SlideShare a Scribd company logo
1 of 31
How to have a successful
Field Inspection / Approval
Presented by: Jozef Jachniak, P.Eng.
April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals
1
Where to start?
 Define the scope of your project (one-off, limited run, mass production)
 Identify which disciplines will be involved (gas, electrical, pressure, plumbing,
building, fire, food, health, worker’s safety, etc)
 Define where your installation(s) will be located
 Identify who has jurisdiction over that location (AHJ)
 Find out what is the outcome that you need (Initial Assessment, Certification,
Field Approval, Installation Permit, or something else (?))
 Find organization(s) which is designated, knowledgeable and experienced to
deal with these disciplines, jurisdictions, and the outcome.
April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals
2
What is AHJ?
 Authority Having Jurisdiction (AHJ) – the governmental body responsible for the
enforcement of any part of a Code, or the official or agency designated by that
body to exercise such a function.
 The AHJ operate mostly on a provincial level, but there is often more that one
AHJ in each province.
 There are some AHJ’s, which have jurisdiction across many provinces (NEB,
Transport Canada)
 There are different AHJ’s for different disciplines (gas, electrical, pressure,
building, plumbing, health, food, etc.)
 Alberta is unique as some AHJ powers are delegated to municipalities.
April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals
3
What is “Certified”?
 Certified (with respect to any appliance, accessory, component, equipment, or
manufacturer’s installation instructions) – investigated and identified by a
designated testing organization as conforming to recognized standards,
requirements, or accepted test reports.
 Certification process includes:
STANDARD(S) -> TESTING LAB -> SAMPLES OF PRODUCT -> ONGOING
PRODUCTION SURVEILLANCE
 Certification cannot be done to a Code because Code does not include test
requirements. CSA B149 and C22.1 are Codes.
 Certification is meant to be used for “repetitive production” of identical
products.
April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals
4
What is “Field Approved”?
 Field Approved (with respect to any appliance, accessory, component,
equipment, or manufacturer’s installation instructions) – investigated and
identified by a designated inspection organization as conforming to
recognized codes, requirements, or accepted test reports.
 Field Approval process includes:
CODES -> FIELD INSPECTION-> EACH PRODUCT-> ONCE IN A
LIFETIME
 Field Approval is based on designated judgment of conformance of one-
off non-certified products, one product at a time.
April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals
5
Certification vs. Field Approval
Both require accreditation (CB to ISO 17065, IB to ISO
17020)
Both require recognition by applicable Authority Having
Jurisdiction (AHJ)
Both are valid until the product is altered
Once altered, such product must be Field Approved if it is
not identical to its certified sample
April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals
6
What is “B149.3”?
 CSA B149.3 is a “Code for field approval of fuel-related components on
appliances and equipment”
 B149.3 is a guideline for designated “inspection organizations”
 B149.3 is a minimum requirement which must be met. It does not
prohibit better that minimum solutions
 B149.3 is not a design handbook, and it does not and never will cover all
applications
 B149.3 and other Codes are not enforceable without provincial
regulations behind them
April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals
7
SAFETY vs. COMPLIANCE vs. LEGALITY
Safety is paramount to compliance
Assembly of compliant components does not make the
assembly automatically compliant or legal
A compliant system, which is unsafe is not acceptable
A compliant system, which does not work is not acceptable
A compliant system, which is illegal is not acceptable
April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals
8
4 ASPECTS OF SAFETY
Safety of people (operators and public)
Safety of equipment (appliance and adjacent
installation and building)
Safety of process
Safety of environment
April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals
9
What are “Appliance”, “Accessory”,
“Equipment”, and “Component”
 Appliance - A device to convert gas into energy, the term includes
any component, control, wiring, piping or tubing required to be part
of the device
 Accessory – a part capable of performing an independent function
and contributing to the function of an appliance that is serves
 Equipment – a device other than appliance, accessory or
component that is connected to a piping or tubing system
 Component – an essential part of an appliance or equipment
April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals
10
What does Alberta Safety Codes Act require?
 Act applies to fire protection, and applies to the design, manufacture,
construction, installation, operation and maintenance of buildings, electrical
systems, elevating devices, gas systems, plumbing and private sewage disposal
systems, pressure equipment.
 Responsibility for compliance rests on owner, designer, manufacturer,
contractor, vendor, professional engineer.
 Regulations identify codes which are in force in each discipline (CSA B149.1,
B149.2, B149.5, C22.1, etc)
 No person shall manufacture, install, sell or offer for sale any equipment related
to gas systems for use in Alberta unless the equipment has been tested and
certified, or inspected and accepted by a body accredited by the Standards
Council of Canada
April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals
11
What do individual codes reference?
 CSA B149.1 references 59 codes and standards including B51,
B149.2, B149.3, C22.1, Z662, also ANSI, ASME, ASTM, NRC, ULc
standards
 CSA B149.2 - 29 references
 CSA B149.3 - 27 references
 CSA B149.5 - 28 references
 API, NFPA, FM, EN standards are also referenced.
 Multiple codes, standards and regulations are
interconnected with each other.
April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals
12
What must be included in a Field Approval?
Any component, control, wiring, piping or tubing
required to be part of the appliance
Accessories and connected equipment
Performance and safety of the entire assembly
References to other codes and standards
Considerations for other provincial/federal regulations
April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals
13
Field Approval Puzzle
April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals
14
SCC Accredited Gas IB program
 CAN-P-1608 Appendix C – Commercial and Industrial Gas-fired
Appliances and Equipment
 IB evaluates appliances and equipment for safety and suitability
 B149.1, B149.2, B149.3, C22.1, BNQ 1784-000, B51
 Variances and provincial deviations as may be issued from time to time
by the Provincial or Territorial Regulatory Authority
 Relevant requirements of the National Building Code of Canada and the
National Fire Code of Canada
April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals
15
SCC Accredited Gas IB program
Multi-disciplinary third party inspection program
Requires that its inspectors are registered P.Eng.(s) who are
competent in the design, operation and safety inspection of
gas-fired appliances and equipment
Inspections are conducted in a consistent and systematic
manner
Inspectors can appropriately apply codes, variances and
standards
April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals
16
Code Interpretations and Variances
 As a Type C IB and a registered engineering consulting company
ENEFEN is accredited by SCC to include elements of professional
judgments and engineering design in Field Approvals
 This allows for broader range of Code Interpretations as well as
Variances based on the intent of the Codes
 The Variance process uses a Valid Technical Reason (VTR) method
where the client provides:
a) technical reason for not following the Code exactly
b) an equal or better solution which will meet the same intent.
April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals
17
Who is SCC?
Standards Council of Canada Safety Codes Council of Alberta
Federal Crown Corporation Statutory provincial corporation
Reports to Parliament through the
Minister of Industry
Responsible to Minister of Alberta
Municipal Affairs
Promotes efficient and effective
standardization in Canada
Works under Authority of Safety
Codes Act (1991)
Accredits Standards Development
Organizations (SDO), Certification
Bodies (CB), Inspection Bodies (IB),
GHG Verifiers and Validators
Accredits municipalities, corporations,
and agencies
Trains and certifies Safety Codes
Officers
April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals
18
Province vs. Federal Role
April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals
19
Who Does What?
 Certification Bodies (CBs) – Certify Products. In some provinces provide non-
accredited gas Special Inspection services under provincial legislation
 Inspection Bodies (IBs) – Field Approve (Special Inspections) Non-certified systems
(electrical and gas) – DO NOT CERTIFY PRODUCTS
 Accredited Municipalities – sell permits and inspect installations / construction
 Accredited Corporations – administer their own permits and inspect their own
installations / construction
 Accredited Inspection Agencies – provide inspection services to accredited
municipalities and corporations
 Safety Codes Officers – work for accredited municipalities, corporations, agencies.
Inspect installation / construction. DO NOT FIELD APPROVE OR CERTIFY
PRODUCTS.
 Licensed Gas Fitters and Electricians – install, pull permits. ARE NOT LICENSED TO
INSTALL NON-CERTIFIED OR NON-FIELD APPROVED SYSTEMS
April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals
20
Field Approval is required
 When installing new non-certified appliance
 When relocating stationary non-certified appliance
 When upgrading or altering existing certified, non-certified or
previously field approved appliance:
change to burners, burner pressure, capacity outside previously
approved maximum and minimum range, BMS, change of
application, change of fuel type, voltage, instrument gas type,
indoor/outdoor location, fuel train configuration – IN GENERAL
WHEN DRAWINGS ARE CHANGED
April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals
21
Field Approval of Portable/Movable Appliances
Applicable to appliance deployments which are short by
their nature and where location of appliances changes
frequently
Includes review of mobilization and demobilization
procedures and logs
Requires qualified personnel trained in moving, testing
and maintaining these appliances.
April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals
22
Field Approval not required
When appliance is destined for jurisdiction which does
not require it, although it can be done on a voluntary
basis to limit liability
When installing certified appliance
When maintaining an appliance
When moving portable/movable appliance
April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals
23
What is maintenance?
All activities required to ensure continuing safety and
performance of an appliance according to manufacturer’s
instructions
Includes, cleaning, lubricating, refilling, painting, testing,
replacing of worn-out components with parts that
provide equivalent operating characteristics, re-adjusting
to original performance specifications.
April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals
24
What do I want?
INITIAL DISCOVERY DESIGN SPECIFIC
Help with code interpretation Use Standard Design Code Documentation
Help with conceptual design Use Custom Design Code Documentation
Review my idea Develop Custom Design Code Documentation
I don’t know what I have and I want someone to
visit to find out
Help with my own Documentation
Use my own Documentation
ASSESSMENT FIELD APPROVAL
April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals
25
ASSESSMENT to FIELD APPROVAL BRIDGEASSESSMENT to FIELD APPROVAL BRIDGE
What is a Design Code?
 Off-the-shelf documentation package showing practical application of the
Codes. Includes P&ID, Electrical and Bill of Materials
April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals
26
Documents for Field Approval
Description of any hazardous condition which
may affect appliance or its installation
Specification of electrical area classification
Process and Instrumentation Diagram (P&ID)
Fuel, overpressure protection, venting
specifications
Bill of Materials (BOM) or Instrument Data Sheets
Commissioning / Combustion Report and list of
setpoints, stack readings
Electrical Wiring Diagram Installation, Operation and Maintenance Manual
Burner Management System specification Fuel switchover procedure (if applicable)
Operating narrative, shutdown key Appliance move procedure and log
April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals
27
Field Approval Steps
 Step I – Design Approval in Principle – intended to ensure that the
design is approvable, should be done prior to construction
 Step II – Shop Inspection – this is an optional step intended to check if
the construction is progressing according to Step I
 Step III – Field Inspection – intended to check final outcome of the
construction and installation in the field, should be done after the
appliance is installed in its final destination, commissioned and started,
but prior to handover to operations.
Note: appliance can be provisionally started for testing purposes
providing such startup is supervised by a qualified technician.
April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals
28
What Do I Get?
April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals
29
GAS FIRED APPLIANCE FIELD APPROVAL IN PROGRESS
+
Appliance can be operated.
This is a temporary Field Inspection Plate. It must be replaced with
the permanent Final Field Approval / Rating Plate once received.
ENEFEN
Energy
Efficiency
Engineering Ltd.
780-665-2863
www.enefen.com
Field Approval
Number
Inspection Date
Inspected By
ENEFEN is accredited by
the Standards Council of
Canada as an Inspection
Body for Gas-fired
Appliances and
Equipment
LSD Location
Appliance Tag /
Description
GAS FIRED APPLIANCE FIELD APPROVAL IN PROGRESS
+This installation has minor Code deficiencies. Proof Of Correction required
within 30 days of the date indicated below.
Appliance can be conditionally operated during this period.
This is a temporary Field Inspection Plate. Once proof has been confirmed it must be
replaced with the permanent Final Field Approval / Rating Plate once received.
Reinspection is not required.
ENEFEN
Energy
Efficiency
Engineering Ltd.
780-665-2863
www.enefen.com
Field Approval
Number
Inspection Date
Inspected By
ENEFEN is accredited by
the Standards Council of
Canada as an Inspection
Body for Gas-fired
Appliances and
Equipment
LSD Location
Appliance Tag /
Description
GAS FIRED APPLIANCE FIELD APPROVAL IN PROGRESS
+This installation has major deficiencies, which should be
corrected immediately.
Appliance should not be operated until deficiencies are corrected.
Reinspection is required after correction of all deficiencies..
ENEFEN
Energy
Efficiency
Engineering Ltd.
780-665-2863
www.enefen.com
Field Approval
Number
Inspection Date
Inspected By
ENEFEN is accredited by
the Standards Council of
Canada as an Inspection
Body for Gas-fired
Appliances and
Equipment
LSD Location
Appliance Tag /
Description
How to Finish an Approval Project?
 Respond to all deficiencies using online POC (proof of correction)
process – upload photos, other docs, short description of what was
done
 Once all POC’s are accepted a final Field Approval is issued and a
6”x 8” stainless steel rating/approval plate is automatically shipped
to designated address
 Replace the temporary inspection plate with final stainless steel
plate, and save the report in a suitable place.
 Copy of the report is available from our online portal to the
appliance owner, our client and the consultant (as applicable)
April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals
30
You have a successful Field Approval
April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals
31
ENEFEN Energy Efficiency Engineering Ltd.
for
Design Code Field Approval
Appliance Approved
ENEFEN Engineering Ltd.
LSD:
Tag Number:
ENEFEN Engineering Ltd.
Leduc AB
Field I nspect ions
15-26-49-25-W4
Oil Product ion Tank
08/ 08/ 2014
www.ENEFEN.com
Suite 705, 101-5101 50th Ave. • Leduc, AB T9E 0B9 • +1-780-665-2863 • Fax: +1-866-583-0520
ENEFEN Project :
Ow ner / Operat or:
Report / Print Date:
Plant :
Appliance Type:
NFN117100
CONFIDENTIAL
Attention
This Appliance is approved and may be operated.
This package contains a rating/approval plate that must be attached to the appliance
and may be subject to an inspection by the Authority Having Jurisdiction.
Area:
Appliance Serial No:
S A M P L E O N L Y
RATI NG PLATE
NFN Number
Design Code
Inspected By
Inspected
Prepared By
Reviewed By
NFN117100
304A-P2-NF003
Kuda Midzi
Rodger Talstra P.Eng.
Product Type
Project Status
Owner
Plant
Area
Contact
Design Code Field Approval
Appliance Approved
LSD
Tag
Serial
Phone
15-26-49-25-W4
Leduc AB
20140808_1146
ENEFEN Engineering Ltd.
Field Inspections
GAS FIRED APPLIANCE RATING PLATE
New Install
Oil Production Tank
15-26-49-25-W4
2625 ft | 800 m
-29 deg C | -20 deg F
40 deg C | 104 deg F
Casing Gas
Sweet Wet
255 kPag | 37.0 psig
Not approved for secondary fuel use
Casing Gas
Sweet Wet
68.9 kPag | 10.0 psig
0.98 GJ/h | 0.93 MM Btuh
1
68.9 kPag | 10.0 psig
6.9 kPag | 1.0 psig
6.9 kPag | 1.0 psig
Unclassified
Class 1 Zone 1
Class 1 Zone 2
12 VDC
New Install or Upgrade
Appliance Type
Location LSD
Elevation Above Sea Level
Ambient Temperature Min
Ambient Temperature Max
Main Fuel Type
Main Fuel Quality
Main Fuel Inlet Pressure
Secondary Fuel Type
Pilot Fuel Type
Pilot Fuel Quality
Pilot Fuel Inlet Pressure
Appliance Max Fuel Input (HHV)
Number of Burners per Appliance
Maximum Burner Pressure
Minimum Burner Pressure
Pilot Pressure
Electrical Area Class At Burner
Electrical Area Class At Fuel Train
Electrical Area Class At Control Panel
Primary Control Power
# 307 4806 47th Avenue, Leduc, AB, T9E 5X3
ENEFEN Engineering Ltd.
GAS FIRED APPLIANCE FIELD APPROVAL
ENEFEN ENERGY EFFICIENCY ENGINEERING LTD.
ENEFEN is accredited by the Standards Council of Canada as an Inspection Body for gas-fired appliances and
equipment. Gas and electrical safety evaluation based on Canadian codes requirements outlined in CAN-P-1608
Appendix C. This approval represents the results of a single field inspection and is not a product certification. This
approval is void if this appliance is altered or relocated.
ENEFEN est accrédité par le Conseil Canadien des Normes en tant qu'Organisme d'Inspection pour les appareils et
équipement à gaz. L'évaluation de la sécurité du gaz et électrique est basée sur les exigences des codes canadiens
énoncés à l'annexe C du CAN-P-1608. Cette approbation représente les résultats d'une seule inspection sur le terrain
et ne constitue pas une certification du produit. Cette approbation est nulle si cet appareil est modifié ou déplacé.
Approved By:
Approval Date:
Field Approval Number: NFN117100
Suite 705, 101-5101 50th Ave. • Leduc, AB T9E 0B9 • +1-780-665-2863 • Fax: +1-866-583-0520
www.ENEFEN.com
ENEFEN Energy Efficiency Engineering Ltd.

More Related Content

What's hot

SiteFM Life Safety Drawings for Accreditation
SiteFM Life Safety Drawings for AccreditationSiteFM Life Safety Drawings for Accreditation
SiteFM Life Safety Drawings for AccreditationMichele Thompson
 
Introduction to The Augustus Group and RBI
Introduction to The Augustus Group and RBIIntroduction to The Augustus Group and RBI
Introduction to The Augustus Group and RBIEdwin A Merrick
 
Ocs training calendar 2022
Ocs training calendar 2022Ocs training calendar 2022
Ocs training calendar 2022Muanisa Waras
 
Simmco Presentation
Simmco PresentationSimmco Presentation
Simmco Presentationsimmco
 
Refrigeration Brochure
Refrigeration BrochureRefrigeration Brochure
Refrigeration Brochurea1-cbiss
 
PROJECT HEALTH, SAFETY, AND ENVIRONMENTAL PLAN
PROJECT HEALTH, SAFETY, AND ENVIRONMENTAL PLANPROJECT HEALTH, SAFETY, AND ENVIRONMENTAL PLAN
PROJECT HEALTH, SAFETY, AND ENVIRONMENTAL PLANDwarika Bhushan Sharma
 
Qc (welding & ndt) course
Qc (welding & ndt) courseQc (welding & ndt) course
Qc (welding & ndt) courseramakrishna333
 
OSHA and Houston Update Oil and Gas Focus
OSHA and Houston Update Oil and Gas FocusOSHA and Houston Update Oil and Gas Focus
OSHA and Houston Update Oil and Gas FocusJames Shelton
 
General Presentation On Augustus
General Presentation On AugustusGeneral Presentation On Augustus
General Presentation On AugustusEdwin A Merrick
 

What's hot (16)

SiteFM Life Safety Drawings for Accreditation
SiteFM Life Safety Drawings for AccreditationSiteFM Life Safety Drawings for Accreditation
SiteFM Life Safety Drawings for Accreditation
 
11 refining
11 refining11 refining
11 refining
 
Introduction to The Augustus Group and RBI
Introduction to The Augustus Group and RBIIntroduction to The Augustus Group and RBI
Introduction to The Augustus Group and RBI
 
Ocs training calendar 2022
Ocs training calendar 2022Ocs training calendar 2022
Ocs training calendar 2022
 
Simmco Presentation
Simmco PresentationSimmco Presentation
Simmco Presentation
 
Refrigeration Brochure
Refrigeration BrochureRefrigeration Brochure
Refrigeration Brochure
 
PROJECT HEALTH, SAFETY, AND ENVIRONMENTAL PLAN
PROJECT HEALTH, SAFETY, AND ENVIRONMENTAL PLANPROJECT HEALTH, SAFETY, AND ENVIRONMENTAL PLAN
PROJECT HEALTH, SAFETY, AND ENVIRONMENTAL PLAN
 
Qc (welding & ndt) course
Qc (welding & ndt) courseQc (welding & ndt) course
Qc (welding & ndt) course
 
08 dust safety and health surveillance
08 dust safety and health surveillance08 dust safety and health surveillance
08 dust safety and health surveillance
 
OSHA and Houston Update Oil and Gas Focus
OSHA and Houston Update Oil and Gas FocusOSHA and Houston Update Oil and Gas Focus
OSHA and Houston Update Oil and Gas Focus
 
Instrumentation Inspector
Instrumentation InspectorInstrumentation Inspector
Instrumentation Inspector
 
T Sachin I_11.05
T Sachin I_11.05T Sachin I_11.05
T Sachin I_11.05
 
General Presentation On Augustus
General Presentation On AugustusGeneral Presentation On Augustus
General Presentation On Augustus
 
Api 510
Api 510Api 510
Api 510
 
Imran_CV
Imran_CV Imran_CV
Imran_CV
 
Infringement search
Infringement searchInfringement search
Infringement search
 

Similar to Enefen how to_have_a_successful_field_inspection_approval

IECEx: Conformity Assessment Solution for the Ex field
IECEx: Conformity Assessment Solution for the Ex fieldIECEx: Conformity Assessment Solution for the Ex field
IECEx: Conformity Assessment Solution for the Ex fieldStatybos Akademija
 
What You Need to Know About Medical Electrical Standards Updates (and how the...
What You Need to Know About Medical Electrical Standards Updates (and how the...What You Need to Know About Medical Electrical Standards Updates (and how the...
What You Need to Know About Medical Electrical Standards Updates (and how the...Greenlight Guru
 
Api 570 course material
Api 570 course materialApi 570 course material
Api 570 course materialTASSIO DOURADO
 
AN ISO SCHEME FOR USE AS A REVIEW GUIDE OR FOR CERTIFICATION OF PERFORMANCE-B...
AN ISO SCHEME FOR USE AS A REVIEW GUIDE OR FOR CERTIFICATION OF PERFORMANCE-B...AN ISO SCHEME FOR USE AS A REVIEW GUIDE OR FOR CERTIFICATION OF PERFORMANCE-B...
AN ISO SCHEME FOR USE AS A REVIEW GUIDE OR FOR CERTIFICATION OF PERFORMANCE-B...Dr. Monideep Dey
 
Lightscene 2018: Global Market Access – What should I know when I am exportin...
Lightscene 2018: Global Market Access – What should I know when I am exportin...Lightscene 2018: Global Market Access – What should I know when I am exportin...
Lightscene 2018: Global Market Access – What should I know when I am exportin...Institution of Lighting Professionals
 
UON-Project-Handover-Guideline-v1.2-010920.pdf
UON-Project-Handover-Guideline-v1.2-010920.pdfUON-Project-Handover-Guideline-v1.2-010920.pdf
UON-Project-Handover-Guideline-v1.2-010920.pdfHabtamuGaroma3
 
2 mcs cert process
2 mcs cert process2 mcs cert process
2 mcs cert processedge7557
 
Building energy codes
Building energy codesBuilding energy codes
Building energy codespdh-pro
 
FCC certification
FCC certificationFCC certification
FCC certificationNemko Italy
 
BER Documentary Evidence – Certification
BER Documentary Evidence – CertificationBER Documentary Evidence – Certification
BER Documentary Evidence – CertificationSustainableEnergyAut
 
Certification of Personnel Competence (CoPC). IECEx
Certification of Personnel Competence (CoPC). IECExCertification of Personnel Competence (CoPC). IECEx
Certification of Personnel Competence (CoPC). IECExStatybos Akademija
 
searchlocalpro.com-Types Of Certifications For HVAC Owners.pdf
searchlocalpro.com-Types Of Certifications For HVAC Owners.pdfsearchlocalpro.com-Types Of Certifications For HVAC Owners.pdf
searchlocalpro.com-Types Of Certifications For HVAC Owners.pdfAhmad Affan
 
ACC ORASCOM PROJECT HANDOVER DOCUMENTATION PROCEDURE ACC Orascom Assiut PROJE...
ACC ORASCOM PROJECT HANDOVER DOCUMENTATION PROCEDURE ACC Orascom Assiut PROJE...ACC ORASCOM PROJECT HANDOVER DOCUMENTATION PROCEDURE ACC Orascom Assiut PROJE...
ACC ORASCOM PROJECT HANDOVER DOCUMENTATION PROCEDURE ACC Orascom Assiut PROJE...Sarah Adams
 
URS - USER REQUIREMENT SPECIFICATIONS.pdf
URS - USER REQUIREMENT SPECIFICATIONS.pdfURS - USER REQUIREMENT SPECIFICATIONS.pdf
URS - USER REQUIREMENT SPECIFICATIONS.pdfDiegoMonge23
 
CE Presentation
CE Presentation CE Presentation
CE Presentation Intertek CE
 
Lecture 1 Bye Laws,codes and spatial data.pdf
Lecture 1 Bye Laws,codes and spatial data.pdfLecture 1 Bye Laws,codes and spatial data.pdf
Lecture 1 Bye Laws,codes and spatial data.pdfMairaNoor4
 
20060516 roles and_responsibilities_final
20060516 roles and_responsibilities_final20060516 roles and_responsibilities_final
20060516 roles and_responsibilities_finaltwevans
 

Similar to Enefen how to_have_a_successful_field_inspection_approval (20)

IECEx: Conformity Assessment Solution for the Ex field
IECEx: Conformity Assessment Solution for the Ex fieldIECEx: Conformity Assessment Solution for the Ex field
IECEx: Conformity Assessment Solution for the Ex field
 
What You Need to Know About Medical Electrical Standards Updates (and how the...
What You Need to Know About Medical Electrical Standards Updates (and how the...What You Need to Know About Medical Electrical Standards Updates (and how the...
What You Need to Know About Medical Electrical Standards Updates (and how the...
 
Api 570 course material
Api 570 course materialApi 570 course material
Api 570 course material
 
AN ISO SCHEME FOR USE AS A REVIEW GUIDE OR FOR CERTIFICATION OF PERFORMANCE-B...
AN ISO SCHEME FOR USE AS A REVIEW GUIDE OR FOR CERTIFICATION OF PERFORMANCE-B...AN ISO SCHEME FOR USE AS A REVIEW GUIDE OR FOR CERTIFICATION OF PERFORMANCE-B...
AN ISO SCHEME FOR USE AS A REVIEW GUIDE OR FOR CERTIFICATION OF PERFORMANCE-B...
 
Lightscene 2018: Global Market Access – What should I know when I am exportin...
Lightscene 2018: Global Market Access – What should I know when I am exportin...Lightscene 2018: Global Market Access – What should I know when I am exportin...
Lightscene 2018: Global Market Access – What should I know when I am exportin...
 
UON-Project-Handover-Guideline-v1.2-010920.pdf
UON-Project-Handover-Guideline-v1.2-010920.pdfUON-Project-Handover-Guideline-v1.2-010920.pdf
UON-Project-Handover-Guideline-v1.2-010920.pdf
 
QC E&I alhassan
QC E&I alhassanQC E&I alhassan
QC E&I alhassan
 
2 mcs cert process
2 mcs cert process2 mcs cert process
2 mcs cert process
 
FORTIFIED for Safer Business™
FORTIFIED for Safer Business™FORTIFIED for Safer Business™
FORTIFIED for Safer Business™
 
Building energy codes
Building energy codesBuilding energy codes
Building energy codes
 
FCC certification
FCC certificationFCC certification
FCC certification
 
BER Documentary Evidence – Certification
BER Documentary Evidence – CertificationBER Documentary Evidence – Certification
BER Documentary Evidence – Certification
 
Certification of Personnel Competence (CoPC). IECEx
Certification of Personnel Competence (CoPC). IECExCertification of Personnel Competence (CoPC). IECEx
Certification of Personnel Competence (CoPC). IECEx
 
Cpr conference tod2014_v02.ppt
Cpr conference tod2014_v02.pptCpr conference tod2014_v02.ppt
Cpr conference tod2014_v02.ppt
 
searchlocalpro.com-Types Of Certifications For HVAC Owners.pdf
searchlocalpro.com-Types Of Certifications For HVAC Owners.pdfsearchlocalpro.com-Types Of Certifications For HVAC Owners.pdf
searchlocalpro.com-Types Of Certifications For HVAC Owners.pdf
 
ACC ORASCOM PROJECT HANDOVER DOCUMENTATION PROCEDURE ACC Orascom Assiut PROJE...
ACC ORASCOM PROJECT HANDOVER DOCUMENTATION PROCEDURE ACC Orascom Assiut PROJE...ACC ORASCOM PROJECT HANDOVER DOCUMENTATION PROCEDURE ACC Orascom Assiut PROJE...
ACC ORASCOM PROJECT HANDOVER DOCUMENTATION PROCEDURE ACC Orascom Assiut PROJE...
 
URS - USER REQUIREMENT SPECIFICATIONS.pdf
URS - USER REQUIREMENT SPECIFICATIONS.pdfURS - USER REQUIREMENT SPECIFICATIONS.pdf
URS - USER REQUIREMENT SPECIFICATIONS.pdf
 
CE Presentation
CE Presentation CE Presentation
CE Presentation
 
Lecture 1 Bye Laws,codes and spatial data.pdf
Lecture 1 Bye Laws,codes and spatial data.pdfLecture 1 Bye Laws,codes and spatial data.pdf
Lecture 1 Bye Laws,codes and spatial data.pdf
 
20060516 roles and_responsibilities_final
20060516 roles and_responsibilities_final20060516 roles and_responsibilities_final
20060516 roles and_responsibilities_final
 

Recently uploaded

SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...ranjana rawat
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 

Recently uploaded (20)

SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 

Enefen how to_have_a_successful_field_inspection_approval

  • 1. How to have a successful Field Inspection / Approval Presented by: Jozef Jachniak, P.Eng. April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals 1
  • 2. Where to start?  Define the scope of your project (one-off, limited run, mass production)  Identify which disciplines will be involved (gas, electrical, pressure, plumbing, building, fire, food, health, worker’s safety, etc)  Define where your installation(s) will be located  Identify who has jurisdiction over that location (AHJ)  Find out what is the outcome that you need (Initial Assessment, Certification, Field Approval, Installation Permit, or something else (?))  Find organization(s) which is designated, knowledgeable and experienced to deal with these disciplines, jurisdictions, and the outcome. April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals 2
  • 3. What is AHJ?  Authority Having Jurisdiction (AHJ) – the governmental body responsible for the enforcement of any part of a Code, or the official or agency designated by that body to exercise such a function.  The AHJ operate mostly on a provincial level, but there is often more that one AHJ in each province.  There are some AHJ’s, which have jurisdiction across many provinces (NEB, Transport Canada)  There are different AHJ’s for different disciplines (gas, electrical, pressure, building, plumbing, health, food, etc.)  Alberta is unique as some AHJ powers are delegated to municipalities. April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals 3
  • 4. What is “Certified”?  Certified (with respect to any appliance, accessory, component, equipment, or manufacturer’s installation instructions) – investigated and identified by a designated testing organization as conforming to recognized standards, requirements, or accepted test reports.  Certification process includes: STANDARD(S) -> TESTING LAB -> SAMPLES OF PRODUCT -> ONGOING PRODUCTION SURVEILLANCE  Certification cannot be done to a Code because Code does not include test requirements. CSA B149 and C22.1 are Codes.  Certification is meant to be used for “repetitive production” of identical products. April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals 4
  • 5. What is “Field Approved”?  Field Approved (with respect to any appliance, accessory, component, equipment, or manufacturer’s installation instructions) – investigated and identified by a designated inspection organization as conforming to recognized codes, requirements, or accepted test reports.  Field Approval process includes: CODES -> FIELD INSPECTION-> EACH PRODUCT-> ONCE IN A LIFETIME  Field Approval is based on designated judgment of conformance of one- off non-certified products, one product at a time. April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals 5
  • 6. Certification vs. Field Approval Both require accreditation (CB to ISO 17065, IB to ISO 17020) Both require recognition by applicable Authority Having Jurisdiction (AHJ) Both are valid until the product is altered Once altered, such product must be Field Approved if it is not identical to its certified sample April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals 6
  • 7. What is “B149.3”?  CSA B149.3 is a “Code for field approval of fuel-related components on appliances and equipment”  B149.3 is a guideline for designated “inspection organizations”  B149.3 is a minimum requirement which must be met. It does not prohibit better that minimum solutions  B149.3 is not a design handbook, and it does not and never will cover all applications  B149.3 and other Codes are not enforceable without provincial regulations behind them April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals 7
  • 8. SAFETY vs. COMPLIANCE vs. LEGALITY Safety is paramount to compliance Assembly of compliant components does not make the assembly automatically compliant or legal A compliant system, which is unsafe is not acceptable A compliant system, which does not work is not acceptable A compliant system, which is illegal is not acceptable April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals 8
  • 9. 4 ASPECTS OF SAFETY Safety of people (operators and public) Safety of equipment (appliance and adjacent installation and building) Safety of process Safety of environment April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals 9
  • 10. What are “Appliance”, “Accessory”, “Equipment”, and “Component”  Appliance - A device to convert gas into energy, the term includes any component, control, wiring, piping or tubing required to be part of the device  Accessory – a part capable of performing an independent function and contributing to the function of an appliance that is serves  Equipment – a device other than appliance, accessory or component that is connected to a piping or tubing system  Component – an essential part of an appliance or equipment April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals 10
  • 11. What does Alberta Safety Codes Act require?  Act applies to fire protection, and applies to the design, manufacture, construction, installation, operation and maintenance of buildings, electrical systems, elevating devices, gas systems, plumbing and private sewage disposal systems, pressure equipment.  Responsibility for compliance rests on owner, designer, manufacturer, contractor, vendor, professional engineer.  Regulations identify codes which are in force in each discipline (CSA B149.1, B149.2, B149.5, C22.1, etc)  No person shall manufacture, install, sell or offer for sale any equipment related to gas systems for use in Alberta unless the equipment has been tested and certified, or inspected and accepted by a body accredited by the Standards Council of Canada April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals 11
  • 12. What do individual codes reference?  CSA B149.1 references 59 codes and standards including B51, B149.2, B149.3, C22.1, Z662, also ANSI, ASME, ASTM, NRC, ULc standards  CSA B149.2 - 29 references  CSA B149.3 - 27 references  CSA B149.5 - 28 references  API, NFPA, FM, EN standards are also referenced.  Multiple codes, standards and regulations are interconnected with each other. April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals 12
  • 13. What must be included in a Field Approval? Any component, control, wiring, piping or tubing required to be part of the appliance Accessories and connected equipment Performance and safety of the entire assembly References to other codes and standards Considerations for other provincial/federal regulations April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals 13
  • 14. Field Approval Puzzle April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals 14
  • 15. SCC Accredited Gas IB program  CAN-P-1608 Appendix C – Commercial and Industrial Gas-fired Appliances and Equipment  IB evaluates appliances and equipment for safety and suitability  B149.1, B149.2, B149.3, C22.1, BNQ 1784-000, B51  Variances and provincial deviations as may be issued from time to time by the Provincial or Territorial Regulatory Authority  Relevant requirements of the National Building Code of Canada and the National Fire Code of Canada April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals 15
  • 16. SCC Accredited Gas IB program Multi-disciplinary third party inspection program Requires that its inspectors are registered P.Eng.(s) who are competent in the design, operation and safety inspection of gas-fired appliances and equipment Inspections are conducted in a consistent and systematic manner Inspectors can appropriately apply codes, variances and standards April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals 16
  • 17. Code Interpretations and Variances  As a Type C IB and a registered engineering consulting company ENEFEN is accredited by SCC to include elements of professional judgments and engineering design in Field Approvals  This allows for broader range of Code Interpretations as well as Variances based on the intent of the Codes  The Variance process uses a Valid Technical Reason (VTR) method where the client provides: a) technical reason for not following the Code exactly b) an equal or better solution which will meet the same intent. April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals 17
  • 18. Who is SCC? Standards Council of Canada Safety Codes Council of Alberta Federal Crown Corporation Statutory provincial corporation Reports to Parliament through the Minister of Industry Responsible to Minister of Alberta Municipal Affairs Promotes efficient and effective standardization in Canada Works under Authority of Safety Codes Act (1991) Accredits Standards Development Organizations (SDO), Certification Bodies (CB), Inspection Bodies (IB), GHG Verifiers and Validators Accredits municipalities, corporations, and agencies Trains and certifies Safety Codes Officers April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals 18
  • 19. Province vs. Federal Role April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals 19
  • 20. Who Does What?  Certification Bodies (CBs) – Certify Products. In some provinces provide non- accredited gas Special Inspection services under provincial legislation  Inspection Bodies (IBs) – Field Approve (Special Inspections) Non-certified systems (electrical and gas) – DO NOT CERTIFY PRODUCTS  Accredited Municipalities – sell permits and inspect installations / construction  Accredited Corporations – administer their own permits and inspect their own installations / construction  Accredited Inspection Agencies – provide inspection services to accredited municipalities and corporations  Safety Codes Officers – work for accredited municipalities, corporations, agencies. Inspect installation / construction. DO NOT FIELD APPROVE OR CERTIFY PRODUCTS.  Licensed Gas Fitters and Electricians – install, pull permits. ARE NOT LICENSED TO INSTALL NON-CERTIFIED OR NON-FIELD APPROVED SYSTEMS April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals 20
  • 21. Field Approval is required  When installing new non-certified appliance  When relocating stationary non-certified appliance  When upgrading or altering existing certified, non-certified or previously field approved appliance: change to burners, burner pressure, capacity outside previously approved maximum and minimum range, BMS, change of application, change of fuel type, voltage, instrument gas type, indoor/outdoor location, fuel train configuration – IN GENERAL WHEN DRAWINGS ARE CHANGED April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals 21
  • 22. Field Approval of Portable/Movable Appliances Applicable to appliance deployments which are short by their nature and where location of appliances changes frequently Includes review of mobilization and demobilization procedures and logs Requires qualified personnel trained in moving, testing and maintaining these appliances. April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals 22
  • 23. Field Approval not required When appliance is destined for jurisdiction which does not require it, although it can be done on a voluntary basis to limit liability When installing certified appliance When maintaining an appliance When moving portable/movable appliance April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals 23
  • 24. What is maintenance? All activities required to ensure continuing safety and performance of an appliance according to manufacturer’s instructions Includes, cleaning, lubricating, refilling, painting, testing, replacing of worn-out components with parts that provide equivalent operating characteristics, re-adjusting to original performance specifications. April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals 24
  • 25. What do I want? INITIAL DISCOVERY DESIGN SPECIFIC Help with code interpretation Use Standard Design Code Documentation Help with conceptual design Use Custom Design Code Documentation Review my idea Develop Custom Design Code Documentation I don’t know what I have and I want someone to visit to find out Help with my own Documentation Use my own Documentation ASSESSMENT FIELD APPROVAL April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals 25 ASSESSMENT to FIELD APPROVAL BRIDGEASSESSMENT to FIELD APPROVAL BRIDGE
  • 26. What is a Design Code?  Off-the-shelf documentation package showing practical application of the Codes. Includes P&ID, Electrical and Bill of Materials April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals 26
  • 27. Documents for Field Approval Description of any hazardous condition which may affect appliance or its installation Specification of electrical area classification Process and Instrumentation Diagram (P&ID) Fuel, overpressure protection, venting specifications Bill of Materials (BOM) or Instrument Data Sheets Commissioning / Combustion Report and list of setpoints, stack readings Electrical Wiring Diagram Installation, Operation and Maintenance Manual Burner Management System specification Fuel switchover procedure (if applicable) Operating narrative, shutdown key Appliance move procedure and log April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals 27
  • 28. Field Approval Steps  Step I – Design Approval in Principle – intended to ensure that the design is approvable, should be done prior to construction  Step II – Shop Inspection – this is an optional step intended to check if the construction is progressing according to Step I  Step III – Field Inspection – intended to check final outcome of the construction and installation in the field, should be done after the appliance is installed in its final destination, commissioned and started, but prior to handover to operations. Note: appliance can be provisionally started for testing purposes providing such startup is supervised by a qualified technician. April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals 28
  • 29. What Do I Get? April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals 29 GAS FIRED APPLIANCE FIELD APPROVAL IN PROGRESS + Appliance can be operated. This is a temporary Field Inspection Plate. It must be replaced with the permanent Final Field Approval / Rating Plate once received. ENEFEN Energy Efficiency Engineering Ltd. 780-665-2863 www.enefen.com Field Approval Number Inspection Date Inspected By ENEFEN is accredited by the Standards Council of Canada as an Inspection Body for Gas-fired Appliances and Equipment LSD Location Appliance Tag / Description GAS FIRED APPLIANCE FIELD APPROVAL IN PROGRESS +This installation has minor Code deficiencies. Proof Of Correction required within 30 days of the date indicated below. Appliance can be conditionally operated during this period. This is a temporary Field Inspection Plate. Once proof has been confirmed it must be replaced with the permanent Final Field Approval / Rating Plate once received. Reinspection is not required. ENEFEN Energy Efficiency Engineering Ltd. 780-665-2863 www.enefen.com Field Approval Number Inspection Date Inspected By ENEFEN is accredited by the Standards Council of Canada as an Inspection Body for Gas-fired Appliances and Equipment LSD Location Appliance Tag / Description GAS FIRED APPLIANCE FIELD APPROVAL IN PROGRESS +This installation has major deficiencies, which should be corrected immediately. Appliance should not be operated until deficiencies are corrected. Reinspection is required after correction of all deficiencies.. ENEFEN Energy Efficiency Engineering Ltd. 780-665-2863 www.enefen.com Field Approval Number Inspection Date Inspected By ENEFEN is accredited by the Standards Council of Canada as an Inspection Body for Gas-fired Appliances and Equipment LSD Location Appliance Tag / Description
  • 30. How to Finish an Approval Project?  Respond to all deficiencies using online POC (proof of correction) process – upload photos, other docs, short description of what was done  Once all POC’s are accepted a final Field Approval is issued and a 6”x 8” stainless steel rating/approval plate is automatically shipped to designated address  Replace the temporary inspection plate with final stainless steel plate, and save the report in a suitable place.  Copy of the report is available from our online portal to the appliance owner, our client and the consultant (as applicable) April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals 30
  • 31. You have a successful Field Approval April 20, 2017© ENEFEN Energy Efficiency Engineering Ltd. - SCC Accredited Field Approvals 31 ENEFEN Energy Efficiency Engineering Ltd. for Design Code Field Approval Appliance Approved ENEFEN Engineering Ltd. LSD: Tag Number: ENEFEN Engineering Ltd. Leduc AB Field I nspect ions 15-26-49-25-W4 Oil Product ion Tank 08/ 08/ 2014 www.ENEFEN.com Suite 705, 101-5101 50th Ave. • Leduc, AB T9E 0B9 • +1-780-665-2863 • Fax: +1-866-583-0520 ENEFEN Project : Ow ner / Operat or: Report / Print Date: Plant : Appliance Type: NFN117100 CONFIDENTIAL Attention This Appliance is approved and may be operated. This package contains a rating/approval plate that must be attached to the appliance and may be subject to an inspection by the Authority Having Jurisdiction. Area: Appliance Serial No: S A M P L E O N L Y RATI NG PLATE NFN Number Design Code Inspected By Inspected Prepared By Reviewed By NFN117100 304A-P2-NF003 Kuda Midzi Rodger Talstra P.Eng. Product Type Project Status Owner Plant Area Contact Design Code Field Approval Appliance Approved LSD Tag Serial Phone 15-26-49-25-W4 Leduc AB 20140808_1146 ENEFEN Engineering Ltd. Field Inspections GAS FIRED APPLIANCE RATING PLATE New Install Oil Production Tank 15-26-49-25-W4 2625 ft | 800 m -29 deg C | -20 deg F 40 deg C | 104 deg F Casing Gas Sweet Wet 255 kPag | 37.0 psig Not approved for secondary fuel use Casing Gas Sweet Wet 68.9 kPag | 10.0 psig 0.98 GJ/h | 0.93 MM Btuh 1 68.9 kPag | 10.0 psig 6.9 kPag | 1.0 psig 6.9 kPag | 1.0 psig Unclassified Class 1 Zone 1 Class 1 Zone 2 12 VDC New Install or Upgrade Appliance Type Location LSD Elevation Above Sea Level Ambient Temperature Min Ambient Temperature Max Main Fuel Type Main Fuel Quality Main Fuel Inlet Pressure Secondary Fuel Type Pilot Fuel Type Pilot Fuel Quality Pilot Fuel Inlet Pressure Appliance Max Fuel Input (HHV) Number of Burners per Appliance Maximum Burner Pressure Minimum Burner Pressure Pilot Pressure Electrical Area Class At Burner Electrical Area Class At Fuel Train Electrical Area Class At Control Panel Primary Control Power # 307 4806 47th Avenue, Leduc, AB, T9E 5X3 ENEFEN Engineering Ltd. GAS FIRED APPLIANCE FIELD APPROVAL ENEFEN ENERGY EFFICIENCY ENGINEERING LTD. ENEFEN is accredited by the Standards Council of Canada as an Inspection Body for gas-fired appliances and equipment. Gas and electrical safety evaluation based on Canadian codes requirements outlined in CAN-P-1608 Appendix C. This approval represents the results of a single field inspection and is not a product certification. This approval is void if this appliance is altered or relocated. ENEFEN est accrédité par le Conseil Canadien des Normes en tant qu'Organisme d'Inspection pour les appareils et équipement à gaz. L'évaluation de la sécurité du gaz et électrique est basée sur les exigences des codes canadiens énoncés à l'annexe C du CAN-P-1608. Cette approbation représente les résultats d'une seule inspection sur le terrain et ne constitue pas une certification du produit. Cette approbation est nulle si cet appareil est modifié ou déplacé. Approved By: Approval Date: Field Approval Number: NFN117100 Suite 705, 101-5101 50th Ave. • Leduc, AB T9E 0B9 • +1-780-665-2863 • Fax: +1-866-583-0520 www.ENEFEN.com ENEFEN Energy Efficiency Engineering Ltd.