Ref : SOP 3 - PORMP Rev B
                                                                      Permit to Operate Ride-on Mobile Plant
Contract No.:             C                                          Project Name:                                               Daily Permit : W/C Monday
Plant type:                                                        Make:                                          Model:                            Serial No. / Vehicle ID
Operator – Daily Plant Check & Briefing                         (Please enter either ( √ ) ( X ) or ( N/A )
In signing below I confirm that I have undertaken the following                               Monday          Tuesday       Wednesday    Thursday          Friday         Saturday          Sunday
checks in accordance with the manufacturer’s instructions.
  Steering system
  Braking systems     (e.g. operation of brakes & level of brake fluid)
  Seat & lap belts
  Tyres               (e.g. condition & pressure)
  ROPS & FOPS         (e.g. Roll-over & Falling object protection)
      O
  360 vision          (e.g. mirrors &/ or cctv)

  Lights & indicators
  Windscreen          (e.g. visibility, washers & wipers)
  Hydraulic system (e.g. pipes, hoses, leaks & levels)
  Warning devices     (e.g. horn, reversing alarms, flashing beacons & ASLI

  Safety devices      (e.g. quick-hitch pins, PTO shaft guards & interlocks)

              Signature       (Plant Operator / Designated ‘Key Holder’ if multi-user)



Miller Construction – Daily Permit Issue (Please enter either ( √ )                      ( X ) or ( N/A )

 Daily traffic management briefing conducted
 ‘Permit to Disturb Ground’ issued
 ‘Authorised Plant Operator’ tabard & key issued
                                          Signature       (Miller Construction Issuer)



Daily Permit Closure
 ‘Authorised Plant Operator’ tabard & key returned
              Signature       (Plant Operator / Designated ‘Key Holder’ if multi-user)


                                          Signature       (Miller Construction Issuer)


Key : √ : No defect   X : Defect   N/A : Not Applicable to this item of plant

Details of defects, and remedial actions taken to rectify them, should be entered on Page 2




                                                                                                              Page 1 of 2
Ref : SOP 3 - PORMP Rev B
                                                            Permit to Operate Ride-on Mobile Plant

                                              Monday                    Tuesday                Wednesday                   Thursday                     Friday                  Saturday                      Sunday
                                        Print Name – Operator 2   Print Name – Operator 2   Print Name – Operator 2   Print Name – Operator 2   Print Name – Operator 2   Print Name – Operator 2    Print Name – Operator 2
Plant authorisation is a two stage
process:
1. ‘Initial Authorisation’ - based on   Signature – Operator 2    Signature – Operator 2    Signature – Operator 2    Signature – Operator 2    Signature – Operator 2    Signature – Operator 2     Signature – Operator 2

(i) card holding & (ii) demonstration
of plant familiarisation; AND
                                        Print Name – Operator 3   Print Name – Operator 3   Print Name – Operator 3   Print Name – Operator 3   Print Name – Operator 3   Print Name – Operator 3    Print Name – Operator 3
2. ‘Daily Authorisation’ - based on
(i) the Operator / Designated ‘Key
Holder’ completing a daily plant        Signature – Operator 3    Signature – Operator 3    Signature – Operator 3    Signature – Operator 3    Signature – Operator 3    Signature – Operator 3     Signature – Operator 3
check & (ii) Miller Construction
providing    a      Daily     Traffic
Management briefing AND issuing         Print Name – Operator 4   Print Name – Operator 4   Print Name – Operator 4   Print Name – Operator 4   Print Name – Operator 4   Print Name – Operator 4    Print Name – Operator 4
any appropriate Permit to Disturb
Ground.
                                        Signature – Operator 4    Signature – Operator 4    Signature – Operator 4    Signature – Operator 4    Signature – Operator 4    Signature – Operator 4     Signature – Operator 4


Where there are multi-users of plant
                                        Print Name – Operator 5   Print Name – Operator 5   Print Name – Operator 5   Print Name – Operator 5   Print Name – Operator 5   Print Name – Operator 5    Print Name – Operator 5
ALL plant operators must attend the
traffic management briefing for that
day AND be briefed on the
                                        Signature – Operator 5    Signature – Operator 5    Signature – Operator 5    Signature – Operator 5    Signature – Operator 5    Signature – Operator 5     Signature – Operator 5
requirements of any relevant Permit
to Disturb Ground.
                                        Remedial actions related to defects identified on Page 1:
Multi-users of the item of plant
identified on Page 1 should PRINT
and SIGN their name opposite to
confirm this has taken place.
Operator’s declaration
In signing opposite I confirm that
I   have     received   a    traffic
management briefing in relation
to the relevant day and that I have
been briefed on the requirements
of any Permit to Dig applicable to
my work.




                                                                                                     Page 2 of 2

More Related Content

Similar to Mcl sop (no.03)_-_permit_to_operate_ride-on_mobile_plant_(rev_b_aug_09)

biodata%252520giman
biodata%252520gimanbiodata%252520giman
biodata%252520giman
Benjie Giman
 
Heavy-Equipment-HSE-Checklists-hseprof-com.docx
Heavy-Equipment-HSE-Checklists-hseprof-com.docxHeavy-Equipment-HSE-Checklists-hseprof-com.docx
Heavy-Equipment-HSE-Checklists-hseprof-com.docx
IntracoDharmaEkatama
 
Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...
Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...
Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...
MohammedAliQazi
 
747 8 mdcd -pnl-decking trade
747 8 mdcd -pnl-decking trade747 8 mdcd -pnl-decking trade
747 8 mdcd -pnl-decking trade
Shawn Paul Boike
 
Plant certification
Plant certificationPlant certification
Plant certification
Ahmed Zidan
 
JOHN CAMPBELL WAHLIN RESUME 2014
JOHN CAMPBELL WAHLIN RESUME 2014JOHN CAMPBELL WAHLIN RESUME 2014
JOHN CAMPBELL WAHLIN RESUME 2014
John Wahlin
 
Stainless Turbines LLC_Brochure rev.2.3
Stainless Turbines LLC_Brochure rev.2.3Stainless Turbines LLC_Brochure rev.2.3
Stainless Turbines LLC_Brochure rev.2.3
Theron Smith
 
25 Demolition of existing concrete structures Risk Assessment Templates.docx
25 Demolition of existing concrete structures Risk Assessment Templates.docx25 Demolition of existing concrete structures Risk Assessment Templates.docx
25 Demolition of existing concrete structures Risk Assessment Templates.docx
Dwarika Bhushan Sharma
 
14 Use of Plant- Graders and road rollers Risk Assessment Templates.docx
14 Use of Plant- Graders and road rollers Risk Assessment Templates.docx14 Use of Plant- Graders and road rollers Risk Assessment Templates.docx
14 Use of Plant- Graders and road rollers Risk Assessment Templates.docx
Dwarika Bhushan Sharma
 
AWP Incident Investigation Document North America Market Issue 01 May 2015
AWP Incident Investigation Document North America Market  Issue 01  May 2015AWP Incident Investigation Document North America Market  Issue 01  May 2015
AWP Incident Investigation Document North America Market Issue 01 May 2015
Craig Ihde
 
AWP Incident Investigation Document North America Market Issue 01 May 2015
AWP Incident Investigation Document North America Market  Issue 01  May 2015AWP Incident Investigation Document North America Market  Issue 01  May 2015
AWP Incident Investigation Document North America Market Issue 01 May 2015
Craig Ihde
 

Similar to Mcl sop (no.03)_-_permit_to_operate_ride-on_mobile_plant_(rev_b_aug_09) (20)

biodata%252520giman
biodata%252520gimanbiodata%252520giman
biodata%252520giman
 
Heavy-Equipment-HSE-Checklists-hseprof-com.docx
Heavy-Equipment-HSE-Checklists-hseprof-com.docxHeavy-Equipment-HSE-Checklists-hseprof-com.docx
Heavy-Equipment-HSE-Checklists-hseprof-com.docx
 
DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE
DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE
DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE
 
Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...
Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...
Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...
 
Const cranes 9 3 10
Const cranes 9 3 10Const cranes 9 3 10
Const cranes 9 3 10
 
Arturo Final Resume
Arturo Final ResumeArturo Final Resume
Arturo Final Resume
 
747 8 mdcd -pnl-decking trade
747 8 mdcd -pnl-decking trade747 8 mdcd -pnl-decking trade
747 8 mdcd -pnl-decking trade
 
Plant certification
Plant certificationPlant certification
Plant certification
 
Example Of An Effective Pm
Example Of An Effective PmExample Of An Effective Pm
Example Of An Effective Pm
 
JOHN CAMPBELL WAHLIN RESUME 2014
JOHN CAMPBELL WAHLIN RESUME 2014JOHN CAMPBELL WAHLIN RESUME 2014
JOHN CAMPBELL WAHLIN RESUME 2014
 
Stainless Turbines LLC_Brochure rev.2.3
Stainless Turbines LLC_Brochure rev.2.3Stainless Turbines LLC_Brochure rev.2.3
Stainless Turbines LLC_Brochure rev.2.3
 
Engine damage
Engine damageEngine damage
Engine damage
 
25 Demolition of existing concrete structures Risk Assessment Templates.docx
25 Demolition of existing concrete structures Risk Assessment Templates.docx25 Demolition of existing concrete structures Risk Assessment Templates.docx
25 Demolition of existing concrete structures Risk Assessment Templates.docx
 
MADHU CV
MADHU CVMADHU CV
MADHU CV
 
Vijay cv
Vijay cvVijay cv
Vijay cv
 
14 Use of Plant- Graders and road rollers Risk Assessment Templates.docx
14 Use of Plant- Graders and road rollers Risk Assessment Templates.docx14 Use of Plant- Graders and road rollers Risk Assessment Templates.docx
14 Use of Plant- Graders and road rollers Risk Assessment Templates.docx
 
AWP Incident Investigation Document North America Market Issue 01 May 2015
AWP Incident Investigation Document North America Market  Issue 01  May 2015AWP Incident Investigation Document North America Market  Issue 01  May 2015
AWP Incident Investigation Document North America Market Issue 01 May 2015
 
AWP Incident Investigation Document North America Market Issue 01 May 2015
AWP Incident Investigation Document North America Market  Issue 01  May 2015AWP Incident Investigation Document North America Market  Issue 01  May 2015
AWP Incident Investigation Document North America Market Issue 01 May 2015
 
testing formats
testing formatstesting formats
testing formats
 
MADHU CV
MADHU CVMADHU CV
MADHU CV
 

Recently uploaded

Recently uploaded (20)

Gyanartha SciBizTech Quiz slideshare.pptx
Gyanartha SciBizTech Quiz slideshare.pptxGyanartha SciBizTech Quiz slideshare.pptx
Gyanartha SciBizTech Quiz slideshare.pptx
 
Operations Management - Book1.p - Dr. Abdulfatah A. Salem
Operations Management - Book1.p  - Dr. Abdulfatah A. SalemOperations Management - Book1.p  - Dr. Abdulfatah A. Salem
Operations Management - Book1.p - Dr. Abdulfatah A. Salem
 
size separation d pharm 1st year pharmaceutics
size separation d pharm 1st year pharmaceuticssize separation d pharm 1st year pharmaceutics
size separation d pharm 1st year pharmaceutics
 
Keeping Your Information Safe with Centralized Security Services
Keeping Your Information Safe with Centralized Security ServicesKeeping Your Information Safe with Centralized Security Services
Keeping Your Information Safe with Centralized Security Services
 
Post Exam Fun(da) Intra UEM General Quiz - Finals.pdf
Post Exam Fun(da) Intra UEM General Quiz - Finals.pdfPost Exam Fun(da) Intra UEM General Quiz - Finals.pdf
Post Exam Fun(da) Intra UEM General Quiz - Finals.pdf
 
50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...
50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...
50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...
 
....................Muslim-Law notes.pdf
....................Muslim-Law notes.pdf....................Muslim-Law notes.pdf
....................Muslim-Law notes.pdf
 
slides CapTechTalks Webinar May 2024 Alexander Perry.pptx
slides CapTechTalks Webinar May 2024 Alexander Perry.pptxslides CapTechTalks Webinar May 2024 Alexander Perry.pptx
slides CapTechTalks Webinar May 2024 Alexander Perry.pptx
 
How to Manage Notification Preferences in the Odoo 17
How to Manage Notification Preferences in the Odoo 17How to Manage Notification Preferences in the Odoo 17
How to Manage Notification Preferences in the Odoo 17
 
Word Stress rules esl .pptx
Word Stress rules esl               .pptxWord Stress rules esl               .pptx
Word Stress rules esl .pptx
 
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT VẬT LÝ 2024 - TỪ CÁC TRƯỜNG, TRƯ...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT VẬT LÝ 2024 - TỪ CÁC TRƯỜNG, TRƯ...TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT VẬT LÝ 2024 - TỪ CÁC TRƯỜNG, TRƯ...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT VẬT LÝ 2024 - TỪ CÁC TRƯỜNG, TRƯ...
 
Open Educational Resources Primer PowerPoint
Open Educational Resources Primer PowerPointOpen Educational Resources Primer PowerPoint
Open Educational Resources Primer PowerPoint
 
B.ed spl. HI pdusu exam paper-2023-24.pdf
B.ed spl. HI pdusu exam paper-2023-24.pdfB.ed spl. HI pdusu exam paper-2023-24.pdf
B.ed spl. HI pdusu exam paper-2023-24.pdf
 
“O BEIJO” EM ARTE .
“O BEIJO” EM ARTE                       .“O BEIJO” EM ARTE                       .
“O BEIJO” EM ARTE .
 
UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...
UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...
UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...
 
The Last Leaf, a short story by O. Henry
The Last Leaf, a short story by O. HenryThe Last Leaf, a short story by O. Henry
The Last Leaf, a short story by O. Henry
 
Morse OER Some Benefits and Challenges.pptx
Morse OER Some Benefits and Challenges.pptxMorse OER Some Benefits and Challenges.pptx
Morse OER Some Benefits and Challenges.pptx
 
factors influencing drug absorption-final-2.pptx
factors influencing drug absorption-final-2.pptxfactors influencing drug absorption-final-2.pptx
factors influencing drug absorption-final-2.pptx
 
Salient features of Environment protection Act 1986.pptx
Salient features of Environment protection Act 1986.pptxSalient features of Environment protection Act 1986.pptx
Salient features of Environment protection Act 1986.pptx
 
2024_Student Session 2_ Set Plan Preparation.pptx
2024_Student Session 2_ Set Plan Preparation.pptx2024_Student Session 2_ Set Plan Preparation.pptx
2024_Student Session 2_ Set Plan Preparation.pptx
 

Mcl sop (no.03)_-_permit_to_operate_ride-on_mobile_plant_(rev_b_aug_09)

  • 1. Ref : SOP 3 - PORMP Rev B Permit to Operate Ride-on Mobile Plant Contract No.: C Project Name: Daily Permit : W/C Monday Plant type: Make: Model: Serial No. / Vehicle ID Operator – Daily Plant Check & Briefing (Please enter either ( √ ) ( X ) or ( N/A ) In signing below I confirm that I have undertaken the following Monday Tuesday Wednesday Thursday Friday Saturday Sunday checks in accordance with the manufacturer’s instructions. Steering system Braking systems (e.g. operation of brakes & level of brake fluid) Seat & lap belts Tyres (e.g. condition & pressure) ROPS & FOPS (e.g. Roll-over & Falling object protection) O 360 vision (e.g. mirrors &/ or cctv) Lights & indicators Windscreen (e.g. visibility, washers & wipers) Hydraulic system (e.g. pipes, hoses, leaks & levels) Warning devices (e.g. horn, reversing alarms, flashing beacons & ASLI Safety devices (e.g. quick-hitch pins, PTO shaft guards & interlocks) Signature (Plant Operator / Designated ‘Key Holder’ if multi-user) Miller Construction – Daily Permit Issue (Please enter either ( √ ) ( X ) or ( N/A ) Daily traffic management briefing conducted ‘Permit to Disturb Ground’ issued ‘Authorised Plant Operator’ tabard & key issued Signature (Miller Construction Issuer) Daily Permit Closure ‘Authorised Plant Operator’ tabard & key returned Signature (Plant Operator / Designated ‘Key Holder’ if multi-user) Signature (Miller Construction Issuer) Key : √ : No defect X : Defect N/A : Not Applicable to this item of plant Details of defects, and remedial actions taken to rectify them, should be entered on Page 2 Page 1 of 2
  • 2. Ref : SOP 3 - PORMP Rev B Permit to Operate Ride-on Mobile Plant Monday Tuesday Wednesday Thursday Friday Saturday Sunday Print Name – Operator 2 Print Name – Operator 2 Print Name – Operator 2 Print Name – Operator 2 Print Name – Operator 2 Print Name – Operator 2 Print Name – Operator 2 Plant authorisation is a two stage process: 1. ‘Initial Authorisation’ - based on Signature – Operator 2 Signature – Operator 2 Signature – Operator 2 Signature – Operator 2 Signature – Operator 2 Signature – Operator 2 Signature – Operator 2 (i) card holding & (ii) demonstration of plant familiarisation; AND Print Name – Operator 3 Print Name – Operator 3 Print Name – Operator 3 Print Name – Operator 3 Print Name – Operator 3 Print Name – Operator 3 Print Name – Operator 3 2. ‘Daily Authorisation’ - based on (i) the Operator / Designated ‘Key Holder’ completing a daily plant Signature – Operator 3 Signature – Operator 3 Signature – Operator 3 Signature – Operator 3 Signature – Operator 3 Signature – Operator 3 Signature – Operator 3 check & (ii) Miller Construction providing a Daily Traffic Management briefing AND issuing Print Name – Operator 4 Print Name – Operator 4 Print Name – Operator 4 Print Name – Operator 4 Print Name – Operator 4 Print Name – Operator 4 Print Name – Operator 4 any appropriate Permit to Disturb Ground. Signature – Operator 4 Signature – Operator 4 Signature – Operator 4 Signature – Operator 4 Signature – Operator 4 Signature – Operator 4 Signature – Operator 4 Where there are multi-users of plant Print Name – Operator 5 Print Name – Operator 5 Print Name – Operator 5 Print Name – Operator 5 Print Name – Operator 5 Print Name – Operator 5 Print Name – Operator 5 ALL plant operators must attend the traffic management briefing for that day AND be briefed on the Signature – Operator 5 Signature – Operator 5 Signature – Operator 5 Signature – Operator 5 Signature – Operator 5 Signature – Operator 5 Signature – Operator 5 requirements of any relevant Permit to Disturb Ground. Remedial actions related to defects identified on Page 1: Multi-users of the item of plant identified on Page 1 should PRINT and SIGN their name opposite to confirm this has taken place. Operator’s declaration In signing opposite I confirm that I have received a traffic management briefing in relation to the relevant day and that I have been briefed on the requirements of any Permit to Dig applicable to my work. Page 2 of 2