Hayfield Road Pipe Conveyance Project Meeting September 16, 2020Fairfax County
The project provides approximately 3,600 linear feet (LF) of new stormwater conveyance; and 2,000 LF of new sanitary main and service connections for 23 homes; and fully milled and repaved Hayfield Road, Telegraph Road intersection and Bridgewater Court. Presented at a Hayfield Citizens Association Meeting on September 16, 2020.
The International Centre for Environmental Management (ICEM) led this session on using green infrastructure as nature based solutions to create resilience and sustainability in development of Mekong countries. The session gave an overview of the different types of green infrastructure and their potentials for resilience, citing examples in Myanmar and the Mekong.
Andy Freifeld, Temple University, “Landscape Design and Reuse Planning in Min...Michael Hewitt, GISP
Funding for mine land reclamation is difficult to acquire and, while the environmental benefits of reclamation are fully understood, the economic benefits of reclamation are just beginning to be appreciated. Innovations in landscape design and reuse planning can attract partnerships with lenders and investors and spur the economic development associated with reuse of abandoned mine lands. Strategies like energy development, carbon sequestration, and wetland banking can address environmental concerns, but should also preserve historical and cultural legacies in order to maximize economic gain. These environmental strategies are now being encouraged by State and Federal agencies, while the cultural legacies are more universally overlooked. This presentation will discuss the ways in which environmental design of reclamation projects could benefit both economically and environmentally by the inclusion of preservation and consideration of historical and cultural legacies of the sites, while still utilizing core environmental strategies.
Hayfield Road Pipe Conveyance Project Meeting September 16, 2020Fairfax County
The project provides approximately 3,600 linear feet (LF) of new stormwater conveyance; and 2,000 LF of new sanitary main and service connections for 23 homes; and fully milled and repaved Hayfield Road, Telegraph Road intersection and Bridgewater Court. Presented at a Hayfield Citizens Association Meeting on September 16, 2020.
The International Centre for Environmental Management (ICEM) led this session on using green infrastructure as nature based solutions to create resilience and sustainability in development of Mekong countries. The session gave an overview of the different types of green infrastructure and their potentials for resilience, citing examples in Myanmar and the Mekong.
Andy Freifeld, Temple University, “Landscape Design and Reuse Planning in Min...Michael Hewitt, GISP
Funding for mine land reclamation is difficult to acquire and, while the environmental benefits of reclamation are fully understood, the economic benefits of reclamation are just beginning to be appreciated. Innovations in landscape design and reuse planning can attract partnerships with lenders and investors and spur the economic development associated with reuse of abandoned mine lands. Strategies like energy development, carbon sequestration, and wetland banking can address environmental concerns, but should also preserve historical and cultural legacies in order to maximize economic gain. These environmental strategies are now being encouraged by State and Federal agencies, while the cultural legacies are more universally overlooked. This presentation will discuss the ways in which environmental design of reclamation projects could benefit both economically and environmentally by the inclusion of preservation and consideration of historical and cultural legacies of the sites, while still utilizing core environmental strategies.
Elizabeth Hughes, Earth Conservancy, “Lessons Learned from 25 Years of Recove...Michael Hewitt, GISP
In 1994, EC purchased the lands of the Blue Coal Corporation, which had declared bankruptcy in the mid-1970s. Generally located in the lower Wyoming Valley in Luzerne County, many of these 16,000 acres have been ignored, seen only as permanent eyesores and reminders of the past. EC, however, views these lands as an opportunity for growth, progress, and transformation. To this end, EC has devoted the last 25 years working toward environmental and economic recovery in the region through reclamation of these legacy mine lands. The proposed presentation will provide an overview of EC’s history and work, and lessons gained through its experiences.
February 11, 2014 public meeting presentation for three proposed stormwater facility management projects off of Cabin Branch of Great Seneca Creek. (powerpoint file)
The former quarries Rohrbach, Leimen and “farmers quarry” are very rich in species; however they are isolated from each other despite their spatial proximity. The quarries should be integrated with one another and integration should also take place in the surrounding landscape.
The NGO Heidelberger Biotopschutz e. V. (HBS) has been looking after nature conservation areas and spawning waters within the forest and in the open land districts all around the quarries for many years, and also the nature reserve at the Rohrbach quarry since the year 2000. It hence virtually suggested itself to network all the nature conservation areas, and also include the nature reserve at the Leimen quarry.
February 11, 2014 public meeting presentation for three proposed stormwater facility management projects off of Cabin Branch of Great Seneca Creek. (pdf file)
IJERA (International journal of Engineering Research and Applications) is International online, ... peer reviewed journal. For more detail or submit your article, please visit www.ijera.com
Andrew Struck, director of the Ozaukee County Planning and Parks Department, will lead an interactive presentation on the department’s fish passage program, which actively reconnects existing, high quality fish and wildlife habitat throughout the Milwaukee River Watershed and direct drainage to Lake Michigan. The workshop presenters will discuss concepts of aquatic connectivity, provide a comprehensive overview of a multi-million dollar watershed-wide approach to aquatic connectivity, and engage the audience in designing for options for fish passage using successful completed projects as case-studies. This presentation was given by Andrew Struck, Director, Ozaukee County Planning and Parks Department.
Elizabeth Hughes, Earth Conservancy, “Lessons Learned from 25 Years of Recove...Michael Hewitt, GISP
In 1994, EC purchased the lands of the Blue Coal Corporation, which had declared bankruptcy in the mid-1970s. Generally located in the lower Wyoming Valley in Luzerne County, many of these 16,000 acres have been ignored, seen only as permanent eyesores and reminders of the past. EC, however, views these lands as an opportunity for growth, progress, and transformation. To this end, EC has devoted the last 25 years working toward environmental and economic recovery in the region through reclamation of these legacy mine lands. The proposed presentation will provide an overview of EC’s history and work, and lessons gained through its experiences.
February 11, 2014 public meeting presentation for three proposed stormwater facility management projects off of Cabin Branch of Great Seneca Creek. (powerpoint file)
The former quarries Rohrbach, Leimen and “farmers quarry” are very rich in species; however they are isolated from each other despite their spatial proximity. The quarries should be integrated with one another and integration should also take place in the surrounding landscape.
The NGO Heidelberger Biotopschutz e. V. (HBS) has been looking after nature conservation areas and spawning waters within the forest and in the open land districts all around the quarries for many years, and also the nature reserve at the Rohrbach quarry since the year 2000. It hence virtually suggested itself to network all the nature conservation areas, and also include the nature reserve at the Leimen quarry.
February 11, 2014 public meeting presentation for three proposed stormwater facility management projects off of Cabin Branch of Great Seneca Creek. (pdf file)
IJERA (International journal of Engineering Research and Applications) is International online, ... peer reviewed journal. For more detail or submit your article, please visit www.ijera.com
Andrew Struck, director of the Ozaukee County Planning and Parks Department, will lead an interactive presentation on the department’s fish passage program, which actively reconnects existing, high quality fish and wildlife habitat throughout the Milwaukee River Watershed and direct drainage to Lake Michigan. The workshop presenters will discuss concepts of aquatic connectivity, provide a comprehensive overview of a multi-million dollar watershed-wide approach to aquatic connectivity, and engage the audience in designing for options for fish passage using successful completed projects as case-studies. This presentation was given by Andrew Struck, Director, Ozaukee County Planning and Parks Department.
A PowerPoint presentation giving basic information you will need to answer questions on volcanoes and earthquakes in the Hostile World Unit and Case Study recaps.
The Art of the Pitch: WordPress Relationships and SalesLaura Byrne
Clients don’t know what they don’t know. What web solutions are right for them? How does WordPress come into the picture? How do you make sure you understand scope and timeline? What do you do if sometime changes?
All these questions and more will be explored as we talk about matching clients’ needs with what your agency offers without pulling teeth or pulling your hair out. Practical tips, and strategies for successful relationship building that leads to closing the deal.
Securing your Kubernetes cluster_ a step-by-step guide to success !KatiaHIMEUR1
Today, after several years of existence, an extremely active community and an ultra-dynamic ecosystem, Kubernetes has established itself as the de facto standard in container orchestration. Thanks to a wide range of managed services, it has never been so easy to set up a ready-to-use Kubernetes cluster.
However, this ease of use means that the subject of security in Kubernetes is often left for later, or even neglected. This exposes companies to significant risks.
In this talk, I'll show you step-by-step how to secure your Kubernetes cluster for greater peace of mind and reliability.
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024Tobias Schneck
As AI technology is pushing into IT I was wondering myself, as an “infrastructure container kubernetes guy”, how get this fancy AI technology get managed from an infrastructure operational view? Is it possible to apply our lovely cloud native principals as well? What benefit’s both technologies could bring to each other?
Let me take this questions and provide you a short journey through existing deployment models and use cases for AI software. On practical examples, we discuss what cloud/on-premise strategy we may need for applying it to our own infrastructure to get it to work from an enterprise perspective. I want to give an overview about infrastructure requirements and technologies, what could be beneficial or limiting your AI use cases in an enterprise environment. An interactive Demo will give you some insides, what approaches I got already working for real.
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024Albert Hoitingh
In this session I delve into the encryption technology used in Microsoft 365 and Microsoft Purview. Including the concepts of Customer Key and Double Key Encryption.
Elevating Tactical DDD Patterns Through Object CalisthenicsDorra BARTAGUIZ
After immersing yourself in the blue book and its red counterpart, attending DDD-focused conferences, and applying tactical patterns, you're left with a crucial question: How do I ensure my design is effective? Tactical patterns within Domain-Driven Design (DDD) serve as guiding principles for creating clear and manageable domain models. However, achieving success with these patterns requires additional guidance. Interestingly, we've observed that a set of constraints initially designed for training purposes remarkably aligns with effective pattern implementation, offering a more ‘mechanical’ approach. Let's explore together how Object Calisthenics can elevate the design of your tactical DDD patterns, offering concrete help for those venturing into DDD for the first time!
Key Trends Shaping the Future of Infrastructure.pdfCheryl Hung
Keynote at DIGIT West Expo, Glasgow on 29 May 2024.
Cheryl Hung, ochery.com
Sr Director, Infrastructure Ecosystem, Arm.
The key trends across hardware, cloud and open-source; exploring how these areas are likely to mature and develop over the short and long-term, and then considering how organisations can position themselves to adapt and thrive.
Generating a custom Ruby SDK for your web service or Rails API using Smithyg2nightmarescribd
Have you ever wanted a Ruby client API to communicate with your web service? Smithy is a protocol-agnostic language for defining services and SDKs. Smithy Ruby is an implementation of Smithy that generates a Ruby SDK using a Smithy model. In this talk, we will explore Smithy and Smithy Ruby to learn how to generate custom feature-rich SDKs that can communicate with any web service, such as a Rails JSON API.
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...UiPathCommunity
💥 Speed, accuracy, and scaling – discover the superpowers of GenAI in action with UiPath Document Understanding and Communications Mining™:
See how to accelerate model training and optimize model performance with active learning
Learn about the latest enhancements to out-of-the-box document processing – with little to no training required
Get an exclusive demo of the new family of UiPath LLMs – GenAI models specialized for processing different types of documents and messages
This is a hands-on session specifically designed for automation developers and AI enthusiasts seeking to enhance their knowledge in leveraging the latest intelligent document processing capabilities offered by UiPath.
Speakers:
👨🏫 Andras Palfi, Senior Product Manager, UiPath
👩🏫 Lenka Dulovicova, Product Program Manager, UiPath
Connector Corner: Automate dynamic content and events by pushing a buttonDianaGray10
Here is something new! In our next Connector Corner webinar, we will demonstrate how you can use a single workflow to:
Create a campaign using Mailchimp with merge tags/fields
Send an interactive Slack channel message (using buttons)
Have the message received by managers and peers along with a test email for review
But there’s more:
In a second workflow supporting the same use case, you’ll see:
Your campaign sent to target colleagues for approval
If the “Approve” button is clicked, a Jira/Zendesk ticket is created for the marketing design team
But—if the “Reject” button is pushed, colleagues will be alerted via Slack message
Join us to learn more about this new, human-in-the-loop capability, brought to you by Integration Service connectors.
And...
Speakers:
Akshay Agnihotri, Product Manager
Charlie Greenberg, Host
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered QualityInflectra
In this insightful webinar, Inflectra explores how artificial intelligence (AI) is transforming software development and testing. Discover how AI-powered tools are revolutionizing every stage of the software development lifecycle (SDLC), from design and prototyping to testing, deployment, and monitoring.
Learn about:
• The Future of Testing: How AI is shifting testing towards verification, analysis, and higher-level skills, while reducing repetitive tasks.
• Test Automation: How AI-powered test case generation, optimization, and self-healing tests are making testing more efficient and effective.
• Visual Testing: Explore the emerging capabilities of AI in visual testing and how it's set to revolutionize UI verification.
• Inflectra's AI Solutions: See demonstrations of Inflectra's cutting-edge AI tools like the ChatGPT plugin and Azure Open AI platform, designed to streamline your testing process.
Whether you're a developer, tester, or QA professional, this webinar will give you valuable insights into how AI is shaping the future of software delivery.
Neuro-symbolic is not enough, we need neuro-*semantic*Frank van Harmelen
Neuro-symbolic (NeSy) AI is on the rise. However, simply machine learning on just any symbolic structure is not sufficient to really harvest the gains of NeSy. These will only be gained when the symbolic structures have an actual semantics. I give an operational definition of semantics as “predictable inference”.
All of this illustrated with link prediction over knowledge graphs, but the argument is general.
3. Meander bend on the River Conwy A B A cross section through a meander River Cliff FEATURE Slip off slope Erosion PROCESS Deposition Deep DEPTH Shallow Fast SPEED OF FLOW Slow CONCAVE CONVEX
4.
5.
6. What factors increase The risk of flooding? * Impermeable rock * Hard dry soil * Very wet soil *steep slopes * Cutting down trees Building in the drainage basin * Many tributaries
7. Flood protection *Dams hold back flood waters *reservoirs store floodwater *straighten channels Increases speed of flow *Dredging Makes channel deeper so can hold more water *levees and embankments Prevents river from overflowing *land use zoning Restricts development to uses unaffected by flooding *afforestation Increases interception etc, reduces run off
8. Management of water quality and amenities River pollution *nitrates from fertilisers causes eutrophication Water taken from river for cooling in power stations is returned warmer and de-oxygenates water Poisonous / smelling waste from industrial sites Domestic sewage containing dissolved chemicals such as phosphorous from washing powder
13. Grain silos and combines, crops 11. Less labour – more mechanised farming 10. More farm labour Larger, regular shape 9. Irregular shaped fields Fewer fields 8. Many fields Amalgamated farms 7.Small farm buildings and farm size Large, modern farm buildings, grain silos, concrete 6.Traditional small farm buildings, stone built Diversification – golf course & carpark 5. All fields Few trees, hedgerows removed 4. Hedges and isolated trees Roads 3.Limited accessibility to farm Tractors, combines 2.Horse pulled cart, plough Much larger fields 1. Small fields 1995 1935
14.
15. Case study – Waterside House Farm Annual rainfall high 2000mm Leaches nutrients Low cloud common – no photosynthesis High - 2000mm per year Steepnes means it runs off quickly Is high 1476mm per year Water drains down the valley – throughflow and so water table is near surface too wet for growing crops Rainfall Soil is thin, stony and acidic with few plant nutrients Soil is thin and stony in higher areas sticky acidic soils in lower parts Gravelly and silty so it is well drained Some is a sticky clay which is impermeable and acidic Soil Cliffs Too steep for machinery and to improve vegetation Bare rock common Too steep for machinery Gently sloping so that tractors can be used At lake level – may be boggy Only 4ha are flat - not enough space for crops Relief Barton Fell – 520m Sheep can be kept on this land Supports fewer sheep than intake 81ha 160 – 330m rough pasture with many scattered vegetation can only be used for sheep grazing 32ha improved grassland used for growing grass to make silage in summer and to graze sheep in winter Fell land Intake Inbye
16.
17.
18.
19.
20.
21.
22. 2004, P1 Study Figure 2 on the insert which is an aerial photograph of a new urban development on the rural-urban fringe of Bristol.
38. Nearby industrial and domestic demand provide the necessary high head of water Steep upland gradients or former waterfall Cheap land, sparsely populated Impermeable rock – water does not soak through Narrow valleys are ideal for dam construction and water storage Upland areas where narrow valleys with strong and impermeable rock Large and regular rainfall Relief rainfall ( > 1500mm pa) Low rates of evaporation provides a constant supply of water Found mainly in the north and west of the UK in upland areas REASON HEP REQUIREMENTS
41. Textbook pg 57 - 58 The wind speeds are higher in the west of the country In Britain there are more days when winds blow from the west than from any other direction so there are more days when the wind turbines can be operated. Higher up wind speeds are faster and there are fewer obstacles to block the wind. In areas with high and regular wind speeds. Found in exposed coastal locations or in remote upland areas REASON WIND REQUIREMENTS
42.
43.
44.
45.
46. H Q3b Study fig 4 which shows the location of some wind farms in the UK Explain why these locations are likely to have been chosen F Q3c Study fig 4 which shows the location of some wind farms in the UK Using figure 4 and your own knowledge, explain the locations of wind farms in the UK