Ref : SOP 3 Rev B

                                                                    STANDARD OPERATING PROCEDURE No. 3
The use of ride-on mobile plant can give rise to significant risks on our sites and in the surrounding streets. Where such plant is the subject of a recognised training registration
scheme (ie CPCS, IPAF, RTITB or AITT) then this procedure shall apply.
Ride-on mobile plant

Ride-on mobile plant includes all items of plant, either wheeled or tracked, on which the operator rides. It includes, in addition to the obvious plant, items such as ride-on rollers,
MEWPs, piling rigs and mobile cranes but not fixed cranes (eg tower cranes).

Authorisation - Overview

    1.   No operation of ride-on mobile plant is permitted unless the operator has been authorised to do so by Miller Construction.
    2.   Authorisation takes place at two levels.
          ‘Initial Authorisation’ – which is gained if the operator presents proof of ’card holding’ and demonstrates familiarity with the plant to be operated; AND
          ‘Daily Authorisation’ – which is required to ensure adequate control of traffic management risk on site.
    3.   Names of those authorised to operate plant, and the categories of plant covered by that authorisation, will be held on the site Register of Authorised Ride-on Mobile
         Plant Operators
    4.   Authorisation is undertaken only on a site by site basis. No multi site authorisation is permitted.
    5.   The Miller Construction employee responsible for ensuring authorisations take place in accordance with this procedure is identified within the site Roles and
         Responsibilities Chart.
    6.   Miller Construction personnel below Regional Director have no authority to waiver any requirement within this procedure.

Authorisation - Prerequisite for Card Holding Required

Authorisation will require production of either:

        An accepted training registration scheme card; OR
        A photocopy of an accepted training registration scheme card authenticated by the employer (pre-arranged circumstances only – see ‘Initial Authorisation Process’ below)

Note : Card holding is compulsory for operators of ride-on mobile plant. No cover letters or other evidence of training can be accepted by our personnel.

The ONLY accepted training registration schemes are:

        CPCS        Construction Plant Competence Scheme                    RTITB     Road Transport Industry Training Board          (Industrial forklift truck & lorry loaders only)
        IPAF        International Powered Access Federation                 AITT      Association of Industrial Truck Trainers        (Industrial forklift truck only)




                               Nothing we do is so important that we cannot take the time to do it safely
                                                                                    Page 1 of 2
Ref : SOP 3 Rev B


                                                                    STANDARD OPERATING PROCEDURE No. 3
‘Initial Authorisation’ Process
    1. The operator will present themselves and their relevant scheme card, or an employer verified copy thereof, to Miller Construction.
            Employer verified copies of relevant scheme cards are only acceptable if:
                  a. there is a good reason why the actual card cannot be produced on site; AND
                  b. the provision of a photocopy has been pre-arranged; AND
                  c. the Miller Construction person making that arrangement has satisfied themselves that records to be provided are likely to be authentic; AND
                  d. the Miller Construction person responsible for plant authorisations on site has been pre-notified; AND
                  e. any photocopies produced are clearly legible and include images of both the front and the back of the card.
            A failure on ANY of the above points will render the operator ineligible to be authorised at that time.
            Miller Construction personnel are NOT permitted to accept cover letters, pass certificates, or any alternative evidence of training.
    2.   Miller Construction will:
            Ensure the operator can demonstrate familiarisation with ALL CATEGORIES OF PLANT authorisation is being sought for at that time. Plant Familiarisation Record
             Where the operator cannot demonstrate familiarity with an item of plant they cannot gain ‘Initial Authorisation’ at that time. The operator should instead be referred to
             the manufacturer’s guidance and should familiarise themselves with its contents and the operation of the plant – particularly the whereabouts and operation of its
             essential safety features and mechanisms. They should then re-present themselves for ‘Initial Authorisation’.
            Enter the operator’s NAME and CATEGORIES OF PLANT BEING AUTHORISED FOR USE in the Register of Authorised Ride-on Mobile Plant Operators .
            Retain the Plant Familiarisation Record(s) on file.
            Retain a copy of the card / verified photocopy of the card on file.
            Explain the ‘Daily Authorisation’ process.
‘Daily Authorisation’ Process
    1. The operator will conduct a daily plant inspection, record the findings on the Permit to Operate Ride-on Mobile Plant , and present them to Miller Construction.
    2.   Miller Construction will:
            Brief the operator on traffic management arrangements, zoning and restrictions in place that day.
            Issue any relevant Permit to Dig.
            Issue an ‘Authorised Plant Operator’ tabard and the plant key to the operator. (the tabard is usually orange with ‘Authorised Plant Operator’ printed on the back)
            Complete the Permit to Operate Ride-on Mobile Plant to authorise operation of specified plant for that day.
    3. The operator will return the plant key, any Permit to Dig, and the ‘Authorised Plant Operator’ tabard to Miller Construction either when THEIR operation of the plant has
       finished for the day OR when use of the plant has ceased for the day.
         Where there are to be multi-users of a single item of plant during the day then all those operators must be authorised that day. They must all attend the Miller Construction
         briefing (No. 2 above) and sign the Permit to Operate Ride-on Mobile Plant. Their employer will nominate one of them to be regarded as the ‘key holder’ and the ‘key holder’
         will be in charge of key control during the day and responsible for its return to Miller Construction at the end of the day.
Disciplinary Code
Unauthorised use of plant is a Red Card offence. Where this has happened with the express or tacit consent of any other person that/those other person(s) will also be subject to a
Red Card. Where this is a Miller Construction employee they will be subject to internal disciplinary procedures.

                              Nothing we do is so important that we cannot take the time to do it safely
                                                                                 Page 2 of 2

More Related Content

Recently uploaded

IATP How-to Foreign Travel May 2024.pdff
IATP How-to Foreign Travel May 2024.pdffIATP How-to Foreign Travel May 2024.pdff
IATP How-to Foreign Travel May 2024.pdff
17thcssbs2
 
會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽
會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽
會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽
中 央社
 
ppt your views.ppt your views of your college in your eyes
ppt your views.ppt your views of your college in your eyesppt your views.ppt your views of your college in your eyes
ppt your views.ppt your views of your college in your eyes
ashishpaul799
 

Recently uploaded (20)

philosophy and it's principles based on the life
philosophy and it's principles based on the lifephilosophy and it's principles based on the life
philosophy and it's principles based on the life
 
INU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdf
INU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdfINU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdf
INU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdf
 
slides CapTechTalks Webinar May 2024 Alexander Perry.pptx
slides CapTechTalks Webinar May 2024 Alexander Perry.pptxslides CapTechTalks Webinar May 2024 Alexander Perry.pptx
slides CapTechTalks Webinar May 2024 Alexander Perry.pptx
 
Post Exam Fun(da) Intra UEM General Quiz 2024 - Prelims q&a.pdf
Post Exam Fun(da) Intra UEM General Quiz 2024 - Prelims q&a.pdfPost Exam Fun(da) Intra UEM General Quiz 2024 - Prelims q&a.pdf
Post Exam Fun(da) Intra UEM General Quiz 2024 - Prelims q&a.pdf
 
IATP How-to Foreign Travel May 2024.pdff
IATP How-to Foreign Travel May 2024.pdffIATP How-to Foreign Travel May 2024.pdff
IATP How-to Foreign Travel May 2024.pdff
 
Basic Civil Engg Notes_Chapter-6_Environment Pollution & Engineering
Basic Civil Engg Notes_Chapter-6_Environment Pollution & EngineeringBasic Civil Engg Notes_Chapter-6_Environment Pollution & Engineering
Basic Civil Engg Notes_Chapter-6_Environment Pollution & Engineering
 
Incoming and Outgoing Shipments in 2 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 2 STEPS Using Odoo 17Incoming and Outgoing Shipments in 2 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 2 STEPS Using Odoo 17
 
Mbaye_Astou.Education Civica_Human Rights.pptx
Mbaye_Astou.Education Civica_Human Rights.pptxMbaye_Astou.Education Civica_Human Rights.pptx
Mbaye_Astou.Education Civica_Human Rights.pptx
 
Morse OER Some Benefits and Challenges.pptx
Morse OER Some Benefits and Challenges.pptxMorse OER Some Benefits and Challenges.pptx
Morse OER Some Benefits and Challenges.pptx
 
Open Educational Resources Primer PowerPoint
Open Educational Resources Primer PowerPointOpen Educational Resources Primer PowerPoint
Open Educational Resources Primer PowerPoint
 
Basic_QTL_Marker-assisted_Selection_Sourabh.ppt
Basic_QTL_Marker-assisted_Selection_Sourabh.pptBasic_QTL_Marker-assisted_Selection_Sourabh.ppt
Basic_QTL_Marker-assisted_Selection_Sourabh.ppt
 
會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽
會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽
會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽
 
Word Stress rules esl .pptx
Word Stress rules esl               .pptxWord Stress rules esl               .pptx
Word Stress rules esl .pptx
 
size separation d pharm 1st year pharmaceutics
size separation d pharm 1st year pharmaceuticssize separation d pharm 1st year pharmaceutics
size separation d pharm 1st year pharmaceutics
 
“O BEIJO” EM ARTE .
“O BEIJO” EM ARTE                       .“O BEIJO” EM ARTE                       .
“O BEIJO” EM ARTE .
 
B.ed spl. HI pdusu exam paper-2023-24.pdf
B.ed spl. HI pdusu exam paper-2023-24.pdfB.ed spl. HI pdusu exam paper-2023-24.pdf
B.ed spl. HI pdusu exam paper-2023-24.pdf
 
How to the fix Attribute Error in odoo 17
How to the fix Attribute Error in odoo 17How to the fix Attribute Error in odoo 17
How to the fix Attribute Error in odoo 17
 
MichaelStarkes_UncutGemsProjectSummary.pdf
MichaelStarkes_UncutGemsProjectSummary.pdfMichaelStarkes_UncutGemsProjectSummary.pdf
MichaelStarkes_UncutGemsProjectSummary.pdf
 
Application of Matrices in real life. Presentation on application of matrices
Application of Matrices in real life. Presentation on application of matricesApplication of Matrices in real life. Presentation on application of matrices
Application of Matrices in real life. Presentation on application of matrices
 
ppt your views.ppt your views of your college in your eyes
ppt your views.ppt your views of your college in your eyesppt your views.ppt your views of your college in your eyes
ppt your views.ppt your views of your college in your eyes
 

Featured

Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
Kurio // The Social Media Age(ncy)
 

Featured (20)

Skeleton Culture Code
Skeleton Culture CodeSkeleton Culture Code
Skeleton Culture Code
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
 
12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work
 
ChatGPT webinar slides
ChatGPT webinar slidesChatGPT webinar slides
ChatGPT webinar slides
 
More than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike RoutesMore than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike Routes
 
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
 

Mcl sop (no.03)_-_authorisation_of_ride-on_mobile_plant_operators_(rev_b_aug_09)

  • 1. Ref : SOP 3 Rev B STANDARD OPERATING PROCEDURE No. 3 The use of ride-on mobile plant can give rise to significant risks on our sites and in the surrounding streets. Where such plant is the subject of a recognised training registration scheme (ie CPCS, IPAF, RTITB or AITT) then this procedure shall apply. Ride-on mobile plant Ride-on mobile plant includes all items of plant, either wheeled or tracked, on which the operator rides. It includes, in addition to the obvious plant, items such as ride-on rollers, MEWPs, piling rigs and mobile cranes but not fixed cranes (eg tower cranes). Authorisation - Overview 1. No operation of ride-on mobile plant is permitted unless the operator has been authorised to do so by Miller Construction. 2. Authorisation takes place at two levels.  ‘Initial Authorisation’ – which is gained if the operator presents proof of ’card holding’ and demonstrates familiarity with the plant to be operated; AND  ‘Daily Authorisation’ – which is required to ensure adequate control of traffic management risk on site. 3. Names of those authorised to operate plant, and the categories of plant covered by that authorisation, will be held on the site Register of Authorised Ride-on Mobile Plant Operators 4. Authorisation is undertaken only on a site by site basis. No multi site authorisation is permitted. 5. The Miller Construction employee responsible for ensuring authorisations take place in accordance with this procedure is identified within the site Roles and Responsibilities Chart. 6. Miller Construction personnel below Regional Director have no authority to waiver any requirement within this procedure. Authorisation - Prerequisite for Card Holding Required Authorisation will require production of either:  An accepted training registration scheme card; OR  A photocopy of an accepted training registration scheme card authenticated by the employer (pre-arranged circumstances only – see ‘Initial Authorisation Process’ below) Note : Card holding is compulsory for operators of ride-on mobile plant. No cover letters or other evidence of training can be accepted by our personnel. The ONLY accepted training registration schemes are:  CPCS Construction Plant Competence Scheme  RTITB Road Transport Industry Training Board (Industrial forklift truck & lorry loaders only)  IPAF International Powered Access Federation  AITT Association of Industrial Truck Trainers (Industrial forklift truck only) Nothing we do is so important that we cannot take the time to do it safely Page 1 of 2
  • 2. Ref : SOP 3 Rev B STANDARD OPERATING PROCEDURE No. 3 ‘Initial Authorisation’ Process 1. The operator will present themselves and their relevant scheme card, or an employer verified copy thereof, to Miller Construction.  Employer verified copies of relevant scheme cards are only acceptable if: a. there is a good reason why the actual card cannot be produced on site; AND b. the provision of a photocopy has been pre-arranged; AND c. the Miller Construction person making that arrangement has satisfied themselves that records to be provided are likely to be authentic; AND d. the Miller Construction person responsible for plant authorisations on site has been pre-notified; AND e. any photocopies produced are clearly legible and include images of both the front and the back of the card.  A failure on ANY of the above points will render the operator ineligible to be authorised at that time.  Miller Construction personnel are NOT permitted to accept cover letters, pass certificates, or any alternative evidence of training. 2. Miller Construction will:  Ensure the operator can demonstrate familiarisation with ALL CATEGORIES OF PLANT authorisation is being sought for at that time. Plant Familiarisation Record Where the operator cannot demonstrate familiarity with an item of plant they cannot gain ‘Initial Authorisation’ at that time. The operator should instead be referred to the manufacturer’s guidance and should familiarise themselves with its contents and the operation of the plant – particularly the whereabouts and operation of its essential safety features and mechanisms. They should then re-present themselves for ‘Initial Authorisation’.  Enter the operator’s NAME and CATEGORIES OF PLANT BEING AUTHORISED FOR USE in the Register of Authorised Ride-on Mobile Plant Operators .  Retain the Plant Familiarisation Record(s) on file.  Retain a copy of the card / verified photocopy of the card on file.  Explain the ‘Daily Authorisation’ process. ‘Daily Authorisation’ Process 1. The operator will conduct a daily plant inspection, record the findings on the Permit to Operate Ride-on Mobile Plant , and present them to Miller Construction. 2. Miller Construction will:  Brief the operator on traffic management arrangements, zoning and restrictions in place that day.  Issue any relevant Permit to Dig.  Issue an ‘Authorised Plant Operator’ tabard and the plant key to the operator. (the tabard is usually orange with ‘Authorised Plant Operator’ printed on the back)  Complete the Permit to Operate Ride-on Mobile Plant to authorise operation of specified plant for that day. 3. The operator will return the plant key, any Permit to Dig, and the ‘Authorised Plant Operator’ tabard to Miller Construction either when THEIR operation of the plant has finished for the day OR when use of the plant has ceased for the day. Where there are to be multi-users of a single item of plant during the day then all those operators must be authorised that day. They must all attend the Miller Construction briefing (No. 2 above) and sign the Permit to Operate Ride-on Mobile Plant. Their employer will nominate one of them to be regarded as the ‘key holder’ and the ‘key holder’ will be in charge of key control during the day and responsible for its return to Miller Construction at the end of the day. Disciplinary Code Unauthorised use of plant is a Red Card offence. Where this has happened with the express or tacit consent of any other person that/those other person(s) will also be subject to a Red Card. Where this is a Miller Construction employee they will be subject to internal disciplinary procedures. Nothing we do is so important that we cannot take the time to do it safely Page 2 of 2