The document summarizes maintenance work done on a debris filter from January 19-20, 2012. The debris filter was dismantled due to high pressure drop and debris not being removed. worn seals and sheared coupling disc bolts were found and replaced. The overhauled debris filter was then tested for 15 minutes and found to be in good working condition. Spare parts used during the maintenance are listed.
A process flow diagram (PFD) is a diagram commonly used in chemical and process engineering to indicate the general flow of plant processes and equipment.
Design Considerations for Antisurge Valve SizingVijay Sarathy
Centrifugal Compressors experience a phenomenon called “Surge” which can be defined as a situation where a flow reversal from the discharge side back into the compressor casing causing mechanical damage.
The reasons are multitude ranging from driver failure, power failure, upset process conditions, start up, shutdown, failure of anti-surge mechanisms, check valve failure to operator error to name a few. The consequences of surge are more mechanical in nature whereby ball bearings, seals, thrust bearing, collar shafts, impellers wear out and sometimes depending on the how powerful are the surge forces, cause fractures to the machinery parts due to excessive vibrations.
The following tutorial explains how to size an anti-surge valve for a single stage VSD system for Concept/Basic Engineering purposes.
Assembly and Disassembly Procedure of Screw type Compressor Shah Jalal
The Procedure will be very much helpful for complete overhauling of Screw type Compressor .The Maintenance Procedure is for Fuel Gas Compressor(KOBELCO) of 450 MW Meghnaghat Power Plant.
A process flow diagram (PFD) is a diagram commonly used in chemical and process engineering to indicate the general flow of plant processes and equipment.
Design Considerations for Antisurge Valve SizingVijay Sarathy
Centrifugal Compressors experience a phenomenon called “Surge” which can be defined as a situation where a flow reversal from the discharge side back into the compressor casing causing mechanical damage.
The reasons are multitude ranging from driver failure, power failure, upset process conditions, start up, shutdown, failure of anti-surge mechanisms, check valve failure to operator error to name a few. The consequences of surge are more mechanical in nature whereby ball bearings, seals, thrust bearing, collar shafts, impellers wear out and sometimes depending on the how powerful are the surge forces, cause fractures to the machinery parts due to excessive vibrations.
The following tutorial explains how to size an anti-surge valve for a single stage VSD system for Concept/Basic Engineering purposes.
Assembly and Disassembly Procedure of Screw type Compressor Shah Jalal
The Procedure will be very much helpful for complete overhauling of Screw type Compressor .The Maintenance Procedure is for Fuel Gas Compressor(KOBELCO) of 450 MW Meghnaghat Power Plant.
1. Purpose of Hydro test.
2. Types of Pressure Test.
3. Procedure of Hydro test.
4. Limitations of Pneumatic Test.
5. Hydro testing test Pressure.
6. Test pressure subjected to external pressure.
7. Hydro test Pressure according to different process.
8. Volume required for the Hydro testing.
9. Pipeline De watering, Cleaning & Drying.
Haripur Combined Cycle Power Plant have two cooling water pump (CWP-A/B) each 50% capacity. According to schedule maintenance plan each pump is overhauled after 16,000 running hours.
The pump suction is from river water to discharge to water boxes of steam condenser. It’s a vertical shaft, 1350 discharge bore mixed flow pump. It’s driven by an 1100 KW vertically mounted motor with a rated full load rpm of 494. Rated flow rate of the pump is 18, 600 m3/hr.
Before the overhauling CWP-A, NDE side vibration of motor as being monitored was too high for its sound performance. Vertical vibration data at NDE was measured as high as 6.3 mm/sec which was way alarming.
Suspected regions were out-clearances of bearings and wear-rings. O & M came to a decision for complete overhauling of the pump which started on November 27, 2011 and was completed on December 01, 2011.
1. Purpose of Hydro test.
2. Types of Pressure Test.
3. Procedure of Hydro test.
4. Limitations of Pneumatic Test.
5. Hydro testing test Pressure.
6. Test pressure subjected to external pressure.
7. Hydro test Pressure according to different process.
8. Volume required for the Hydro testing.
9. Pipeline De watering, Cleaning & Drying.
Haripur Combined Cycle Power Plant have two cooling water pump (CWP-A/B) each 50% capacity. According to schedule maintenance plan each pump is overhauled after 16,000 running hours.
The pump suction is from river water to discharge to water boxes of steam condenser. It’s a vertical shaft, 1350 discharge bore mixed flow pump. It’s driven by an 1100 KW vertically mounted motor with a rated full load rpm of 494. Rated flow rate of the pump is 18, 600 m3/hr.
Before the overhauling CWP-A, NDE side vibration of motor as being monitored was too high for its sound performance. Vertical vibration data at NDE was measured as high as 6.3 mm/sec which was way alarming.
Suspected regions were out-clearances of bearings and wear-rings. O & M came to a decision for complete overhauling of the pump which started on November 27, 2011 and was completed on December 01, 2011.
ماذا أنت يا إلهي ؟ ماذا أنت إلا الرب الإله ! لأنه من هو السيد إلا الرب ؟ ومن هو الإله سوي إلهنا ؟ 0
عـــال جداً ! صـــالح جداً ! قـــوي جداً ! مقـــتدر جداً !
رؤوف جداً ومع ذلك عادل جداً ! 000 مستتر للغاية ومع ذلك ظاهر جداً !000 جميل جداً ومع ذلك قاس جداً ! 000 دائم ومع ذلك لا يمكن إدراكه ! 000 ثابت ومع ذلك يغير كل شئ ! 000 أباً حديث وعتيق علي الإطلاق ! 000 يجدد الكل ويعطي المتكبرين أياماً وهم لا يعلمون ! 000 دائم يعمل ومستريح إلي الغاية ! 000 دائماً يحشد ومع ذلك غير محتاج إلي شئ ! 000 يدعم ويسد العوز ويستر ! 000 يبدع ويعول وينمي ! 000 يطلب ومع ذلك يملك كل شئ ! 0
* * *
أنت تحب بلا شهوة وغيور بلا قلق ! 000 تندم ومع ذلك لا تأسف ! 000 أنت حانق ومع ذلك أنت هادئ ! 000 تغير كل أعمالك وغرضك ثابت ! 000 تأخذ كل ما تجده ومع ذلك أنت لا تضيعه أبداً ! 000 لا تحتاج مطلقاً إلي شئ ومع ذلك تسر بالأرباح ! 000 لست طماعاً ومع ذلك تطالب بالأرباح ! 000 تأخذ كثيراً لكي تصير مديوناً ومن عنده شئ وليس هو ملكك ؟ 000 أنت تدفع ديوناً ليس لهل أصل وتعيد ديونا دون أن تنقص منها شيئاً ! 000 ماذا أقول عنك الآن يا إلهي يا حياتي وقرحي الطاهر !؟ 000 وماذا يقول أي إنسان عندما يتكلم عنك ! ؟ 000 ويل لمن لا يتحدث بحمدك عندما ينطق الأخرس ويصير كأفصح البلغاء ! 0
The inhibitive performance of seven synthesized
2-(2-benzimidazolyl)-4 (phenylazo) phenol (BPP_1–7)
derivatives was investigated experimentally on the corrosion
of copper in 2.0 MHNO3 acid using mass loss, thermometric
and DC potentiodynamic polarization techniques. Quantum
chemical calculations was investigated to correlate the
electronic structure parameters of the investigated benzimidazole
derivatives with their inhibition efficiencies (IE%)
values. Global reactivity parameters such as EHOMO, ELUMO,
the energy gap between ELUMO and EHOMO (DE), chemical
hardness, softness, electronegativity, proton affinity, electrophilicity
and nucleophilicity have been calculated and
discussed. Molecular dynamics simulation was applied on
the compounds, to optimize the equilibrium configurations
of the molecules on the copper surface
I have attached this report where we find out the actual reason steam turbine Deaerating Condenser Performance degradation which was written on June 06, 2012.That time I was in Haripur Power Limited (HPL) ,A 360 MW CCPP of Pendekar Energy Bangladesh Ltd.
The report outcome showed that the Steam turbine load could be reached to its maximum capacity after those valve maintenance works on the next Steam Turbine Major inspection on 2013.We hope we can increase our steam turbine load to 5-7 MW/D on that time.
The operational guys were indicating Circulating water pumps (CWP A&B) were not performing to its design capacity & Ejectors/vacuum pumps are not performing well.So,Mechanical Maintenance Team (MMT) team find this successful outcome after several study.
Condenser vacuum condition has improved a lot after maintenance of the valves on last Major Inspection on 2013.
It is a sample report where we can realize that identifying actual reason for an equipment performance is not only a job of operational people but also a responsibility of the maintenance guys.
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024Tobias Schneck
As AI technology is pushing into IT I was wondering myself, as an “infrastructure container kubernetes guy”, how get this fancy AI technology get managed from an infrastructure operational view? Is it possible to apply our lovely cloud native principals as well? What benefit’s both technologies could bring to each other?
Let me take this questions and provide you a short journey through existing deployment models and use cases for AI software. On practical examples, we discuss what cloud/on-premise strategy we may need for applying it to our own infrastructure to get it to work from an enterprise perspective. I want to give an overview about infrastructure requirements and technologies, what could be beneficial or limiting your AI use cases in an enterprise environment. An interactive Demo will give you some insides, what approaches I got already working for real.
Transcript: Selling digital books in 2024: Insights from industry leaders - T...BookNet Canada
The publishing industry has been selling digital audiobooks and ebooks for over a decade and has found its groove. What’s changed? What has stayed the same? Where do we go from here? Join a group of leading sales peers from across the industry for a conversation about the lessons learned since the popularization of digital books, best practices, digital book supply chain management, and more.
Link to video recording: https://bnctechforum.ca/sessions/selling-digital-books-in-2024-insights-from-industry-leaders/
Presented by BookNet Canada on May 28, 2024, with support from the Department of Canadian Heritage.
Accelerate your Kubernetes clusters with Varnish CachingThijs Feryn
A presentation about the usage and availability of Varnish on Kubernetes. This talk explores the capabilities of Varnish caching and shows how to use the Varnish Helm chart to deploy it to Kubernetes.
This presentation was delivered at K8SUG Singapore. See https://feryn.eu/presentations/accelerate-your-kubernetes-clusters-with-varnish-caching-k8sug-singapore-28-2024 for more details.
Securing your Kubernetes cluster_ a step-by-step guide to success !KatiaHIMEUR1
Today, after several years of existence, an extremely active community and an ultra-dynamic ecosystem, Kubernetes has established itself as the de facto standard in container orchestration. Thanks to a wide range of managed services, it has never been so easy to set up a ready-to-use Kubernetes cluster.
However, this ease of use means that the subject of security in Kubernetes is often left for later, or even neglected. This exposes companies to significant risks.
In this talk, I'll show you step-by-step how to secure your Kubernetes cluster for greater peace of mind and reliability.
Epistemic Interaction - tuning interfaces to provide information for AI supportAlan Dix
Paper presented at SYNERGY workshop at AVI 2024, Genoa, Italy. 3rd June 2024
https://alandix.com/academic/papers/synergy2024-epistemic/
As machine learning integrates deeper into human-computer interactions, the concept of epistemic interaction emerges, aiming to refine these interactions to enhance system adaptability. This approach encourages minor, intentional adjustments in user behaviour to enrich the data available for system learning. This paper introduces epistemic interaction within the context of human-system communication, illustrating how deliberate interaction design can improve system understanding and adaptation. Through concrete examples, we demonstrate the potential of epistemic interaction to significantly advance human-computer interaction by leveraging intuitive human communication strategies to inform system design and functionality, offering a novel pathway for enriching user-system engagements.
UiPath Test Automation using UiPath Test Suite series, part 3DianaGray10
Welcome to UiPath Test Automation using UiPath Test Suite series part 3. In this session, we will cover desktop automation along with UI automation.
Topics covered:
UI automation Introduction,
UI automation Sample
Desktop automation flow
Pradeep Chinnala, Senior Consultant Automation Developer @WonderBotz and UiPath MVP
Deepak Rai, Automation Practice Lead, Boundaryless Group and UiPath MVP
JMeter webinar - integration with InfluxDB and GrafanaRTTS
Watch this recorded webinar about real-time monitoring of application performance. See how to integrate Apache JMeter, the open-source leader in performance testing, with InfluxDB, the open-source time-series database, and Grafana, the open-source analytics and visualization application.
In this webinar, we will review the benefits of leveraging InfluxDB and Grafana when executing load tests and demonstrate how these tools are used to visualize performance metrics.
Length: 30 minutes
Session Overview
-------------------------------------------
During this webinar, we will cover the following topics while demonstrating the integrations of JMeter, InfluxDB and Grafana:
- What out-of-the-box solutions are available for real-time monitoring JMeter tests?
- What are the benefits of integrating InfluxDB and Grafana into the load testing stack?
- Which features are provided by Grafana?
- Demonstration of InfluxDB and Grafana using a practice web application
To view the webinar recording, go to:
https://www.rttsweb.com/jmeter-integration-webinar
Connector Corner: Automate dynamic content and events by pushing a buttonDianaGray10
Here is something new! In our next Connector Corner webinar, we will demonstrate how you can use a single workflow to:
Create a campaign using Mailchimp with merge tags/fields
Send an interactive Slack channel message (using buttons)
Have the message received by managers and peers along with a test email for review
But there’s more:
In a second workflow supporting the same use case, you’ll see:
Your campaign sent to target colleagues for approval
If the “Approve” button is clicked, a Jira/Zendesk ticket is created for the marketing design team
But—if the “Reject” button is pushed, colleagues will be alerted via Slack message
Join us to learn more about this new, human-in-the-loop capability, brought to you by Integration Service connectors.
And...
Speakers:
Akshay Agnihotri, Product Manager
Charlie Greenberg, Host
State of ICS and IoT Cyber Threat Landscape Report 2024 previewPrayukth K V
The IoT and OT threat landscape report has been prepared by the Threat Research Team at Sectrio using data from Sectrio, cyber threat intelligence farming facilities spread across over 85 cities around the world. In addition, Sectrio also runs AI-based advanced threat and payload engagement facilities that serve as sinks to attract and engage sophisticated threat actors, and newer malware including new variants and latent threats that are at an earlier stage of development.
The latest edition of the OT/ICS and IoT security Threat Landscape Report 2024 also covers:
State of global ICS asset and network exposure
Sectoral targets and attacks as well as the cost of ransom
Global APT activity, AI usage, actor and tactic profiles, and implications
Rise in volumes of AI-powered cyberattacks
Major cyber events in 2024
Malware and malicious payload trends
Cyberattack types and targets
Vulnerability exploit attempts on CVEs
Attacks on counties – USA
Expansion of bot farms – how, where, and why
In-depth analysis of the cyber threat landscape across North America, South America, Europe, APAC, and the Middle East
Why are attacks on smart factories rising?
Cyber risk predictions
Axis of attacks – Europe
Systemic attacks in the Middle East
Download the full report from here:
https://sectrio.com/resources/ot-threat-landscape-reports/sectrio-releases-ot-ics-and-iot-security-threat-landscape-report-2024/
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...UiPathCommunity
💥 Speed, accuracy, and scaling – discover the superpowers of GenAI in action with UiPath Document Understanding and Communications Mining™:
See how to accelerate model training and optimize model performance with active learning
Learn about the latest enhancements to out-of-the-box document processing – with little to no training required
Get an exclusive demo of the new family of UiPath LLMs – GenAI models specialized for processing different types of documents and messages
This is a hands-on session specifically designed for automation developers and AI enthusiasts seeking to enhance their knowledge in leveraging the latest intelligent document processing capabilities offered by UiPath.
Speakers:
👨🏫 Andras Palfi, Senior Product Manager, UiPath
👩🏫 Lenka Dulovicova, Product Program Manager, UiPath
When stars align: studies in data quality, knowledge graphs, and machine lear...
Maintenance report of Debris Filter
1. Debris Filter
(Cleaning Device For Closed Cooling Water)
Maintenance Report
January 19~20, 2012
Page
1
Prepared by
Ashik Ahmed
Maintenance Engineer
In a Multinational Power Plant
Email: ashik_rofy@yahoo.com,ashik.rofy@gmail.com
Mobile: +880-173-0059920
2. January 19~20, 2012
EQUIPMENT NO: AC-M-SR-001
EQUIPMENT NAME: DEBRIS FILTER
INTRODUCTION
Debris filter is used to protect heat exchanger tubes from cooling water
fragments. The debris filter is designed to automatically separate & remove
debris from cooling water during operation of the cooling system.
PROBLEM:
Debris filter D.P was high & debris was not coming from debris outlet nozzle.
DISMANTLING
DISMANTLING PROCEDURE
I.
II.
During the outage period the following works were carried out in debris filter:Debris filter manhole was opened. It was seen that the main shaft with injection
(spraying) arm were rotating (CW outlet side of the screen basket) but the collecting
arm was not rotating (CW inlet side of the screen basket).
The collecting arm & outlet pipes were dismantled.
DEBRIS FILTER MAINTENANCE REPORT 2012
DEBRIS FILTER MAINTENANCE REPORT 2012
2/10
3. January 19~20, 2012
III.
IV.
The outlet bearing was found jam and dismantled.
The coupling (Outlet disc) disc bolts (M 16 six nos) were found sheared.
V.
VI.
The gear box, motor & front sealing was dismantled.
Drive shaft sealing disc was dismantled and the seals were found worn.
DEBRIS FILTER MAINTENANCE REPORT 2012
DEBRIS FILTER MAINTENANCE REPORT 2012
3/10
4. January 19~20, 2012
ASSEMBLING PROCEDURE
The new M-16 bolts of drive shaft were quite a bit long so it was machined in
M/S Meghnaghat Power Plant work shop.
New seals were installed in drive shaft sealing disc & sealing disc cover
respectively.
The new outlet bearing was installed by hydraulic press in the MPL
workshop. After matching with the outlet pipe 01 mm clearance was found.
DEBRIS FILTER MAINTENANCE REPORT 2012
DEBRIS FILTER MAINTENANCE REPORT 2012
4/10
5. January 19~20, 2012
The drive shaft with Injection arm, sealing disc were installed with new
gasket. The gap between the arm & basket was found 4 to 6 m. m. Some
portion of spraying water was leaking through the injection arm front side. It
was welded properly as well as some machining was done in the injection arm
flange to ease the installing procedure.
The gearbox with motor was then coupled with the drive shaft.
DEBRIS FILTER MAINTENANCE REPORT 2012
DEBRIS FILTER MAINTENANCE REPORT 2012
5/10
6. January 19~20, 2012
The out let (Coupling) disc was installed by new M-16 Allen key bolts.
The out let bearing was installed after proper bearing alignment.
The out let pipe and the collecting arms were installed.
DEBRIS FILTER MAINTENANCE REPORT 2012
DEBRIS FILTER MAINTENANCE REPORT 2012
6/10
7. January 19~20, 2012
After successful completion of the overhauling work the
overhauling
operated
.The
debris filter was operated for 15 minutes .The overall
good.
condition was found good.
CONSUMED SPARES:SPARES:Serial
01
02
03
Part No
AC-M-SR-001SEAL-02
AC-M-SR-001SlLVE-01
NEW CODE
REQUIRED
04
NEW CODE
REQUIRED
05
NEW CODE
REQUIRED
06
AC-M-SR-001SlLVE-02
07
AC-M-SR-001RING-01
(WS spare is not of
proper size)
08
AC-M-SR-001RING-01
(WS spare is not of
proper size)
AC-M-SR-001GSKT-02
09
Description
Qty Used
Qty to
Procure for
Future
Maintenance
U SEAL,PART NO 3206,
Dwg No:-- GI 829 201 05 057
SEAL (Lubron),PART NO 3207,
Dwg No:-- GI 829 201 05 057
Injection pipe seal ø125X110X12 mm ,
Part No- 3607
Dwg No:-- GI 829 201 05 061
Injection pipe seal ø75X63X8.7 mm , Part
No- 3617
Dwg No:-- GI 829 201 05 061
Injection pipe o-ring ID 350X T 5.3 mmø,
Part No-3606
Dwg No:-- GI 829 201 05 061
Outlet bearing (Lubron)
ø 152X139X60 mm , Part No- 3723
Dwg No:-- NA (Scanned copy could be
sent)
(V-Ring)
ø 161X141X146X35 mm ,
Part No- 3724 Dwg No:-- NA (Scanned
copy could be sent)
01
02
01
02
01 (From
Vendor)
01(01 is given by
vendor)
01 (From
Vendor)
01(01 is given by
vendor)
01 (From
Vendor)
01(01 is given by
vendor)
01
02
01
(Old One)
02
Screen basket (Lebrun) ID 103
01
(Old One)
02
Gasket
01
02
DEBRIS FILTER MAINTENANCE REPORT 2012
DEBRIS FILTER MAINTENANCE REPORT 2012