SlideShare a Scribd company logo
1 of 10
Joshi Resume
Vaman Pandurangrao Joshi
Sr. Commissioning/Maint. Manager/Engineer E&I, (Oil/Gas/ Rig/Marine/Power)
Rhythm, C-202, Kalewadi Phata, Wakad, Pune-411 057
Mobile No: +971509350574(UAE)/+919423018341 (INDIA)
E-mail: vamanj@gmail.com
Skype id: vaman_joshi
OBJECTIVE
Engineering Professional with well expertise in Electrical, Instrumentation and Telecom
Engineering Coordination, Project Execution, Inspection, QA/QC, Testing,
Commissioning ,start-up, Operation, Maintenance & Technical Training with 26 years of
experience in Onshore / Offshore Oil & Gas projects, Oil & Gas production, power and
Marine Service in India, Qatar, Saudi Arabia, UAE, Oman, Yemen, Sudan and Iran.
SKILLS:-
Experienced Engineering professional, pro-active, team player, motivated, ability to work in
fast-paced and managing multi tasks simultaneously, excellent communication and
interpersonal skills, good people management and leadership skills allied to a strong
commercial awareness; Thorough knowledge of Electrical and Instrumentation Engineering,
Procurement, Construction & Commissioning methods and practices; Sound knowledge on
ISO-9000 Quality system, international codes & standards and hazardous area/Ex equipment
inspection; Good understanding of the Contractual relationships between Client, Consultant,
Contractor; Ability to function effectively in a multi-discipline environment; Good Knowledge
in system/subsystem concepts and Turnover/Certification requirements.
COMPUTER SKILLS: Quick learner of any kind of software. Windos10, XP Office,
SPF(Smart Plant Foundation), Maximo, MS-Office-2015, Paint, Etap, SAP, ABB (PCM-
600), ECS, IPCS, GE-MM-300.
EDUCATION:
* MBA in Operation ,IIBM, Pune.,Year-2010, with 79.25%.
* B.E. Electrical (Dyneshwer Vidhyapeeth,Pune,India) Year-2003, with 69.80%.
* Diploma Electrical Engineering, Government Polytechnic Latur,India,Year- 1988, with
60.90%.
1
Joshi Resume
* Higher Secondary Certificate in Science, Latur, India, Year-1986, 75.50%.
* Secondary School Certificate Latur, Year-1984, 74.57%.
TRAINING & CERTIFICATIONS:
* CompEx Hazardous Areas Ex01-Ex04 (ATEX) training from Forth Valley College, Scotland,
UK (valid up to May 2018.)
* Sea survival, H2s & BA set, Basic First Aid, HUET Training in Abu-Dhabi,UAE
* Electrical Safety Rules Training.
* Shell permit to work, Plant Emergency Planning, fire fighting course and Plant safety rules.
* Saudi ARAMCO authorized Job Task standard Evaluator & Job Trainer.
* Senior Technician Certificate, AMIE(India)
* PWD Electrical Supervisor , Mumbai, India(License No.22069)
* E-tap Software Training (Version-5.5) completed from KLG SYSTEL,Mumbai,India.
(Training including Study of Single line diagram, Load flow analysis, Unbalanced Load
flow, Motor acceleration with transient study, Harmonic Analysis effect study,
short ckt. Fault analysis, Optimal Power flow study, Protective relay coordination,
Electrical Circuit & Design study etc.)
* Member of the Society of Petroleum Engineers-Saudi Arabia Section (SPE ID 3417744)
TECHNICAL PROFILE:
* Lends 26 years of rich experience with expertise in Project Quality Control, Commissioning,
Operation & Maintenance, industrial automation, standard systems configurations for Switchgears
in Oil & Gas industry.
* Experienced in prepare, review and implement of Quality plan, Quality Control Procedures,
Inspection and Test Plan and Method statements and perform site audits and provide inputs to
KPI.
* Experience in reviewing Purchase requisition (PR), Purchase order (PO),ITPs,Test Procedures,
Release note and review of MRB & IOM.
* Ability to provide leadership and assume overall responsibility for delivery of projects within
required standards, quality, time and cost parameters.
* Experience in electrical control testing, commissioning and start-up with the ability to
review/approve commissioning procedures and reports, coordinate the commissioning/startup
schedule with the project schedule, oversee the testing and commissioning/startup.
* Inspection, Testing, Commissioning and start-up of various electrical equipment such as Gas
Turbine Generators, Diesel Generators, Transformers, HV/LV switchgears, HV/LV cables, HV/LV
motors, UPS, Batteries, industrial lighting, Electrical Heaters, Electrical heat tracing and Cathodic
Protection.
2
Joshi Resume
* Possess excellent analytical and problem resolution skills.
* Experience in Power Management Systems (PMS), Power generation monitoring and control,
Power distribution monitoring and control, Instrumentation system, ICSS (Process Control
system, Emergency Control System, Fire & Gas System), Well head hydraulic control panel,
PAGA, CCTV, Fiber optic and telecom system.
* All predictive, preventive and corrective routine electrical engineering and utilities
management activities pertinent to all electrical, generators, HVAV, Extra Low
Voltage (ELV), Building Management System (CAMS), Loss Prevention.
* Represents a fine blend of engineering and technology, with proficiency in Quality systems like
IEC , IEEE, NEC, API, NEPA,NEC, NEMA, IP, CSA, UL, EN, HSE, OSHA, EEx,
Norsok, ATEX/IECEx regulations etc.
* Worked with SAP, SPF-Smart Plant Foundation, PCM-600, Maximo, Windows-XP,
MS-Word, MS-Excel, Power point, MS-Paint, E-tap as core team member in Electrical
& Instrument department.
* Proficient in PLC Programming, Electrical systems, pneumatics systems, AC/DC
drives, field instrumentation.
* Strong fundamentals in the dynamic concepts of TPM, QC tools.
* Noted for delivery of output well ahead of timelines and within economy budgets.
* Well experience in manpower planning, lowering costs and breakdowns, enhancing productivity
and in time project delivery.
* Good knowledge and experienced on selection, installation, commissioning and maintenance of
hazardous area Ex equipment.
WORK EXPERIENCES:
AbuDhabi Gas Industries (GASCO) UAE:-Duration: 26
th
Feb, 2012 to till date
Responsibilities
* Presently working in NGL/AGR/SRU/GTG/Sulfur granulation plant as commissioning, Operation
& maintenance supervisor Working representing the GASCO for Oil & Gas projects.(EPCs are
ABB, JGC, Technimont & Hyundai).
* Managing Quality testing and installation works including commissioning with vendors like ABB
on ECS/IPCS, Load management, Three Phase Principles/ Three Phase Power Measurement
and Power Factor Correction/Three Phase Motor Principles Schematic diagram, magnetic
bearing for Turbo expander, Maximo, PCM-600 SPF (Smart Plant Foundation) software etc.
* Analyses & diagnoses obsolescence problems to determine the Root Cause & to recommend the
solution and to verify the implementation effectively.
* Lead the Operation and Maintenance team for Preventive and Corrective maintenance for MV
motors, transformers, equipment testing including cables test like partial discharge test, tan delta
3
Joshi Resume
test etc.
* Controlling of obsolescence measuring & testing equipment.
* The job responsibilities include Maintenance Strategy and Procedures Development of MAXIMO system
along with data population & obsolescence implementation Guidelines and Maintenance Management
Reporting
* Look after all critical machines condition monitoring, obsolescence Major overhauling, Turn
around Maintenance, Preventive Maintenance & Predictive maintenance
* Proper analysis/ diagnosis of existing issues in proactive way to prevent any catastrophic failures
of equipment.
* Reliability improvement and condition monitoring of rotating equipment.
* Reviewing the Commissioning procedures and Execution. Prepare obsolescence strategy for
overhauling of critical equipment to run reliable.
* Responsible for machinery PM Planning and budget forecast for the critical machinery overhaul,
repair plan, new parts and insurance spares procurement along with planning for budget
forecasting for critical Rotating Equipment obsolescence planning under new project.
* After getting the detail of obsolescence status from vendor, populate all items as per the
obsolescence categorization table and evaluate using the impact matrix.
* Develop virtual obsolescence matrix of associated equipment in coordination with other discipline
engineers.
Responsibilities during Construction and Commissioning stage:-
* Participate in internal & external audits and assessments based on ISO
14001:2004 & OHSAS 18001:2007 standards.
* Supervise the contractor & Sub-contractor QC personnel..
* Ensure compliance with the site health and safety regulations.
Inspection, Testing, Commissioning and start-up of various electrical equipment such as Gas
Turbine Generators(40 MW GE Make 8nos.), 220/132 KV Grid substation, 132 KV/33 KV GIS
substation, Diesel Generators, Transformers, HV/LV switchgears, HV/LV cables, HV/LV motors,
UPS, Batteries, industrial lighting, Electrical Heaters, Electrical heat tracing and Cathodic
Protection. All predictive, preventive, obsolescence and corrective routine electrical engineering
and utilities management activities pertinent to all electrical, generators, HVAC, Extra Low Voltage
(ELV), Building Management System (CAMS), Loss Prevention and mechanical facilities.
Bureau VERITAS(Abu Dhabi) UAE:-Duration:-Feb 2011 to 9
th
Feb 2012.
Responsibilities
ď‚· Working as E&I Quality Engineer for ADPC (Tawalliah Port Project), ADMA, ADCO, NDC and Rig
inspector for NDC Cyber rigs like ND-51 to 59.
ď‚· Involvement in Technical meetings, Industry standards, Technical Document review, ITP, FAT
witness, Material, Plant equipment Inspection, Certification etc.
4
Joshi Resume
ď‚· Upon completion of inspection evaluate findings and issue recommendations detailing corrective
actions. Document potential deficiencies on the quality improvements form and prepare for
obsolescence agreements in the Exit meetings.
ď‚· Identify audit scope and perform systematic and independent examinations of quality activities in
compliance with the planned arrangements.
ď‚· Submit audit schedules for review to the quality manager and ensure all aspects of the quality
system are audited at least once.
ď‚· In case of serious deficiency during the execution of a contract notify the project manager and
initiate an unscheduled audit.
ď‚· Identify the audit team and obtain copies of relevant procedures, specifications and inspection
test plans.
ď‚· Witness Factory acceptance test and inspection at vendor premises.
ď‚· Working on high rise towers SUN & SKY in Reem Island for HVAC, Electrical, BMS system.
Zenith Gen. Cont. Company, Al-Khober (KSA): - Duration:-8
th
Feb 2010 to 13
th
Jan 2011
Responsibilities
I was working as a Lead Electrical/I Engineer on site Princes Noora Bint Abdul Raheman Women’s
University project near Riyadh Air Port. Handle the all site for Electrical substation installation, MV
switchgear, UPS, Transformer HVAC, street lighting etc.
Red Sea Marine Services KSA: - Duration:-26
th
June 2009 to 1
st
Jan 2010
Responsibilities
I was working with marine services company vessels/fleets using for the oil & chemical tankers as an
Electrical/Electronics engineer on shore/offshore basis different ports in UAE & Saudi Arabia.
Troubleshooting & maintenance in Engine room, Cargo control room, Bridge area all kinds of fault with
BGORGE - Smart chief II - DCS/ SCADA & PLC systems, Generators, Boilers, control
panel for process & engine room etc.
ARAMCO, (MAS-Contractor) Dhahran, KSA: - (Electrical Consultant):- Duration:-9
th
Jan 2007
to 15
th
April 2009
Responsibilities
* Working as Electrical pre-commissioning Engineer On site Aramco Project-Hiawatha Stabilizer
Upgrade PS-3 Station near Riyadh. I have familiar with Aramco GI, SAIC & SATR, SAMSS,
SATIP Documents.
* We installed new substation with 230/13.8 KV & 50 MVA 2 incomer transformer
Hyundai make. In the switchyard we used SF6 pad mounted 230KV breakers 3
no’s for line A, line B & for bus coupler. Inside the substation 13.8 KV panel &
other distribution panel Power Feeder Panel.MCC, DB etc.
5
Joshi Resume
* Installation of Overhead Compressor was in stabilizer area PS-3 station. Working
with ABB team for commissioning the all Electrical project works. All kinds of
commissioning tests was conducted with ABB team & other associated venders.
* In ARAMCO onshore & offshore field give the on job training & job task standard Evaluation for
Rig Electricians.
* Preparation of obsolescence training materials Subject CV, PowerPoint slides etc. for courses
and give the practical training at rig site onshore & offshore, working as a Subject matter expert.
* Working on Ross Hill/IPS SCR, DC Motor, Top Drive, Mud Pumps, and Draw works Engine
rooms/Generators etc.
* Planning of maintenance & material procurement for rig site, Alone handle the drilling rig
operation & rig move process. I have done the troubleshooting & maintenance of all rig
equipments.
* I have worked on Jack up Rig SAR-201 offshore & other Land Rigs SAR-101, SAR-102, SAR-
103, SAR-151, SAR-152, SAR-153.
* Rig camp maintenance, HVAC, generators etc.
Shell Iran Offshore Ltd. (Soroosh and Nowrooz Integrated Development EPICM project):-
Overall responsibility for all activities of production 200,000 bopd, Soroosh Multi
Platform Complex and Remote Wellhead Platform connected to 2.2 million bbl Floating
Storage Unit:-Duration:-4
th
April 2004 to 30
th
Aug 2006
Responsibilities
* Working as a Power Maintenance Technician (Authorized Electrical Person) with 28 days on/off
rotation.
* I have worked with Shell Iran Offshore Ltd., at Soroosh / Nowroosh integrated oilfield of Iran. Our
site Contains with many platforms like a SPP1 & SPP2 Production Platforms, SWP1 & SWP2
Wellhead Platforms, SLQ Accommodation Platform, Jack up Drilling/Production Rig.
* Joined as a part of commissioning and startup team. Active participant in doing PTP. Pre comm.
Test procedures. & commissioning of the systems as per engineering standards.
* Studying all electrical drawings and checking for the integrity of the same or otherwise making the
AS BUILTS on site and sending to vendor for approval.
* Worked with ALSTOM vendor as a part of team for commissioning Of 13.5 MW GT 35 dual fuel
turbines.
* Knowledge of synchronizing HV turbine generator sets and running them in parallel with sharing
load.
* Black starts Emergency generator 2H energy & Start up and commissioning.
6
Joshi Resume
* S & I MCC and MV. Panels loop checking and setting the protection parameters.
* Knowledge and understanding of setting up MICOM relay ALSTOM for feeder management,
motor protection. Check the relay with current injection & voltage injection kit.
* Knowledge of Yokogava GS 3000 DCS. And loop checking for the same for alarm and start/stop
sequence.
* Start up of ESP pumps (electrical submersible pumps used for pumping oil. Knowledge of
keltronics and phoenix controls for the pump (REDA / SCHLUMBERGER).
* A chloride industrial system UPS trouble shooting and obsolescence maintenance of the same.
* Working as active production team member for lifting wells and running chemical injection skid at
remote platforms having knowledge of Oil well start up procedures.
* Knowledge of Power management systems, Managar management system (Mincom software)
for material & maintenance.
* Expertise in De-hydrator De-salter vessels transformer HVAC controls, operation
and maintenance of the same.
* SIEMENS. Daily Electrical Routine check. EDG, HVAC, Fire water Pump, UPS AC/DC,
Switchgear rooms any relay Alarms.
* Planning for work permits & material requirement, PMR, Switching Programs.
* Routine, planned/unplanned, preventive maintenance, condition monitoring of plant with safety
work permit system.
* Maintain daily logbook record and their faultfinding, investigation.
* Maintain safety lock boxes, Isolation/De-isolation, trip, alarm logbook.
Hyundai Heavy Ind. Ltd. Al-Shaeen field, Maersk Oil Qatar Offshore:- Duration:-2
nd
June to
12
th
Oct 2003
Responsibilities
Working as an Electrical & Instrument Engineer in Qatar Offshore on short term for Block-5
Development project contract. We were member of Installation & Commissioning team for Flare,
Production, Water Injection, Gas Compression, Accommodation Platforms with different locations like A,
B, C, D, E, F. My role was Installations & Comm. of HT Transformer, Switchgear rooms, Solar Turbines,
HVAC system, lighting, all types of Valves & Transmitters, ESD, and F&G system.
Reliance Petroleum Ltd, Jamnagar India:-Duration:-25
th
Aug 1999 to 29
th
March 203
Responsibilities
* Working as an Electrical Maintenance Engineer in Reliance Industries Refinery Division
Jamnagar and plant was World Largest Delayed Coker & Gas Plant.
* Plant Installation and Commissioning of various types of LT and HT Motors, UPS, VSD, MCC,
7
Joshi Resume
PCC, PMCC, D.G. sets, ELDB, LT&HT Switchgears.
* Routine, planned /unplanned ,preventive maintenance ,condition monitoring of Coker plant with
safety work permit system maintain daily log book record and their fault finding, investigation and
reporting to Maintenance Manager.
* Shutdown maintenance overhauling and testing activities of the Electrical equipments.
* Records updating and documentation.
* Looking after new modification projects if any.
* Independently handling all the electrical activities of the plant during shift/silent hours.
* Spares-parts procurement & stores up-keeping.
Equipment Handled at RIL-Coker Plant:
* Transformers – 33/11KV, 11/0.415 KV- Capacity- 31.5MVA/2MVA/1MVA
* Motors-H.T. Siemens, BHEL CGL Make. Largest of 3.8 MW rating. L.T. of various make.
* RELAYS-Siemens make micro-processor based relays like 7SJ600 (O/C & E/F), 7UT512
(Differential protection), 7SD511 (Current comparison), 7SJ551 (Motor protection), 6MB5250.
* P & B UK make microprocessor based relay like advanced feeder vision like AFV, FV, AMV, MV
MREF relays.
* GEC make electromagnetic relays of various types.
* Xcell data concentrator for serial communication to each and every relays of motors and
PCC, MCC I/Cs.
* ELDMS for assigning priority of load distribution and load monitoring energy metering of HT
switchboard.
* Grab cranes 02 nos/24.5 tones capacity with static step less controls, VSDs, Slip ring motors of
300 HP, Laser operated distance detectors and related logic, EOT cranes of 5/10 tones.
* Rotork (U.K.) Make motor operated valves, Service Lifts, Coke Crushers (USA) Gundalch Make &
PLC controlled coke loading, conveying System.
* DCS Systems, Process Interface Building (PIB), Interface Relay Logic system panels etc
* Emergency D.G. set of 1500 KVA with AMF control panel.
Test Equipment Handled:
1. High voltages Insulation and Earth Loop Tester.
2. Oil BDV Test Kit.
3. Vibration and HT Line Tester.
4. Bearing Induction Heater and Laser Thermometer.
5. DC Earth leakage testing Equipment.
6. Battery Impedance Tester.
7. Low resistance contact tester.
8
Joshi Resume
Oman National Dairy Products Co. Ltd. Oman:-Duration:-2
nd
Feb 1998 to 30
th
June 1999
Responsibilities
Working as a maintenance Supervisor in Muscat Oman & job handled in maintenance of
Tetrapak Machines like TBA-19, TBA-8, TBA-3 and Tetrapak Conveyer system, Accumulator multi-shrink
wrapping machines, Tetrapak CIP Alcip-100 plant, Riv-5 ice cream, Polopak packing machines, Trepko
Laban/yogurt filling machines, Whole milk UHT plant, Juice Plant, HTST plant, Utility and Refrigeration
plant with SABORE make Ammonia compressor, Boilers, Cold stores, PLC control panels, Frequency
converters, Pneumatic, Hydraulic, Steam operated equipments. Battery operated Electronic based Forklift
maintenance. 3000 KVA D.G. set Plc controlled INK JET printing machines like SOLO-6/5, LUX made in
U.K.
Worldwide Oilfield Machines India:-Duration:-22
nd
Feb 1995 to 9
th
Jan 1998
Responsibilities
Working as a Maintenance Engineer in Pune & j ob involved in maintenance of conventional
machines like Lathe, Boring, Drilling, Milling, and Sharpening. Then maintaining Fanuc controlled
CNC machines like VMC, SL-7, MORI-SEIKI, NAKAMURA TOME 6T, 11T, MAZAK.
Maintenance of Air compressor, forging hammers, Hydraulic pumps, Electrical Furnace, Maintain
the power factor, Power consumption, Capacitor bank, etc.
Kenana Sugar Company Ltd. Sudan:- Duration:-1
st
Aug 1994 to 21
st
Jan 1995
Responsibilities
Working as Maintenance Foreman in Khartoum Sudan for a seasonal short term Maintenance
contract & Shutdown job involved in Sugar Refinery, Maintenance of Sugarcane crashing mill
panels, Centrifugal section panels, Boilers, pumps, Sugar pans, Conveyer belts, HT/LT
motors, HT/LT Breakers, Minimum oil circuit Breakers, Petbow make DC welding set,
Boiler section panels, Power plant panels, Transformers etc. Company having its own Captive
power plant capacity 160 Mw. Fuji makes Genset 04 Nos. made in Japan.
Qatar Liquidities Gas Company Ltd Qatar: -Duration:-12
th
Oct 1993 to 21
st
April 1994
Responsibilities
Working as an Electrical Technician in Ras Lafan, Doha, Qatar for Short-term project job
involved in installation of Gas compressor, HT & LT motors, and control panels, HT/LT, ACB/VCB
breakers, VSD, UPS, Transformers etc.
Juma Al Majid Dubai, UAE: -Duration:-2
nd
June 1992 to 12
th
Sept 1993
Responsibilities
Working as a Switchgear Foreman in Klockner-Moller Switchgear Department Dubai with
hands on experience in switchgear control panel assembly, Wiring, Erection, and Servicing &
9
Joshi Resume
Maintenance of the panels.
Soft-Ron Control System Thane, India:-Duration:-8
th
Nov 1989 to 15
th
May 1992
Responsibilities
Working as an Electrical switchgear Engineer in Thane, Mumbai with Company was called
“Siemens House of Atomization” We are made all types of control panels like Simovert PLC, VSD, MCC,
PMCC, etc. We provide the panels for Steel Plant Tata Iron & Steel Company, Tatanagar,
Mukand steel plant, Thane, Vishakhapatnam steel plant, Krupa chemicals Ltd. (Detergent
plant) Pune, Indian Machine Tools Ltd. Nasik. Etc.
Mahindra Engineering & Chemical product Ltd. India:-Duration:-1
st
Nov 1988 to 31
st
Oct 1989
Responsibilities
Working as a Trainee Engineer on Mahindra Owen Division Pimpri, Pune. Maintenance
experience in preventive and Breakdown with all types of conventional machines like Press, Shearing,
Bending, Welding, Milling, Spot welding, Drilling etc. Then Transformers, D.G. sets, EOT cranes, Air
compressors, pump house, Portable equipments (Drill, Grinder). There was doing the Auto wiring of as
a like Mahindra Tractor, Mahindra-maniuto Forklift, Air-India weight loader, Army Trailers
etc.
PERSONAL INFORMATIONS:
Birth Date : 25
th
April, 1967.
Marital Status : Married.
Nationality : Indian.
Passport Details : Passport No. M1015802, (Valid up to 22.09.2024)
Birth Date : 25
th
April, 1967.
Driving Licenses : UAE Driving License (Valid Up to 2023)
Languages Known: English, Hindi, Marathi (Excellent) & Guajarati, Arabic, and Malayalam (Poor)
10

More Related Content

What's hot

QA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENTQA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENTmuhammad jamil
 
Resume mep latest
Resume mep latestResume mep latest
Resume mep latestArun Das
 
RESUME ELECTRICAL ENGINEER
RESUME ELECTRICAL ENGINEERRESUME ELECTRICAL ENGINEER
RESUME ELECTRICAL ENGINEERAMIT BISWAS
 
MEP ENGINEER CV HABEEB OMER
MEP ENGINEER CV HABEEB OMERMEP ENGINEER CV HABEEB OMER
MEP ENGINEER CV HABEEB OMERHabeeb Omer
 
Khalid -cv_electrical_engineer (2)
Khalid  -cv_electrical_engineer (2)Khalid  -cv_electrical_engineer (2)
Khalid -cv_electrical_engineer (2)Khalid Eltahir
 
Electrical Designer / BIM Modeler
Electrical Designer / BIM Modeler Electrical Designer / BIM Modeler
Electrical Designer / BIM Modeler Rampal birara
 
RAJESH RAMU CV
RAJESH RAMU CVRAJESH RAMU CV
RAJESH RAMU CVRajesh Ramu
 
Electrical Inspector CV
Electrical Inspector CVElectrical Inspector CV
Electrical Inspector CVAbdul Hakkim
 
Ravi Shankar_I&C Engineer
Ravi Shankar_I&C EngineerRavi Shankar_I&C Engineer
Ravi Shankar_I&C EngineerRavi Shankar
 
Electrical Supervisor CV
Electrical Supervisor CVElectrical Supervisor CV
Electrical Supervisor CVMuhammad Naeem
 
CV Field Mechanical and Piping Engineer
CV Field  Mechanical  and Piping EngineerCV Field  Mechanical  and Piping Engineer
CV Field Mechanical and Piping EngineerPopovici Adrian
 
CIVIL SUPERVISOR-CV-abdul shukoor
CIVIL SUPERVISOR-CV-abdul shukoorCIVIL SUPERVISOR-CV-abdul shukoor
CIVIL SUPERVISOR-CV-abdul shukoorabdul shukoor
 
CV Piping Supervisor
CV Piping SupervisorCV Piping Supervisor
CV Piping SupervisorDelfim Moreira
 
Resume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpResume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpSubhash +966535838322
 
Senior Electrical Engineer resume Jan 2016
Senior Electrical Engineer resume  Jan  2016Senior Electrical Engineer resume  Jan  2016
Senior Electrical Engineer resume Jan 2016Khadar Ali Shaik, P.Eng
 

What's hot (20)

Electrical Supervisor
Electrical SupervisorElectrical Supervisor
Electrical Supervisor
 
Shafiq CV
Shafiq CVShafiq CV
Shafiq CV
 
Electrical Engineer CV
Electrical Engineer CVElectrical Engineer CV
Electrical Engineer CV
 
Cv mm
Cv mmCv mm
Cv mm
 
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENTQA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
 
Resume mep latest
Resume mep latestResume mep latest
Resume mep latest
 
RESUME ELECTRICAL ENGINEER
RESUME ELECTRICAL ENGINEERRESUME ELECTRICAL ENGINEER
RESUME ELECTRICAL ENGINEER
 
MEP ENGINEER CV HABEEB OMER
MEP ENGINEER CV HABEEB OMERMEP ENGINEER CV HABEEB OMER
MEP ENGINEER CV HABEEB OMER
 
Khalid -cv_electrical_engineer (2)
Khalid  -cv_electrical_engineer (2)Khalid  -cv_electrical_engineer (2)
Khalid -cv_electrical_engineer (2)
 
Electrical Designer / BIM Modeler
Electrical Designer / BIM Modeler Electrical Designer / BIM Modeler
Electrical Designer / BIM Modeler
 
RAJESH RAMU CV
RAJESH RAMU CVRAJESH RAMU CV
RAJESH RAMU CV
 
MEP Engineer Resume
MEP Engineer ResumeMEP Engineer Resume
MEP Engineer Resume
 
Electrical Inspector CV
Electrical Inspector CVElectrical Inspector CV
Electrical Inspector CV
 
Ravi Shankar_I&C Engineer
Ravi Shankar_I&C EngineerRavi Shankar_I&C Engineer
Ravi Shankar_I&C Engineer
 
Electrical Supervisor CV
Electrical Supervisor CVElectrical Supervisor CV
Electrical Supervisor CV
 
CV Field Mechanical and Piping Engineer
CV Field  Mechanical  and Piping EngineerCV Field  Mechanical  and Piping Engineer
CV Field Mechanical and Piping Engineer
 
CIVIL SUPERVISOR-CV-abdul shukoor
CIVIL SUPERVISOR-CV-abdul shukoorCIVIL SUPERVISOR-CV-abdul shukoor
CIVIL SUPERVISOR-CV-abdul shukoor
 
CV Piping Supervisor
CV Piping SupervisorCV Piping Supervisor
CV Piping Supervisor
 
Resume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpResume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years Exp
 
Senior Electrical Engineer resume Jan 2016
Senior Electrical Engineer resume  Jan  2016Senior Electrical Engineer resume  Jan  2016
Senior Electrical Engineer resume Jan 2016
 

Similar to Resume j

CV Mahboob Updated 24.10.15
CV Mahboob Updated  24.10.15CV Mahboob Updated  24.10.15
CV Mahboob Updated 24.10.15Mahboob Iqbal
 
PROJECTS-RELAIBILITY-MAINTENANCE CV
PROJECTS-RELAIBILITY-MAINTENANCE CVPROJECTS-RELAIBILITY-MAINTENANCE CV
PROJECTS-RELAIBILITY-MAINTENANCE CVMAHMOOD AHMED
 
Barun Dutta Resume
Barun Dutta ResumeBarun Dutta Resume
Barun Dutta Resumebarun dutta
 
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...Sanil Balakrishnan
 
Byjul rahman cv (updated)
Byjul rahman   cv (updated)Byjul rahman   cv (updated)
Byjul rahman cv (updated)BYJUL RAHMAN
 
EE - ejaz cv (dubai) june 2016
EE - ejaz cv (dubai) june 2016EE - ejaz cv (dubai) june 2016
EE - ejaz cv (dubai) june 2016Ejaz Wagi
 
Electrical Engineer - ejaz cv (dubai) june16
Electrical Engineer - ejaz cv (dubai) june16Electrical Engineer - ejaz cv (dubai) june16
Electrical Engineer - ejaz cv (dubai) june16Ejaz Wagi
 
Rama nand yadav cv
Rama nand yadav   cvRama nand yadav   cv
Rama nand yadav cvRama Nand Yadav
 
Khalid -cv_electrical_engineer (1)
Khalid  -cv_electrical_engineer (1)Khalid  -cv_electrical_engineer (1)
Khalid -cv_electrical_engineer (1)Khalid Eltahir
 
Senior Electrical Engineer resume 2016
Senior Electrical Engineer resume  2016Senior Electrical Engineer resume  2016
Senior Electrical Engineer resume 2016Khadar Ali Shaik,P.Eng
 
E&I Eng last update
E&I Eng last updateE&I Eng last update
E&I Eng last updateyasir salih
 

Similar to Resume j (20)

CV Mahboob Updated 24.10.15
CV Mahboob Updated  24.10.15CV Mahboob Updated  24.10.15
CV Mahboob Updated 24.10.15
 
PROJECTS-RELAIBILITY-MAINTENANCE CV
PROJECTS-RELAIBILITY-MAINTENANCE CVPROJECTS-RELAIBILITY-MAINTENANCE CV
PROJECTS-RELAIBILITY-MAINTENANCE CV
 
Hari Maintenance
Hari MaintenanceHari Maintenance
Hari Maintenance
 
Hari Maintenance
Hari MaintenanceHari Maintenance
Hari Maintenance
 
Barun Dutta Resume
Barun Dutta ResumeBarun Dutta Resume
Barun Dutta Resume
 
Mn cv (777)
Mn cv (777)Mn cv (777)
Mn cv (777)
 
Resume
ResumeResume
Resume
 
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
 
Byjul rahman cv (updated)
Byjul rahman   cv (updated)Byjul rahman   cv (updated)
Byjul rahman cv (updated)
 
EE - ejaz cv (dubai) june 2016
EE - ejaz cv (dubai) june 2016EE - ejaz cv (dubai) june 2016
EE - ejaz cv (dubai) june 2016
 
Electrical Engineer - ejaz cv (dubai) june16
Electrical Engineer - ejaz cv (dubai) june16Electrical Engineer - ejaz cv (dubai) june16
Electrical Engineer - ejaz cv (dubai) june16
 
RESUME october 2016 F
RESUME october 2016 FRESUME october 2016 F
RESUME october 2016 F
 
CV-VP-KEMYA
CV-VP-KEMYACV-VP-KEMYA
CV-VP-KEMYA
 
Rama nand yadav cv
Rama nand yadav   cvRama nand yadav   cv
Rama nand yadav cv
 
RESUME
RESUMERESUME
RESUME
 
Khalid -cv_electrical_engineer (1)
Khalid  -cv_electrical_engineer (1)Khalid  -cv_electrical_engineer (1)
Khalid -cv_electrical_engineer (1)
 
Senior Electrical Engineer resume 2016
Senior Electrical Engineer resume  2016Senior Electrical Engineer resume  2016
Senior Electrical Engineer resume 2016
 
Khalid cv (2)
Khalid cv (2)Khalid cv (2)
Khalid cv (2)
 
Khalid cv (2)
Khalid cv (2)Khalid cv (2)
Khalid cv (2)
 
E&I Eng last update
E&I Eng last updateE&I Eng last update
E&I Eng last update
 

Recently uploaded

Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
Effects of rheological properties on mixing
Effects of rheological properties on mixingEffects of rheological properties on mixing
Effects of rheological properties on mixingviprabot1
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
pipeline in computer architecture design
pipeline in computer architecture  designpipeline in computer architecture  design
pipeline in computer architecture designssuser87fa0c1
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 

Recently uploaded (20)

Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
Effects of rheological properties on mixing
Effects of rheological properties on mixingEffects of rheological properties on mixing
Effects of rheological properties on mixing
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
pipeline in computer architecture design
pipeline in computer architecture  designpipeline in computer architecture  design
pipeline in computer architecture design
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 

Resume j

  • 1. Joshi Resume Vaman Pandurangrao Joshi Sr. Commissioning/Maint. Manager/Engineer E&I, (Oil/Gas/ Rig/Marine/Power) Rhythm, C-202, Kalewadi Phata, Wakad, Pune-411 057 Mobile No: +971509350574(UAE)/+919423018341 (INDIA) E-mail: vamanj@gmail.com Skype id: vaman_joshi OBJECTIVE Engineering Professional with well expertise in Electrical, Instrumentation and Telecom Engineering Coordination, Project Execution, Inspection, QA/QC, Testing, Commissioning ,start-up, Operation, Maintenance & Technical Training with 26 years of experience in Onshore / Offshore Oil & Gas projects, Oil & Gas production, power and Marine Service in India, Qatar, Saudi Arabia, UAE, Oman, Yemen, Sudan and Iran. SKILLS:- Experienced Engineering professional, pro-active, team player, motivated, ability to work in fast-paced and managing multi tasks simultaneously, excellent communication and interpersonal skills, good people management and leadership skills allied to a strong commercial awareness; Thorough knowledge of Electrical and Instrumentation Engineering, Procurement, Construction & Commissioning methods and practices; Sound knowledge on ISO-9000 Quality system, international codes & standards and hazardous area/Ex equipment inspection; Good understanding of the Contractual relationships between Client, Consultant, Contractor; Ability to function effectively in a multi-discipline environment; Good Knowledge in system/subsystem concepts and Turnover/Certification requirements. COMPUTER SKILLS: Quick learner of any kind of software. Windos10, XP Office, SPF(Smart Plant Foundation), Maximo, MS-Office-2015, Paint, Etap, SAP, ABB (PCM- 600), ECS, IPCS, GE-MM-300. EDUCATION: * MBA in Operation ,IIBM, Pune.,Year-2010, with 79.25%. * B.E. Electrical (Dyneshwer Vidhyapeeth,Pune,India) Year-2003, with 69.80%. * Diploma Electrical Engineering, Government Polytechnic Latur,India,Year- 1988, with 60.90%. 1
  • 2. Joshi Resume * Higher Secondary Certificate in Science, Latur, India, Year-1986, 75.50%. * Secondary School Certificate Latur, Year-1984, 74.57%. TRAINING & CERTIFICATIONS: * CompEx Hazardous Areas Ex01-Ex04 (ATEX) training from Forth Valley College, Scotland, UK (valid up to May 2018.) * Sea survival, H2s & BA set, Basic First Aid, HUET Training in Abu-Dhabi,UAE * Electrical Safety Rules Training. * Shell permit to work, Plant Emergency Planning, fire fighting course and Plant safety rules. * Saudi ARAMCO authorized Job Task standard Evaluator & Job Trainer. * Senior Technician Certificate, AMIE(India) * PWD Electrical Supervisor , Mumbai, India(License No.22069) * E-tap Software Training (Version-5.5) completed from KLG SYSTEL,Mumbai,India. (Training including Study of Single line diagram, Load flow analysis, Unbalanced Load flow, Motor acceleration with transient study, Harmonic Analysis effect study, short ckt. Fault analysis, Optimal Power flow study, Protective relay coordination, Electrical Circuit & Design study etc.) * Member of the Society of Petroleum Engineers-Saudi Arabia Section (SPE ID 3417744) TECHNICAL PROFILE: * Lends 26 years of rich experience with expertise in Project Quality Control, Commissioning, Operation & Maintenance, industrial automation, standard systems configurations for Switchgears in Oil & Gas industry. * Experienced in prepare, review and implement of Quality plan, Quality Control Procedures, Inspection and Test Plan and Method statements and perform site audits and provide inputs to KPI. * Experience in reviewing Purchase requisition (PR), Purchase order (PO),ITPs,Test Procedures, Release note and review of MRB & IOM. * Ability to provide leadership and assume overall responsibility for delivery of projects within required standards, quality, time and cost parameters. * Experience in electrical control testing, commissioning and start-up with the ability to review/approve commissioning procedures and reports, coordinate the commissioning/startup schedule with the project schedule, oversee the testing and commissioning/startup. * Inspection, Testing, Commissioning and start-up of various electrical equipment such as Gas Turbine Generators, Diesel Generators, Transformers, HV/LV switchgears, HV/LV cables, HV/LV motors, UPS, Batteries, industrial lighting, Electrical Heaters, Electrical heat tracing and Cathodic Protection. 2
  • 3. Joshi Resume * Possess excellent analytical and problem resolution skills. * Experience in Power Management Systems (PMS), Power generation monitoring and control, Power distribution monitoring and control, Instrumentation system, ICSS (Process Control system, Emergency Control System, Fire & Gas System), Well head hydraulic control panel, PAGA, CCTV, Fiber optic and telecom system. * All predictive, preventive and corrective routine electrical engineering and utilities management activities pertinent to all electrical, generators, HVAV, Extra Low Voltage (ELV), Building Management System (CAMS), Loss Prevention. * Represents a fine blend of engineering and technology, with proficiency in Quality systems like IEC , IEEE, NEC, API, NEPA,NEC, NEMA, IP, CSA, UL, EN, HSE, OSHA, EEx, Norsok, ATEX/IECEx regulations etc. * Worked with SAP, SPF-Smart Plant Foundation, PCM-600, Maximo, Windows-XP, MS-Word, MS-Excel, Power point, MS-Paint, E-tap as core team member in Electrical & Instrument department. * Proficient in PLC Programming, Electrical systems, pneumatics systems, AC/DC drives, field instrumentation. * Strong fundamentals in the dynamic concepts of TPM, QC tools. * Noted for delivery of output well ahead of timelines and within economy budgets. * Well experience in manpower planning, lowering costs and breakdowns, enhancing productivity and in time project delivery. * Good knowledge and experienced on selection, installation, commissioning and maintenance of hazardous area Ex equipment. WORK EXPERIENCES: AbuDhabi Gas Industries (GASCO) UAE:-Duration: 26 th Feb, 2012 to till date Responsibilities * Presently working in NGL/AGR/SRU/GTG/Sulfur granulation plant as commissioning, Operation & maintenance supervisor Working representing the GASCO for Oil & Gas projects.(EPCs are ABB, JGC, Technimont & Hyundai). * Managing Quality testing and installation works including commissioning with vendors like ABB on ECS/IPCS, Load management, Three Phase Principles/ Three Phase Power Measurement and Power Factor Correction/Three Phase Motor Principles Schematic diagram, magnetic bearing for Turbo expander, Maximo, PCM-600 SPF (Smart Plant Foundation) software etc. * Analyses & diagnoses obsolescence problems to determine the Root Cause & to recommend the solution and to verify the implementation effectively. * Lead the Operation and Maintenance team for Preventive and Corrective maintenance for MV motors, transformers, equipment testing including cables test like partial discharge test, tan delta 3
  • 4. Joshi Resume test etc. * Controlling of obsolescence measuring & testing equipment. * The job responsibilities include Maintenance Strategy and Procedures Development of MAXIMO system along with data population & obsolescence implementation Guidelines and Maintenance Management Reporting * Look after all critical machines condition monitoring, obsolescence Major overhauling, Turn around Maintenance, Preventive Maintenance & Predictive maintenance * Proper analysis/ diagnosis of existing issues in proactive way to prevent any catastrophic failures of equipment. * Reliability improvement and condition monitoring of rotating equipment. * Reviewing the Commissioning procedures and Execution. Prepare obsolescence strategy for overhauling of critical equipment to run reliable. * Responsible for machinery PM Planning and budget forecast for the critical machinery overhaul, repair plan, new parts and insurance spares procurement along with planning for budget forecasting for critical Rotating Equipment obsolescence planning under new project. * After getting the detail of obsolescence status from vendor, populate all items as per the obsolescence categorization table and evaluate using the impact matrix. * Develop virtual obsolescence matrix of associated equipment in coordination with other discipline engineers. Responsibilities during Construction and Commissioning stage:- * Participate in internal & external audits and assessments based on ISO 14001:2004 & OHSAS 18001:2007 standards. * Supervise the contractor & Sub-contractor QC personnel.. * Ensure compliance with the site health and safety regulations. Inspection, Testing, Commissioning and start-up of various electrical equipment such as Gas Turbine Generators(40 MW GE Make 8nos.), 220/132 KV Grid substation, 132 KV/33 KV GIS substation, Diesel Generators, Transformers, HV/LV switchgears, HV/LV cables, HV/LV motors, UPS, Batteries, industrial lighting, Electrical Heaters, Electrical heat tracing and Cathodic Protection. All predictive, preventive, obsolescence and corrective routine electrical engineering and utilities management activities pertinent to all electrical, generators, HVAC, Extra Low Voltage (ELV), Building Management System (CAMS), Loss Prevention and mechanical facilities. Bureau VERITAS(Abu Dhabi) UAE:-Duration:-Feb 2011 to 9 th Feb 2012. Responsibilities ď‚· Working as E&I Quality Engineer for ADPC (Tawalliah Port Project), ADMA, ADCO, NDC and Rig inspector for NDC Cyber rigs like ND-51 to 59. ď‚· Involvement in Technical meetings, Industry standards, Technical Document review, ITP, FAT witness, Material, Plant equipment Inspection, Certification etc. 4
  • 5. Joshi Resume ď‚· Upon completion of inspection evaluate findings and issue recommendations detailing corrective actions. Document potential deficiencies on the quality improvements form and prepare for obsolescence agreements in the Exit meetings. ď‚· Identify audit scope and perform systematic and independent examinations of quality activities in compliance with the planned arrangements. ď‚· Submit audit schedules for review to the quality manager and ensure all aspects of the quality system are audited at least once. ď‚· In case of serious deficiency during the execution of a contract notify the project manager and initiate an unscheduled audit. ď‚· Identify the audit team and obtain copies of relevant procedures, specifications and inspection test plans. ď‚· Witness Factory acceptance test and inspection at vendor premises. ď‚· Working on high rise towers SUN & SKY in Reem Island for HVAC, Electrical, BMS system. Zenith Gen. Cont. Company, Al-Khober (KSA): - Duration:-8 th Feb 2010 to 13 th Jan 2011 Responsibilities I was working as a Lead Electrical/I Engineer on site Princes Noora Bint Abdul Raheman Women’s University project near Riyadh Air Port. Handle the all site for Electrical substation installation, MV switchgear, UPS, Transformer HVAC, street lighting etc. Red Sea Marine Services KSA: - Duration:-26 th June 2009 to 1 st Jan 2010 Responsibilities I was working with marine services company vessels/fleets using for the oil & chemical tankers as an Electrical/Electronics engineer on shore/offshore basis different ports in UAE & Saudi Arabia. Troubleshooting & maintenance in Engine room, Cargo control room, Bridge area all kinds of fault with BGORGE - Smart chief II - DCS/ SCADA & PLC systems, Generators, Boilers, control panel for process & engine room etc. ARAMCO, (MAS-Contractor) Dhahran, KSA: - (Electrical Consultant):- Duration:-9 th Jan 2007 to 15 th April 2009 Responsibilities * Working as Electrical pre-commissioning Engineer On site Aramco Project-Hiawatha Stabilizer Upgrade PS-3 Station near Riyadh. I have familiar with Aramco GI, SAIC & SATR, SAMSS, SATIP Documents. * We installed new substation with 230/13.8 KV & 50 MVA 2 incomer transformer Hyundai make. In the switchyard we used SF6 pad mounted 230KV breakers 3 no’s for line A, line B & for bus coupler. Inside the substation 13.8 KV panel & other distribution panel Power Feeder Panel.MCC, DB etc. 5
  • 6. Joshi Resume * Installation of Overhead Compressor was in stabilizer area PS-3 station. Working with ABB team for commissioning the all Electrical project works. All kinds of commissioning tests was conducted with ABB team & other associated venders. * In ARAMCO onshore & offshore field give the on job training & job task standard Evaluation for Rig Electricians. * Preparation of obsolescence training materials Subject CV, PowerPoint slides etc. for courses and give the practical training at rig site onshore & offshore, working as a Subject matter expert. * Working on Ross Hill/IPS SCR, DC Motor, Top Drive, Mud Pumps, and Draw works Engine rooms/Generators etc. * Planning of maintenance & material procurement for rig site, Alone handle the drilling rig operation & rig move process. I have done the troubleshooting & maintenance of all rig equipments. * I have worked on Jack up Rig SAR-201 offshore & other Land Rigs SAR-101, SAR-102, SAR- 103, SAR-151, SAR-152, SAR-153. * Rig camp maintenance, HVAC, generators etc. Shell Iran Offshore Ltd. (Soroosh and Nowrooz Integrated Development EPICM project):- Overall responsibility for all activities of production 200,000 bopd, Soroosh Multi Platform Complex and Remote Wellhead Platform connected to 2.2 million bbl Floating Storage Unit:-Duration:-4 th April 2004 to 30 th Aug 2006 Responsibilities * Working as a Power Maintenance Technician (Authorized Electrical Person) with 28 days on/off rotation. * I have worked with Shell Iran Offshore Ltd., at Soroosh / Nowroosh integrated oilfield of Iran. Our site Contains with many platforms like a SPP1 & SPP2 Production Platforms, SWP1 & SWP2 Wellhead Platforms, SLQ Accommodation Platform, Jack up Drilling/Production Rig. * Joined as a part of commissioning and startup team. Active participant in doing PTP. Pre comm. Test procedures. & commissioning of the systems as per engineering standards. * Studying all electrical drawings and checking for the integrity of the same or otherwise making the AS BUILTS on site and sending to vendor for approval. * Worked with ALSTOM vendor as a part of team for commissioning Of 13.5 MW GT 35 dual fuel turbines. * Knowledge of synchronizing HV turbine generator sets and running them in parallel with sharing load. * Black starts Emergency generator 2H energy & Start up and commissioning. 6
  • 7. Joshi Resume * S & I MCC and MV. Panels loop checking and setting the protection parameters. * Knowledge and understanding of setting up MICOM relay ALSTOM for feeder management, motor protection. Check the relay with current injection & voltage injection kit. * Knowledge of Yokogava GS 3000 DCS. And loop checking for the same for alarm and start/stop sequence. * Start up of ESP pumps (electrical submersible pumps used for pumping oil. Knowledge of keltronics and phoenix controls for the pump (REDA / SCHLUMBERGER). * A chloride industrial system UPS trouble shooting and obsolescence maintenance of the same. * Working as active production team member for lifting wells and running chemical injection skid at remote platforms having knowledge of Oil well start up procedures. * Knowledge of Power management systems, Managar management system (Mincom software) for material & maintenance. * Expertise in De-hydrator De-salter vessels transformer HVAC controls, operation and maintenance of the same. * SIEMENS. Daily Electrical Routine check. EDG, HVAC, Fire water Pump, UPS AC/DC, Switchgear rooms any relay Alarms. * Planning for work permits & material requirement, PMR, Switching Programs. * Routine, planned/unplanned, preventive maintenance, condition monitoring of plant with safety work permit system. * Maintain daily logbook record and their faultfinding, investigation. * Maintain safety lock boxes, Isolation/De-isolation, trip, alarm logbook. Hyundai Heavy Ind. Ltd. Al-Shaeen field, Maersk Oil Qatar Offshore:- Duration:-2 nd June to 12 th Oct 2003 Responsibilities Working as an Electrical & Instrument Engineer in Qatar Offshore on short term for Block-5 Development project contract. We were member of Installation & Commissioning team for Flare, Production, Water Injection, Gas Compression, Accommodation Platforms with different locations like A, B, C, D, E, F. My role was Installations & Comm. of HT Transformer, Switchgear rooms, Solar Turbines, HVAC system, lighting, all types of Valves & Transmitters, ESD, and F&G system. Reliance Petroleum Ltd, Jamnagar India:-Duration:-25 th Aug 1999 to 29 th March 203 Responsibilities * Working as an Electrical Maintenance Engineer in Reliance Industries Refinery Division Jamnagar and plant was World Largest Delayed Coker & Gas Plant. * Plant Installation and Commissioning of various types of LT and HT Motors, UPS, VSD, MCC, 7
  • 8. Joshi Resume PCC, PMCC, D.G. sets, ELDB, LT&HT Switchgears. * Routine, planned /unplanned ,preventive maintenance ,condition monitoring of Coker plant with safety work permit system maintain daily log book record and their fault finding, investigation and reporting to Maintenance Manager. * Shutdown maintenance overhauling and testing activities of the Electrical equipments. * Records updating and documentation. * Looking after new modification projects if any. * Independently handling all the electrical activities of the plant during shift/silent hours. * Spares-parts procurement & stores up-keeping. Equipment Handled at RIL-Coker Plant: * Transformers – 33/11KV, 11/0.415 KV- Capacity- 31.5MVA/2MVA/1MVA * Motors-H.T. Siemens, BHEL CGL Make. Largest of 3.8 MW rating. L.T. of various make. * RELAYS-Siemens make micro-processor based relays like 7SJ600 (O/C & E/F), 7UT512 (Differential protection), 7SD511 (Current comparison), 7SJ551 (Motor protection), 6MB5250. * P & B UK make microprocessor based relay like advanced feeder vision like AFV, FV, AMV, MV MREF relays. * GEC make electromagnetic relays of various types. * Xcell data concentrator for serial communication to each and every relays of motors and PCC, MCC I/Cs. * ELDMS for assigning priority of load distribution and load monitoring energy metering of HT switchboard. * Grab cranes 02 nos/24.5 tones capacity with static step less controls, VSDs, Slip ring motors of 300 HP, Laser operated distance detectors and related logic, EOT cranes of 5/10 tones. * Rotork (U.K.) Make motor operated valves, Service Lifts, Coke Crushers (USA) Gundalch Make & PLC controlled coke loading, conveying System. * DCS Systems, Process Interface Building (PIB), Interface Relay Logic system panels etc * Emergency D.G. set of 1500 KVA with AMF control panel. Test Equipment Handled: 1. High voltages Insulation and Earth Loop Tester. 2. Oil BDV Test Kit. 3. Vibration and HT Line Tester. 4. Bearing Induction Heater and Laser Thermometer. 5. DC Earth leakage testing Equipment. 6. Battery Impedance Tester. 7. Low resistance contact tester. 8
  • 9. Joshi Resume Oman National Dairy Products Co. Ltd. Oman:-Duration:-2 nd Feb 1998 to 30 th June 1999 Responsibilities Working as a maintenance Supervisor in Muscat Oman & job handled in maintenance of Tetrapak Machines like TBA-19, TBA-8, TBA-3 and Tetrapak Conveyer system, Accumulator multi-shrink wrapping machines, Tetrapak CIP Alcip-100 plant, Riv-5 ice cream, Polopak packing machines, Trepko Laban/yogurt filling machines, Whole milk UHT plant, Juice Plant, HTST plant, Utility and Refrigeration plant with SABORE make Ammonia compressor, Boilers, Cold stores, PLC control panels, Frequency converters, Pneumatic, Hydraulic, Steam operated equipments. Battery operated Electronic based Forklift maintenance. 3000 KVA D.G. set Plc controlled INK JET printing machines like SOLO-6/5, LUX made in U.K. Worldwide Oilfield Machines India:-Duration:-22 nd Feb 1995 to 9 th Jan 1998 Responsibilities Working as a Maintenance Engineer in Pune & j ob involved in maintenance of conventional machines like Lathe, Boring, Drilling, Milling, and Sharpening. Then maintaining Fanuc controlled CNC machines like VMC, SL-7, MORI-SEIKI, NAKAMURA TOME 6T, 11T, MAZAK. Maintenance of Air compressor, forging hammers, Hydraulic pumps, Electrical Furnace, Maintain the power factor, Power consumption, Capacitor bank, etc. Kenana Sugar Company Ltd. Sudan:- Duration:-1 st Aug 1994 to 21 st Jan 1995 Responsibilities Working as Maintenance Foreman in Khartoum Sudan for a seasonal short term Maintenance contract & Shutdown job involved in Sugar Refinery, Maintenance of Sugarcane crashing mill panels, Centrifugal section panels, Boilers, pumps, Sugar pans, Conveyer belts, HT/LT motors, HT/LT Breakers, Minimum oil circuit Breakers, Petbow make DC welding set, Boiler section panels, Power plant panels, Transformers etc. Company having its own Captive power plant capacity 160 Mw. Fuji makes Genset 04 Nos. made in Japan. Qatar Liquidities Gas Company Ltd Qatar: -Duration:-12 th Oct 1993 to 21 st April 1994 Responsibilities Working as an Electrical Technician in Ras Lafan, Doha, Qatar for Short-term project job involved in installation of Gas compressor, HT & LT motors, and control panels, HT/LT, ACB/VCB breakers, VSD, UPS, Transformers etc. Juma Al Majid Dubai, UAE: -Duration:-2 nd June 1992 to 12 th Sept 1993 Responsibilities Working as a Switchgear Foreman in Klockner-Moller Switchgear Department Dubai with hands on experience in switchgear control panel assembly, Wiring, Erection, and Servicing & 9
  • 10. Joshi Resume Maintenance of the panels. Soft-Ron Control System Thane, India:-Duration:-8 th Nov 1989 to 15 th May 1992 Responsibilities Working as an Electrical switchgear Engineer in Thane, Mumbai with Company was called “Siemens House of Atomization” We are made all types of control panels like Simovert PLC, VSD, MCC, PMCC, etc. We provide the panels for Steel Plant Tata Iron & Steel Company, Tatanagar, Mukand steel plant, Thane, Vishakhapatnam steel plant, Krupa chemicals Ltd. (Detergent plant) Pune, Indian Machine Tools Ltd. Nasik. Etc. Mahindra Engineering & Chemical product Ltd. India:-Duration:-1 st Nov 1988 to 31 st Oct 1989 Responsibilities Working as a Trainee Engineer on Mahindra Owen Division Pimpri, Pune. Maintenance experience in preventive and Breakdown with all types of conventional machines like Press, Shearing, Bending, Welding, Milling, Spot welding, Drilling etc. Then Transformers, D.G. sets, EOT cranes, Air compressors, pump house, Portable equipments (Drill, Grinder). There was doing the Auto wiring of as a like Mahindra Tractor, Mahindra-maniuto Forklift, Air-India weight loader, Army Trailers etc. PERSONAL INFORMATIONS: Birth Date : 25 th April, 1967. Marital Status : Married. Nationality : Indian. Passport Details : Passport No. M1015802, (Valid up to 22.09.2024) Birth Date : 25 th April, 1967. Driving Licenses : UAE Driving License (Valid Up to 2023) Languages Known: English, Hindi, Marathi (Excellent) & Guajarati, Arabic, and Malayalam (Poor) 10