Brief Carrier Summary
A dynamic professional, Specialized as an ELV Electrical Engineer with more than 20 years of experience especially in UAE.
Currently working with ADNOC PMC division handling, Engineering and Supervision building work.
My responsibilities are to review Pre Construction documents of Installation and Testing and Commissioning of ELV systems, Project
completion and handing over to Client/End User, I do play the role of Maintenance Engineer during the maintenance period as well.
Areas of Specialization are Access Control system ,CCTV system ,AV system , , Structural Cabling system, Lighting Control system,
BMS, Fire Alarm system, Central Battery system, PAVA system, IPTV system, Digital Signage system, SMATV system, Aviation
Lights/ Aircraft Warning Lights system, Intrusion Detection system, Master Clock system, Lighting system, Power Distribution
system, UPS, etc.
Core Competencies
 Pre Construction Documents
 Review of Installation & Commissioning Method Statements to ensure compliance with project standards,
specifications and procedures.
 Review Shop Drawings and ensure its compliance with design requirement, contract requirement, properly
coordinated with other discipline.
 Review and comments on Material Submittal and ensuring compliance with contract requirement.
 Review As-Built drawings as submitted by Contractor.
 Review Spare Parts, Maintenance Manuals, and ensure compliance with contract requirements.
 Review special strategies plan related to maintenance procedures.
 Construction
 Ensure quality of work is in compliance with contract requirement, good construction practice, only approved
materials and equipments are installed in compliance with approved method of statements and shop drawings.
 Ensure electrical equipment and service room is constructed as per approved method of statements and its
compliance with contracts requirements.
 Ensure installation and execution work as per Design Standards, Codes of Practice, Local Authorities and good Engineering
principles.
 Advice planning engineer of any slippage of progress related to site activities.
 Attend Technical Meeting with Contractors.
 Prepare snag and punch list if find out during T&C along with end user. Send of officially to the contractor.
 Testing and Commissioning
 Supervise and Coordinate pre-commissioning activities prior to functional testing with contractors and system
specialists.
 Process safe completion of multi-discipline testing and commissioning activities in line with the project schedule
and milestones in consistent and timely manner.
 Witness and verify testing and commissioning of ELV/LV Systems as per Method Statements in accordance with
present regulations, standards and Specifications on Systems such as Access Control system ,CCTV system ,AV
system , , Structural Cabling system, Lighting Control system, BMS, Fire Alarm system, Central Battery system,
MasoodSiddiqui Page 2
PAVA system, IPTV system, Digital Signage system, SMATV system, Aviation Lights/ Aircraft Warning Lights
system, Intrusion Detection system, Master Clock system, Lighting system, Power Distribution system, UPS, etc.
 Review test results coordinated with drawings upon completion of testing and commissioning.
 Carry out Testing and Commissioning / Integration testing activities of ELV/BMS systems.
 Monitoring & update of project commissioning status thru Commissioning Activity Schedule (CAS Sheet).
 Witness all Test related to Electrical Systems.
 Officially arrange training session for the end user.
 Project Handing Over Documents
 Review approved A status Pre construction documents before officially submit to End User.
 Review approved A status ITR, s, MVR documents before officially submit to End User.
 Review approved A status Testing and Commissioning ITR, s, documents before officially submit to End User.
 Review approved A status Snags and Punch list ITR, s, documents before officially submit to End User.
 Review approved A status Operation and Maintenance manual documents before officially submit to End User.
 Review approved A status Training manual documents before officially submit to End User.
 Review approved A status As Built drawings before officially submit to End User.
 Facility Management (Operation & Maintenance)
Maintenance Period
 Plan, direct and supervise all work related to operation & maintenance for electrical equipments during project
maintenance period.
 Recommend electrical repairs, preventive maintenance & equipment replacement to ensure optimum utilization of
electrical facilities during project maintenance period.
 Take preventive & corrective actions to overcome all technical problems related to electrical equipment during
project maintenance period.
 Maintenance of Generators, ATS Panels, Switch Boards, MDB’s, SMDB’s, DB’s, Motor Control Centre’s, VFD’s,
Soft Starters, UPS System. Feeder Pillars, Lighting Control Panels and Street Lights during project maintenance
period.
 Maintenance of Access Control system ,CCTV system ,AV system , , Structural Cabling system, Lighting Control
system, BMS, Fire Alarm system, Central Battery system, PAVA system, IPTV system, Digital Signage system,
SMATV system, Aviation Lights/ Aircraft Warning Lights system, Intrusion Detection system, Master Clock
system etc.
 PROJECT CLOSE OUT
 Checks with the contractor submit officially Close Out draft through DTF.
 Check with the contractor As Built drawing status should be 95%.
 Check with the contractor Shop drawing status should be 95%.
 Check with the contractor ITR, s and MVR, s status should be 95%.
 Check with the contractor Spare parts and Tools handing over to End User.
MasoodSiddiqui Page 3
Professional Experience
1. Working as an Electrical Engineer with Abu Dhabi National Oil Company (ADNOC) UAE for HILL INTERNATIONAL
(USA), Abu Dhabi from April 2010 till date.
Projects Handled
Under Construction
 New ADNOC Corporate Head Quarters PROJECT 2B+G+74
July 2015 till date
Responsibilities
 Engineering and Supervision of ELV & LV Systems Installation & Testing & Commissioning.
 Fire Detection and Alarm System (Manual Call Point, Smoke & Heat Detectors Device) Installation & Testing &
Commissioning.
 Fire Protection Alarms and Supervisory System (Interface Devices Testing Control & Monitoring Modules)
Installation & Testing & Commissioning.
 Emergency Lighting System (Autonomy/ Battery Duration Test & Lux level) Installation & Testing &
Commissioning.
 Security & Access Control System (SACS) Installation of Door Access Control Devices (Electro Magnetic Locks,
Door Strike, Magnetic/proximity Card Readers, Control Modules and I/O Modules)&Testing & Commissioning.
 BMS Panels and Device Installation & Testing & Commissioning.
 Lighting Control System Installation & Testing & Commissioning.
 AV System Installation & Testing & Commissioning.
 Closed Circuit Television System Installation & Testing & Commissioning.
 Public Address System Installation & Testing & Commissioning.
 Structural Cabling System Installation & Testing & Commissioning.
 UPS System Installation & Testing & Commissioning.
Completed Projects
 ADNOC Explosive Storage Facilities at Western Region Abu Dhabi.
October 2014 to July 2015
Responsibilities
 Engineering and Supervision of ELV & LV Systems Installation & Testing & Commissioning.
 Fire Detection and Alarm System (Manual Call Point, Smoke & Heat Detectors Device) Installation & Testing &
Commissioning.
 Fire Protection Alarms and Supervisory System (Interface Devices Testing Control & Monitoring Modules)
Installation & Testing & Commissioning.
 Security & Access Control System (SACS) Installation of Door Access Control Devices (Electro Magnetic Locks,
Door Strike, Magnetic/proximity Card Readers, Control Modules and I/O Modules)&Testing & Commissioning.
 BMS Panels and Device Installation & Testing & Commissioning.
 Lighting Control System Installation & Testing & Commissioning.
 Closed Circuit Television System Installation & Testing & Commissioning.
 Public Address System Installation & Testing & Commissioning.
 Structural Cabling System Installation & Testing & Commissioning.
 Intrusion and Detection System Installation & Testing & Commissioning.
MasoodSiddiqui Page 4
 Bourge Innovation Center Sas Al Nakhil Abu Dhabi
July 2013 to October 2014
Responsibilities
 Engineering and Supervision of ELV & LV Systems Installation & Testing & Commissioning.
 Fire Detection and Alarm System (Manual Call Point, Smoke & Heat Detectors Device ) Installation & Testing &
Commissioning.
 Fire Protection Alarms and Supervisory System (Interface Devices Testing: Control & Monitoring Modules)
Installation & Testing & Commissioning.
 Emergency Lighting System (Autonomy/ Battery Duration Test & Lux level) Installation & Testing &
Commissioning.
 Security & Access Control System (SACS) Installation of Door Access Control, Devices (Electro Magnetic Locks,
Door Strike, Magnetic/proximity Card Readers, Control Modules and I/O Modules)&Testing & Commissioning.
 BMS Panels and Device Installation & Testing & Commissioning.
 Lighting Control System Installation & Testing & Commissioning.
 Closed Circuit Television System Installation & Testing & Commissioning.
 Public Address System Installation & Testing & Commissioning.
 Structural Cabling System Installation & Testing & Commissioning.
 Extension of Glenelg Schools Sas Al Nakhl Abu Dhabi
July 2012 to October 2013
Responsibilities
 Engineering and Supervision of ELV & LV Systems Installation & Testing & Commissioning.
 Fire Detection and Alarm System (Manual Call Point, Smoke & Heat Detectors Device ) Installation & Testing &
Commissioning.
 Fire Protection Alarms and Supervisory System (Interface Devices Testing Control & Monitoring Modules)
Installation & Testing & Commissioning.
 BMS Panels and Device Installation & Testing & Commissioning.
 Lighting Control System Installation & Testing & Commissioning.
 Closed Circuit Television System Installation & Testing & Commissioning.
 Public Address System Installation & Testing & Commissioning.
 Structural Cabling System Installation & Testing & Commissioning.
 UPS System Installation & Testing & Commissioning.
 Master Clock System Installation & Testing & Commissioning.
 Reinstatement OF Existing Road AT Sas Al Nakhil Abu Dhabi
July 2012 to October 2013
Responsibilities
 Engineering and Supervision of ELV & LV Systems Installation & Testing & Commissioning.
 Streets Lights & Control Panels Installation & Testing & Commissioning.
 Traffic Signals & Control Panels Installation & Testing & Commissioning.
 PI Staff Accommodation Building Sas Al Nakhil Abu Dhabi
April 2010 to July 2012
Responsibilities
 Engineering and Supervision of ELV & LV Systems Installation & Testing & Commissioning.
 Fire Detection and Alarm System (Manual Call Point, Smoke & Heat Detectors Device ) Installation & Testing &
Commissioning.
 Fire Protection Alarms and Supervisory System (Interface Devices Testing: Control & Monitoring Modules)
Installation & Testing & Commissioning.
MasoodSiddiqui Page 5
 BMS Panels and Device Installation & Testing & Commissioning.
 Public Address System Installation & Testing & Commissioning.
 Structural Cabling System Installation & Testing & Commissioning.
 SMATV System Installation & Testing & Commissioning.
 Generator, MDB, SMDB, DB,s Installation & Testing & Commissioning.
 Lightening Protection and Earthing System Installation & Testing & Commissioning.
 Swimming Pool System Installation & Testing & Commissioning.
 Gate Barrier Installation & Testing & Commissioning.
2. Worked as a Project Electrical Engineering & Supervision Engineer in THERMO L.L.C Abu Dhabi UAE from
March 2007 to April 2010.
Projects Handled
Completed Projects
 Abu Dhabi Financial Centre (G+4P+36F) 4 Towers & Stock Exchange Abu Dhabi UAE It
is Design built project
CLIENT: - M/S MUBADALA.
April 2008 to April 2010
Responsibilities
 Engineering & Supervision work.
 Studied the specifications, contract drawings, scope of works, BOQ, Tender Addendums and BMS requirements.
 Preparation of Shop Drawings, Method Statements and Material Submittals are prepared by concerned Team fully
complying with all applicable Specification, consultant / Client requirements, with Electrical Standards, Codes of
Practice and good engineering principles to agreed time, cost and quality requirements.
 Coordination meetings between Client & Main Contractor
 Complete Electrical services design for Four office Towers.
 Supervise preparation of shop drawings and documents
 Preparation of shop drawings for ADDC Electrical Substation approval.
 Preparation of Electrical Load Schedules, Single line diagram, Voltage drop calculation as per ADDC regulation.
 Coordination with Client, Consultant and Main contractor representatives for the necessary approvals of Calculations,
Material submittals, Shop drawings, Method Statements, MVR, ITR and any other site issues.
 Liaison with other Discipline Engineers for the effective and smooth completion of the project and also Coordination with
claims department for the variation items.
 Determine the resources (equipment, materials, subcontractors, etc.) required for the project.
 Coordination with the Specialist Sub Contractors for timely submission and to obtain approvals from Authorities. (Civil
Defense, ADDC, Etisalat, ADM etc.)
Local Authority’s Responsibilities
Abu Dhabi Electricity and Water Authority
 Responsible to prepare require document and shop drawing like summary of total Connected Load, Single line Diagram,
General layout and Ground floor layout plans indicating location of Substation, LV Room, along with dimensional layout
details of the LV room and arrangement of MDBs, kWh meters, Load distribution schedules of distribution boards, Lighting
and Wiring Layouts – Power for LV shop drawing approval from ADWEA for timely completion of the project.
 Responsible to prepare require document and drawing for Application for Supply of Electricity. (Estimation).
 Responsible to prepare require document and Site as per ADWEA Standard and guideline for LV Inspection and Release of
Supply by ADWEA Engineer.
MasoodSiddiqui Page 6
Etisalat or DU
 Responsible to prepare require document and drawing to secure construction NOC based on design NOC.
 Responsible to prepare require document and Site (MDF Rooms, IDF Rooms and GSM Rooms Etc) as per Etisalat/Du
Standard and guideline for Etisalat/Du Engineer‘s Approval.
Civil Defence
 Responsible to prepare require document and drawing for fire alarm system and central battery system etc. for civil defence
approval.
 Responsible to prepare require document and Site as per Civil Defence Standard and guideline Engineer’s Approval.
 Sheikh Mubarak Tower (3B+GF+22F) 2 Towers Abu Dhabi UAE
CLIENT: - M/S SHEIKH MUBARAK
April 2007 to April 2008
Responsibilities
 Construction and Supervision work
 Site coordination to address & resolve day to day queries and problems of site
 Supervise preparation of required MEP drawings and documents for the electrical systems.
 Review MEP materials delivered to site for conformance with approved sample materials and equipment and report findings
to Project Manager
 Confirm that MEP materials delivered to site are properly stored and highlight any discrepancy to the Project Manager
 Follow the schedule for project completion that effectively allocates the resources to the activities.
 Closely working, guiding and leading in front the site Electrical project team regarding site coordination & execution.
 Monitor the progress of the project and make adjustments as necessary to ensure the successful completion.
 Ensure that the project deliverables are on time as per the Key Mile Stone requirements, within budget and at the required
level of quality.
 Co-ordination of internal and Third Party testing and commissioning team with quality and site team as per requirement of
Projects Design and Specification.
 Finalization with specialist Sub – Contractor, ensuring timely approval and completion of electrical systems, Installation,
Termination, Testing & Commissioning and Handing Over and Training to End User.
 Ensuring all the required trainings have been conducted to the End User as per the project Specification requirements.
Education Qualification
 Bachelor of Technology Electrical 2010 New Port University, Karachi, Pakistan.
 Bachelor of Science 1994 Karachi University, Karachi, Pakistan.
 Diploma of Power Technology 1991 Govt .College of Technology, Karachi, Pakistan.
Professional Development Certificates
 Certificate of training of structured cabling system by CPT
 Certificate of basic maintenance of Volvo generator set by AL MASOOD
 Certificate of training operation and maintenance of LV Switchgear by Schneider Electric.
 Certificate of training of digital audio intercom systems by TST.
 Certificate of training of simplex fire alarm system by Sibca Electronics.
 Certificate of training of SMATV System by Triax.
Software Proficiency
 Technical software : AUTOCAD,
 Other software : MS Excel, MS Word, MS PowerPoint.

More Related Content

What's hot

Cv noor ali syarifudin
Cv noor ali syarifudinCv noor ali syarifudin
Cv noor ali syarifudin
Noor Ali Sy
 
Minhaj uddin khan cv 2020 1 6-2020
Minhaj uddin khan cv 2020 1 6-2020Minhaj uddin khan cv 2020 1 6-2020
Minhaj uddin khan cv 2020 1 6-2020
minhaj uddin khan
 
ELV Engineer... (2)
ELV Engineer... (2)ELV Engineer... (2)
ELV Engineer... (2)jobby Thomas
 
Resume j
Resume jResume j
Resume j
Vaman Joshi
 
My final resume
My final resumeMy final resume
My final resume
salahuddin sabir khan
 
Curriculum Vitae (2015)
Curriculum Vitae (2015)Curriculum Vitae (2015)
Curriculum Vitae (2015)Jay Arances
 
Electrical safety inspection
Electrical safety inspectionElectrical safety inspection
Electrical safety inspectionMartin Technical
 
Enefen how to_have_a_successful_field_inspection_approval
Enefen how to_have_a_successful_field_inspection_approvalEnefen how to_have_a_successful_field_inspection_approval
Enefen how to_have_a_successful_field_inspection_approval
Sbremkamp
 
Edwin b 1.baldelovar resume
Edwin b 1.baldelovar resumeEdwin b 1.baldelovar resume
Edwin b 1.baldelovar resumeEdwin Baldelovar
 
Blair Mcintosh Resume 1
Blair Mcintosh Resume 1Blair Mcintosh Resume 1
Blair Mcintosh Resume 1Blair Mcintosh
 
Mn cv (777)
Mn cv (777)Mn cv (777)
Mn cv (777)
MANNANNATARAJAN
 

What's hot (18)

Cv noor ali syarifudin
Cv noor ali syarifudinCv noor ali syarifudin
Cv noor ali syarifudin
 
resume markschneider
resume markschneiderresume markschneider
resume markschneider
 
Minhaj uddin khan cv 2020 1 6-2020
Minhaj uddin khan cv 2020 1 6-2020Minhaj uddin khan cv 2020 1 6-2020
Minhaj uddin khan cv 2020 1 6-2020
 
ELV Engineer... (2)
ELV Engineer... (2)ELV Engineer... (2)
ELV Engineer... (2)
 
Resume j
Resume jResume j
Resume j
 
Sreekumar_Resume
Sreekumar_ResumeSreekumar_Resume
Sreekumar_Resume
 
ELV ENGINEER RESUME
ELV ENGINEER RESUMEELV ENGINEER RESUME
ELV ENGINEER RESUME
 
My final resume
My final resumeMy final resume
My final resume
 
asif sup new (4)
asif sup new (4)asif sup new (4)
asif sup new (4)
 
Curriculum Vitae (2015)
Curriculum Vitae (2015)Curriculum Vitae (2015)
Curriculum Vitae (2015)
 
Electrical safety inspection
Electrical safety inspectionElectrical safety inspection
Electrical safety inspection
 
V.Prado.Jr_CV
V.Prado.Jr_CVV.Prado.Jr_CV
V.Prado.Jr_CV
 
Enefen how to_have_a_successful_field_inspection_approval
Enefen how to_have_a_successful_field_inspection_approvalEnefen how to_have_a_successful_field_inspection_approval
Enefen how to_have_a_successful_field_inspection_approval
 
Hari Maintenance
Hari MaintenanceHari Maintenance
Hari Maintenance
 
Edwin b 1.baldelovar resume
Edwin b 1.baldelovar resumeEdwin b 1.baldelovar resume
Edwin b 1.baldelovar resume
 
Blair Mcintosh Resume 1
Blair Mcintosh Resume 1Blair Mcintosh Resume 1
Blair Mcintosh Resume 1
 
Mn cv (777)
Mn cv (777)Mn cv (777)
Mn cv (777)
 
ANBARASAN R CV
ANBARASAN R CV ANBARASAN R CV
ANBARASAN R CV
 

Viewers also liked

Kinds of stars according to color- Grade Six Science
Kinds of stars  according to color- Grade Six ScienceKinds of stars  according to color- Grade Six Science
Kinds of stars according to color- Grade Six Science
mgslikiam
 
S Ta R Gazing
S Ta R GazingS Ta R Gazing
S Ta R Gazingmjscott
 
St1 deep heat
St1 deep heatSt1 deep heat
St1 deep heat
villehulkkonen
 
Chapter 12.1: The View from Earth
Chapter 12.1: The View from EarthChapter 12.1: The View from Earth
Chapter 12.1: The View from Earth
Korrnell Academy: L Class Grade 8 Science
 
NASA Research and Research Missions: Addressing Space Weather Hazards
NASA Research and Research Missions: Addressing Space Weather HazardsNASA Research and Research Missions: Addressing Space Weather Hazards
NASA Research and Research Missions: Addressing Space Weather Hazards
American Astronautical Society
 
Space Weather: Forecasting, Tracking, and the Effects of Earth Directed Solar...
Space Weather: Forecasting, Tracking, and the Effects of Earth Directed Solar...Space Weather: Forecasting, Tracking, and the Effects of Earth Directed Solar...
Space Weather: Forecasting, Tracking, and the Effects of Earth Directed Solar...Emily Schomp
 
The Universe; What's Beyond?
The Universe; What's Beyond?The Universe; What's Beyond?
The Universe; What's Beyond?
Nicasio Balbontin
 
Ch 12.2: The Sun and Other Stars
Ch 12.2: The Sun and Other StarsCh 12.2: The Sun and Other Stars
Ch 12.2: The Sun and Other Stars
Korrnell Academy: L Class Grade 8 Science
 
7.2 characteristics and evolution of stars
7.2 characteristics and evolution of stars7.2 characteristics and evolution of stars
7.2 characteristics and evolution of starsmojavehack
 
Space Explorations Around the World
Space Explorations Around the WorldSpace Explorations Around the World
Space Explorations Around the World
Maps of World
 
Cosmology,bigbang and dark energy
Cosmology,bigbang and dark energyCosmology,bigbang and dark energy
Cosmology,bigbang and dark energy
rvrjc college of enggineering
 
Climate and weather of the philippines (ronith anne s. claro)
Climate and weather of the philippines (ronith anne s. claro)Climate and weather of the philippines (ronith anne s. claro)
Climate and weather of the philippines (ronith anne s. claro)Preciusz Irah
 
Factors affecting climate
Factors affecting climateFactors affecting climate
Factors affecting climate
aloksir
 
Winds and Wind System
Winds and Wind SystemWinds and Wind System
Winds and Wind System
Len Garcia
 
Factors that affect climate
Factors that affect climateFactors that affect climate
Factors that affect climate
حنا قریشئ
 
Seasons
SeasonsSeasons
Seasons
jdherna
 
Factors affecting climate
Factors affecting climateFactors affecting climate
Factors affecting climate
RhajTheWonder
 

Viewers also liked (20)

Kinds of stars according to color- Grade Six Science
Kinds of stars  according to color- Grade Six ScienceKinds of stars  according to color- Grade Six Science
Kinds of stars according to color- Grade Six Science
 
S Ta R Gazing
S Ta R GazingS Ta R Gazing
S Ta R Gazing
 
St1 deep heat
St1 deep heatSt1 deep heat
St1 deep heat
 
Chapter 12.1: The View from Earth
Chapter 12.1: The View from EarthChapter 12.1: The View from Earth
Chapter 12.1: The View from Earth
 
NASA Research and Research Missions: Addressing Space Weather Hazards
NASA Research and Research Missions: Addressing Space Weather HazardsNASA Research and Research Missions: Addressing Space Weather Hazards
NASA Research and Research Missions: Addressing Space Weather Hazards
 
Space Weather: Forecasting, Tracking, and the Effects of Earth Directed Solar...
Space Weather: Forecasting, Tracking, and the Effects of Earth Directed Solar...Space Weather: Forecasting, Tracking, and the Effects of Earth Directed Solar...
Space Weather: Forecasting, Tracking, and the Effects of Earth Directed Solar...
 
The Universe; What's Beyond?
The Universe; What's Beyond?The Universe; What's Beyond?
The Universe; What's Beyond?
 
Ch 12.2: The Sun and Other Stars
Ch 12.2: The Sun and Other StarsCh 12.2: The Sun and Other Stars
Ch 12.2: The Sun and Other Stars
 
7.2 characteristics and evolution of stars
7.2 characteristics and evolution of stars7.2 characteristics and evolution of stars
7.2 characteristics and evolution of stars
 
Space Explorations Around the World
Space Explorations Around the WorldSpace Explorations Around the World
Space Explorations Around the World
 
Cosmology,bigbang and dark energy
Cosmology,bigbang and dark energyCosmology,bigbang and dark energy
Cosmology,bigbang and dark energy
 
Global winds
Global windsGlobal winds
Global winds
 
Philippine climate
Philippine climatePhilippine climate
Philippine climate
 
Global and local winds
Global and local windsGlobal and local winds
Global and local winds
 
Climate and weather of the philippines (ronith anne s. claro)
Climate and weather of the philippines (ronith anne s. claro)Climate and weather of the philippines (ronith anne s. claro)
Climate and weather of the philippines (ronith anne s. claro)
 
Factors affecting climate
Factors affecting climateFactors affecting climate
Factors affecting climate
 
Winds and Wind System
Winds and Wind SystemWinds and Wind System
Winds and Wind System
 
Factors that affect climate
Factors that affect climateFactors that affect climate
Factors that affect climate
 
Seasons
SeasonsSeasons
Seasons
 
Factors affecting climate
Factors affecting climateFactors affecting climate
Factors affecting climate
 

Similar to Masood Resume - G

Elv project engineer
Elv project engineerElv project engineer
Elv project engineer
Fahim Mohamed
 
mallick resume qc eng.
mallick resume qc eng.mallick resume qc eng.
mallick resume qc eng.SAJID MALLICK
 
Jamal_Ashraf -1 oil@gas
Jamal_Ashraf -1 oil@gasJamal_Ashraf -1 oil@gas
Jamal_Ashraf -1 oil@gasJAMAL ASHRAF
 
Noman Jamil CV and Certificates updated
Noman Jamil CV and Certificates updatedNoman Jamil CV and Certificates updated
Noman Jamil CV and Certificates updatedNouman Jamil
 
E&I QA QC MD LATEEFUR RAHMAN (2)
E&I QA QC MD LATEEFUR RAHMAN (2)E&I QA QC MD LATEEFUR RAHMAN (2)
E&I QA QC MD LATEEFUR RAHMAN (2)lateefur rahman
 
CV_-_Salman_Shaikh-NEW.doc
CV_-_Salman_Shaikh-NEW.docCV_-_Salman_Shaikh-NEW.doc
CV_-_Salman_Shaikh-NEW.docsalman shaikh
 
vikram 5+ years Experience
vikram 5+ years Experiencevikram 5+ years Experience
vikram 5+ years ExperienceVikram manni
 
Ajit Kumar Singh - BMS Specialist
Ajit Kumar Singh - BMS SpecialistAjit Kumar Singh - BMS Specialist
Ajit Kumar Singh - BMS SpecialistAjit Singh
 
M.A.Zakout Resume_11_5_2015
M.A.Zakout Resume_11_5_2015M.A.Zakout Resume_11_5_2015
M.A.Zakout Resume_11_5_2015Mohammed Zakout
 

Similar to Masood Resume - G (20)

Elv project engineer
Elv project engineerElv project engineer
Elv project engineer
 
mallick resume qc eng.
mallick resume qc eng.mallick resume qc eng.
mallick resume qc eng.
 
Jamal_Ashraf -1 oil@gas
Jamal_Ashraf -1 oil@gasJamal_Ashraf -1 oil@gas
Jamal_Ashraf -1 oil@gas
 
Resume (S.Saravanan)
Resume (S.Saravanan)Resume (S.Saravanan)
Resume (S.Saravanan)
 
roshan-CV1
roshan-CV1roshan-CV1
roshan-CV1
 
Noman Jamil CV and Certificates updated
Noman Jamil CV and Certificates updatedNoman Jamil CV and Certificates updated
Noman Jamil CV and Certificates updated
 
E&I QA QC MD LATEEFUR RAHMAN (2)
E&I QA QC MD LATEEFUR RAHMAN (2)E&I QA QC MD LATEEFUR RAHMAN (2)
E&I QA QC MD LATEEFUR RAHMAN (2)
 
CV_-_Salman_Shaikh-NEW.doc
CV_-_Salman_Shaikh-NEW.docCV_-_Salman_Shaikh-NEW.doc
CV_-_Salman_Shaikh-NEW.doc
 
vikram 5+ years Experience
vikram 5+ years Experiencevikram 5+ years Experience
vikram 5+ years Experience
 
LATEST UPDATED CV OF MR SAJEEV R
LATEST UPDATED CV OF MR SAJEEV RLATEST UPDATED CV OF MR SAJEEV R
LATEST UPDATED CV OF MR SAJEEV R
 
Fahad CV
Fahad CVFahad CV
Fahad CV
 
dovil jacildo cv
dovil jacildo cvdovil jacildo cv
dovil jacildo cv
 
HASSAN CV
HASSAN CVHASSAN CV
HASSAN CV
 
SATHISH KUMAR - E&I
SATHISH KUMAR - E&ISATHISH KUMAR - E&I
SATHISH KUMAR - E&I
 
M Imran
M ImranM Imran
M Imran
 
CV Electrical QA QC Engineer
CV Electrical QA QC EngineerCV Electrical QA QC Engineer
CV Electrical QA QC Engineer
 
Farookh Engr
Farookh EngrFarookh Engr
Farookh Engr
 
Hari Maintenance
Hari MaintenanceHari Maintenance
Hari Maintenance
 
Ajit Kumar Singh - BMS Specialist
Ajit Kumar Singh - BMS SpecialistAjit Kumar Singh - BMS Specialist
Ajit Kumar Singh - BMS Specialist
 
M.A.Zakout Resume_11_5_2015
M.A.Zakout Resume_11_5_2015M.A.Zakout Resume_11_5_2015
M.A.Zakout Resume_11_5_2015
 

Masood Resume - G

  • 1. MasoodSiddiqui Page 1 Resume Masood Siddiqui M: +971 55 4070616 E: siddiquimasood@hotmail.com Brief Carrier Summary A dynamic professional, Specialized as an ELV Electrical Engineer with more than 20 years of experience especially in UAE. Currently working with ADNOC PMC division handling, Engineering and Supervision building work. My responsibilities are to review Pre Construction documents of Installation and Testing and Commissioning of ELV systems, Project completion and handing over to Client/End User, I do play the role of Maintenance Engineer during the maintenance period as well. Areas of Specialization are Access Control system ,CCTV system ,AV system , , Structural Cabling system, Lighting Control system, BMS, Fire Alarm system, Central Battery system, PAVA system, IPTV system, Digital Signage system, SMATV system, Aviation Lights/ Aircraft Warning Lights system, Intrusion Detection system, Master Clock system, Lighting system, Power Distribution system, UPS, etc. Core Competencies  Pre Construction Documents  Review of Installation & Commissioning Method Statements to ensure compliance with project standards, specifications and procedures.  Review Shop Drawings and ensure its compliance with design requirement, contract requirement, properly coordinated with other discipline.  Review and comments on Material Submittal and ensuring compliance with contract requirement.  Review As-Built drawings as submitted by Contractor.  Review Spare Parts, Maintenance Manuals, and ensure compliance with contract requirements.  Review special strategies plan related to maintenance procedures.  Construction  Ensure quality of work is in compliance with contract requirement, good construction practice, only approved materials and equipments are installed in compliance with approved method of statements and shop drawings.  Ensure electrical equipment and service room is constructed as per approved method of statements and its compliance with contracts requirements.  Ensure installation and execution work as per Design Standards, Codes of Practice, Local Authorities and good Engineering principles.  Advice planning engineer of any slippage of progress related to site activities.  Attend Technical Meeting with Contractors.  Prepare snag and punch list if find out during T&C along with end user. Send of officially to the contractor.  Testing and Commissioning  Supervise and Coordinate pre-commissioning activities prior to functional testing with contractors and system specialists.  Process safe completion of multi-discipline testing and commissioning activities in line with the project schedule and milestones in consistent and timely manner.  Witness and verify testing and commissioning of ELV/LV Systems as per Method Statements in accordance with present regulations, standards and Specifications on Systems such as Access Control system ,CCTV system ,AV system , , Structural Cabling system, Lighting Control system, BMS, Fire Alarm system, Central Battery system,
  • 2. MasoodSiddiqui Page 2 PAVA system, IPTV system, Digital Signage system, SMATV system, Aviation Lights/ Aircraft Warning Lights system, Intrusion Detection system, Master Clock system, Lighting system, Power Distribution system, UPS, etc.  Review test results coordinated with drawings upon completion of testing and commissioning.  Carry out Testing and Commissioning / Integration testing activities of ELV/BMS systems.  Monitoring & update of project commissioning status thru Commissioning Activity Schedule (CAS Sheet).  Witness all Test related to Electrical Systems.  Officially arrange training session for the end user.  Project Handing Over Documents  Review approved A status Pre construction documents before officially submit to End User.  Review approved A status ITR, s, MVR documents before officially submit to End User.  Review approved A status Testing and Commissioning ITR, s, documents before officially submit to End User.  Review approved A status Snags and Punch list ITR, s, documents before officially submit to End User.  Review approved A status Operation and Maintenance manual documents before officially submit to End User.  Review approved A status Training manual documents before officially submit to End User.  Review approved A status As Built drawings before officially submit to End User.  Facility Management (Operation & Maintenance) Maintenance Period  Plan, direct and supervise all work related to operation & maintenance for electrical equipments during project maintenance period.  Recommend electrical repairs, preventive maintenance & equipment replacement to ensure optimum utilization of electrical facilities during project maintenance period.  Take preventive & corrective actions to overcome all technical problems related to electrical equipment during project maintenance period.  Maintenance of Generators, ATS Panels, Switch Boards, MDB’s, SMDB’s, DB’s, Motor Control Centre’s, VFD’s, Soft Starters, UPS System. Feeder Pillars, Lighting Control Panels and Street Lights during project maintenance period.  Maintenance of Access Control system ,CCTV system ,AV system , , Structural Cabling system, Lighting Control system, BMS, Fire Alarm system, Central Battery system, PAVA system, IPTV system, Digital Signage system, SMATV system, Aviation Lights/ Aircraft Warning Lights system, Intrusion Detection system, Master Clock system etc.  PROJECT CLOSE OUT  Checks with the contractor submit officially Close Out draft through DTF.  Check with the contractor As Built drawing status should be 95%.  Check with the contractor Shop drawing status should be 95%.  Check with the contractor ITR, s and MVR, s status should be 95%.  Check with the contractor Spare parts and Tools handing over to End User.
  • 3. MasoodSiddiqui Page 3 Professional Experience 1. Working as an Electrical Engineer with Abu Dhabi National Oil Company (ADNOC) UAE for HILL INTERNATIONAL (USA), Abu Dhabi from April 2010 till date. Projects Handled Under Construction  New ADNOC Corporate Head Quarters PROJECT 2B+G+74 July 2015 till date Responsibilities  Engineering and Supervision of ELV & LV Systems Installation & Testing & Commissioning.  Fire Detection and Alarm System (Manual Call Point, Smoke & Heat Detectors Device) Installation & Testing & Commissioning.  Fire Protection Alarms and Supervisory System (Interface Devices Testing Control & Monitoring Modules) Installation & Testing & Commissioning.  Emergency Lighting System (Autonomy/ Battery Duration Test & Lux level) Installation & Testing & Commissioning.  Security & Access Control System (SACS) Installation of Door Access Control Devices (Electro Magnetic Locks, Door Strike, Magnetic/proximity Card Readers, Control Modules and I/O Modules)&Testing & Commissioning.  BMS Panels and Device Installation & Testing & Commissioning.  Lighting Control System Installation & Testing & Commissioning.  AV System Installation & Testing & Commissioning.  Closed Circuit Television System Installation & Testing & Commissioning.  Public Address System Installation & Testing & Commissioning.  Structural Cabling System Installation & Testing & Commissioning.  UPS System Installation & Testing & Commissioning. Completed Projects  ADNOC Explosive Storage Facilities at Western Region Abu Dhabi. October 2014 to July 2015 Responsibilities  Engineering and Supervision of ELV & LV Systems Installation & Testing & Commissioning.  Fire Detection and Alarm System (Manual Call Point, Smoke & Heat Detectors Device) Installation & Testing & Commissioning.  Fire Protection Alarms and Supervisory System (Interface Devices Testing Control & Monitoring Modules) Installation & Testing & Commissioning.  Security & Access Control System (SACS) Installation of Door Access Control Devices (Electro Magnetic Locks, Door Strike, Magnetic/proximity Card Readers, Control Modules and I/O Modules)&Testing & Commissioning.  BMS Panels and Device Installation & Testing & Commissioning.  Lighting Control System Installation & Testing & Commissioning.  Closed Circuit Television System Installation & Testing & Commissioning.  Public Address System Installation & Testing & Commissioning.  Structural Cabling System Installation & Testing & Commissioning.  Intrusion and Detection System Installation & Testing & Commissioning.
  • 4. MasoodSiddiqui Page 4  Bourge Innovation Center Sas Al Nakhil Abu Dhabi July 2013 to October 2014 Responsibilities  Engineering and Supervision of ELV & LV Systems Installation & Testing & Commissioning.  Fire Detection and Alarm System (Manual Call Point, Smoke & Heat Detectors Device ) Installation & Testing & Commissioning.  Fire Protection Alarms and Supervisory System (Interface Devices Testing: Control & Monitoring Modules) Installation & Testing & Commissioning.  Emergency Lighting System (Autonomy/ Battery Duration Test & Lux level) Installation & Testing & Commissioning.  Security & Access Control System (SACS) Installation of Door Access Control, Devices (Electro Magnetic Locks, Door Strike, Magnetic/proximity Card Readers, Control Modules and I/O Modules)&Testing & Commissioning.  BMS Panels and Device Installation & Testing & Commissioning.  Lighting Control System Installation & Testing & Commissioning.  Closed Circuit Television System Installation & Testing & Commissioning.  Public Address System Installation & Testing & Commissioning.  Structural Cabling System Installation & Testing & Commissioning.  Extension of Glenelg Schools Sas Al Nakhl Abu Dhabi July 2012 to October 2013 Responsibilities  Engineering and Supervision of ELV & LV Systems Installation & Testing & Commissioning.  Fire Detection and Alarm System (Manual Call Point, Smoke & Heat Detectors Device ) Installation & Testing & Commissioning.  Fire Protection Alarms and Supervisory System (Interface Devices Testing Control & Monitoring Modules) Installation & Testing & Commissioning.  BMS Panels and Device Installation & Testing & Commissioning.  Lighting Control System Installation & Testing & Commissioning.  Closed Circuit Television System Installation & Testing & Commissioning.  Public Address System Installation & Testing & Commissioning.  Structural Cabling System Installation & Testing & Commissioning.  UPS System Installation & Testing & Commissioning.  Master Clock System Installation & Testing & Commissioning.  Reinstatement OF Existing Road AT Sas Al Nakhil Abu Dhabi July 2012 to October 2013 Responsibilities  Engineering and Supervision of ELV & LV Systems Installation & Testing & Commissioning.  Streets Lights & Control Panels Installation & Testing & Commissioning.  Traffic Signals & Control Panels Installation & Testing & Commissioning.  PI Staff Accommodation Building Sas Al Nakhil Abu Dhabi April 2010 to July 2012 Responsibilities  Engineering and Supervision of ELV & LV Systems Installation & Testing & Commissioning.  Fire Detection and Alarm System (Manual Call Point, Smoke & Heat Detectors Device ) Installation & Testing & Commissioning.  Fire Protection Alarms and Supervisory System (Interface Devices Testing: Control & Monitoring Modules) Installation & Testing & Commissioning.
  • 5. MasoodSiddiqui Page 5  BMS Panels and Device Installation & Testing & Commissioning.  Public Address System Installation & Testing & Commissioning.  Structural Cabling System Installation & Testing & Commissioning.  SMATV System Installation & Testing & Commissioning.  Generator, MDB, SMDB, DB,s Installation & Testing & Commissioning.  Lightening Protection and Earthing System Installation & Testing & Commissioning.  Swimming Pool System Installation & Testing & Commissioning.  Gate Barrier Installation & Testing & Commissioning. 2. Worked as a Project Electrical Engineering & Supervision Engineer in THERMO L.L.C Abu Dhabi UAE from March 2007 to April 2010. Projects Handled Completed Projects  Abu Dhabi Financial Centre (G+4P+36F) 4 Towers & Stock Exchange Abu Dhabi UAE It is Design built project CLIENT: - M/S MUBADALA. April 2008 to April 2010 Responsibilities  Engineering & Supervision work.  Studied the specifications, contract drawings, scope of works, BOQ, Tender Addendums and BMS requirements.  Preparation of Shop Drawings, Method Statements and Material Submittals are prepared by concerned Team fully complying with all applicable Specification, consultant / Client requirements, with Electrical Standards, Codes of Practice and good engineering principles to agreed time, cost and quality requirements.  Coordination meetings between Client & Main Contractor  Complete Electrical services design for Four office Towers.  Supervise preparation of shop drawings and documents  Preparation of shop drawings for ADDC Electrical Substation approval.  Preparation of Electrical Load Schedules, Single line diagram, Voltage drop calculation as per ADDC regulation.  Coordination with Client, Consultant and Main contractor representatives for the necessary approvals of Calculations, Material submittals, Shop drawings, Method Statements, MVR, ITR and any other site issues.  Liaison with other Discipline Engineers for the effective and smooth completion of the project and also Coordination with claims department for the variation items.  Determine the resources (equipment, materials, subcontractors, etc.) required for the project.  Coordination with the Specialist Sub Contractors for timely submission and to obtain approvals from Authorities. (Civil Defense, ADDC, Etisalat, ADM etc.) Local Authority’s Responsibilities Abu Dhabi Electricity and Water Authority  Responsible to prepare require document and shop drawing like summary of total Connected Load, Single line Diagram, General layout and Ground floor layout plans indicating location of Substation, LV Room, along with dimensional layout details of the LV room and arrangement of MDBs, kWh meters, Load distribution schedules of distribution boards, Lighting and Wiring Layouts – Power for LV shop drawing approval from ADWEA for timely completion of the project.  Responsible to prepare require document and drawing for Application for Supply of Electricity. (Estimation).  Responsible to prepare require document and Site as per ADWEA Standard and guideline for LV Inspection and Release of Supply by ADWEA Engineer.
  • 6. MasoodSiddiqui Page 6 Etisalat or DU  Responsible to prepare require document and drawing to secure construction NOC based on design NOC.  Responsible to prepare require document and Site (MDF Rooms, IDF Rooms and GSM Rooms Etc) as per Etisalat/Du Standard and guideline for Etisalat/Du Engineer‘s Approval. Civil Defence  Responsible to prepare require document and drawing for fire alarm system and central battery system etc. for civil defence approval.  Responsible to prepare require document and Site as per Civil Defence Standard and guideline Engineer’s Approval.  Sheikh Mubarak Tower (3B+GF+22F) 2 Towers Abu Dhabi UAE CLIENT: - M/S SHEIKH MUBARAK April 2007 to April 2008 Responsibilities  Construction and Supervision work  Site coordination to address & resolve day to day queries and problems of site  Supervise preparation of required MEP drawings and documents for the electrical systems.  Review MEP materials delivered to site for conformance with approved sample materials and equipment and report findings to Project Manager  Confirm that MEP materials delivered to site are properly stored and highlight any discrepancy to the Project Manager  Follow the schedule for project completion that effectively allocates the resources to the activities.  Closely working, guiding and leading in front the site Electrical project team regarding site coordination & execution.  Monitor the progress of the project and make adjustments as necessary to ensure the successful completion.  Ensure that the project deliverables are on time as per the Key Mile Stone requirements, within budget and at the required level of quality.  Co-ordination of internal and Third Party testing and commissioning team with quality and site team as per requirement of Projects Design and Specification.  Finalization with specialist Sub – Contractor, ensuring timely approval and completion of electrical systems, Installation, Termination, Testing & Commissioning and Handing Over and Training to End User.  Ensuring all the required trainings have been conducted to the End User as per the project Specification requirements. Education Qualification  Bachelor of Technology Electrical 2010 New Port University, Karachi, Pakistan.  Bachelor of Science 1994 Karachi University, Karachi, Pakistan.  Diploma of Power Technology 1991 Govt .College of Technology, Karachi, Pakistan. Professional Development Certificates  Certificate of training of structured cabling system by CPT  Certificate of basic maintenance of Volvo generator set by AL MASOOD  Certificate of training operation and maintenance of LV Switchgear by Schneider Electric.  Certificate of training of digital audio intercom systems by TST.  Certificate of training of simplex fire alarm system by Sibca Electronics.  Certificate of training of SMATV System by Triax. Software Proficiency  Technical software : AUTOCAD,  Other software : MS Excel, MS Word, MS PowerPoint.