Jobby Thomas
Mobile: +974-66518846, 70205046 (Qatar)
: +91-9846383833(India)
Jobythomas6@gmail.com
Looking for ELV/BMS/Instrumentation Site/Commissioning/Maintenance job as
Engineer Position
Career Objective
To work in a challenging and growth oriented environment, unifying my progress with the team and
organization in which I work.
Career History
Total 12+ years’ experience (including 6+ years of Gulf experience) in Installation, Testing &
Commissioning, and Maintenance & Operation in instrumentation/ELV Systems.
PROFESSIONAL EXPERIENCE IN GCC
• Currently working as Airport Special System site Engineer in SEPAM, Qatar (from Sep 2013 to
till date) for Hamad International Airport Project (Passenger Terminal, VIP lounges &
Business Class Lounges, Staff Access Facility Building)
• Worked as Airport Special System Site Engineer in CNA Group Ltd, Qatar (from Sep 2011
to2013 August) for Hamad International Airport Project (Emiri Terminal, Parking Structure
& Mosque)
• Worked as a ELV Asst.Engineer in TECHNOFIN Electromechanical LLC, Dubai (from Nov 2008
to Sep 2011) for Meydan Racecourse Dubai, Cleveland Clinic Abu Dhabi , Dubai Metro – Red
and Green Line.
These project involved Engineering, Installation, Testing & Commissioning and Maintenance &
Operation of HVAC System monitoring and control like Air Handling Units (AHU), Fresh Air Handling
Units (FAHU), Fan coil Units (FCU), VAV calibration, Chillers, Cooling Tower, MD, MSD, Temperature
sensors, Pressure sensors, all type of Motors, Pumps, Fans BTU Meter, Water Meter and Electrical points
monitoring and controlling systems like ATS, MDB, Generator, Lighting Panel, all type of electrical
panels, Escalator, Lift, DDC and Third party integration with BMS(Fire alarm systems, Lighting control
panels, diff type electrical panels and meters, Crac unit..)
Has an excellent inter-personal communication, Problem solving, Project Management, Person
management and Analytical & Technical skills.
Project
Dubai Metro Red Line & Green Line Project
BMS: Honeywell & Rockwell (Each Station Around 1500 BMS Points)
MEYDAN Racecourse Project in Dubai, Nad Al Sheeba (Hotel, DRC, Grand Stand, Main Track, Car
Parking & Horse Tunnel)
IBMS: Honeywell (Total Around 25,000 IBMS Points)
ACS: Honeywell
Cleveland Clinic Abu Dhabi Project
Preparing Shop Drawing, Riser Drawing and Power matrix for BMS
BMS - Johnson Controls (Total Around 25,000 BMS Points)
NDIA Doha Qatar Project (Emiri Pavilion, D & B Area, Parking, Mosque)
BMS: Siemens (Total Around 15,000 BMS Points)
FAS: Edward System
Current Project
NDIA Doha Qatar Project (Passenger Terminal, VIP lounges & Business Class Lounges, Staff Access
Building)
BMS: Siemens (Total Around 10,000 BMS Points)
Sales Experience
Belimo Valves & Actuators and Lonix Automation Systems
Roles & Responsibilities on Site
• Engineering, Supervision of Cabling, Device and Panel Installation, Termination, T&C and
Maintenance/Operation of BMS/FAS/PA/ACS
• Monitoring of the BMS in the control room and carried out routine maintenance of the
system as recommended by the Supplier.
• Handling, supervising and managing the projects in all aspects
• Assisting the Site engineers in the execution of Civil Defense, Cause and Effect Matrix and
the Doomsday Matrix Inspection.
• Job planning according to the main contractor’s site program.
• Material procurement in prior to the site requirements and preparation of material
requisitions and established a full site store setup according to the material approval
received from consultant.
• Job allocation and man power control at site and regular monitoring of the site activities as
per the schedule program.
• Record the weekly/monthly reports during maintenance.
• Lead a team of technicians and giving solution for the onsite issues.
• Coordinate with consultant, main contractor & MEP contract for solve the issues
• Prepare and submit Work Progress Report , Request Form for Inspection & Approval
• Prepare DDC I/O Point Schedules & As Built Drawing
• Prepare BOQ, Shop Drawing, Schematic Drawing and Power matrix for BMS
• QA/QC Inspection & Safety Officer
PROFESSIONAL EXPERIENCE IN INDIA
I have over four years of experience in the Telecommunications field in installation and trouble
shooting of Communication systems like GSM products Lucent & Siemens BTS, Microwave radios Nera
& DMC, FCT products Beetel & Micromax, CDMA Product FWT & FWP and PCO monitors
 Worked as Radio Technician and Electrician in ESCOTEL MOBILE COMMUNICATIONS LTD on
Contract base. Delma Complex, Calicut, Kerala. India (Dec 2002 to June 2004)
Roles & Responsibilities
• Installation and commissioning support for Radio systems, BTS, repeaters and antennas
• Trouble-shoot, repair, maintain various radio, related electronic equipment in mobile units
and antennas
• Log transmitter readings.
• Weekly check of backup power systems like generator, ups, battery bank
• Regulate and tune signals from Radio and BTS.
 Worked as Reliance PCO Engineer in Reliance LBA UP'S MARKETING Calicut, Kerala.
(July 2004 to Aug 2005)
 Worked as Sr. Engineer in Airtel PCO Distributor WORLD SCAN COMMUNICATIONS
Vadagara, Calicut, Kerala (Sep 2005 to Oct 2008)
Roles & Responsibilities
• To provide on-site Customer Service Support to customers across the defined region.
• Executing the installations and warranty service of Electronics Equipment’s GSM/CDMA
products like FCT and FWT/FWP, PCO monitors and printers
• To ensure optimum utilization of resources like spare parts, logistics etc.
• Monitoring and improving the Customer base through Annual Service Contracts, sales of
spare parts etc.
• Forecasting and ensuring on-time availability of spare parts for the Field Service activities at
customer site...
Educational Profile
Pre-Degree In Commerce University Calicut, Kerala.
Diploma In Electronics Engineer State Board Of Technical Education Kerala.
IOSH Managing Safely Course Safety Course Certified By UK.
Computer Hardware Course Kerala Government Polytechnic Calicut.
B.tech Electronics &
Telecommunication Engineering
(4th Semester completed)
Karnataka open university, India
Software Proficiency
Personal Information
Date of Birth : 20/05/1981.
Language Known : English, Hindi, Malayalam and Tamil
Marital Status : Married
Nationality : India.
Passport No : J3292664, DATE EXPIRY: 22/09/2020
Visa Status : Transferable
Notification
I hereby declare that the above information’s are true to the best of my Knowledge.
JOBBY THOMAS
Languages & Packages MS-Office, AutoCAD
BMS End User Training Siemens Desigo, X Works, RXT Software

ELV Engineer... (2)

  • 1.
    Jobby Thomas Mobile: +974-66518846,70205046 (Qatar) : +91-9846383833(India) Jobythomas6@gmail.com Looking for ELV/BMS/Instrumentation Site/Commissioning/Maintenance job as Engineer Position Career Objective To work in a challenging and growth oriented environment, unifying my progress with the team and organization in which I work. Career History Total 12+ years’ experience (including 6+ years of Gulf experience) in Installation, Testing & Commissioning, and Maintenance & Operation in instrumentation/ELV Systems. PROFESSIONAL EXPERIENCE IN GCC • Currently working as Airport Special System site Engineer in SEPAM, Qatar (from Sep 2013 to till date) for Hamad International Airport Project (Passenger Terminal, VIP lounges & Business Class Lounges, Staff Access Facility Building) • Worked as Airport Special System Site Engineer in CNA Group Ltd, Qatar (from Sep 2011 to2013 August) for Hamad International Airport Project (Emiri Terminal, Parking Structure & Mosque) • Worked as a ELV Asst.Engineer in TECHNOFIN Electromechanical LLC, Dubai (from Nov 2008 to Sep 2011) for Meydan Racecourse Dubai, Cleveland Clinic Abu Dhabi , Dubai Metro – Red and Green Line. These project involved Engineering, Installation, Testing & Commissioning and Maintenance & Operation of HVAC System monitoring and control like Air Handling Units (AHU), Fresh Air Handling Units (FAHU), Fan coil Units (FCU), VAV calibration, Chillers, Cooling Tower, MD, MSD, Temperature sensors, Pressure sensors, all type of Motors, Pumps, Fans BTU Meter, Water Meter and Electrical points monitoring and controlling systems like ATS, MDB, Generator, Lighting Panel, all type of electrical panels, Escalator, Lift, DDC and Third party integration with BMS(Fire alarm systems, Lighting control panels, diff type electrical panels and meters, Crac unit..) Has an excellent inter-personal communication, Problem solving, Project Management, Person management and Analytical & Technical skills. Project Dubai Metro Red Line & Green Line Project BMS: Honeywell & Rockwell (Each Station Around 1500 BMS Points) MEYDAN Racecourse Project in Dubai, Nad Al Sheeba (Hotel, DRC, Grand Stand, Main Track, Car Parking & Horse Tunnel) IBMS: Honeywell (Total Around 25,000 IBMS Points) ACS: Honeywell Cleveland Clinic Abu Dhabi Project Preparing Shop Drawing, Riser Drawing and Power matrix for BMS
  • 2.
    BMS - JohnsonControls (Total Around 25,000 BMS Points) NDIA Doha Qatar Project (Emiri Pavilion, D & B Area, Parking, Mosque) BMS: Siemens (Total Around 15,000 BMS Points) FAS: Edward System Current Project NDIA Doha Qatar Project (Passenger Terminal, VIP lounges & Business Class Lounges, Staff Access Building) BMS: Siemens (Total Around 10,000 BMS Points) Sales Experience Belimo Valves & Actuators and Lonix Automation Systems Roles & Responsibilities on Site • Engineering, Supervision of Cabling, Device and Panel Installation, Termination, T&C and Maintenance/Operation of BMS/FAS/PA/ACS • Monitoring of the BMS in the control room and carried out routine maintenance of the system as recommended by the Supplier. • Handling, supervising and managing the projects in all aspects • Assisting the Site engineers in the execution of Civil Defense, Cause and Effect Matrix and the Doomsday Matrix Inspection. • Job planning according to the main contractor’s site program. • Material procurement in prior to the site requirements and preparation of material requisitions and established a full site store setup according to the material approval received from consultant. • Job allocation and man power control at site and regular monitoring of the site activities as per the schedule program. • Record the weekly/monthly reports during maintenance. • Lead a team of technicians and giving solution for the onsite issues. • Coordinate with consultant, main contractor & MEP contract for solve the issues • Prepare and submit Work Progress Report , Request Form for Inspection & Approval • Prepare DDC I/O Point Schedules & As Built Drawing • Prepare BOQ, Shop Drawing, Schematic Drawing and Power matrix for BMS • QA/QC Inspection & Safety Officer PROFESSIONAL EXPERIENCE IN INDIA I have over four years of experience in the Telecommunications field in installation and trouble shooting of Communication systems like GSM products Lucent & Siemens BTS, Microwave radios Nera & DMC, FCT products Beetel & Micromax, CDMA Product FWT & FWP and PCO monitors  Worked as Radio Technician and Electrician in ESCOTEL MOBILE COMMUNICATIONS LTD on Contract base. Delma Complex, Calicut, Kerala. India (Dec 2002 to June 2004) Roles & Responsibilities • Installation and commissioning support for Radio systems, BTS, repeaters and antennas • Trouble-shoot, repair, maintain various radio, related electronic equipment in mobile units and antennas • Log transmitter readings.
  • 3.
    • Weekly checkof backup power systems like generator, ups, battery bank • Regulate and tune signals from Radio and BTS.  Worked as Reliance PCO Engineer in Reliance LBA UP'S MARKETING Calicut, Kerala. (July 2004 to Aug 2005)  Worked as Sr. Engineer in Airtel PCO Distributor WORLD SCAN COMMUNICATIONS Vadagara, Calicut, Kerala (Sep 2005 to Oct 2008) Roles & Responsibilities • To provide on-site Customer Service Support to customers across the defined region. • Executing the installations and warranty service of Electronics Equipment’s GSM/CDMA products like FCT and FWT/FWP, PCO monitors and printers • To ensure optimum utilization of resources like spare parts, logistics etc. • Monitoring and improving the Customer base through Annual Service Contracts, sales of spare parts etc. • Forecasting and ensuring on-time availability of spare parts for the Field Service activities at customer site... Educational Profile Pre-Degree In Commerce University Calicut, Kerala. Diploma In Electronics Engineer State Board Of Technical Education Kerala. IOSH Managing Safely Course Safety Course Certified By UK. Computer Hardware Course Kerala Government Polytechnic Calicut. B.tech Electronics & Telecommunication Engineering (4th Semester completed) Karnataka open university, India Software Proficiency Personal Information Date of Birth : 20/05/1981. Language Known : English, Hindi, Malayalam and Tamil Marital Status : Married Nationality : India. Passport No : J3292664, DATE EXPIRY: 22/09/2020 Visa Status : Transferable Notification I hereby declare that the above information’s are true to the best of my Knowledge. JOBBY THOMAS Languages & Packages MS-Office, AutoCAD BMS End User Training Siemens Desigo, X Works, RXT Software