This document provides guidance on writing project proposals using the logical framework approach. It begins with general remarks on ensuring thoughtful planning and addressing a genuine problem. It then covers identifying the project idea, conducting a problem analysis including a problem tree, and analyzing objectives to transform problems into measurable objectives. The document explains the logical framework matrix and how it provides a summary of the project's objectives, strategy, assumptions and means of verification. It emphasizes defining objectively verifiable indicators and considering risks and assumptions. The document also provides guidance on activity planning, resource planning, and writing the different sections of a project proposal, including the executive summary, presentation of the organization, methodology, budget, and sustainability.