Abstract
This report consists of two project initiatives taken by myself, Swati Iyer in the department of
Finance namely market analysis of GCC nations-India-IHH, Cost benefit of centralizing pre-
printed stationary items.. The first project on finding out the cost benefit of printing all our
stationary under one roof was conducted. It required me to identify key verticals such as Oman,
Qatar, and Dubai etc. It required us to find out what their average expenditure is on Pre-printed
stationary and how this could be reduced in the future if the entire production is outsourced to a
single unit. The second project involved a market analysis of our competitors in the GCC, India
and globally. These nations were judged on the basis of certain KPIs such as Bed occupancy
percentage, ALOS, stores revenue etc. The report aims at providing a brief outline to the various
stages involved in the two projects. It also contains the key contributions made by me in the
department during my brief stint. Lastly the report consists of my observations in how the company
functions and how these projects and the respective contribution made will be useful in the future.
MANAGEMENT TRAINING PROGRAMPROJECTS AND OUTCOMES
Acknowledgement
I use this opportunity to express my gratitude to everyone who supported me throughout this
project. I am thankful for their aspiring guidance, invaluably constructive criticism and friendly
advice during the project work. I am sincerely grateful to them for sharing their truthful and
illuminating views on a number of issues related to the project.
I express my warm thanks to Mr Kartik Thakrar for his constant guidance and feedback during the
completion of the two projects under him.
I would also like to thank all the people from the different verticals who provided me with the
necessary data to complete my project successfully.
Thank you,
Swati Iyer
MANAGEMENT TRAINING PROGRAMPROJECTS AND OUTCOMES
Table of Contents
MANAGEMENT TRAINEE PROGRAM ....................................................................................................1
Abstract.............................................................................................................................................2
Introduction .......................................................................................................................................5
Project phases.....................................................................................................................................6
Project 1: Feasibility of centralized purchase of Pre-printed stationary................................................6
Project 2: Market analysis of Competitors in the GCC-India-IHH......................................................7
Results and findings............................................................................................................................8
Project 1: Feasibility of centralized purchase of Pre-printed stationary................................................8
Project 2: Market analysis of Competitors in the GCC-India-IHH......................................................8
Conclusion.........................................................................................................................................9
Appendix .........................................................................................................................................10
MANAGEMENT TRAINING PROGRAMPROJECTS AND OUTCOMES
Introduction
At Aster DM Healthcare we are constantly trying to improve our process and better our quality
and good prices. We have a large group of hospitals, clinics and pharmacies there is a huge
consumption of pre-printed stationary items. With current load of 3 hospitals, 50+ clinics and 100+
pharmacies, there has been a good load of laundry work. Further, there is a robust pipeline of new
units – 6 more hospitals in pipeline, which are commencing operations over the next 3 to 24
months; 30 clinics, commencing operations in next 2-6 months; 30 pharmacies, commencing
operations in next 2-6 months. Considering the existing patient and customer load and the future
load, the daily census of footfall is likely to touch around 50,000 by the end of FY 16 from the
current levels of 20,000.My first project centered on the idea of producing or sourcing all these
stationary items under one roof. The vertical with the most cost effective vendor will be chosen as
the ideal center. On completion of the project we noticed a huge net savings on the expenditure on
these items.
In the second project we conducted a small market analysis of few key KPI indicators namely Bed
occupancy, ALOS, Stores revenue etc. This research was done on competitors in the GCC, India
and a global competitor which is IHH. The results of the same will be discussed further in the
report.
MANAGEMENT TRAINING PROGRAMPROJECTS AND OUTCOMES
Project phases
Project 1: Feasibility of centralized purchase of Pre-printed stationary
The main objective of this project is to work out the feasibility of centralizing the purchase of pre-
printed and blank stationery, which is used across all verticals and geographies. To ascertain the
quantum of savings, which could be achieved through this exercise.
I was required to collect information from the following people regarding the consumption of the
pre-printed stationary item and the cost associated with the same.
 Samsad in clinics accounts
 Jinesh in Medcare accounts
 Jocy in Pharmacy accounts
 Samir in Aster Hospital accounts
 Aneesh in Oman vertical
 Arun in Qatar vertical
 Manesh at Clinic stores purchase
 Benny at Medcare Hospital Purchase
 Anoop at Oman Purchase
 Rohit at Pharmacy stores purchase.
The articles focused on were as follows:
 Bill papers
 Letter heads
 A4 sheets
 Patient files
MANAGEMENT TRAINING PROGRAMPROJECTS AND OUTCOMES
Project 2: Market analysis of Competitors in the GCC-India-IHH
The second project required me to do a market analysis of the competitors of aster namely:
 Al noor hospitals
 NMC
 Apollo
 IHH
 Medcity
The basis of comparing these firms was few KPI (key performance indicators) which served as
measure to analyze the standing of Aster DM Healthcare in comparison to these large hospital
networks. The objective was to judge our competitors and see where we lack.
The KPIs we used for the analysis are –
 Bed occupancy
 Total revenue per bed
 Conversion Ratio
 No. of stores
 Total staff classification
 ALOS
The results from the Analysis are revealed in the next segment.
MANAGEMENT TRAINING PROGRAMPROJECTS AND OUTCOMES
Results and findings
Project 1: Feasibility of centralized purchase of Pre-printed stationary
 The project revealed the volume of consumption of the printed stationary items and their
cost.
 The cost-befit analysis revealed how much of money can be saved by printing all the
stationary under one roof which came to around 10,000 Dhs per item.
Project 2: Market analysis of Competitors in the GCC-India-IHH
 The market analysis gave me an insight into how our competitors are performing. A
quantitative measure of their strengths and weaknesses in the different KPIs.
 Our company is ahead as compared to others when it comes to GCC hospitals, but as
compared to Apollo hospitals, IHH and Med-city we have a long way to go.
MANAGEMENT TRAINING PROGRAMPROJECTS AND OUTCOMES
Conclusion
The two weeks of the project was a great learning experience for me. I was able to successfully
achieve my targets and give my best in both the projects. The feasibility study on centralizing pre-
printed stationary items allowed us to understand the amount of money that can be saved upon
centralizing purchase and carry the project forward. In the market analysis, the information
produced will be used in future presentations. On the whole the projects submitted were up-to the
mark and submitted on time. I have worked on the initial stages of each of the projects and the
results will be used for further analysis by the department.
MANAGEMENT TRAINING PROGRAMPROJECTS AND OUTCOMES
Appendix
Project 3: Centralized Purchase
Detailed study on centralized purchase of all pre-printed and
blank stationery
Background:
With current load of 3 hospitals, 50+ clinics and 100+ pharmacies, there has been
a good load of laundry work. Further, there is a robust pipeline of new units - 6
more hospitals in pipeline, which are commencing operations over the next 3 to 24
months; 30 clinics, commencing operations in next 2-6 months; 30 pharmacies,
commencing operations in next 2-6 months. Considering the existing patient and
customer load and the future load, the daily census of footfall is likely to touch
around 50,000 by the end of FY 16 from the current levels of 20,000.
Objective: To work out the feasibility of centralizing the purchase of pre-printed
and blank stationery, which is used across all verticals and geographies. To
ascertain the quantum of savings, which could be achieved thru this exercise.
Frequency: one-time report
Source: Samsad in clinics accounts; Jinesh in Medcare accounts; Jocy in Pharmacy
accounts; Samir in Aster Hospital accounts; Aneesh in Oman vertical; Arun in Qatar
vertical; Manesh at Clinic stores purchase; Benny at Medcare Hospital Purchase;
Anoop at Oman Purchase; Rohit at Pharmacy stores purchase
Support: Salvin to coordinate with Shamij from IT to set the system required to
access sites on web, if blocked
Period: 18 months data ending June 2015; 12-24 months horizon
Timeline: 2 weeks
Interim update: Every alternate day
Final report: To be in ppt form
To be monitored by: Ankit Garg/FC – GCC
MANAGEMENT TRAINING PROGRAMPROJECTS AND OUTCOMES
total
revenue
total
revenue
In AED
No. Of
beds
Bed
Occupancy
Occupied
beds
Avg revenue per
occupied bed
In-patient (in
'000s)
Ou
(
In-patient O
Al noor hospitals 245.00 87 212
Al noor hospitals
(airportroad) 49.00 46 23 6,300 27
Al noor hospitals
(Khalifastreet) 106.00 40 42
al noor(Al Ain) 90.00 51 46 6,500 27
dhs 1,100 1,100 490.00 66 323 9,336
NMC Healthllc dhs 551 551 261.00 74 193 7,815 8,000 52
NMC (island)
NMC(speciality)
Apollohospital Rs 24,971 1,508 6,382.00 72 4,595 899 313,000 2,
IHH healthcare RM 1,758 2,011 1,935.00 63 1,219 4,519 158,990,000
Mediclinic R 6,467 2,230 7,493.00 72.3 5,417 1,128
Stores revenue
Walgreensstores
CVS
Rite Aid
MANAGEMENT TRAINING PROGRAMPROJECTS AND OUTCOMES
unit price/per pieceqty /in yearsTotal consumption/per year
bill papers
UAE
clinics 0.03 699500 20985
pharmacies 0.06 300000 18000
Oman 0.03 398412 11952.36
qatar 0.02 137500 2750
Medcare 0.0833 4500 374.85
0 0
1539912 54062.21
30798.24 23263.97
Letter Heads
UAE
clinics 0.108 1276000 137808
Oman 0.08 528000 42240
Qatar 0.057 360000 20520
Medcare 0.25 55000 13750
2219000 214318
87835 126483
A4 sheets
oman 10 1128 11280
UAE 9.5 13990 132905
qatar 12 3300 39600
medcare 10.2 7476 76255.2
Patient files
UAE
clinics 0.37 86290 31927.3
oman 0.8 9900 7920
qatar 0.108 21475 2,319
medcare 2.75 26433 72690.75
Shopperdrug
market

More Related Content

What's hot

Challenge in marketing it enable product with special reference to ascent i t...
Challenge in marketing it enable product with special reference to ascent i t...Challenge in marketing it enable product with special reference to ascent i t...
Challenge in marketing it enable product with special reference to ascent i t...
Pradeep Kumar Tiwari
 
Project report titles for mba in production management
Project report titles for mba in production managementProject report titles for mba in production management
Project report titles for mba in production management
mbaprojectconsultacy2014
 
Project Management Plan for a Bookstore opening. Case: Uzbekistan
Project Management Plan for a Bookstore opening. Case: UzbekistanProject Management Plan for a Bookstore opening. Case: Uzbekistan
Project Management Plan for a Bookstore opening. Case: Uzbekistan
Madina Tursunboeva
 
Total quality management_and_six_sigma
Total quality management_and_six_sigmaTotal quality management_and_six_sigma
Total quality management_and_six_sigma
Abdullah Azzam
 
Akhil new Profile
Akhil new ProfileAkhil new Profile
Akhil new Profile
Akhil M L
 
Introduction To Sphoorthi
Introduction To SphoorthiIntroduction To Sphoorthi
Introduction To Sphoorthi
RachanaKN
 
Akhil new Profile August 2016
Akhil new Profile August 2016Akhil new Profile August 2016
Akhil new Profile August 2016
Akhil M L
 
SAPSD Resume
SAPSD ResumeSAPSD Resume
SAPSD Resume
Gaurav Bhanot
 
CV-Siddharth with photo
CV-Siddharth with photoCV-Siddharth with photo
CV-Siddharth with photo
Siddharth Gupta
 
Project Management - AIB (MBA)
Project Management - AIB (MBA)Project Management - AIB (MBA)
Project Management - AIB (MBA)
Rohana K Amarakoon
 
Quickheal report final
Quickheal report finalQuickheal report final
Quickheal report final
kgnmatin
 
Thesis Project
Thesis ProjectThesis Project
Thesis Project
Gulab Khan
 
Sundeep_Kumar- Management Consultant
Sundeep_Kumar- Management ConsultantSundeep_Kumar- Management Consultant
Sundeep_Kumar- Management Consultant
Sundeep Kumar
 
CV_Dushyant Kale
CV_Dushyant KaleCV_Dushyant Kale
CV_Dushyant Kale
Dushyant Kale
 
Ashu Sharma CV-12yrs Experience
Ashu Sharma CV-12yrs ExperienceAshu Sharma CV-12yrs Experience
Ashu Sharma CV-12yrs Experience
Ashu Sharma
 
Service companies vs product companies
Service companies vs product companiesService companies vs product companies
Service companies vs product companies
Manuswath K.B
 
Vhpse.profile2018 r3
Vhpse.profile2018 r3Vhpse.profile2018 r3
Vhpse.profile2018 r3
Dr Hari Narain Singh
 
Six sigma introduction & tu tor
Six sigma introduction & tu torSix sigma introduction & tu tor
Products versus Services: or Not
Products versus Services: or NotProducts versus Services: or Not
Products versus Services: or Not
Malcolm Ryder
 
Resume dated May'16
Resume dated May'16Resume dated May'16
Resume dated May'16
Thanga Gauri
 

What's hot (20)

Challenge in marketing it enable product with special reference to ascent i t...
Challenge in marketing it enable product with special reference to ascent i t...Challenge in marketing it enable product with special reference to ascent i t...
Challenge in marketing it enable product with special reference to ascent i t...
 
Project report titles for mba in production management
Project report titles for mba in production managementProject report titles for mba in production management
Project report titles for mba in production management
 
Project Management Plan for a Bookstore opening. Case: Uzbekistan
Project Management Plan for a Bookstore opening. Case: UzbekistanProject Management Plan for a Bookstore opening. Case: Uzbekistan
Project Management Plan for a Bookstore opening. Case: Uzbekistan
 
Total quality management_and_six_sigma
Total quality management_and_six_sigmaTotal quality management_and_six_sigma
Total quality management_and_six_sigma
 
Akhil new Profile
Akhil new ProfileAkhil new Profile
Akhil new Profile
 
Introduction To Sphoorthi
Introduction To SphoorthiIntroduction To Sphoorthi
Introduction To Sphoorthi
 
Akhil new Profile August 2016
Akhil new Profile August 2016Akhil new Profile August 2016
Akhil new Profile August 2016
 
SAPSD Resume
SAPSD ResumeSAPSD Resume
SAPSD Resume
 
CV-Siddharth with photo
CV-Siddharth with photoCV-Siddharth with photo
CV-Siddharth with photo
 
Project Management - AIB (MBA)
Project Management - AIB (MBA)Project Management - AIB (MBA)
Project Management - AIB (MBA)
 
Quickheal report final
Quickheal report finalQuickheal report final
Quickheal report final
 
Thesis Project
Thesis ProjectThesis Project
Thesis Project
 
Sundeep_Kumar- Management Consultant
Sundeep_Kumar- Management ConsultantSundeep_Kumar- Management Consultant
Sundeep_Kumar- Management Consultant
 
CV_Dushyant Kale
CV_Dushyant KaleCV_Dushyant Kale
CV_Dushyant Kale
 
Ashu Sharma CV-12yrs Experience
Ashu Sharma CV-12yrs ExperienceAshu Sharma CV-12yrs Experience
Ashu Sharma CV-12yrs Experience
 
Service companies vs product companies
Service companies vs product companiesService companies vs product companies
Service companies vs product companies
 
Vhpse.profile2018 r3
Vhpse.profile2018 r3Vhpse.profile2018 r3
Vhpse.profile2018 r3
 
Six sigma introduction & tu tor
Six sigma introduction & tu torSix sigma introduction & tu tor
Six sigma introduction & tu tor
 
Products versus Services: or Not
Products versus Services: or NotProducts versus Services: or Not
Products versus Services: or Not
 
Resume dated May'16
Resume dated May'16Resume dated May'16
Resume dated May'16
 

Viewers also liked

MANAGEMENT TRAINEE PROGRAM-HR
MANAGEMENT TRAINEE PROGRAM-HRMANAGEMENT TRAINEE PROGRAM-HR
MANAGEMENT TRAINEE PROGRAM-HR
Swati Iyer
 
Management Trainee Programme
Management Trainee ProgrammeManagement Trainee Programme
Management Trainee Programme
Marco Cheung
 
Front office mgt trainee
Front office mgt traineeFront office mgt trainee
Front office mgt trainee
InternshipsThailand
 
Skills for the Future - Nurturing Worcestershire's Treasures
Skills for the Future - Nurturing Worcestershire's TreasuresSkills for the Future - Nurturing Worcestershire's Treasures
Skills for the Future - Nurturing Worcestershire's Treasures
akinnersley
 
The Young Science Graduate - Empathy Map & Problem Statement
The Young Science Graduate - Empathy Map & Problem Statement The Young Science Graduate - Empathy Map & Problem Statement
The Young Science Graduate - Empathy Map & Problem Statement
sasharonh
 
Template tuning for high performance
Template tuning for high performanceTemplate tuning for high performance
Template tuning for high performance
Chris Davenport
 
Pipeline to Talent, Davine Bey, Cornell University
Pipeline to Talent, Davine Bey, Cornell UniversityPipeline to Talent, Davine Bey, Cornell University
Pipeline to Talent, Davine Bey, Cornell University
Glassdoor
 
e2e - Management Trainee Program
e2e - Management Trainee Programe2e - Management Trainee Program
e2e - Management Trainee Program
Naima Shabab
 
CSL Graduate Trainee Program 2014
CSL Graduate Trainee Program 2014CSL Graduate Trainee Program 2014
CSL Graduate Trainee Program 2014
Bernard NG
 
Company overview of DSCL
Company overview of DSCLCompany overview of DSCL
Company overview of DSCL
sunil sahoo
 
Management trainee report.ppt
Management trainee report.pptManagement trainee report.ppt
Management trainee report.ppt
Geekaranja
 
Marketing mix bajaj Pulsar 150 cc
Marketing mix bajaj Pulsar 150 ccMarketing mix bajaj Pulsar 150 cc
Marketing mix bajaj Pulsar 150 cc
Atul Mishra
 
Nestlé Purina Management Trainee Program
Nestlé Purina Management Trainee Program Nestlé Purina Management Trainee Program
Nestlé Purina Management Trainee Program
Nestlé Purina PetCare Company
 
Workshop Talent 2.0, Career Management 2.0 & Outplacement 2.0 Explored & Exp...
Workshop Talent 2.0, Career Management 2.0 & Outplacement 2.0  Explored & Exp...Workshop Talent 2.0, Career Management 2.0 & Outplacement 2.0  Explored & Exp...
Workshop Talent 2.0, Career Management 2.0 & Outplacement 2.0 Explored & Exp...
Alexander Crépin
 
Relationships matter: How to build, nurture, and transform your talent pipeli...
Relationships matter: How to build, nurture, and transform your talent pipeli...Relationships matter: How to build, nurture, and transform your talent pipeli...
Relationships matter: How to build, nurture, and transform your talent pipeli...
LinkedIn Talent Solutions
 
How to Build a World Class Talent Pipeline | Webinar
How to Build a World Class Talent Pipeline | WebinarHow to Build a World Class Talent Pipeline | Webinar
How to Build a World Class Talent Pipeline | Webinar
LinkedIn Talent Solutions
 
Talent Pipeline Optimisation: Ensuring Your Talented People Realise Their Po...
Talent Pipeline Optimisation:  Ensuring Your Talented People Realise Their Po...Talent Pipeline Optimisation:  Ensuring Your Talented People Realise Their Po...
Talent Pipeline Optimisation: Ensuring Your Talented People Realise Their Po...
The HR Observer
 
Employee First Customer Second
Employee First Customer SecondEmployee First Customer Second
Employee First Customer Second
HCL Technologies
 
On the-job-trainee (NARRATiVE REPORT) Sheenbie Palado
On the-job-trainee (NARRATiVE REPORT) Sheenbie PaladoOn the-job-trainee (NARRATiVE REPORT) Sheenbie Palado
On the-job-trainee (NARRATiVE REPORT) Sheenbie Palado
Sheenbie Palado
 

Viewers also liked (19)

MANAGEMENT TRAINEE PROGRAM-HR
MANAGEMENT TRAINEE PROGRAM-HRMANAGEMENT TRAINEE PROGRAM-HR
MANAGEMENT TRAINEE PROGRAM-HR
 
Management Trainee Programme
Management Trainee ProgrammeManagement Trainee Programme
Management Trainee Programme
 
Front office mgt trainee
Front office mgt traineeFront office mgt trainee
Front office mgt trainee
 
Skills for the Future - Nurturing Worcestershire's Treasures
Skills for the Future - Nurturing Worcestershire's TreasuresSkills for the Future - Nurturing Worcestershire's Treasures
Skills for the Future - Nurturing Worcestershire's Treasures
 
The Young Science Graduate - Empathy Map & Problem Statement
The Young Science Graduate - Empathy Map & Problem Statement The Young Science Graduate - Empathy Map & Problem Statement
The Young Science Graduate - Empathy Map & Problem Statement
 
Template tuning for high performance
Template tuning for high performanceTemplate tuning for high performance
Template tuning for high performance
 
Pipeline to Talent, Davine Bey, Cornell University
Pipeline to Talent, Davine Bey, Cornell UniversityPipeline to Talent, Davine Bey, Cornell University
Pipeline to Talent, Davine Bey, Cornell University
 
e2e - Management Trainee Program
e2e - Management Trainee Programe2e - Management Trainee Program
e2e - Management Trainee Program
 
CSL Graduate Trainee Program 2014
CSL Graduate Trainee Program 2014CSL Graduate Trainee Program 2014
CSL Graduate Trainee Program 2014
 
Company overview of DSCL
Company overview of DSCLCompany overview of DSCL
Company overview of DSCL
 
Management trainee report.ppt
Management trainee report.pptManagement trainee report.ppt
Management trainee report.ppt
 
Marketing mix bajaj Pulsar 150 cc
Marketing mix bajaj Pulsar 150 ccMarketing mix bajaj Pulsar 150 cc
Marketing mix bajaj Pulsar 150 cc
 
Nestlé Purina Management Trainee Program
Nestlé Purina Management Trainee Program Nestlé Purina Management Trainee Program
Nestlé Purina Management Trainee Program
 
Workshop Talent 2.0, Career Management 2.0 & Outplacement 2.0 Explored & Exp...
Workshop Talent 2.0, Career Management 2.0 & Outplacement 2.0  Explored & Exp...Workshop Talent 2.0, Career Management 2.0 & Outplacement 2.0  Explored & Exp...
Workshop Talent 2.0, Career Management 2.0 & Outplacement 2.0 Explored & Exp...
 
Relationships matter: How to build, nurture, and transform your talent pipeli...
Relationships matter: How to build, nurture, and transform your talent pipeli...Relationships matter: How to build, nurture, and transform your talent pipeli...
Relationships matter: How to build, nurture, and transform your talent pipeli...
 
How to Build a World Class Talent Pipeline | Webinar
How to Build a World Class Talent Pipeline | WebinarHow to Build a World Class Talent Pipeline | Webinar
How to Build a World Class Talent Pipeline | Webinar
 
Talent Pipeline Optimisation: Ensuring Your Talented People Realise Their Po...
Talent Pipeline Optimisation:  Ensuring Your Talented People Realise Their Po...Talent Pipeline Optimisation:  Ensuring Your Talented People Realise Their Po...
Talent Pipeline Optimisation: Ensuring Your Talented People Realise Their Po...
 
Employee First Customer Second
Employee First Customer SecondEmployee First Customer Second
Employee First Customer Second
 
On the-job-trainee (NARRATiVE REPORT) Sheenbie Palado
On the-job-trainee (NARRATiVE REPORT) Sheenbie PaladoOn the-job-trainee (NARRATiVE REPORT) Sheenbie Palado
On the-job-trainee (NARRATiVE REPORT) Sheenbie Palado
 

Similar to MANAGEMENT TRAINEE PROGRAM-FINANCE

“RAKTANCHAL” An Blood bank finder application (Priyanka Tiwari) (4) (1).docx
“RAKTANCHAL” An Blood bank finder application (Priyanka Tiwari) (4) (1).docx“RAKTANCHAL” An Blood bank finder application (Priyanka Tiwari) (4) (1).docx
“RAKTANCHAL” An Blood bank finder application (Priyanka Tiwari) (4) (1).docx
ArpitMishra139426
 
Application of marginal costing technique & its limitations
Application of marginal costing technique & its limitationsApplication of marginal costing technique & its limitations
Application of marginal costing technique & its limitations
Vivek Mahajan
 
159913388 krishna-kumar-pandey-jaunpur
159913388 krishna-kumar-pandey-jaunpur159913388 krishna-kumar-pandey-jaunpur
159913388 krishna-kumar-pandey-jaunpur
homeworkping7
 
What are leadership The simple definizion is that leadership - is
What are leadership The simple definizion is that leadership - isWhat are leadership The simple definizion is that leadership - is
What are leadership The simple definizion is that leadership - is
lorileemcclatchie
 
resumeliliane
resumelilianeresumeliliane
resumeliliane
Liliane Al Halaby
 
Unit 3
Unit 3Unit 3
projectformulationandappraisal.pptx
projectformulationandappraisal.pptxprojectformulationandappraisal.pptx
projectformulationandappraisal.pptx
AlkaPandya5
 
Om0013 advanced production and operations management
Om0013   advanced production and operations managementOm0013   advanced production and operations management
Om0013 advanced production and operations management
smumbahelp
 
Smu mba semester 2
Smu mba semester 2Smu mba semester 2
Smu mba semester 2
Rajesh Kumar Singh
 
A036501014
A036501014A036501014
A036501014
theijes
 
Study of Managing Business at Reliance Industries Limited”
Study of Managing Business at Reliance Industries Limited”Study of Managing Business at Reliance Industries Limited”
Study of Managing Business at Reliance Industries Limited”
shah kunal
 
Chinmayy_Purohit_C028_Executive_Summary
Chinmayy_Purohit_C028_Executive_SummaryChinmayy_Purohit_C028_Executive_Summary
Chinmayy_Purohit_C028_Executive_Summary
Chinmayy Purohit
 
Production and operations management
Production and operations managementProduction and operations management
Production and operations management
RajKumar825466
 
Assessment of Perform Achieve and Trade (Pat), Cycle in India and Conceptuali...
Assessment of Perform Achieve and Trade (Pat), Cycle in India and Conceptuali...Assessment of Perform Achieve and Trade (Pat), Cycle in India and Conceptuali...
Assessment of Perform Achieve and Trade (Pat), Cycle in India and Conceptuali...
rahulmonikasharma
 
supply_chain_management.pdf
supply_chain_management.pdfsupply_chain_management.pdf
supply_chain_management.pdf
CedrickBryllCastuloS
 
51872470 samsung-electronics
51872470 samsung-electronics51872470 samsung-electronics
51872470 samsung-electronics
sherrysher82
 
Final Proposal
Final ProposalFinal Proposal
Final Proposal
Guoxin Guan
 
ED chapter 3- by Dr.K.G.Raja Sabarish Babu, Assistant Professor, Research Dep...
ED chapter 3- by Dr.K.G.Raja Sabarish Babu, Assistant Professor, Research Dep...ED chapter 3- by Dr.K.G.Raja Sabarish Babu, Assistant Professor, Research Dep...
ED chapter 3- by Dr.K.G.Raja Sabarish Babu, Assistant Professor, Research Dep...
BBAsourashtracollege
 
Rachhu
RachhuRachhu
Rachhu
RachhuRachhu

Similar to MANAGEMENT TRAINEE PROGRAM-FINANCE (20)

“RAKTANCHAL” An Blood bank finder application (Priyanka Tiwari) (4) (1).docx
“RAKTANCHAL” An Blood bank finder application (Priyanka Tiwari) (4) (1).docx“RAKTANCHAL” An Blood bank finder application (Priyanka Tiwari) (4) (1).docx
“RAKTANCHAL” An Blood bank finder application (Priyanka Tiwari) (4) (1).docx
 
Application of marginal costing technique & its limitations
Application of marginal costing technique & its limitationsApplication of marginal costing technique & its limitations
Application of marginal costing technique & its limitations
 
159913388 krishna-kumar-pandey-jaunpur
159913388 krishna-kumar-pandey-jaunpur159913388 krishna-kumar-pandey-jaunpur
159913388 krishna-kumar-pandey-jaunpur
 
What are leadership The simple definizion is that leadership - is
What are leadership The simple definizion is that leadership - isWhat are leadership The simple definizion is that leadership - is
What are leadership The simple definizion is that leadership - is
 
resumeliliane
resumelilianeresumeliliane
resumeliliane
 
Unit 3
Unit 3Unit 3
Unit 3
 
projectformulationandappraisal.pptx
projectformulationandappraisal.pptxprojectformulationandappraisal.pptx
projectformulationandappraisal.pptx
 
Om0013 advanced production and operations management
Om0013   advanced production and operations managementOm0013   advanced production and operations management
Om0013 advanced production and operations management
 
Smu mba semester 2
Smu mba semester 2Smu mba semester 2
Smu mba semester 2
 
A036501014
A036501014A036501014
A036501014
 
Study of Managing Business at Reliance Industries Limited”
Study of Managing Business at Reliance Industries Limited”Study of Managing Business at Reliance Industries Limited”
Study of Managing Business at Reliance Industries Limited”
 
Chinmayy_Purohit_C028_Executive_Summary
Chinmayy_Purohit_C028_Executive_SummaryChinmayy_Purohit_C028_Executive_Summary
Chinmayy_Purohit_C028_Executive_Summary
 
Production and operations management
Production and operations managementProduction and operations management
Production and operations management
 
Assessment of Perform Achieve and Trade (Pat), Cycle in India and Conceptuali...
Assessment of Perform Achieve and Trade (Pat), Cycle in India and Conceptuali...Assessment of Perform Achieve and Trade (Pat), Cycle in India and Conceptuali...
Assessment of Perform Achieve and Trade (Pat), Cycle in India and Conceptuali...
 
supply_chain_management.pdf
supply_chain_management.pdfsupply_chain_management.pdf
supply_chain_management.pdf
 
51872470 samsung-electronics
51872470 samsung-electronics51872470 samsung-electronics
51872470 samsung-electronics
 
Final Proposal
Final ProposalFinal Proposal
Final Proposal
 
ED chapter 3- by Dr.K.G.Raja Sabarish Babu, Assistant Professor, Research Dep...
ED chapter 3- by Dr.K.G.Raja Sabarish Babu, Assistant Professor, Research Dep...ED chapter 3- by Dr.K.G.Raja Sabarish Babu, Assistant Professor, Research Dep...
ED chapter 3- by Dr.K.G.Raja Sabarish Babu, Assistant Professor, Research Dep...
 
Rachhu
RachhuRachhu
Rachhu
 
Rachhu
RachhuRachhu
Rachhu
 

MANAGEMENT TRAINEE PROGRAM-FINANCE

  • 1. MANAGEMENT TRAINING PROGRAMPROJECTS AND OUTCOMES MANAGEMENT TRAINEE PROGRAM PROJECT REPORT 3 DEPARTMENT- Finance TOPICS- Feasibility of outsourcing Pre-printed stationary Market analysis of competitors in the GCC-India_IHH AUTHOR- Swati Iyer GUIDE- Mr Kartik Thakrar
  • 2. MANAGEMENT TRAINING PROGRAMPROJECTS AND OUTCOMES Abstract This report consists of two project initiatives taken by myself, Swati Iyer in the department of Finance namely market analysis of GCC nations-India-IHH, Cost benefit of centralizing pre- printed stationary items.. The first project on finding out the cost benefit of printing all our stationary under one roof was conducted. It required me to identify key verticals such as Oman, Qatar, and Dubai etc. It required us to find out what their average expenditure is on Pre-printed stationary and how this could be reduced in the future if the entire production is outsourced to a single unit. The second project involved a market analysis of our competitors in the GCC, India and globally. These nations were judged on the basis of certain KPIs such as Bed occupancy percentage, ALOS, stores revenue etc. The report aims at providing a brief outline to the various stages involved in the two projects. It also contains the key contributions made by me in the department during my brief stint. Lastly the report consists of my observations in how the company functions and how these projects and the respective contribution made will be useful in the future.
  • 3. MANAGEMENT TRAINING PROGRAMPROJECTS AND OUTCOMES Acknowledgement I use this opportunity to express my gratitude to everyone who supported me throughout this project. I am thankful for their aspiring guidance, invaluably constructive criticism and friendly advice during the project work. I am sincerely grateful to them for sharing their truthful and illuminating views on a number of issues related to the project. I express my warm thanks to Mr Kartik Thakrar for his constant guidance and feedback during the completion of the two projects under him. I would also like to thank all the people from the different verticals who provided me with the necessary data to complete my project successfully. Thank you, Swati Iyer
  • 4. MANAGEMENT TRAINING PROGRAMPROJECTS AND OUTCOMES Table of Contents MANAGEMENT TRAINEE PROGRAM ....................................................................................................1 Abstract.............................................................................................................................................2 Introduction .......................................................................................................................................5 Project phases.....................................................................................................................................6 Project 1: Feasibility of centralized purchase of Pre-printed stationary................................................6 Project 2: Market analysis of Competitors in the GCC-India-IHH......................................................7 Results and findings............................................................................................................................8 Project 1: Feasibility of centralized purchase of Pre-printed stationary................................................8 Project 2: Market analysis of Competitors in the GCC-India-IHH......................................................8 Conclusion.........................................................................................................................................9 Appendix .........................................................................................................................................10
  • 5. MANAGEMENT TRAINING PROGRAMPROJECTS AND OUTCOMES Introduction At Aster DM Healthcare we are constantly trying to improve our process and better our quality and good prices. We have a large group of hospitals, clinics and pharmacies there is a huge consumption of pre-printed stationary items. With current load of 3 hospitals, 50+ clinics and 100+ pharmacies, there has been a good load of laundry work. Further, there is a robust pipeline of new units – 6 more hospitals in pipeline, which are commencing operations over the next 3 to 24 months; 30 clinics, commencing operations in next 2-6 months; 30 pharmacies, commencing operations in next 2-6 months. Considering the existing patient and customer load and the future load, the daily census of footfall is likely to touch around 50,000 by the end of FY 16 from the current levels of 20,000.My first project centered on the idea of producing or sourcing all these stationary items under one roof. The vertical with the most cost effective vendor will be chosen as the ideal center. On completion of the project we noticed a huge net savings on the expenditure on these items. In the second project we conducted a small market analysis of few key KPI indicators namely Bed occupancy, ALOS, Stores revenue etc. This research was done on competitors in the GCC, India and a global competitor which is IHH. The results of the same will be discussed further in the report.
  • 6. MANAGEMENT TRAINING PROGRAMPROJECTS AND OUTCOMES Project phases Project 1: Feasibility of centralized purchase of Pre-printed stationary The main objective of this project is to work out the feasibility of centralizing the purchase of pre- printed and blank stationery, which is used across all verticals and geographies. To ascertain the quantum of savings, which could be achieved through this exercise. I was required to collect information from the following people regarding the consumption of the pre-printed stationary item and the cost associated with the same.  Samsad in clinics accounts  Jinesh in Medcare accounts  Jocy in Pharmacy accounts  Samir in Aster Hospital accounts  Aneesh in Oman vertical  Arun in Qatar vertical  Manesh at Clinic stores purchase  Benny at Medcare Hospital Purchase  Anoop at Oman Purchase  Rohit at Pharmacy stores purchase. The articles focused on were as follows:  Bill papers  Letter heads  A4 sheets  Patient files
  • 7. MANAGEMENT TRAINING PROGRAMPROJECTS AND OUTCOMES Project 2: Market analysis of Competitors in the GCC-India-IHH The second project required me to do a market analysis of the competitors of aster namely:  Al noor hospitals  NMC  Apollo  IHH  Medcity The basis of comparing these firms was few KPI (key performance indicators) which served as measure to analyze the standing of Aster DM Healthcare in comparison to these large hospital networks. The objective was to judge our competitors and see where we lack. The KPIs we used for the analysis are –  Bed occupancy  Total revenue per bed  Conversion Ratio  No. of stores  Total staff classification  ALOS The results from the Analysis are revealed in the next segment.
  • 8. MANAGEMENT TRAINING PROGRAMPROJECTS AND OUTCOMES Results and findings Project 1: Feasibility of centralized purchase of Pre-printed stationary  The project revealed the volume of consumption of the printed stationary items and their cost.  The cost-befit analysis revealed how much of money can be saved by printing all the stationary under one roof which came to around 10,000 Dhs per item. Project 2: Market analysis of Competitors in the GCC-India-IHH  The market analysis gave me an insight into how our competitors are performing. A quantitative measure of their strengths and weaknesses in the different KPIs.  Our company is ahead as compared to others when it comes to GCC hospitals, but as compared to Apollo hospitals, IHH and Med-city we have a long way to go.
  • 9. MANAGEMENT TRAINING PROGRAMPROJECTS AND OUTCOMES Conclusion The two weeks of the project was a great learning experience for me. I was able to successfully achieve my targets and give my best in both the projects. The feasibility study on centralizing pre- printed stationary items allowed us to understand the amount of money that can be saved upon centralizing purchase and carry the project forward. In the market analysis, the information produced will be used in future presentations. On the whole the projects submitted were up-to the mark and submitted on time. I have worked on the initial stages of each of the projects and the results will be used for further analysis by the department.
  • 10. MANAGEMENT TRAINING PROGRAMPROJECTS AND OUTCOMES Appendix Project 3: Centralized Purchase Detailed study on centralized purchase of all pre-printed and blank stationery Background: With current load of 3 hospitals, 50+ clinics and 100+ pharmacies, there has been a good load of laundry work. Further, there is a robust pipeline of new units - 6 more hospitals in pipeline, which are commencing operations over the next 3 to 24 months; 30 clinics, commencing operations in next 2-6 months; 30 pharmacies, commencing operations in next 2-6 months. Considering the existing patient and customer load and the future load, the daily census of footfall is likely to touch around 50,000 by the end of FY 16 from the current levels of 20,000. Objective: To work out the feasibility of centralizing the purchase of pre-printed and blank stationery, which is used across all verticals and geographies. To ascertain the quantum of savings, which could be achieved thru this exercise. Frequency: one-time report Source: Samsad in clinics accounts; Jinesh in Medcare accounts; Jocy in Pharmacy accounts; Samir in Aster Hospital accounts; Aneesh in Oman vertical; Arun in Qatar vertical; Manesh at Clinic stores purchase; Benny at Medcare Hospital Purchase; Anoop at Oman Purchase; Rohit at Pharmacy stores purchase Support: Salvin to coordinate with Shamij from IT to set the system required to access sites on web, if blocked Period: 18 months data ending June 2015; 12-24 months horizon Timeline: 2 weeks Interim update: Every alternate day Final report: To be in ppt form To be monitored by: Ankit Garg/FC – GCC
  • 11. MANAGEMENT TRAINING PROGRAMPROJECTS AND OUTCOMES total revenue total revenue In AED No. Of beds Bed Occupancy Occupied beds Avg revenue per occupied bed In-patient (in '000s) Ou ( In-patient O Al noor hospitals 245.00 87 212 Al noor hospitals (airportroad) 49.00 46 23 6,300 27 Al noor hospitals (Khalifastreet) 106.00 40 42 al noor(Al Ain) 90.00 51 46 6,500 27 dhs 1,100 1,100 490.00 66 323 9,336 NMC Healthllc dhs 551 551 261.00 74 193 7,815 8,000 52 NMC (island) NMC(speciality) Apollohospital Rs 24,971 1,508 6,382.00 72 4,595 899 313,000 2, IHH healthcare RM 1,758 2,011 1,935.00 63 1,219 4,519 158,990,000 Mediclinic R 6,467 2,230 7,493.00 72.3 5,417 1,128 Stores revenue Walgreensstores CVS Rite Aid
  • 12. MANAGEMENT TRAINING PROGRAMPROJECTS AND OUTCOMES unit price/per pieceqty /in yearsTotal consumption/per year bill papers UAE clinics 0.03 699500 20985 pharmacies 0.06 300000 18000 Oman 0.03 398412 11952.36 qatar 0.02 137500 2750 Medcare 0.0833 4500 374.85 0 0 1539912 54062.21 30798.24 23263.97 Letter Heads UAE clinics 0.108 1276000 137808 Oman 0.08 528000 42240 Qatar 0.057 360000 20520 Medcare 0.25 55000 13750 2219000 214318 87835 126483 A4 sheets oman 10 1128 11280 UAE 9.5 13990 132905 qatar 12 3300 39600 medcare 10.2 7476 76255.2 Patient files UAE clinics 0.37 86290 31927.3 oman 0.8 9900 7920 qatar 0.108 21475 2,319 medcare 2.75 26433 72690.75 Shopperdrug market