MASTERING THE TEAM APPROACH
Dr. Sandra Palmer
6/28/2018
Dr. Sandra Palmer
Business Guru & Resultant
Above or Beyond
Dr. Leahcim Semaj
Quantum Transformation Psychologist
Above or Beyond
6/28/2018 www.ABOVEorBEYONDjm.com 3
What We Do
AN ORGANIZATION IS
A PERFECT SYSTEM
SHAPED TO BE WHAT IT IS
by the behaviours that are reinforced
This can be by
direct or indirect actions
intended or un-intended
actions
TEAM WORK
6/28/2018 www.ABOVEorBEYONDjm.com 7
Insert New Department
Acronyms Here
TEAM ACTIVITY
6/28/2018 www.ABOVEorBEYONDjm.com 8
The Newest Departments
• What does the
acronym stand for?
• What are the
objectives of the
department?
• What is the motto
of this
department?
6/28/2018www.ABOVEorBEYONDjm.com 9
The Secrets of Effective Team Building
• Rule # 1: The “TEAM” is Spiritually Significant
• Rule # 2: Understand The Definition of Team
• Rule # 3: Communication is The Life Blood of The Team
• Rule # 4: There Must be A Business Purpose
• Rule # 5: Emotionally Intelligent Teams Work Best
• Rule # 6: A Team Requires 10 Functions Covered
• Rule # 7: The 4 Team Working Styles
• Rule # 8: Working Through The 5 Stages Of Team Development
• Rule # 9: Work With The 7 Team-Building Functions
• Rule # 10: Avoid The Principal Destructive Functions
• Rule # 11: Teams Have Less Need For Managers and More For
Coaches and Leaders
6/28/2018 www.ABOVEorBEYONDjm.com 10
6/28/2018 www.ABOVEorBEYONDjm.com 11
Burn Your Boats
All Working Hard, But Not As A Team
6/28/2018 www.ABOVEorBEYONDjm.com 12
Rule # 1: The “TEAM” is
Spiritually Significant
• Jesus formed a team
–Even Jesus knew he could
not change the world by
himself
–You need to coordinate the
energies of a range of
complementary people
working towards the same
goal
6/28/2018 www.ABOVEorBEYONDjm.com 13
Jesus on Team Building
• He had a plan
–He had a clear picture of the big picture and
always gave his team clear instructions
• He trained his replacement
–He constantly reminded his team that
• “Greater things than I have done shall you do”
6/28/2018 www.ABOVEorBEYONDjm.com 14
Jesus: Lead by Example
• He set an example
–The team was shocked when he
took off his garment and washed
their feet
–His answer was simple,
• “I am doing this to set an example
for you”
6/28/2018 www.ABOVEorBEYONDjm.com 15
Jesus: Teams Should Have Fun
• He was constantly is a state of celebration
–His first “miracle” was turning water into wine (not
grape juice)
–He was always invited to parties and dinners
–The night before his arrest he gathers his staff to sing
and dine
–The constant message was
• “Why worry? Look at the flowers”
6/28/2018 www.ABOVEorBEYONDjm.com 16
The Outcome
6/28/2018
www.ABOVEorBEYONDjm.com
1
7
Rule # 2: Understand The
Definition of Team
• A group of interdependent
people
• They master effective
communication
• They are able to play a variety of
complementary roles
6/28/2018 www.ABOVEorBEYONDjm.com 18
Definition of Team
•They agree on a goal
•They accept that the
best way to achieve
this goal is to work
together
6/28/2018 www.ABOVEorBEYONDjm.com 19
Definition of Team
• They foresee each other’s needs
• They make useful suggestions to
each other
• They enhance each other’s strengths
• They compensate for each other’s
weaknesses
6/28/2018 www.ABOVEorBEYONDjm.com 20
Definition of Team
• The result of this
process is usually a
synergistic level of
increased efficiency and
productivity
6/28/2018 www.ABOVEorBEYONDjm.com 21
Rule #3
Communication
is The Life Blood of
The Team
Timely and Accurate
• People who have learned to
support and trust one
another share what they
know freely
• Pass on the information that
members need to operate
more effectively
6/28/2018 www.ABOVEorBEYONDjm.com 22
Rule # 4: There Must be A
Business Purpose
• Don’t assemble a
team unless it has a
real business
purpose that
requires diverse
skills and talents
6/28/2018 www.ABOVEorBEYONDjm.com 23
Rule # 5: Emotionally Intelligent Teams Work Best
• Our specie has
probably gone as
far as we can
based on
cognitive
Intelligence alone
• The rest of the
journey will
require greater
development of
Emotional
Intelligence
6/28/2018 www.ABOVEorBEYONDjm.com 24
6/28/2018 www.ABOVEorBEYONDjm.com 25
Communication & Conflict
6/28/2018 www.ABOVEorBEYONDjm.com 26
This talk/listen cycle helps
to keep BP evenly regulated
• When we speak our blood
pressure goes up
• When we are listening attentively
in a relaxed manner, blood
pressure usually falls
• Heart rate slows - below resting
level
6/28/2018 www.ABOVEorBEYONDjm.com 27
In periods of great stress
• communicating with others that pull us through
• renewing inner strength
• lifting our vision
• reaffirming the meaning of life
6/28/2018 www.ABOVEorBEYONDjm.com 28
• trustworthy
• likeable
• represent warmth
• represent comfort
• represent safety
For the message to get
through people must
believe that you are
29
This happens without words
We plug into
thousands of
preconscious cues.
30
The First Brain:
The Non-reasoning, Non-rational Part
• Seat of human emotion
• The brain stem
–Provide immediate
instinctual response
• Limbic system
–The emotional centre
6/28/2018 www.AboveorBeyondJM.com 31
The New Brain: The cerebral cortex
Seat of conscious thought
• Memory
• Language
• Creativity
• Decision making
6/28/2018 www.AboveorBeyondJM.com 32
To Get To The New Brain
•The message
must first pass
through the
first brain
6/28/2018 www.ABOVEorBEYONDjm.com 33
34
EFFECTIVE COMMUNICATION…
• is based on emotional impact
• we must be believed to have
impact
• ALL FIRST BRAIN
LIKABILITY IS THE SHORTEST
PATH
TO BELIEVABILITY AND TRUST
Good communications
means
• expressing yourself clearly
through verbal and non-
verbal language;
• listening so that you
understand what others are
saying
35
We spend
between 50% and
80% of our
waking hours
communicating
HOW MUCH TIME
DO YOU SPEND
COMMUNICATING?
36
COMMUNICATION IN A TEAM
There can’t be collaboration an
d support without
communication among the peo
ple in a group
37www.ABOVEorBEYONDjm.com6/28/2018
COMMUNICATING IN A TEAM
The way people communicate
with one another-in both
words and nonverbal clues-
Reflects how they feel about
working with one another
Builds (or detracts from) the
team's effectiveness
Good Communication
• Gives clear messages
• conducive to people working
productively and harmoniously
• without misunderstanding and misin
terpretation
39www.ABOVEorBEYONDjm.com6/28/2018
Good Communication
• As people on the team le
arn to take other mem
bers at face value
–they build trust and cre
dibility
40www.ABOVEorBEYONDjm.com6/28/2018
6/28/2018 www.ABOVEorBEYONDjm.com 41
The Twin Messages Are:
• 1. What you see is what is
there
• 2. What you hear is what is
meant
6/28/2018 www.ABOVEorBEYONDjm.com 42
The Spectrum of Communication
• Aggressiveness
• Assertiveness
• Responsiveness
• Non-assertiveness
6/28/2018 www.ABOVEorBEYONDjm.com 43
Team: Relationships
• Effective Teams
• Trusting
• Respectful
• Collaborative
• Supportive
• Ineffective Teams
• Suspicious and partisan
• Pragmatic, based on need or
liking
• Competitive
• Withholding
6/28/2018 www.ABOVEorBEYONDjm.com 44
Team: Information
• Effective Teams
• Flows freely up, down,
sideways
• Full sharing
• Open and honest
• Ineffective Teams
• Flows mainly down a weak
horizontally
• Hoarded, withheld
• Used to build power
• Incomplete, mixed messages
6/28/2018 www.ABOVEorBEYONDjm.com 45
Team: Conflict
• Effective Teams
• Regarded as natural
–even helpful
• On issues
–not persons
• Ineffective Teams
• Frowned on
– avoided
• Destructive
• Involves personal traits and
motives
6/28/2018 www.ABOVEorBEYONDjm.com 46
Team: Atmosphere
• Effective Teams
• Open
• Non-threatening
• Non-competitive
• Participative
• Ineffective Teams
• Compartmentalised
• Intimidating
• Guarded
• Fragmented
• Closed groups
Generations X,Y, Z
and the Others
Can You Gen-Flex?
6/28/2018 www.ABOVEorBEYONDjm.com 47
The 5 Generations
1922–1943
Traditionalists: 1922 – 1943
(over 70)
1944–1964
Baby Boomers: 1944 – 1964
(51– 70)
1965–1980
Generation X: 1965 – 1980
(35 – 50)
1981–1994
Generation Y: 1981 – 1994
(21 – 34)
1995
Generation Z: 1995 - ?
(Under 20)
6/28/2018 www.ABOVEorBEYONDjm.com 49
Intimacy and Communication
6/28/2018 www.ABOVEorBEYONDjm.com 50
6/28/2018 www.ABOVEorBEYONDjm.com 51
Rule # 4: There Must be A
Business Purpose
• Don’t assemble a
team unless it has a
real business
purpose that
requires diverse
skills and talents
6/28/2018 www.ABOVEorBEYONDjm.com 52
Teams With Purpose
• Usually prove successful
• If the team were given the authority to
–Reassign persons
–Realign channels of authority
–Redesign work spaces
–Choose new suppliers
• It might transform an organisation
6/28/2018 www.ABOVEorBEYONDjm.com 53
A Real Business Purpose
• Avoid the situation where teams are
assembled with the intent of being
fashionable
• Teams need specific problems to
solve or they flounder
6/28/2018 www.ABOVEorBEYONDjm.com 54
Remember:
A Committee is Not a Team
What is a committee?
•picked from the unfit
•to do the unnecessary
• Richard Harkness
A group of the unwilling
Rule # 5: Emotionally Intelligent Teams Work Best
• Our specie has
probably gone as
far as we can
based on
cognitive
Intelligence alone
• The rest of the
journey will
require greater
development of
Emotional
Intelligence
6/28/2018 www.ABOVEorBEYONDjm.com 56
6/28/2018 www.ABOVEorBEYONDjm.com 57
Emotional Intelligence (EQ)
• The ability to sense,
understand, and
effectively apply the
power and acumen of
emotions
–as a source of human
energy, information, trust,
creativity and influence
6/28/2018 www.ABOVEorBEYONDjm.com 58
The Case For EQ
6/28/2018 www.AboveorBeyondJM 59
The Emotions of
oEmpathy, Compassion,
Cooperation, and
Forgiveness
oAll have the potential to
unite us as a species
6/28/2018 60
Generally Speaking:
oEmotions unite us
oBeliefs divide us
6/28/2018 61
Dr. Maya
Angelou
6/28/2018
62
Emotional Intelligence
6/28/2018 www.AboveorBeyondJM 63
Survival
• Nature developed our emotions over millions
of years of evolution
• Result
• Our emotions have the potential to serve us
today as a delicate and sophisticated internal
guidance system
6/28/2018 www.ABOVEorBEYONDjm.com 64
6/28/2018 www.ABOVEorBEYONDjm.com 65
Theme Song for Your Department/ Company
6/28/2018 www.ABOVEorBEYONDjm.com 66
Now to
Rule #6
Yes We Can!
6/28/2018 www.AboveorBeyondJM.com 67
Rule # 6: A Team Requires
10 Functions to be Covered
•A variety of functions
are required for a
operate optimally
• Visionary
• Pragmatist
• Explorer
• Challenger
• Referee
• Peacemaker
• Beaver
• Coach
• Librarian
• Confessor
6/28/2018 www.ABOVEorBEYONDjm.com 68
6/28/2018 www.ABOVEorBEYONDjm.com 69
Visionary
• Should be one or more in the
team able to see beyond the
team's own requirements
6/28/2018 www.ABOVEorBEYONDjm.com 70
Pragmatists
• Acts as foil to
the visionary
and his or her
supporters
6/28/2018 www.ABOVEorBEYONDjm.com 71
Explorer
• Seeks information,
material and
support from
outside the team
environment
6/28/2018 www.ABOVEorBEYONDjm.com 72
Challengers
•There will always
be somebody who
challenges the
accepted position
6/28/2018 www.ABOVEorBEYONDjm.com 73
Referee
•Takes as near an
independent view of
team progress and
decisions as is
possible
6/28/2018 www.ABOVEorBEYONDjm.com 74
Peacemaker
• The team will have friction
between its individual members
from time to time
6/28/2018 www.ABOVEorBEYONDjm.com 75
Beaver
• Does all the work!
• The worker bee
• The soldier ant
• The company worker
• The Mr./Ms fix it
6/28/2018 www.ABOVEorBEYONDjm.com 76
Coach
• Morale is not always going to be the
high in a team, even in the best-led
groups
• There will be times when the team
loses its direction or loses its own
focus of its mission
6/28/2018 www.ABOVEorBEYONDjm.com 77
Librarians
• The librarian is the
repository to which
team members can
go for historical
information about
what the team has
been doing
6/28/2018 www.ABOVEorBEYONDjm.com 78
The Confessor
• There is a need for someone
to whom members can tell all
their troubles
• A shoulder to cry on
• A priest to whom to confess
Rule #7:
The 4 Team Working Styles
It doesn’t help if everyone thinks the
same way.
Carson Tate, Harvard Business Review
April, 2015
6/28/2018 www.ABOVEorBEYONDjm.com 79
The Power of Diversity
Most leaders now
recognize that the
best teams leverage
diversity to achieve
long-term success.
01
Many think about it
in pretty narrow
terms:
• gender, ethnicity,
religion, sexual
orientation, and/or age.
02
Sometimes they also
consider
organizational
attributes, like
function or rank.
03
Differing
Work Styles
Can Help
Team
Performance
• But there’s another kind of
diversity that might be even
more helpful:
–differences in work style
–or the way in which we
think about, organize, and
complete tasks.
Sameness Sucks!
• When members of a team, or leaders of an
organization, all have the same style, you’ll quickly
run into trouble.
6/28/2018 www.ABOVEorBEYONDjm.com 82
For example,
• if everyone in your group has a big-picture, strategic,
intuitive approach to work and chafes against the structure
of project plans, you might frequently be over budget and
behind schedule.
• Or, if everyone has a linear, analytical, and planned
approach to work and dislikes disruption, innovative new
product development would be impossible.
6/28/2018 www.ABOVEorBEYONDjm.com 83
Promoting And Leveraging
Work-style Diversity?
6/28/2018 www.ABOVEorBEYONDjm.com 84
Observe your team members
• In poker, they call them tells — betting patterns or unconscious
behavior you can use to guess your opponent’s hand.
• The same rules apply to work style.
• To evaluate a report or colleague, think about the following
questions:
– Does she consistently complete work early, in advance of deadlines or
wait until the last minute?
– Does he send emails with only a few words or write novels?
– Does she gesture and use her hands while talking?
– Or is she more controlled and stoic in their movements?
6/28/2018 www.ABOVEorBEYONDjm.com 85
Team Work Styles
• These tells, both subtle and overt, will give you clues
as to someone’s work style.
• You might also try to take this quick assessment from
the perspective of each team member.
• Because work styles are fairly ingrained,
– recruitment, not development, is the best way to build diversity in
a group.
– If you find that one or two work styles are overrepresented, it’s
probably time to add some fresh blood to your team.
6/28/2018 www.ABOVEorBEYONDjm.com 86
Leverage Everyone’s
Strengths
• DATA
– Your logical, analytical colleague is
at her best when she is processing
data and solving complex problems.
– She will focus like a laser on
achieving any stated goal or
outcome and will ensure that you
stay on budget.
6/28/2018 87
Leverage Everyone’s
Strengths
• DETAIL
– Your organized, detail oriented
colleague’s strengths are in
establishing order, structuring
projects, and accurately completing
tasks.
– He will ensure work is completed on
time.
6/28/2018 88
Leverage everyone’s
strengths
• EMOTIONAL
– Your supportive, expressive
colleague is most skilled at building
relationships, facilitating team
interaction, and persuading or
selling ideas.
– She will keep all stakeholders up to
date on work and effectively
communicate ideas through the
organization.
6/28/2018 89
Leverage everyone’s
strengths
• IDEA
– Your big-picture, integrative
colleague can serve as a catalyst for
change, brainstorming solutions to
problems and synthesizing
disparate thinking.
– He will drive innovation, ensure
variety in both thought and
execution and keep you moving
forward.
6/28/2018 90
Rule # 8: You Must Work Through The 5
Stages Of Team Development
6/28/2018 www.ABOVEorBEYONDjm.com 91
Forming
Storming
TransformingNorming
Performing
Where Are You
in The Stages
of
Team
Development?
Jamaica’s Greatest Team Achievement
6/28/2018 www.ABOVEorBEYONDjm.com 93
FORMING
• The start-up stage
• Purpose and expectation unclear
94www.ABOVEorBEYONDjm.com6/28/2018
Members Test the Waters to Determine
–Acceptable behavior
–The nature of their task
–How the group will get its work done
–They want to be told what to do
–Interactions are superficial
–Tend to be directed to the formal leader
95www.ABOVEorBEYONDjm.com6/28/2018
STORMING
• This stage is characterized by con
flict and resistance to the group
’s task and structure
• Team members express conce
rns and frustrations
• Freely exchange ideas and opinio
ns
96www.ABOVEorBEYONDjm.com6/28/2018
STORMING
97www.ABOVEorBEYONDjm.com6/28/2018
• Team is learning to
deal with
differences in order
to work together to
meet its goals
• A team that
doesn’t get
through this stage
successfully is
usually more
divided and less
creative
6/28/2018 www.AboveorBeyond.com 98
NORMING STAGE
• A sense of group cohesion
develops in this stage
6/28/2018 www.AboveorBeyond.com 99
NORMING
• Members accept the team and develop norms for
resolving conflict, making decisions, and completing
assignments
• Members enjoy meetings and freely exchange
information
• Shared leadership emerges
• Risk of stagnating into groupthink
6/28/2018 www.AboveorBeyond.com 100
PERFORMING STAGE
• Now team work really begin
•This is the payoff stage
6/28/2018 www.AboveorBeyond.com 101
Performing
• Team has structure and purpose
• Ready to tackle task
• Members take initiative
• Problem-solving and decision-making procedures
emphasize results
6/28/2018 www.AboveorBeyond.com 102
As the Team GELLS
• It receives recognition from
other parts of the organization
• Complacency is a risk
• May show up in missed
deadlines or a lack of creative
spark
• The bad habits of earlier stages
may reappear
6/28/2018 www.ABOVEorBEYONDjm.com 103
Rule # 9:
The Basic Team-Building Functions
• SUPPORTING
• GATEKEEPING
• HARMONIZING
• PROCESS OBSERVING
• CONFRONTING
• MEDIATING
• SUMMARIZING
6/28/2018 www.ABOVEorBEYONDjm.com 104
Rule # 9:
More Critical Team-Building Functions
•Trust
•Respect
•Confidentiality
•Accountability
6/28/2018 www.ABOVEorBEYONDjm.com 105
Trust
6/28/2018www.LTSemaj.com 106
13 Behaviors of High-Trust Teams
1. Talk Straight
2. Demonstrate Respect
3. Create Transparency
4. Right Wrongs
5. Show Loyalty
6. Deliver Results
7. Get Better
8. Confront Reality
9. Clarify Expectation
10. Practice Accountability
11. Listen First
12. Keep Commitments
13. Extend Trust
6/28/2018www.LTSemaj.com 107
The Four
Elements of
Trust – The
ABCD Model
Able,
Believable,
Connected,
Dependable
6/28/2018 www.LTSemaj.com 108
1 - Able
is about demonstrating competence.
Do team members know how to get the job done?
Are they able to produce results?
Do they have the skills to make things happen—including
knowing the organization and equipping people with the
resources and information they need to get their job done?
6/28/2018 www.ABOVEorBEYONDjm.com 109
2 - Believable
Acting with integrity.
Honest in their dealings
with people.
Creating and following
fair processes.
People need to feel
that they are being
treated equitably.
Acting in a consistent,
values-driven manner
that reassures all that
they can rely on their
team members.
6/28/2018 www.LTSemaj.com 110
3 – Connected
Demonstrating care and
concern for other
people.
Focusing on people and
identifying their needs.
This is supported by
good communication
skills.
Share information about
the organization and
about self.
When people share a
little bit of information
about themselves, it
creates a sense of
connection.
6/28/2018 www.LTSemaj.com 111
4 - Dependable
• is about reliably
following through on
what the team say that
they are going to do.
– © 2010 The Ken Blanchard Companies
6/28/2018 112
Eight Things Your Organization Can Do
to Improve Trust
Demonstrating Trust—If you want to create a trusting work environment, you have to begin
by demonstrating trust.Demonstrating
Sharing Information—Information is power.Sharing
Telling It Straight—Study after study has indicated that the number one quality that people
want in a leader is integrity.Telling
Providing Opportunities for Everyone to Win—Do you want your people to work together or
to compete against each other?Providing
Eight Things Your Organization Can Do
to Improve Trust
5. Providing Feedback—Make sure leaders schedule and hold regular progress-check meetings with
their direct reports.
6. Resolving Concerns Head On—Resolve concerns head on by putting challenges on the table
and giving people an opportunity to influence the process.
7. Admitting Mistakes—An apology can be an effective way to correct a mistake and restore
the trust needed for a good relationship.
8. Walking the Talk—A leader, above all, has to be a walking example of the vision and values
of the organization.
© 2010 The Ken Blanchard Companies
6/28/2018 www.LTSemaj.com 114
How to Build a Culture of Trust:
Defining Your Strategy
1. Client focus: you need your employees to believe in the
mantra that you're not in business solely to make money, but
actually to help your customer. Money is a byproduct of
success, not the other way around.
2. Collaborative: don't instinctively lead with what you think
should be done or what your competitors aren't doing. Make it
work like any team, and show customers that you want to work
together to reach the best solution.
6/28/2018 www.LTSemaj.com 115
How to Build a Culture of Trust:
Defining Your Strategy
3. Transparency: if you want trust, you can't keep secrets from others. One
of the buzzwords of President Barack Obama's campaign in 2008
was "transparency," as it stresses being open and visible without hidden
agendas.
4. Timeframe: perhaps the most important measurement, you need to be
thinking about your business in terms of relationships and not simple
transactions.
• You think about your business in a more medium- to long-term
perspective, with an ongoing, ever-flowing cycle, you're developing a
relationship of trust. Charles H. Green, founder and CEO of Trusted Advisors Associates,.
6/28/2018 www.LTSemaj.com 116
How to Build a Culture of Trust:
Implementing the Strategy
Capability trust, or allowing people to make decisions, involving them
in discussions, and trusting that their opinions and input will be useful.
Contractual trust, or being consistent in terms of keeping agreements
and managing expectations.
Communication trust, or sharing information, providing constructive
feedback and speaking with good purpose about people.
Lou Dubois - http://www.inc.com/guides/2010/08/how-to-build-a-corporate-culture-of-trust.html
6/28/2018www.LTSemaj.com 118
Accountability
6/28/2018www.LTSemaj.com 120
6/28/2018www.LTSemaj.com 121
7 Ways to Build An Accountable Organization
1. Clear roles, team leadership and individual ownership.
2. A sense of ownership for team results.
3. Freedom, support and control to navigate competing priorities
4. It’s not about punishment.
5. It’s about improvement.
6. The expectation of evaluation.
7. Integrity counts.
Accountability Is Simple
6/28/2018www.LTSemaj.com 123
6/28/2018www.LTSemaj.com 124
6/28/2018www.LTSemaj.com 125
6/28/2018www.LTSemaj.com 126
6/28/2018www.LTSemaj.com 127
Confidentiality
6/28/2018www.LTSemaj.com 129
6/28/2018 www.AboveorBandJM.com 130
Confidentiality
Rule # 10: Avoid The Principal
Destructive Functions
• Shutting off
• Analysing or Labelling
• Dominating
• Yes-butting
• Naysaying
6/28/2018 www.ABOVEorBEYONDjm.com 132
6/28/2018 www.ABOVEorBEYONDjm.com 133
Rule # 11:
Teams Have Less Need For Managers and
More For Coaches and Leaders
• Coaches help teams solve problems
• Old Order bosses design and allocate
work, supervise, check, monitor and
control
• Teams do these things for
themselves
6/28/2018 www.ABOVEorBEYONDjm.com 134
LET'S GET RID OF
MANAGEMENT
People don't want to be managed,
They want to be led.
Whoever heard of a world manager?
World leader, yes
Educational leader Political leader
Religious leader Scout leader
Community leader Labour leader
Business leader Gang Leader
They lead
They don't manage
6/28/2018 135
Moses
•Did he
manage
•Or lead?
6/28/2018 www.ABOVEorBEYONDjm.com 136
THE CARROT ALWAYS WINS OVER THE STICK
• Ask your horse
–You can lead your
horse to water,
• But you can't manage
him to drink
6/28/2018 www.ABOVEorBEYONDjm.com 137
www.LTSemaj.com 138
IF YOU WANT TO MANAGE SOMEBODY,
•Manage yourself
• Do that well and you'll be
ready to stop managing
•And start leading
6/28/2018 www.ABOVEorBEYONDjm.com 138
Teams
•No one is
smarter
than a
team
6/28/2018 139
6/28/2018 www.ABOVEorBEYONDjm.com 140
WHAT IS YOUR POSITION?
6/28/2018 www.ABOVEorBEYONDjm.com 141www.jobbank-ja.com 141
What’s Your Position?
• Up until recently, John Brown worked with Big Timers
International.
– He had worked there for over 20 years
• He used to have a very good income and many benefits
including medical insurance that allowed for treatments
overseas
• His post was made redundant
• Now his family is in crisis
• They are living very marginally as he has not been able to secure
another job and his wife has not been able to work
6/28/2018 www.ABOVEorBEYONDjm.com 142
What’s Your Position?
• She is very ill and needs to have treatments and medication that
is very costly
• Her monthly bill for medicine alone is over J$40,000.00
• They have no health insurance
• She has run out of medication
• John breaks into a pharmacy and steals the medication for his
wife
• He is arrested and charged as he was caught on the security
cameras
• If found guilty, he will be sentenced to 6 years hard labour.
6/28/2018 www.ABOVEorBEYONDjm.com 143
What’s Your Position?
• Do you agree with this?
• Be prepared to argue your point
–Strongly Agree
–Somewhat Agree
–Disagree
–Strongly Disagree
• The participants are allowed to choose their side
and to discuss why they have taken that posture
6/28/2018 www.ABOVEorBEYONDjm.com 144www.jobbank-ja.com 144
What’s Your Position?
• Phase Two:
• You are now the members of the jury and
must arrive at a unanimous decision, the
verdict on this case
–Guilty or Not Guilty
• You must also decide the punishment
6/28/2018 www.ABOVEorBEYONDjm.com 145www.jobbank-ja.com 145
WHAT IS YOUR POSITION?
6/28/2018 www.ABOVEorBEYONDjm.com 146www.jobbank-ja.com 146
A manifesto
for small
teams doing
important
work
6/28/2018 www.ABOVEorBEYONDjm.com 147
We are always under tight deadlines, because time
is our most valuable asset.
If you make a promise, set a date. No date, no
promise.
If you set a date, meet it.
If you can't make a date, tell us early and often.
Plan B well prepared is a better strategy than hope.
Clean up your own mess.
Clean up other people's messes.
A manifesto
for small
teams doing
important
work
6/28/2018 www.ABOVEorBEYONDjm.com 148
Overcommunicate.
Question premises and strategy.
Don't question goodwill, effort or intent.
"I'll know it when I see it," is not a professional thing to say.
Describing and discussing in the abstract is what we do.
Big projects are not nearly as important
as scary commitments.
Seth Godin, Feb 18, 2016
A manifesto
for small
teams doing
important
work
6/28/2018 www.ABOVEorBEYONDjm.com 149
If what you're working on right now doesn't matter to the
mission, help someone else with their work.
Make mistakes, own them, fix them, share the learning.
Cheap, reliable, public software might be boring, but it's
usually better. Because it's cheap and reliable.
Yesterday's hierarchy is not nearly as important as today's
project structure.
Lock in the things that must be locked in, leave the
implementation loose until you figure out how it can get
done.
A manifesto
for small
teams doing
important
work
6/28/2018 www.ABOVEorBEYONDjm.com 150
Mostly, we do things that haven't been done before, so
don't be surprised when you're surprised.
Care more.
If an outsider can do it faster and cheaper than we can,
don't hesitate.
Always be seeking outside resources. A better rolodex is
better, even if we don't have rolodexes any more.
Talk to everyone as if they were your boss, your
customer, the founder, your employee. It's all the same.
It works because it's personal.
Your Action Plan:
Time
Frame YOU
Your
Team
Immediately
Next 4 Weeks
Next 4 Months
6/28/2018 www.ABOVEorBEYONDjm.com 151
Dr. Sandra Palmer
Business Guru & Resultant
Above or Beyond
www.AboveorBeyondJM.com
6/28/2018 www.AboveorBeyond.com 153
DEAL?
6/28/2018 www.AboveorBeyonfJM.com 154

Mastering the team approach haj-jun2018

  • 1.
    MASTERING THE TEAMAPPROACH Dr. Sandra Palmer 6/28/2018
  • 2.
    Dr. Sandra Palmer BusinessGuru & Resultant Above or Beyond
  • 3.
    Dr. Leahcim Semaj QuantumTransformation Psychologist Above or Beyond 6/28/2018 www.ABOVEorBEYONDjm.com 3
  • 4.
  • 5.
    AN ORGANIZATION IS APERFECT SYSTEM SHAPED TO BE WHAT IT IS by the behaviours that are reinforced This can be by direct or indirect actions intended or un-intended actions
  • 6.
  • 7.
  • 8.
    Insert New Department AcronymsHere TEAM ACTIVITY 6/28/2018 www.ABOVEorBEYONDjm.com 8
  • 9.
    The Newest Departments •What does the acronym stand for? • What are the objectives of the department? • What is the motto of this department? 6/28/2018www.ABOVEorBEYONDjm.com 9
  • 10.
    The Secrets ofEffective Team Building • Rule # 1: The “TEAM” is Spiritually Significant • Rule # 2: Understand The Definition of Team • Rule # 3: Communication is The Life Blood of The Team • Rule # 4: There Must be A Business Purpose • Rule # 5: Emotionally Intelligent Teams Work Best • Rule # 6: A Team Requires 10 Functions Covered • Rule # 7: The 4 Team Working Styles • Rule # 8: Working Through The 5 Stages Of Team Development • Rule # 9: Work With The 7 Team-Building Functions • Rule # 10: Avoid The Principal Destructive Functions • Rule # 11: Teams Have Less Need For Managers and More For Coaches and Leaders 6/28/2018 www.ABOVEorBEYONDjm.com 10
  • 11.
  • 12.
    All Working Hard,But Not As A Team 6/28/2018 www.ABOVEorBEYONDjm.com 12
  • 13.
    Rule # 1:The “TEAM” is Spiritually Significant • Jesus formed a team –Even Jesus knew he could not change the world by himself –You need to coordinate the energies of a range of complementary people working towards the same goal 6/28/2018 www.ABOVEorBEYONDjm.com 13
  • 14.
    Jesus on TeamBuilding • He had a plan –He had a clear picture of the big picture and always gave his team clear instructions • He trained his replacement –He constantly reminded his team that • “Greater things than I have done shall you do” 6/28/2018 www.ABOVEorBEYONDjm.com 14
  • 15.
    Jesus: Lead byExample • He set an example –The team was shocked when he took off his garment and washed their feet –His answer was simple, • “I am doing this to set an example for you” 6/28/2018 www.ABOVEorBEYONDjm.com 15
  • 16.
    Jesus: Teams ShouldHave Fun • He was constantly is a state of celebration –His first “miracle” was turning water into wine (not grape juice) –He was always invited to parties and dinners –The night before his arrest he gathers his staff to sing and dine –The constant message was • “Why worry? Look at the flowers” 6/28/2018 www.ABOVEorBEYONDjm.com 16
  • 17.
  • 18.
    Rule # 2:Understand The Definition of Team • A group of interdependent people • They master effective communication • They are able to play a variety of complementary roles 6/28/2018 www.ABOVEorBEYONDjm.com 18
  • 19.
    Definition of Team •Theyagree on a goal •They accept that the best way to achieve this goal is to work together 6/28/2018 www.ABOVEorBEYONDjm.com 19
  • 20.
    Definition of Team •They foresee each other’s needs • They make useful suggestions to each other • They enhance each other’s strengths • They compensate for each other’s weaknesses 6/28/2018 www.ABOVEorBEYONDjm.com 20
  • 21.
    Definition of Team •The result of this process is usually a synergistic level of increased efficiency and productivity 6/28/2018 www.ABOVEorBEYONDjm.com 21
  • 22.
    Rule #3 Communication is TheLife Blood of The Team Timely and Accurate • People who have learned to support and trust one another share what they know freely • Pass on the information that members need to operate more effectively 6/28/2018 www.ABOVEorBEYONDjm.com 22
  • 23.
    Rule # 4:There Must be A Business Purpose • Don’t assemble a team unless it has a real business purpose that requires diverse skills and talents 6/28/2018 www.ABOVEorBEYONDjm.com 23
  • 24.
    Rule # 5:Emotionally Intelligent Teams Work Best • Our specie has probably gone as far as we can based on cognitive Intelligence alone • The rest of the journey will require greater development of Emotional Intelligence 6/28/2018 www.ABOVEorBEYONDjm.com 24
  • 25.
  • 26.
    Communication & Conflict 6/28/2018www.ABOVEorBEYONDjm.com 26
  • 27.
    This talk/listen cyclehelps to keep BP evenly regulated • When we speak our blood pressure goes up • When we are listening attentively in a relaxed manner, blood pressure usually falls • Heart rate slows - below resting level 6/28/2018 www.ABOVEorBEYONDjm.com 27
  • 28.
    In periods ofgreat stress • communicating with others that pull us through • renewing inner strength • lifting our vision • reaffirming the meaning of life 6/28/2018 www.ABOVEorBEYONDjm.com 28
  • 29.
    • trustworthy • likeable •represent warmth • represent comfort • represent safety For the message to get through people must believe that you are 29
  • 30.
    This happens withoutwords We plug into thousands of preconscious cues. 30
  • 31.
    The First Brain: TheNon-reasoning, Non-rational Part • Seat of human emotion • The brain stem –Provide immediate instinctual response • Limbic system –The emotional centre 6/28/2018 www.AboveorBeyondJM.com 31
  • 32.
    The New Brain:The cerebral cortex Seat of conscious thought • Memory • Language • Creativity • Decision making 6/28/2018 www.AboveorBeyondJM.com 32
  • 33.
    To Get ToThe New Brain •The message must first pass through the first brain 6/28/2018 www.ABOVEorBEYONDjm.com 33
  • 34.
    34 EFFECTIVE COMMUNICATION… • isbased on emotional impact • we must be believed to have impact • ALL FIRST BRAIN LIKABILITY IS THE SHORTEST PATH TO BELIEVABILITY AND TRUST
  • 35.
    Good communications means • expressingyourself clearly through verbal and non- verbal language; • listening so that you understand what others are saying 35
  • 36.
    We spend between 50%and 80% of our waking hours communicating HOW MUCH TIME DO YOU SPEND COMMUNICATING? 36
  • 37.
    COMMUNICATION IN ATEAM There can’t be collaboration an d support without communication among the peo ple in a group 37www.ABOVEorBEYONDjm.com6/28/2018
  • 38.
    COMMUNICATING IN ATEAM The way people communicate with one another-in both words and nonverbal clues- Reflects how they feel about working with one another Builds (or detracts from) the team's effectiveness
  • 39.
    Good Communication • Givesclear messages • conducive to people working productively and harmoniously • without misunderstanding and misin terpretation 39www.ABOVEorBEYONDjm.com6/28/2018
  • 40.
    Good Communication • Aspeople on the team le arn to take other mem bers at face value –they build trust and cre dibility 40www.ABOVEorBEYONDjm.com6/28/2018
  • 41.
    6/28/2018 www.ABOVEorBEYONDjm.com 41 TheTwin Messages Are: • 1. What you see is what is there • 2. What you hear is what is meant
  • 42.
    6/28/2018 www.ABOVEorBEYONDjm.com 42 TheSpectrum of Communication • Aggressiveness • Assertiveness • Responsiveness • Non-assertiveness
  • 43.
    6/28/2018 www.ABOVEorBEYONDjm.com 43 Team:Relationships • Effective Teams • Trusting • Respectful • Collaborative • Supportive • Ineffective Teams • Suspicious and partisan • Pragmatic, based on need or liking • Competitive • Withholding
  • 44.
    6/28/2018 www.ABOVEorBEYONDjm.com 44 Team:Information • Effective Teams • Flows freely up, down, sideways • Full sharing • Open and honest • Ineffective Teams • Flows mainly down a weak horizontally • Hoarded, withheld • Used to build power • Incomplete, mixed messages
  • 45.
    6/28/2018 www.ABOVEorBEYONDjm.com 45 Team:Conflict • Effective Teams • Regarded as natural –even helpful • On issues –not persons • Ineffective Teams • Frowned on – avoided • Destructive • Involves personal traits and motives
  • 46.
    6/28/2018 www.ABOVEorBEYONDjm.com 46 Team:Atmosphere • Effective Teams • Open • Non-threatening • Non-competitive • Participative • Ineffective Teams • Compartmentalised • Intimidating • Guarded • Fragmented • Closed groups
  • 47.
    Generations X,Y, Z andthe Others Can You Gen-Flex? 6/28/2018 www.ABOVEorBEYONDjm.com 47
  • 48.
    The 5 Generations 1922–1943 Traditionalists:1922 – 1943 (over 70) 1944–1964 Baby Boomers: 1944 – 1964 (51– 70) 1965–1980 Generation X: 1965 – 1980 (35 – 50) 1981–1994 Generation Y: 1981 – 1994 (21 – 34) 1995 Generation Z: 1995 - ? (Under 20)
  • 49.
  • 50.
    Intimacy and Communication 6/28/2018www.ABOVEorBEYONDjm.com 50
  • 51.
  • 52.
    Rule # 4:There Must be A Business Purpose • Don’t assemble a team unless it has a real business purpose that requires diverse skills and talents 6/28/2018 www.ABOVEorBEYONDjm.com 52
  • 53.
    Teams With Purpose •Usually prove successful • If the team were given the authority to –Reassign persons –Realign channels of authority –Redesign work spaces –Choose new suppliers • It might transform an organisation 6/28/2018 www.ABOVEorBEYONDjm.com 53
  • 54.
    A Real BusinessPurpose • Avoid the situation where teams are assembled with the intent of being fashionable • Teams need specific problems to solve or they flounder 6/28/2018 www.ABOVEorBEYONDjm.com 54
  • 55.
    Remember: A Committee isNot a Team What is a committee? •picked from the unfit •to do the unnecessary • Richard Harkness A group of the unwilling
  • 56.
    Rule # 5:Emotionally Intelligent Teams Work Best • Our specie has probably gone as far as we can based on cognitive Intelligence alone • The rest of the journey will require greater development of Emotional Intelligence 6/28/2018 www.ABOVEorBEYONDjm.com 56
  • 57.
  • 58.
    Emotional Intelligence (EQ) •The ability to sense, understand, and effectively apply the power and acumen of emotions –as a source of human energy, information, trust, creativity and influence 6/28/2018 www.ABOVEorBEYONDjm.com 58
  • 59.
    The Case ForEQ 6/28/2018 www.AboveorBeyondJM 59
  • 60.
    The Emotions of oEmpathy,Compassion, Cooperation, and Forgiveness oAll have the potential to unite us as a species 6/28/2018 60
  • 61.
    Generally Speaking: oEmotions uniteus oBeliefs divide us 6/28/2018 61
  • 62.
  • 63.
  • 64.
    Survival • Nature developedour emotions over millions of years of evolution • Result • Our emotions have the potential to serve us today as a delicate and sophisticated internal guidance system 6/28/2018 www.ABOVEorBEYONDjm.com 64
  • 65.
  • 66.
    Theme Song forYour Department/ Company 6/28/2018 www.ABOVEorBEYONDjm.com 66
  • 67.
    Now to Rule #6 YesWe Can! 6/28/2018 www.AboveorBeyondJM.com 67
  • 68.
    Rule # 6:A Team Requires 10 Functions to be Covered •A variety of functions are required for a operate optimally • Visionary • Pragmatist • Explorer • Challenger • Referee • Peacemaker • Beaver • Coach • Librarian • Confessor 6/28/2018 www.ABOVEorBEYONDjm.com 68
  • 69.
    6/28/2018 www.ABOVEorBEYONDjm.com 69 Visionary •Should be one or more in the team able to see beyond the team's own requirements
  • 70.
    6/28/2018 www.ABOVEorBEYONDjm.com 70 Pragmatists •Acts as foil to the visionary and his or her supporters
  • 71.
    6/28/2018 www.ABOVEorBEYONDjm.com 71 Explorer •Seeks information, material and support from outside the team environment
  • 72.
    6/28/2018 www.ABOVEorBEYONDjm.com 72 Challengers •Therewill always be somebody who challenges the accepted position
  • 73.
    6/28/2018 www.ABOVEorBEYONDjm.com 73 Referee •Takesas near an independent view of team progress and decisions as is possible
  • 74.
    6/28/2018 www.ABOVEorBEYONDjm.com 74 Peacemaker •The team will have friction between its individual members from time to time
  • 75.
    6/28/2018 www.ABOVEorBEYONDjm.com 75 Beaver •Does all the work! • The worker bee • The soldier ant • The company worker • The Mr./Ms fix it
  • 76.
    6/28/2018 www.ABOVEorBEYONDjm.com 76 Coach •Morale is not always going to be the high in a team, even in the best-led groups • There will be times when the team loses its direction or loses its own focus of its mission
  • 77.
    6/28/2018 www.ABOVEorBEYONDjm.com 77 Librarians •The librarian is the repository to which team members can go for historical information about what the team has been doing
  • 78.
    6/28/2018 www.ABOVEorBEYONDjm.com 78 TheConfessor • There is a need for someone to whom members can tell all their troubles • A shoulder to cry on • A priest to whom to confess
  • 79.
    Rule #7: The 4Team Working Styles It doesn’t help if everyone thinks the same way. Carson Tate, Harvard Business Review April, 2015 6/28/2018 www.ABOVEorBEYONDjm.com 79
  • 80.
    The Power ofDiversity Most leaders now recognize that the best teams leverage diversity to achieve long-term success. 01 Many think about it in pretty narrow terms: • gender, ethnicity, religion, sexual orientation, and/or age. 02 Sometimes they also consider organizational attributes, like function or rank. 03
  • 81.
    Differing Work Styles Can Help Team Performance •But there’s another kind of diversity that might be even more helpful: –differences in work style –or the way in which we think about, organize, and complete tasks.
  • 82.
    Sameness Sucks! • Whenmembers of a team, or leaders of an organization, all have the same style, you’ll quickly run into trouble. 6/28/2018 www.ABOVEorBEYONDjm.com 82
  • 83.
    For example, • ifeveryone in your group has a big-picture, strategic, intuitive approach to work and chafes against the structure of project plans, you might frequently be over budget and behind schedule. • Or, if everyone has a linear, analytical, and planned approach to work and dislikes disruption, innovative new product development would be impossible. 6/28/2018 www.ABOVEorBEYONDjm.com 83
  • 84.
    Promoting And Leveraging Work-styleDiversity? 6/28/2018 www.ABOVEorBEYONDjm.com 84
  • 85.
    Observe your teammembers • In poker, they call them tells — betting patterns or unconscious behavior you can use to guess your opponent’s hand. • The same rules apply to work style. • To evaluate a report or colleague, think about the following questions: – Does she consistently complete work early, in advance of deadlines or wait until the last minute? – Does he send emails with only a few words or write novels? – Does she gesture and use her hands while talking? – Or is she more controlled and stoic in their movements? 6/28/2018 www.ABOVEorBEYONDjm.com 85
  • 86.
    Team Work Styles •These tells, both subtle and overt, will give you clues as to someone’s work style. • You might also try to take this quick assessment from the perspective of each team member. • Because work styles are fairly ingrained, – recruitment, not development, is the best way to build diversity in a group. – If you find that one or two work styles are overrepresented, it’s probably time to add some fresh blood to your team. 6/28/2018 www.ABOVEorBEYONDjm.com 86
  • 87.
    Leverage Everyone’s Strengths • DATA –Your logical, analytical colleague is at her best when she is processing data and solving complex problems. – She will focus like a laser on achieving any stated goal or outcome and will ensure that you stay on budget. 6/28/2018 87
  • 88.
    Leverage Everyone’s Strengths • DETAIL –Your organized, detail oriented colleague’s strengths are in establishing order, structuring projects, and accurately completing tasks. – He will ensure work is completed on time. 6/28/2018 88
  • 89.
    Leverage everyone’s strengths • EMOTIONAL –Your supportive, expressive colleague is most skilled at building relationships, facilitating team interaction, and persuading or selling ideas. – She will keep all stakeholders up to date on work and effectively communicate ideas through the organization. 6/28/2018 89
  • 90.
    Leverage everyone’s strengths • IDEA –Your big-picture, integrative colleague can serve as a catalyst for change, brainstorming solutions to problems and synthesizing disparate thinking. – He will drive innovation, ensure variety in both thought and execution and keep you moving forward. 6/28/2018 90
  • 91.
    Rule # 8:You Must Work Through The 5 Stages Of Team Development 6/28/2018 www.ABOVEorBEYONDjm.com 91 Forming Storming TransformingNorming Performing
  • 92.
    Where Are You inThe Stages of Team Development?
  • 93.
    Jamaica’s Greatest TeamAchievement 6/28/2018 www.ABOVEorBEYONDjm.com 93
  • 94.
    FORMING • The start-upstage • Purpose and expectation unclear 94www.ABOVEorBEYONDjm.com6/28/2018
  • 95.
    Members Test theWaters to Determine –Acceptable behavior –The nature of their task –How the group will get its work done –They want to be told what to do –Interactions are superficial –Tend to be directed to the formal leader 95www.ABOVEorBEYONDjm.com6/28/2018
  • 96.
    STORMING • This stageis characterized by con flict and resistance to the group ’s task and structure • Team members express conce rns and frustrations • Freely exchange ideas and opinio ns 96www.ABOVEorBEYONDjm.com6/28/2018
  • 97.
    STORMING 97www.ABOVEorBEYONDjm.com6/28/2018 • Team islearning to deal with differences in order to work together to meet its goals • A team that doesn’t get through this stage successfully is usually more divided and less creative
  • 98.
    6/28/2018 www.AboveorBeyond.com 98 NORMINGSTAGE • A sense of group cohesion develops in this stage
  • 99.
    6/28/2018 www.AboveorBeyond.com 99 NORMING •Members accept the team and develop norms for resolving conflict, making decisions, and completing assignments • Members enjoy meetings and freely exchange information • Shared leadership emerges • Risk of stagnating into groupthink
  • 100.
    6/28/2018 www.AboveorBeyond.com 100 PERFORMINGSTAGE • Now team work really begin •This is the payoff stage
  • 101.
    6/28/2018 www.AboveorBeyond.com 101 Performing •Team has structure and purpose • Ready to tackle task • Members take initiative • Problem-solving and decision-making procedures emphasize results
  • 102.
    6/28/2018 www.AboveorBeyond.com 102 Asthe Team GELLS • It receives recognition from other parts of the organization • Complacency is a risk • May show up in missed deadlines or a lack of creative spark • The bad habits of earlier stages may reappear
  • 103.
  • 104.
    Rule # 9: TheBasic Team-Building Functions • SUPPORTING • GATEKEEPING • HARMONIZING • PROCESS OBSERVING • CONFRONTING • MEDIATING • SUMMARIZING 6/28/2018 www.ABOVEorBEYONDjm.com 104
  • 105.
    Rule # 9: MoreCritical Team-Building Functions •Trust •Respect •Confidentiality •Accountability 6/28/2018 www.ABOVEorBEYONDjm.com 105
  • 106.
  • 107.
    13 Behaviors ofHigh-Trust Teams 1. Talk Straight 2. Demonstrate Respect 3. Create Transparency 4. Right Wrongs 5. Show Loyalty 6. Deliver Results 7. Get Better 8. Confront Reality 9. Clarify Expectation 10. Practice Accountability 11. Listen First 12. Keep Commitments 13. Extend Trust 6/28/2018www.LTSemaj.com 107
  • 108.
    The Four Elements of Trust– The ABCD Model Able, Believable, Connected, Dependable 6/28/2018 www.LTSemaj.com 108
  • 109.
    1 - Able isabout demonstrating competence. Do team members know how to get the job done? Are they able to produce results? Do they have the skills to make things happen—including knowing the organization and equipping people with the resources and information they need to get their job done? 6/28/2018 www.ABOVEorBEYONDjm.com 109
  • 110.
    2 - Believable Actingwith integrity. Honest in their dealings with people. Creating and following fair processes. People need to feel that they are being treated equitably. Acting in a consistent, values-driven manner that reassures all that they can rely on their team members. 6/28/2018 www.LTSemaj.com 110
  • 111.
    3 – Connected Demonstratingcare and concern for other people. Focusing on people and identifying their needs. This is supported by good communication skills. Share information about the organization and about self. When people share a little bit of information about themselves, it creates a sense of connection. 6/28/2018 www.LTSemaj.com 111
  • 112.
    4 - Dependable •is about reliably following through on what the team say that they are going to do. – © 2010 The Ken Blanchard Companies 6/28/2018 112
  • 113.
    Eight Things YourOrganization Can Do to Improve Trust Demonstrating Trust—If you want to create a trusting work environment, you have to begin by demonstrating trust.Demonstrating Sharing Information—Information is power.Sharing Telling It Straight—Study after study has indicated that the number one quality that people want in a leader is integrity.Telling Providing Opportunities for Everyone to Win—Do you want your people to work together or to compete against each other?Providing
  • 114.
    Eight Things YourOrganization Can Do to Improve Trust 5. Providing Feedback—Make sure leaders schedule and hold regular progress-check meetings with their direct reports. 6. Resolving Concerns Head On—Resolve concerns head on by putting challenges on the table and giving people an opportunity to influence the process. 7. Admitting Mistakes—An apology can be an effective way to correct a mistake and restore the trust needed for a good relationship. 8. Walking the Talk—A leader, above all, has to be a walking example of the vision and values of the organization. © 2010 The Ken Blanchard Companies 6/28/2018 www.LTSemaj.com 114
  • 115.
    How to Builda Culture of Trust: Defining Your Strategy 1. Client focus: you need your employees to believe in the mantra that you're not in business solely to make money, but actually to help your customer. Money is a byproduct of success, not the other way around. 2. Collaborative: don't instinctively lead with what you think should be done or what your competitors aren't doing. Make it work like any team, and show customers that you want to work together to reach the best solution. 6/28/2018 www.LTSemaj.com 115
  • 116.
    How to Builda Culture of Trust: Defining Your Strategy 3. Transparency: if you want trust, you can't keep secrets from others. One of the buzzwords of President Barack Obama's campaign in 2008 was "transparency," as it stresses being open and visible without hidden agendas. 4. Timeframe: perhaps the most important measurement, you need to be thinking about your business in terms of relationships and not simple transactions. • You think about your business in a more medium- to long-term perspective, with an ongoing, ever-flowing cycle, you're developing a relationship of trust. Charles H. Green, founder and CEO of Trusted Advisors Associates,. 6/28/2018 www.LTSemaj.com 116
  • 117.
    How to Builda Culture of Trust: Implementing the Strategy Capability trust, or allowing people to make decisions, involving them in discussions, and trusting that their opinions and input will be useful. Contractual trust, or being consistent in terms of keeping agreements and managing expectations. Communication trust, or sharing information, providing constructive feedback and speaking with good purpose about people. Lou Dubois - http://www.inc.com/guides/2010/08/how-to-build-a-corporate-culture-of-trust.html
  • 118.
  • 120.
  • 121.
  • 122.
    7 Ways toBuild An Accountable Organization 1. Clear roles, team leadership and individual ownership. 2. A sense of ownership for team results. 3. Freedom, support and control to navigate competing priorities 4. It’s not about punishment. 5. It’s about improvement. 6. The expectation of evaluation. 7. Integrity counts.
  • 123.
  • 124.
  • 125.
  • 126.
  • 127.
  • 129.
  • 130.
  • 131.
  • 132.
    Rule # 10:Avoid The Principal Destructive Functions • Shutting off • Analysing or Labelling • Dominating • Yes-butting • Naysaying 6/28/2018 www.ABOVEorBEYONDjm.com 132
  • 133.
  • 134.
    Rule # 11: TeamsHave Less Need For Managers and More For Coaches and Leaders • Coaches help teams solve problems • Old Order bosses design and allocate work, supervise, check, monitor and control • Teams do these things for themselves 6/28/2018 www.ABOVEorBEYONDjm.com 134
  • 135.
    LET'S GET RIDOF MANAGEMENT People don't want to be managed, They want to be led. Whoever heard of a world manager? World leader, yes Educational leader Political leader Religious leader Scout leader Community leader Labour leader Business leader Gang Leader They lead They don't manage 6/28/2018 135
  • 136.
  • 137.
    THE CARROT ALWAYSWINS OVER THE STICK • Ask your horse –You can lead your horse to water, • But you can't manage him to drink 6/28/2018 www.ABOVEorBEYONDjm.com 137
  • 138.
    www.LTSemaj.com 138 IF YOUWANT TO MANAGE SOMEBODY, •Manage yourself • Do that well and you'll be ready to stop managing •And start leading 6/28/2018 www.ABOVEorBEYONDjm.com 138
  • 139.
    Teams •No one is smarter thana team 6/28/2018 139
  • 140.
  • 141.
    WHAT IS YOURPOSITION? 6/28/2018 www.ABOVEorBEYONDjm.com 141www.jobbank-ja.com 141
  • 142.
    What’s Your Position? •Up until recently, John Brown worked with Big Timers International. – He had worked there for over 20 years • He used to have a very good income and many benefits including medical insurance that allowed for treatments overseas • His post was made redundant • Now his family is in crisis • They are living very marginally as he has not been able to secure another job and his wife has not been able to work 6/28/2018 www.ABOVEorBEYONDjm.com 142
  • 143.
    What’s Your Position? •She is very ill and needs to have treatments and medication that is very costly • Her monthly bill for medicine alone is over J$40,000.00 • They have no health insurance • She has run out of medication • John breaks into a pharmacy and steals the medication for his wife • He is arrested and charged as he was caught on the security cameras • If found guilty, he will be sentenced to 6 years hard labour. 6/28/2018 www.ABOVEorBEYONDjm.com 143
  • 144.
    What’s Your Position? •Do you agree with this? • Be prepared to argue your point –Strongly Agree –Somewhat Agree –Disagree –Strongly Disagree • The participants are allowed to choose their side and to discuss why they have taken that posture 6/28/2018 www.ABOVEorBEYONDjm.com 144www.jobbank-ja.com 144
  • 145.
    What’s Your Position? •Phase Two: • You are now the members of the jury and must arrive at a unanimous decision, the verdict on this case –Guilty or Not Guilty • You must also decide the punishment 6/28/2018 www.ABOVEorBEYONDjm.com 145www.jobbank-ja.com 145
  • 146.
    WHAT IS YOURPOSITION? 6/28/2018 www.ABOVEorBEYONDjm.com 146www.jobbank-ja.com 146
  • 147.
    A manifesto for small teamsdoing important work 6/28/2018 www.ABOVEorBEYONDjm.com 147 We are always under tight deadlines, because time is our most valuable asset. If you make a promise, set a date. No date, no promise. If you set a date, meet it. If you can't make a date, tell us early and often. Plan B well prepared is a better strategy than hope. Clean up your own mess. Clean up other people's messes.
  • 148.
    A manifesto for small teamsdoing important work 6/28/2018 www.ABOVEorBEYONDjm.com 148 Overcommunicate. Question premises and strategy. Don't question goodwill, effort or intent. "I'll know it when I see it," is not a professional thing to say. Describing and discussing in the abstract is what we do. Big projects are not nearly as important as scary commitments. Seth Godin, Feb 18, 2016
  • 149.
    A manifesto for small teamsdoing important work 6/28/2018 www.ABOVEorBEYONDjm.com 149 If what you're working on right now doesn't matter to the mission, help someone else with their work. Make mistakes, own them, fix them, share the learning. Cheap, reliable, public software might be boring, but it's usually better. Because it's cheap and reliable. Yesterday's hierarchy is not nearly as important as today's project structure. Lock in the things that must be locked in, leave the implementation loose until you figure out how it can get done.
  • 150.
    A manifesto for small teamsdoing important work 6/28/2018 www.ABOVEorBEYONDjm.com 150 Mostly, we do things that haven't been done before, so don't be surprised when you're surprised. Care more. If an outsider can do it faster and cheaper than we can, don't hesitate. Always be seeking outside resources. A better rolodex is better, even if we don't have rolodexes any more. Talk to everyone as if they were your boss, your customer, the founder, your employee. It's all the same. It works because it's personal.
  • 151.
    Your Action Plan: Time FrameYOU Your Team Immediately Next 4 Weeks Next 4 Months 6/28/2018 www.ABOVEorBEYONDjm.com 151
  • 152.
    Dr. Sandra Palmer BusinessGuru & Resultant Above or Beyond
  • 153.
  • 154.

Editor's Notes