mahmood
CV of Tahir MahmoodCV of Tahir Mahmood
CV of Tahir Mahmood
Tahir Mahmood
 
Production and Cost Estimation-EPelo - Copy.pptx
Production and Cost Estimation-EPelo - Copy.pptxProduction and Cost Estimation-EPelo - Copy.pptx
Production and Cost Estimation-EPelo - Copy.pptx
EileenPelo1
 
Sbai value of commissioning
Sbai value of commissioningSbai value of commissioning
Sbai value of commissioning
jeff_ranson
 
Effective Engineering Management in EPC Industry
Effective Engineering Management in EPC IndustryEffective Engineering Management in EPC Industry
Effective Engineering Management in EPC IndustryPMI Chennai Chapter
 
QA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEERQA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEERSajjad Ali
 

Similar to MEP (20)

Mohamed Mostafa Kamal Mohamed Elsahn 2016
Mohamed Mostafa Kamal Mohamed Elsahn 2016Mohamed Mostafa Kamal Mohamed Elsahn 2016
Mohamed Mostafa Kamal Mohamed Elsahn 2016
 
Jitendra_B_Chaudhari BE (MEP)
Jitendra_B_Chaudhari BE (MEP)Jitendra_B_Chaudhari BE (MEP)
Jitendra_B_Chaudhari BE (MEP)
 
Hussein Ahmad Salem-CV
Hussein Ahmad Salem-CVHussein Ahmad Salem-CV
Hussein Ahmad Salem-CV
 
Curriculum vitae 3.2
Curriculum vitae 3.2Curriculum vitae 3.2
Curriculum vitae 3.2
 
resume design engineer
resume design engineerresume design engineer
resume design engineer
 
CV-ES Enslin
CV-ES EnslinCV-ES Enslin
CV-ES Enslin
 
Ayman curriculum vitae2
Ayman curriculum vitae2Ayman curriculum vitae2
Ayman curriculum vitae2
 
Ayman curriculum vitae
Ayman curriculum vitaeAyman curriculum vitae
Ayman curriculum vitae
 
Ayman curriculum vitae
Ayman curriculum vitaeAyman curriculum vitae
Ayman curriculum vitae
 
CV of Tahir Mahmood
CV of Tahir MahmoodCV of Tahir Mahmood
CV of Tahir Mahmood
 
Senthil-CV[-1]
Senthil-CV[-1]Senthil-CV[-1]
Senthil-CV[-1]
 
RESUME
RESUMERESUME
RESUME
 
Kumlachew Mechanical QC Eng.
Kumlachew Mechanical QC Eng.Kumlachew Mechanical QC Eng.
Kumlachew Mechanical QC Eng.
 
Elect Eng. Rizwan CV
Elect Eng. Rizwan CVElect Eng. Rizwan CV
Elect Eng. Rizwan CV
 
Production and Cost Estimation-EPelo - Copy.pptx
Production and Cost Estimation-EPelo - Copy.pptxProduction and Cost Estimation-EPelo - Copy.pptx
Production and Cost Estimation-EPelo - Copy.pptx
 
JEEWAN KUMAR
JEEWAN KUMARJEEWAN KUMAR
JEEWAN KUMAR
 
Sbai value of commissioning
Sbai value of commissioningSbai value of commissioning
Sbai value of commissioning
 
Effective Engineering Management in EPC Industry
Effective Engineering Management in EPC IndustryEffective Engineering Management in EPC Industry
Effective Engineering Management in EPC Industry
 
QA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEERQA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEER
 
LinkedIn
LinkedInLinkedIn
LinkedIn
 

MEP