3. Existing Tappan Zee Bridge Mobility Deficiencies
▪ Existing bridge does not allow for multi-modal travel
▪ Cyclists and pedestrians are prohibited from crossing the span
Governor Mario M. Cuomo Bridge Goals and Objectives
▪ Improve transportation operations and safety
▪ Maximize public investment
▪ Provide connectivity to existing bicycle and pedestrian routes
SHARED-USE PATH (SUP) GOALS & OBJECTIVES
4. ▪ 3.5-mile scenic Trans-Hudson bicycle/pedestrian connection from Rockland County
to Westchester County on north side crossing
▪ 12-foot wide minimum clearance
▪ Pavement markings separate pedestrians and cyclists along the full length
▪ Six signature scenic overlooks
SUP FEATURES
5. SUP & OVERLOOKS
Able-Bodied Walking Times From Landings to Overlooks
Overlook #1 Overlook #2 Overlook #3 Overlook #4 Overlook #5 Overlook #6
From Rockland 12.5 min 21.5 min 32 min 41.5 min 52.5 min 56.5 min
From Westchester 56.5 min 47.5 min 37 min 27.5 min 16.5 min 12.5 min
6. Off-street parking in eastern area of
Interchange 10 with connection to SUP
via South Broadway Underpass using
closed local access ramp to I-87/287;
local access to I-87/287 Eastbound
relocated via Franklin Street and Hillside
Avenue
ROCKLAND TERMINUS
21. ▪Landing communities
▪Hours of operation
▪Security and maintenance
▪Access
▪Visual Quality
ON-GOING STAKEHOLDER ENGAGEMENT
22. Grant Recipient and Scope Amount
Lyndhurst, public restrooms and trail improvements $50,000
Town of Orangetown, bicycle traffic counters and bike traffic planning study $46,000
Nyack Union Free School District, repairs to foot path along Route 9W $300,000
Sustainable Westchester (Village of Irvington), Route 9 Active Transportation
Corridor Study
$150,000
Scenic Hudson - Riverwalk feasibility assessment $300,000
Village of Nyack, Bike/Pedestrian Master Plan $120,000
Historic Hudson Valley, RiverWalk connection $300,000
Village of Sleepy Hollow, improvements to RiverWalk $300,000
Village of Grand View, Hader Park revitalization $289,200
Town of Greenburgh, Route 119 Complete Street Design Plan) $250,000
Total $2,232,200
CONNECTIVITY INVESTMENTS – $2.2M
25. Contact
Peter Harckham
Director of Intergovernmental Affairs
New NY Bridge Project
914.524.5445
Peter.Harckham@newnybridge.com
Visit us at NewNYBridge.com