LOGISTICS
Defined
Planning implementing and controlling the physical flow of material and finished goods
from point of origin to point of use to meet customer`s need at a profit
By “Philip Kotler”
It is essentially a planning process and an information activity
So A integrative process that optimizes the flow of material and supplies through the
organization and its operations to the customer
The word logistic has originated from Greek word
‘Logistikos’ and the Latin word ‘Logisticus’ which
means science of computing & calculating
In ancient times it was used more in connection
with moving armies, the supplies of food &
armaments to the war front.
During World War II logistics gained importance
in army operations covering the movement of
supplies , men & equipment across the border
Today
It has acquired the wider meaning and is used in the
business for the movement of material from
suppliers to the manufacturer and finally the
finished goods to the consumers
Scope of Logistic
It is of critical importance to the organization how it delivers
products & services to the customer , whether the product is
tangible or intangible.
Effective & efficient Physical movement of the tangible
product will speak of intangible services associated with the
product and the organization which is delivering it.
In Case of intangible product , the delivery of tangibles at the
right place & right time will speak about its quality.
On the macro level infrastructure such as Various modes of
transport , transportation equip., storage facilities,
connectivity & information processing are contributing to a
larg3e extent in the physical movement of goods produced in
manufacturing , mining & agriculture Sectors.
Scope of logistics
This speed & reliability in distribution of products &
services contribute to a great extent in the growth
of a country`s domestic & international trade .
Logistic cost as a percentage of GDP across the
world is shown in the following table
Country
Logistic cost as a percentage of GDP
Korea
China
Japan
India
France
UK
USA

16
15
14
13
12
11
10
Scope of logistics
India spent nearly $ 50 billion to move material
from one use to another.
So the “ Public distribution system in the country needs
logistical support for delivering goods at right place on
time and the lowest cost.
At Micro Level logistic plays a critical role in the value
delivery system of business organization to provide
superior customer service i.e. to achieve a desired level
of delivered services and quality at the lowest possible
cost.
In a nutshell any productivity improvement that could
be achieved in any part of logistic system,at the micro
or macro level would help in cost reduction and proper
deployment of scare national resources to the
Fact
In a manufacturing org. the business process starts with
the flow of material from the suppliers, progress to the
plant, then to the customer through the distribution
channel the department may excel in their respective
function but org. as a whole their performance may be
dismal.
Reason
 Lack of Co ordination in their activities
They have different goal to cherish
There is no single agency that coordinates their functions
and homogenizes them.
How to overcome ?
Use of Logistic as a system
Logistic –A system approach
Logistic recognizes that all the activities of material
movement across the business process are
interdependent and needs close coordination and these
are to be maintained as a system and not the functional
Silos.
System is shown as logistic Mix including following
functional Areas
Order Processing
Information Flow
Warehousing
Inventory control
Packaging
Order Processing
Involve following activities
Order checking for any deviation in agreed on negotiated
term
Technical details;price;delivery period;payment terms;taxes
etc
Checking the availability of material in stock (material
requisition)
Production & material scheduling for shortage
Acknowledging the order, indicating deviation if any
It is routine operation but require great deal of planning
training of people involved and investment to bring about
efficiency & accuracy
In a large organization a system capable of handling thousands
of voluminous orders with minimum human involvement or
without human involvement is a must involving shortened order
Information Flow
It is basically information based activity of inventory
movement across the supply chain. Hence role of
information system plays a vital role in delivering superior
customer service
This function is required to facilitate the following
information needs
Order Registration
Order checking & editing
Order processing
Coordination means to integrate the total supply chain of
the company with informational needs as to time ,quantity,
value e.g Lead time, rate of consumption , delivery schedule
& price of the material , Transportation time & cost etc.
Warehousing
A storage place wherein finished goods are stored till they
are sold.Effectiveness of an organization`s marketing
strategy depends on making the right decision regarding
warehouse.

Nowadays
Warehouse are treated as switching facilities rather
than storage place.It is a major cost center, many
customer problem are the direct result of improper
warehousing management.
Major decision of ware house are as follows:Location ,Size & Number of warehousing facilities
Warehouse layout
Design of building

Inventory management
Point order problem
That is
How much to order
When to
order
For this we require
Dependable IMS
Independent IMS
Purchase Control

Stores control

Issue

management
ABC Analysis
VED Analysis

Level Management
Packaging
It is also a critical element in physical
distribution of the product , which
influences the efficiency of the logistic
system this is done with the view of
following : Foe handling and damage prevention
For communications
For inter modal transportation
Storage space economy
Thus to reduce packaging cost
Transportation
Foe the movement of goods from supplier to buyer ,
transportation is the most fundamental and important
component of logistic.
E.g. for low unit value products the transportation
cost component is 20% of the product cost.
In logistic cost its share varies up to 65-70% in case
of mass consumed very low unit price products.
Mode of transportation ( Cost & time factor)
Own fleet or Outsourcing
Route Planning
Vehicle scheduling
Are the few decision which are involved in
Three Forces
Which have change the perspective of logistics

Globalization

Focus on Supply chain Management
Outsourcing of Non Core
Competency Functional Area
Globalization
The entire world has become a global village
for marketers because of the liberalization
of economics of most countries and the
emergence of WTO which is forcing business
organizations to supply products beyond the
national boundaries wherever there is a
market opportunity.
In such conditions the role of

LOGISTICS
Will be to provide time and place time and
place utility of the product to the customer
Focus on Supply Chain Management
Business the world over are striving for
competitiveness. In their struggle for survival their
focus has shifted to the supply chain
I.e.
Integrating the process of Procurement , processing
& distributing to deliver value for money to the
customer
Two key roles logistics planning & support
are
Value delivery process
success of supply
chain
management
Outsourcing of Non Core Competency functional
Area
Outsourcing is a acceptable trend in business.
Corporation have realized that doing everything by
themselves does not result in effective & efficient use
of scare resources available to them.
It is better to outsource functional area to experts
who can do job at the lowest cost and that to
efficiently & Effectively.
LOGISTICS
Is one such area where most of business org. do not
have enough expertise thus needs to be outsourced
Thus Logistics have shaped into different service
industry offering complete & customized logistics
Value Chain
It is understood now that an organization`s
competitive Success could only come through
either cost leadership or offering differentiated
product and services

LOGISTIC MANAGEMENT
Can provide both the benefits simultaneously
Through its value chain activities
Which can be categorized into different types
Inbound logistics
operations
Out bound logistics
Support activates e.g HR, Accounts & finace, IT &
Infrastructure

O
A&F
p
e
r
operations
a
S&M
t
i Out bond
In bound
o Logistics
logistics
n
s
Technology

M&M

HR

Services

Customer Value
Supply Chain

Stores

Procurement

Vendor

I n b ou n d
L og istics

Operations

Stores

Warehouse

Customer

O u t B ou n d
L og ist ics
Supply Chain
M at er ial flow

S tor es
RM

P u r ch ase

V en d or

P
r
o
c
u
r
e
m
e
n
t

M ater ial flow

O PE RAT IO N S

I n for m ation flow

I n b ou n d L og ist ics

D
S tor es
is
FG
tr
i
b
uW ar eh ou sin g
ti
o
n C u stom er

O u t b ou n d log istics
Logistics for Business Excellence
For Business Excellence logistics operation need to
be integrated on the following two fronts
 integration of logistic into business
Integration

of components of logistics
To achieve the objective of making available right
product at the right place and at a right time at low
cost , every business is required to integrate
logistics into the business process.
For logistic operation to run smoothly, proper
integration amongst the component of logistic
process is a must.
Logistic
HR

A/
Cs

FinanceUtilities
Marketing PPC

QC

Mat. Mng.

IT

Others

Organizational Functions
In process Log.

Suppliers

Procurement

Processing

Distribution

In Bound Log.

Customer

Out Bound Logistic

Logistic System Component
Transportation

Material Handling & Storage

Logistical Packaging

W
arehousing
Information
Inventory Mang.

LOGISTIC FUNCTION
Order Processing
Objectives of Logistic management


Inventory Reduction
Reliable and consistent delivery
performance
Freight economy
Minimum product damage
 quick Response

NOTE:
Amongst most of the Indian companies
logistics outsourcing
Has now become an accepted trend for the
following reasons:
Cost Saving
Focus on core Business
Paucity of funds
Reduction in liabilities
Wider Geographical coverage
Cross pollination of better available practice
Warehousing
Nowadays warehousing is used as a switching facility rather than as a long term storage
house.
Attention is paid to
1

2

3

Higher
lower
shorter
inventory turnover operating cost
cycle time
And in light of these warehouse`s performance is judged by its productivity and cost
performance while trying to achieve 2 polemic goals.
Customer`s satisfaction
1

lower cost of operation
2
We have to decide on 2 factors
Whether to have
Centralized
decentralized
warehouse
warehouse

It ensures tight control
distribution
On inventories and can
Operate on EOS

multiple
centers
location of sites
Objective
Main
better customer service
low operating
cost
Ancillary objective
Maximum utilization of storage space
Higher labour productivity
Maximum Asset utilization
Reduction in material handling
Increase in inventory turnover
Reduce order filing time
Warehousing Function
3 Functions
Material Storage Function
Material Handling Function
Information Handling Function
Material Storage function
Due to non synchronization of Manufacturing cycle
with that of the consumption cycle of the material ,
storage of the material remains a big hurdle
So material storage is required to accommodate the
following functions:
Holding
Consolidation
Postponement
Break Bulk
packing
Cross Docking
Mixing
Material Handling function
This involves three function

1.

Loading & unloading

2.

Material Movement
3.

Order filing
Information handling function
For this following information is required
Goods inward
Inspection & auditing
Goods outward
Excess Stock
Invoicing
Warehouse expenses
Transit damage & Breakage
Consignment tracking
This all information facilitate quick decision

Logistic management

  • 1.
    Logistic Management An SupplyChain Imperative By Subhash Raje Asstt. Prof. Academy of e-learning solutions Pvt. Ltd sraje10@gmail.com 9028007445,9405030300
  • 2.
    LOGISTICS Defined Planning implementing andcontrolling the physical flow of material and finished goods from point of origin to point of use to meet customer`s need at a profit By “Philip Kotler” It is essentially a planning process and an information activity So A integrative process that optimizes the flow of material and supplies through the organization and its operations to the customer
  • 3.
    The word logistichas originated from Greek word ‘Logistikos’ and the Latin word ‘Logisticus’ which means science of computing & calculating In ancient times it was used more in connection with moving armies, the supplies of food & armaments to the war front. During World War II logistics gained importance in army operations covering the movement of supplies , men & equipment across the border Today It has acquired the wider meaning and is used in the business for the movement of material from suppliers to the manufacturer and finally the finished goods to the consumers
  • 4.
    Scope of Logistic Itis of critical importance to the organization how it delivers products & services to the customer , whether the product is tangible or intangible. Effective & efficient Physical movement of the tangible product will speak of intangible services associated with the product and the organization which is delivering it. In Case of intangible product , the delivery of tangibles at the right place & right time will speak about its quality. On the macro level infrastructure such as Various modes of transport , transportation equip., storage facilities, connectivity & information processing are contributing to a larg3e extent in the physical movement of goods produced in manufacturing , mining & agriculture Sectors.
  • 5.
    Scope of logistics Thisspeed & reliability in distribution of products & services contribute to a great extent in the growth of a country`s domestic & international trade . Logistic cost as a percentage of GDP across the world is shown in the following table Country Logistic cost as a percentage of GDP Korea China Japan India France UK USA 16 15 14 13 12 11 10
  • 6.
    Scope of logistics Indiaspent nearly $ 50 billion to move material from one use to another. So the “ Public distribution system in the country needs logistical support for delivering goods at right place on time and the lowest cost. At Micro Level logistic plays a critical role in the value delivery system of business organization to provide superior customer service i.e. to achieve a desired level of delivered services and quality at the lowest possible cost. In a nutshell any productivity improvement that could be achieved in any part of logistic system,at the micro or macro level would help in cost reduction and proper deployment of scare national resources to the
  • 7.
    Fact In a manufacturingorg. the business process starts with the flow of material from the suppliers, progress to the plant, then to the customer through the distribution channel the department may excel in their respective function but org. as a whole their performance may be dismal. Reason  Lack of Co ordination in their activities They have different goal to cherish There is no single agency that coordinates their functions and homogenizes them. How to overcome ? Use of Logistic as a system
  • 8.
    Logistic –A systemapproach Logistic recognizes that all the activities of material movement across the business process are interdependent and needs close coordination and these are to be maintained as a system and not the functional Silos. System is shown as logistic Mix including following functional Areas Order Processing Information Flow Warehousing Inventory control Packaging
  • 9.
    Order Processing Involve followingactivities Order checking for any deviation in agreed on negotiated term Technical details;price;delivery period;payment terms;taxes etc Checking the availability of material in stock (material requisition) Production & material scheduling for shortage Acknowledging the order, indicating deviation if any It is routine operation but require great deal of planning training of people involved and investment to bring about efficiency & accuracy In a large organization a system capable of handling thousands of voluminous orders with minimum human involvement or without human involvement is a must involving shortened order
  • 10.
    Information Flow It isbasically information based activity of inventory movement across the supply chain. Hence role of information system plays a vital role in delivering superior customer service This function is required to facilitate the following information needs Order Registration Order checking & editing Order processing Coordination means to integrate the total supply chain of the company with informational needs as to time ,quantity, value e.g Lead time, rate of consumption , delivery schedule & price of the material , Transportation time & cost etc.
  • 11.
    Warehousing A storage placewherein finished goods are stored till they are sold.Effectiveness of an organization`s marketing strategy depends on making the right decision regarding warehouse. Nowadays Warehouse are treated as switching facilities rather than storage place.It is a major cost center, many customer problem are the direct result of improper warehousing management. Major decision of ware house are as follows:Location ,Size & Number of warehousing facilities Warehouse layout Design of building 
  • 12.
    Inventory management Point orderproblem That is How much to order When to order For this we require Dependable IMS Independent IMS Purchase Control Stores control Issue management ABC Analysis VED Analysis Level Management
  • 13.
    Packaging It is alsoa critical element in physical distribution of the product , which influences the efficiency of the logistic system this is done with the view of following : Foe handling and damage prevention For communications For inter modal transportation Storage space economy Thus to reduce packaging cost
  • 14.
    Transportation Foe the movementof goods from supplier to buyer , transportation is the most fundamental and important component of logistic. E.g. for low unit value products the transportation cost component is 20% of the product cost. In logistic cost its share varies up to 65-70% in case of mass consumed very low unit price products. Mode of transportation ( Cost & time factor) Own fleet or Outsourcing Route Planning Vehicle scheduling Are the few decision which are involved in
  • 15.
    Three Forces Which havechange the perspective of logistics Globalization Focus on Supply chain Management Outsourcing of Non Core Competency Functional Area
  • 16.
    Globalization The entire worldhas become a global village for marketers because of the liberalization of economics of most countries and the emergence of WTO which is forcing business organizations to supply products beyond the national boundaries wherever there is a market opportunity. In such conditions the role of LOGISTICS Will be to provide time and place time and place utility of the product to the customer
  • 17.
    Focus on SupplyChain Management Business the world over are striving for competitiveness. In their struggle for survival their focus has shifted to the supply chain I.e. Integrating the process of Procurement , processing & distributing to deliver value for money to the customer Two key roles logistics planning & support are Value delivery process success of supply chain management
  • 18.
    Outsourcing of NonCore Competency functional Area Outsourcing is a acceptable trend in business. Corporation have realized that doing everything by themselves does not result in effective & efficient use of scare resources available to them. It is better to outsource functional area to experts who can do job at the lowest cost and that to efficiently & Effectively. LOGISTICS Is one such area where most of business org. do not have enough expertise thus needs to be outsourced Thus Logistics have shaped into different service industry offering complete & customized logistics
  • 19.
    Value Chain It isunderstood now that an organization`s competitive Success could only come through either cost leadership or offering differentiated product and services LOGISTIC MANAGEMENT Can provide both the benefits simultaneously Through its value chain activities Which can be categorized into different types Inbound logistics operations Out bound logistics Support activates e.g HR, Accounts & finace, IT &
  • 20.
    Infrastructure O A&F p e r operations a S&M t i Out bond Inbound o Logistics logistics n s Technology M&M HR Services Customer Value
  • 21.
    Supply Chain Stores Procurement Vendor I nb ou n d L og istics Operations Stores Warehouse Customer O u t B ou n d L og ist ics
  • 22.
    Supply Chain M ater ial flow S tor es RM P u r ch ase V en d or P r o c u r e m e n t M ater ial flow O PE RAT IO N S I n for m ation flow I n b ou n d L og ist ics D S tor es is FG tr i b uW ar eh ou sin g ti o n C u stom er O u t b ou n d log istics
  • 23.
    Logistics for BusinessExcellence For Business Excellence logistics operation need to be integrated on the following two fronts  integration of logistic into business Integration of components of logistics To achieve the objective of making available right product at the right place and at a right time at low cost , every business is required to integrate logistics into the business process. For logistic operation to run smoothly, proper integration amongst the component of logistic process is a must.
  • 24.
    Logistic HR A/ Cs FinanceUtilities Marketing PPC QC Mat. Mng. IT Others OrganizationalFunctions In process Log. Suppliers Procurement Processing Distribution In Bound Log. Customer Out Bound Logistic Logistic System Component Transportation Material Handling & Storage Logistical Packaging W arehousing Information Inventory Mang. LOGISTIC FUNCTION Order Processing
  • 25.
    Objectives of Logisticmanagement  Inventory Reduction Reliable and consistent delivery performance Freight economy Minimum product damage  quick Response 
  • 26.
    NOTE: Amongst most ofthe Indian companies logistics outsourcing Has now become an accepted trend for the following reasons: Cost Saving Focus on core Business Paucity of funds Reduction in liabilities Wider Geographical coverage Cross pollination of better available practice
  • 27.
    Warehousing Nowadays warehousing isused as a switching facility rather than as a long term storage house. Attention is paid to 1 2 3 Higher lower shorter inventory turnover operating cost cycle time And in light of these warehouse`s performance is judged by its productivity and cost performance while trying to achieve 2 polemic goals. Customer`s satisfaction 1 lower cost of operation 2
  • 28.
    We have todecide on 2 factors Whether to have Centralized decentralized warehouse warehouse It ensures tight control distribution On inventories and can Operate on EOS multiple centers location of sites
  • 29.
    Objective Main better customer service lowoperating cost Ancillary objective Maximum utilization of storage space Higher labour productivity Maximum Asset utilization Reduction in material handling Increase in inventory turnover Reduce order filing time
  • 30.
    Warehousing Function 3 Functions MaterialStorage Function Material Handling Function Information Handling Function
  • 31.
    Material Storage function Dueto non synchronization of Manufacturing cycle with that of the consumption cycle of the material , storage of the material remains a big hurdle So material storage is required to accommodate the following functions: Holding Consolidation Postponement Break Bulk packing Cross Docking Mixing
  • 32.
    Material Handling function Thisinvolves three function 1. Loading & unloading 2. Material Movement 3. Order filing
  • 33.
    Information handling function Forthis following information is required Goods inward Inspection & auditing Goods outward Excess Stock Invoicing Warehouse expenses Transit damage & Breakage Consignment tracking This all information facilitate quick decision